Loading...
HomeSearchMy WebLinkAbout20190397 Ver 1_ R-2566B Concurrence Point 4B_Corps_2021021520190397 Ver 1_ R-2566B CP_4B Meeting Minutes_Final_2021031020190397 Ver 1_ R-2566B_2021021020190397 Ver 1_401 Application_2019040120190397 Ver 1_Approval Letter_2019061920190397 Ver 1_closeups of stream habitat 2_2021021820190397 Ver 1_closeups of stream habitat 3_2021021820190397 Ver 1_closeups of stream habitat1_2021021820190397 Ver 1_Complaint Investigation_2023030920190397 Ver 1_Corps Correspondence_2019040820190397 Ver 1_looking upstream from culvert_2021021820190397 Ver 1_R-2566 Updated Watauga April 17 2019_2019041820190397 Ver 1_R-2566B 4B next week_2021021020190397 Ver 1_R-2566B concurrence follow up_2021021020190397 Ver 1_R-2566B concurrence follow up_2021021520190397 Ver 1_R-2566B Concurrence Point 4B Meeting Minutes_2021021520190397 Ver 1_R-2566B Concurrence Point 4B Meeting Minutes_20210215 (2)20190397 Ver 1_R-2566B Concurrence Point 4B Meeting Minutes_2021021820190397 Ver 1_R-2566B Concurrence Point 4B Meeting_DOT_2021021820190397 Ver 1_R-2566B Concurrence Point 4B Meeting_WRC_2021021820190397 Ver 1_R-2566B Concurrence Point 4B Notes_rev_2021021520190397 Ver 1_R-2566B Concurrence Point 4B_2021021820190397 Ver 1_R-2566B Concurrence Point 4B_DOT_2021021920190397 Ver 1_R-2566B FWS Comments_2021030120190397 Ver 1_R-2566B Merger issue_2019032920190397 Ver 1_R-2566B scour hole below pipes_2021021520190397 Ver 1_R-2566B_2021021020190397 Ver 1_RE_ _External_ RE_ R-2566B_2019032920190397 Ver 1_Revised R-2566B preliminary drawings_2019070220190397 Ver 1_SAW-2010-00653-PN_2019061920190397 Ver 1_Staff Report_2019061920190397 Ver 1_STIP R-2566B_ SR1136 (clarks Creek RD) to SR1107 (NC 105 Bypass) in Boone_20200506cleanup crew inside of stagnant side channel 10-22-22.jpgFW_ SedimentHey 105 bridge all goodNPDES inspection_AprilRE_ _External_ Stormwater runoff_Erosion control measures at 105 bridge projectRe_ _External_ Stormwater runoff_Erosion control measures at 105 bridge project (1)RE_ _External_ Stormwater runoff_Erosion control measures at 105_finalRe_ _External_ Stormwater runoff_Erosion_finalRe_ _External_ Valle Crucis NC_ Project at Broadstone and 105RE_ R-2566BA Watauga RiverRE_ R-2566BA Watauga River_DWRRecords review_March 2023Site Inspection_AprilSite inspection_Mar 2023Watauga at causeway during 10-21-22 concrete pour.JPGWatauga river mainstem photo 1 10-22-22.jpgWatauga river mainstem photo 2 10-22-22.jpgWatauga with causeway in background during 10-21-22 concrete pour.JPG