Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
Search
My WebLink
About
20210046 Ver 1_Approval Letter_20210303
20210046 Ver 1_Ashe 355 - Catawba response_20210208
20210046 Ver 1_Ashe 355 - Cherokee nation response_20210208
20210046 Ver 1_Ashe 355 Archaeology_20210208
20210046 Ver 1_Ashe 355 Architecture_20210208
20210046 Ver 1_Ashe 355 causeway for new pier installation_20211007
20210046 Ver 1_Ashe 355 distance from Wild and Scenic_20210208
20210046 Ver 1_Ashe 355 EC plans for PCN_20210208
20210046 Ver 1_Ashe 355 old bridge supports_20211007
20210046 Ver 1_Ashe 355 PCN Summary letter_20210208
20210046 Ver 1_Ashe 355 structure plans for PCN_20210208
20210046 Ver 1_Ashe 355 Vicinity Map_20210208
20210046 Ver 1_Ashe 355 Wild and scenic correspondance_20210208
20210046 Ver 1_Ashe Bridge 355 - UKB response_20210208
20210046 Ver 1_Ashe355_Permit Drawings_20201228_20210208
20210046 Ver 1_B-5823_NRTR_October 2016_20210208
20210046 Ver 1_Before photo - Just before bridge supports were removed_20211029
20210046 Ver 1_Catawba Ashe 355 notification_20210208
20210046 Ver 1_Causeway question_20211007
20210046 Ver 1_Causeway question_Final_20211007
20210046 Ver 1_Cherokee Nation Ashe 355 notification_20210208
20210046 Ver 1_Decision Email_20210303
20210046 Ver 1_EBCI Ashe 355 notification_20210208
20210046 Ver 1_ePCN Application_20210208
20210046 Ver 1_Inspection Comments_20211021
20210046 Ver 1_Inspections_20211021
20210046 Ver 1_Meeting Request Review Doc Attachment_20210107
20210046 Ver 1_Meeting Request Review_20210107
20210046 Ver 1_Muskogee Ashe 355 notification_20210208
20210046 Ver 1_NCWRC Comments_20210312
20210046 Ver 1_Photo 1 - Setting up turbidity curtain for first support removal_20211029
20210046 Ver 1_Photo 10 - 300 meters downstream, 1.5 hours after removal started_20211029
20210046 Ver 1_Photo 11 - 0.5 miles downstream, 1.5 hours after removal started_20211029
20210046 Ver 1_Photo 12 - 1 mile downstream 1.5 hours after removal started_20211029
20210046 Ver 1_Photo 2 - Curtain in place just before removal of first support_20211029
20210046 Ver 1_Photo 3 - turbidity going under curtain during removal_20211029
20210046 Ver 1_Photo 4 - first support removal_20211029
20210046 Ver 1_Photo 5 - first support removal_20211029
20210046 Ver 1_Photo 6 - third support removal_20211029
20210046 Ver 1_Photo 7 - third support removal_20211029
20210046 Ver 1_Photo 8 - trackhoe moving from third to second support_20211029
20210046 Ver 1_Photo 9 - second support removal_20211029
20210046 Ver 1_photos of Hartzog Ford Bridge support removal_20211029
20210046 Ver 1_PreFiling 30-Day Clock Reached Email_20210207
20210046 Ver 1_Pre-Filing Acknowledgement Email_20210108
20210046 Ver 1_Pre-Filing Meeting Information_20210208
20210046 Ver 1_Project Notification Email_20210212
20210046 Ver 1_project_report_ashe_355_replacement_28610_28610_20210208
20210046 Ver 1_Site inspection Follow-up_20211026
20210046 Ver 1_Site inspection_Oct_20211021
20210046 Ver 1_SMCD Ashe 355 13Dec2018_20210208
20210046 Ver 1_Staff Report Wanucha, Dave_20210303
20210046 Ver 1_UKBCI Ashe 355 notification_20210208
20210046 Ver 1_VID_20211025_104914785.mp4_20211029
20210046 Ver 1_video 1_20211029
20210046 Ver 1_WRC Comments_20210312