Loading...
HomeSearchMy WebLinkAbout20180182 Ver 1_Approval Letter_2019100220180182 Ver 1_Design plans_2019082920180182 Ver 1_Determination forms_2019082920180182 Ver 1_DRAFT IRT Meeting Minutes - March 23 2021_2021032620180182 Ver 1_DRAFT_Red Barn MBI_Dec 2018_2019021820180182 Ver 1_DRAFT_Red Barn MP Appendices_Dec 2018_2019021820180182 Ver 1_Fee Received_2019083020180182 Ver 1_Final AsBuilt Monitoring Report_2020091820180182 Ver 1_Initial Credit Release (SAW-2017-01927)_2020102820180182 Ver 1_Initial Credit Release (SAW-2017-01927)_20201028 (2)20180182 Ver 1_MBI Final_2019091720180182 Ver 1_Mitigation Bank Instrument_2019111220180182 Ver 1_Mitigation Evaluation_2022070720180182 Ver 1_Mitigation Information_2022030820180182 Ver 1_MY1 Credit Release (SAW-2017-01927)_2021042020180182 Ver 1_NWP27 verification_2019110420180182 Ver 1_PCN Form Submission_2019082920180182 Ver 1_Red Barn Mitigation Bank Site_2019021820180182 Ver 1_Red_Barn_MY3_2022_FINAL_01202023_2023012020180182 Ver 1_SAW-2017-01927 MY1 Report_2021021020180182 Ver 1_SAW-2018-01441 PJD_2019082920180182 Ver 1_Staff Report Davis, Erin B_2021021620180182 Ver 1_Staff Report EADS_ebdavis_2022021120180182 Ver 1_Staff Report Hamilton, Ryan_2023020620180182 Ver 1_Staff Report_2019061920180182 Ver 1_Staff Report_2019091920180182 Ver 1_USACE Intent to Approve_2019120320180182 Ver 1_USACE MBI and Mitigation Plan Approval_2020012820180182 Ver 1_Yd 01- Red Barn Instrument-EPR-signature-L Culpepper_2019111320180182 Ver 1_Year 1 Monitoring Report_FINAL_2021021620180182 Ver 1_Year 2 Monitoring Report_FINAL_2022020320180182 Ver 2_Cover Ltr Draft As-built Baseline MR_2020060520180182 Ver 2_Initial Credit Release (SAW-2017-01927)_2020031220180182 Ver 2_IRT Meeting Minutes - June 10 2020_2020061120180182 Ver 2_MBI FINAL_2019091720180182 Ver 2_RE IRT Meeting Minutes - June 10 2020_2020061620180182 Ver 2_RE IRT Meeting Minutes - June 10 2020_20200616 (4)20180182 Ver 2_Staff Report_20200803