Loading...
HomeSearchMy WebLinkAbout[External] DWR #20240430 - Tucker Residence Forms for Final Review20240430 Ver 1_ More info recieved and responses20240430 Ver 1_112deb08-6759-40e6-926f-66bf3d396a80_2024031520240430 Ver 1_719c5d35-db0d-4e2e-807f-9fd34eeb4734_2024031520240430 Ver 1_Approval Letter_2024052220240430 Ver 1_Approval Letter_20240522 (2)20240430 Ver 1_c6a97e73-1852-41a3-becc-bb64a7cc8615_2024031520240430 Ver 1_Decision Email_2024052220240430 Ver 1_Fee Received Email_2024032120240430 Ver 1_Fee Received Email_20240321 (2)20240430 Ver 1_Fee Received_2024031920240430 Ver 1_Fee Request Email_2024031820240430 Ver 1_Fee Request Email_2024032020240430 Ver 1_Final full landscape design plan20240430 Ver 1_Final landscape design plan20240430 ver 1_More info requested20240430 Ver 1_Riparian Buffer Authorization Request_2024031520240430 Ver 1_Shoreline Stabilization_2024031820240430 Ver 1_Site Plan_2024031820240430 Ver 1_Staff Report Andrew.Pitner_2024052220240430 Ver 1_Tucker Rear Yard DETAILS (1)_2024031520240430 Ver 1_Tucker Rear Yard_2024031520240430 Ver 1_TUCKER RESIDENCE REVISED PLAN 2-26-24 (1)_2024031520240430 Ver 1_TUCKER RESIDENCE REVISED PLAN 2-26-24 (3)_2024031520240430 Ver 1_TUCKER RESIDENCE REVISED PLAN 2-26-24 (4)_20240315BA 10-2013_Buffer Auth Form_06-22-23_0 (2)BA 10-2013_Buffer Auth Form_06-22-23_0.docxBuffer Authorization Application 3-15-24.pdfCatawba Riparian Buffer & Agent Authorization FormsCatawba Riparian Buffer & Agent Authorization Forms (2).pdfCatawba Riparian Buffer & Agent Authorization Forms.pdfCompensatory Mitigation Form_KyleTuckerLandscape2024Diffuse Flow Plan NotesDiffuse Flow Plan Notes.docxDogtown Buffer SOA - Sherrills Ford on Lake NormanDogtown Buffer SOA - Sherrills Ford on Lake Norman.pdfFlo-Well Drainage System.pdfimage001 (2).pngimage001 (3).pngimage001.pngimage002.pngKyle Tucker Soil_MapKyle Tucker Soil_Map.pdfKyle Tucker topo.jpgRiparian Buffer Authorization Form Revised 5-20-24TUCKER RESIDENCE DIFFUSE FLOW PLAN (with phase 2 plantings)TUCKER RESIDENCE DIFFUSE FLOW PLAN (with phase 2 plantings).pdfTUCKER RESIDENCE DIFFUSE FLOW PLAN (without phase 2 plantings)TUCKER RESIDENCE DIFFUSE FLOW PLAN (without phase 2plantings).pdfTUCKER RESIDENCE DISTURBED AREA SF ZONE1 - ZONE2 5-16-24TUCKER RESIDENCE DISTURBED AREA SF ZONE1 - ZONE2 5-16-24.pdfTUCKER RESIDENCE DISTURBED AREA SF ZONE1 - ZONE2 5-7-24.pdfTUCKER RESIDENCE MASTER PLANTUCKER RESIDENCE MASTER PLAN.pdf