Loading...
HomeSearchMy WebLinkAbout20210046 Ver 1_Approval Letter_2021030320210046 Ver 1_Ashe 355 - Catawba response_2021020820210046 Ver 1_Ashe 355 - Cherokee nation response_2021020820210046 Ver 1_Ashe 355 Archaeology_2021020820210046 Ver 1_Ashe 355 Architecture_2021020820210046 Ver 1_Ashe 355 causeway for new pier installation_2021100720210046 Ver 1_Ashe 355 distance from Wild and Scenic_2021020820210046 Ver 1_Ashe 355 EC plans for PCN_2021020820210046 Ver 1_Ashe 355 old bridge supports_2021100720210046 Ver 1_Ashe 355 PCN Summary letter_2021020820210046 Ver 1_Ashe 355 structure plans for PCN_2021020820210046 Ver 1_Ashe 355 Vicinity Map_2021020820210046 Ver 1_Ashe 355 Wild and scenic correspondance_2021020820210046 Ver 1_Ashe Bridge 355 - UKB response_2021020820210046 Ver 1_Ashe355_Permit Drawings_20201228_2021020820210046 Ver 1_B-5823_NRTR_October 2016_2021020820210046 Ver 1_Before photo - Just before bridge supports were removed_2021102920210046 Ver 1_Catawba Ashe 355 notification_2021020820210046 Ver 1_Causeway question_2021100720210046 Ver 1_Causeway question_Final_2021100720210046 Ver 1_Cherokee Nation Ashe 355 notification_2021020820210046 Ver 1_Decision Email_2021030320210046 Ver 1_EBCI Ashe 355 notification_2021020820210046 Ver 1_ePCN Application_2021020820210046 Ver 1_Inspection Comments_2021102120210046 Ver 1_Inspections_2021102120210046 Ver 1_Meeting Request Review Doc Attachment_2021010720210046 Ver 1_Meeting Request Review_2021010720210046 Ver 1_Muskogee Ashe 355 notification_2021020820210046 Ver 1_NCWRC Comments_2021031220210046 Ver 1_Photo 1 - Setting up turbidity curtain for first support removal_2021102920210046 Ver 1_Photo 10 - 300 meters downstream, 1.5 hours after removal started_2021102920210046 Ver 1_Photo 11 - 0.5 miles downstream, 1.5 hours after removal started_2021102920210046 Ver 1_Photo 12 - 1 mile downstream 1.5 hours after removal started_2021102920210046 Ver 1_Photo 2 - Curtain in place just before removal of first support_2021102920210046 Ver 1_Photo 3 - turbidity going under curtain during removal_2021102920210046 Ver 1_Photo 4 - first support removal_2021102920210046 Ver 1_Photo 5 - first support removal_2021102920210046 Ver 1_Photo 6 - third support removal_2021102920210046 Ver 1_Photo 7 - third support removal_2021102920210046 Ver 1_Photo 8 - trackhoe moving from third to second support_2021102920210046 Ver 1_Photo 9 - second support removal_2021102920210046 Ver 1_photos of Hartzog Ford Bridge support removal_2021102920210046 Ver 1_PreFiling 30-Day Clock Reached Email_2021020720210046 Ver 1_Pre-Filing Acknowledgement Email_2021010820210046 Ver 1_Pre-Filing Meeting Information_2021020820210046 Ver 1_Project Notification Email_2021021220210046 Ver 1_project_report_ashe_355_replacement_28610_28610_2021020820210046 Ver 1_Site inspection Follow-up_2021102620210046 Ver 1_Site inspection_Oct_2021102120210046 Ver 1_SMCD Ashe 355 13Dec2018_2021020820210046 Ver 1_Staff Report Wanucha, Dave_2021030320210046 Ver 1_UKBCI Ashe 355 notification_2021020820210046 Ver 1_VID_20211025_104914785.mp4_2021102920210046 Ver 1_video 1_2021102920210046 Ver 1_WRC Comments_20210312