Loading...
HomeSearchMy WebLinkAbout20140189 Ver 1_401 Application_2018021820140189 Ver 1_Adaptive Management Plan_2020022720140189 Ver 1_Approval Letter_2018030120140189 Ver 1_Arrington Bridge III Final Mit Plans_2015062220140189 Ver 1_Baseline Monitoring Plan_2016071520140189 Ver 1_Baseline Monitoring Report_2018022720140189 Ver 1_Close Out Report_2023042020140189 Ver 1_Close Out Report_20230420 (2)20140189 Ver 1_Close-outs_2022103120140189 Ver 1_Close-outs_20221031 (2)20140189 Ver 1_Close-outs_20221031 (3)20140189 Ver 1_design plans_2018022720140189 Ver 1_Draft Mitigation Plan_2015032720140189 Ver 1_DWR comments on Monitoring Reports 12-18-2019_2019121820140189 Ver 1_DWR Staff comments to ACOE on Final Mit Plan 071315_2015071320140189 Ver 1_email from andrea ACOE_2015092520140189 Ver 1_Figure 9 with soil areas of concern in mit plan_2015101320140189 Ver 1_FINAL-Mitigation Plan _2018022720140189 Ver 1_FINAL-Mitigation Plan_2015091720140189 Ver 1_Mitigation Bank Information_2014022620140189 Ver 1_Mitigation Evaluation_2022031820140189 Ver 1_Mitigation Information_2022011820140189 Ver 1_Mitigation Remediation Plans_2020042020140189 Ver 1_More Info Letter_2015032720140189 Ver 1_PCN Transmittal _2018022720140189 Ver 1_Post Construction Credit Release_2017010320140189 Ver 1_SAW-2015-00360 Year 4 Monitoring Credit Release_2020040120140189 Ver 1_SAW-2015-00360 Year 4 Monitoring Report_2019103120140189 Ver 1_Site visit 9-8-2016 - Sep 9 2016 8 51 AM_2016090920140189 Ver 1_Site Visit Minutes_2020121820140189 Ver 1_Some soil comments_2015101320140189 Ver 1_Staff Comments_2014031820140189 Ver 1_Staff Report Davis, Erin B_2020100520140189 Ver 1_Staff Report Davis, Erin B_2021122020140189 Ver 1_Staff Report Davis, Erin B_2022100320140189 Ver 1_Staff Report_2019102820140189 Ver 1_USACE eApproval Letter_2015112720140189 Ver 1_USACE Revised Mit Plan Comment Memo_2015110520140189 Ver 1_Year 2 Monitoring Report_2017_2017100620140189 Ver 1_Year 4 Memo_Adaptive Management Plan_2020022720140189 Ver 1_Year 4 Monitoring Report_2019101520140189 Ver 1_Year 4 Monitoring Report_2020100220140189 Ver 1_Year 5 Monitoring Credit Release_2020121820140189 Ver 1_Year 5 Monitoring Report_2020_2020093020140189 Ver 1_Year 6 Monitoring Report_2021_2021121720140189 Ver 1_Year 7_2022_Monitoring Report_20220831ABIII dirt pile easement markersFigure 2 - ABIII Site MY7 CCPV Map CloseoutRE_ Oct 24 Arrington Bridge Close-Out