Loading...
HomeSearchMy WebLinkAboutCompletion of HB630 Letters to DukeDEQ Correspondene to LawyersLetters Sent to Well Owners from DEQ2018_01_17 Response to 2017_09_29 letterAlternate Water - Draft HB630 Guidance Response for Sheila V3 - signed_20180824Alternate Water Supply Requirements_20180703DEQ Letter to Duke_20160922Duke Energy Performance Standards_20170614Duke Revised Performance Monitoring Plans Comments_20170825Duke-Aqua Ack Letter_20170814Letter to Mr. Draovitch_20170113Letter to Paul Draovitch_20170719Letter to Paul Draovitch_20180110Ltr to Draovitch re ref ltr 1-20-17 approval of Duke's Water Supply plans_20170215Ltr to P. Draovitch re Permanent Alt Water Supply Plan at Allen_20170707Performance Monitoring Plan Comments_20170720Permanent Alternate Water Response_20170712Response to 4.04.2018 Duke Energy Req for DEQ DirectionRevised Performance Plan and Technology Approval_20171011