Loading...
HomeSearchMy WebLinkAboutMore Info Received 4-23-2020[External] Notice of Credit Release and As-Built Approval/WLS Upper Rocky UMBI- Upper Rocky Mitigation Site/SAW-2015-01816/Mecklenburg County[External] RE: Notice of Conservation Easement Modification Request/ WLS Upper Rocky Mitigation Bank/ SAW-2015-01816 / Mecklenburg County20160849 Ver 1_Agencies Signature Page SAW-2015-01816_2020052020160849 Ver 1_Appendix A_Figures_2016083120160849 Ver 1_Appendix D_Preconstruction Baseline Monitoring_2016083120160849 Ver 1_Appendix_C_Options_2016083120160849 Ver 1_Approval Email_2020050520160849 Ver 1_Approval Letter_2020050520160849 Ver 1_Draft Mitigation Plan SAW-2015-01816_2019101720160849 Ver 1_DRAFT_Prospectus Ver 1.7_FINAL_2016083120160849 Ver 1_Fee Received_2020022820160849 Ver 1_Fee Request Email_2020030220160849 Ver 1_FINAL_URMB_Complete_Prospectus_2019061320160849 Ver 1_Initial Credit Release (SAW-2015-01816)_2020112720160849 Ver 1_Initial Evaluation Letter_SAW-2015-01816_2020022720160849 Ver 1_Mitigation Bank Instrument_2020082020160849 Ver 1_Mitigation Evaluation_2022070720160849 Ver 1_Mitigation Information_2022051720160849 Ver 1_Mitigation Information_2022062820160849 Ver 1_Mitigation Information_2022071120160849 Ver 1_Mitigation plan call_2020031720160849 Ver 1_Mitigation Plans_2016082220160849 Ver 1_MP_DRAFT_Sept2019_2019101720160849 Ver 1_MP_FINAL_April2020_2020042320160849 Ver 1_MP_FINAL_Feb2020_2020022720160849 Ver 1_MP_FINAL_Feb2020_20200227 (2)20160849 Ver 1_MP_FINAL_IRT Response Letter_2020022720160849 Ver 1_MY0 IRT Site Visit_Upper Rocky_2022061420160849 Ver 1_Notice of Deficiency_2020031920160849 Ver 1_Notice of Monitoring Report Review_2022110320160849 Ver 1_PCN Form Submission_2020022720160849 Ver 1_PROPOSED_CAT Edit to R6_R5_2020040720160849 Ver 1_Prospectus Site Review_2019062420160849 Ver 1_RE Reach 6 3 Concerns_2020040820160849 Ver 1_Reach 6 3 Concerns_2020040820160849 Ver 1_SAW-2015-01816 (Draft Mit Plan Comments)_2020012420160849 Ver 1_SAW-2015-01816 (signed PJD)_2020022720160849 Ver 1_Site Visit Mtg Minutes_2019062720160849 Ver 1_Staff Report Davis, Erin B (MBI)_2020042720160849 Ver 1_Staff Report Davis, Erin B (MP)_2020022820160849 Ver 1_Staff Report Davis, Erin B (MP)_2020042720160849 Ver 1_Staff Report Davis, Erin B_2020022820160849 Ver 1_Staff Report Davis, Erin B_2022051220160849 Ver 1_Staff Report Davis, Erin B_20220512 (2)20160849 Ver 1_Staff Report Davis, Erin B_2022110720160849 Ver 1_Staff Report Maria Polizzi_2023112720160849 Ver 1_Staff Report_2019102820160849 Ver 1_Staff Report_20191028 (2)20160849 Ver 1_Staff Report_2020080320160849 Ver 1_UMBI - WLS - DWR signed_2020062920160849 Ver 1_UMBI Draft_2019101720160849 Ver 1_UMBI Final_2020042320160849 Ver 1_UMBI Final_signed WLS_2020022720160849 Ver 1_Upper Rocky MY2 Report 2023_2023112220160849 Ver 1_USACE Correspondence_2020032320160849 Ver 1_USACE Intent to Approve_2020052020160849 Ver 1_USACE Permit_2020082020160849 Ver 1_Year 0 Monitoring Report_2022_2022051120160849 Ver 1_Year 0 Monitoring Report_2022_2022051220160849 Ver 1_Year 1 Monitoring Report_Final_20221101MY1 Credit Release_ WLS Upper Rocky Mitigation BankMY1 Credit Release_Upper Rocky_SAW-2015-01816Upper Rocky MY2 Credit Release Schedule_Signed