04_07_2023_Post-Incident Review_Pender_Escaped Fire
05_15_2023_Incident Report_Pender Co_Property Damage
07-20-2023_Peder County_Spill Response
07-20-2023_Peder County_Spill Response (2)
1 _ Idalia _ SR6 Pipe Outlet
12.05.2022 - Turbidity 853+-00 -L1N- JS
18+-00 -Y32 - berm blowout into old js, flowing into new js
18+-00 -Y32- sediment loss from old js
19+-25 -Y32RPB1- 225FT RT - water flowing out of woods undermined fence and matting
2 _ Idalia _ SR6 Sediment in Pond
20161268 Ver 1_clean_up_mechClear_20211007
20161268 Ver 1_clean_up_wetlands_20211007
20161268 Ver 1_email_NCDOT_U-4751 Military Cutoff Rd Site 33-follow-up_20210721
20161268 Ver 1_Loss_1_Oct6_20211007
20161268 Ver 1_Loss_2_Oct6_20211007
20161268 Ver 1_Loss_photo1_20210921_20210922
20161268 Ver 1_Loss_photo2_20210921_20210922
20161268 Ver 1_New Hanover U-4751 Military Cutoff Ext. Oct 6_20211007
20161268 Ver 1_RE_ U- 4751 Loss Site 3_20210922
20161268 Ver 1_Site3_Loss_postRetrieval_20210922
20161268 Ver 1_Site3_topSlope_20210922
20161268 Ver 1_Site4_Foam_20210922
20161268 Ver 1_Site4_ToeProtection_20210922
20161268 Ver 1_Site4_ToeProtection_foam_20210922
20161268 Ver 1_U- 4751 Loss Site 3_20210922
20161268 Ver 1_U-4751 Military Cutoff Rd Site 33-follow-up_20210721
20161268 Ver 1_U-4751 Military Cutoff Rd. Extension Sediment at Site 33_20210720
20161268 Ver 2_C203980 Losses during recent rain event_20200617
20161268 Ver 2_Losses cleaned up 6-17-20_20200618
20161268 Ver 2_U-4751 Military Cutoff sediment losses_20200818
20161268 Ver 2_U-4751Sediment Releases 6-17-20_20200617
20161268 Ver 4_site 33 (002)_20210702
20161268 Ver 4_Site 33 photo_20210702
20161268 Ver 4_Site 33 photos_20210702
20161268 Ver 4_site inspection and losses 20210607_20210608
20161268 Ver 4_U-4751 after sediment removal 20210611_20210611
20161268 Ver 4_U-4751 after sediment removal 20210611_20210702
20221202_112340
20221202_112421
20221202_114428
20230721_141642000_iOS
20230721_141642000_iOS (2)
28+-00 -Y32- LT - sediment loss, SDO failure
29+-00 -Y32- LT - water flowing out of woods undermined fence and matting
3 _ Idalia _ Culvert 13 Inlet Wing Wall Wash
4 _ Idalia _ Culvert 13 Inlet Wing Wall Sediment in CF Mat
42in Pipe Inlet Y32 STA 18+00
42in pipes
5 _ Idalia _ Culvert 13 Inlet Wing Wall Sediment in CF Mat
7-20-23 Fuel Spill Manifest
725+-00 -L1- temp js crossing loss, inlet.northern
725+-00 -L1- temp js crossing loss, outlet.southern
78in inlet
78in Inlet Side Blowout at Headwall
78in Inlet Side Blowout at Headwall2
78in Inlet Side Blowout at Headwall3
78in Outlet Side Ditch
78in Outlet Side Ditch2
ADTE9217
Aerial away from D1
Aerial towards D1
Air Bridge
Area A1
Area A2
Area B
Area C1
Area C2
Area C3
Basin for PIt G
Border between pits
C204553 _ CM Mitchell Wetland Impacts Survey
C204553 _ CM Mitchell_20230512
C204553 12-11-23 Losses
C204553 Fire Parcel 82&87 4.6.2023
C204553 Hampstead Losses 12.18.2023.pdf
C204553 Sediment Losses 5.20.2023
CamScanner 03-01-2023 10.09
CamScanner 03-13-2023 15.06
CamScanner 10-05-2022 13.11
CamScanner 10-07-2022 08.00
CamScanner 12-01-2022 14.46_1
Clearing Limit Deviation Full Report _ CM Mitchell & Conti
Crossing 1a
Crossing 1b
Crossing 1c
Crossing 2
Crossing 3
Culvert #10 - Ponding water flowing through weephole into riprap and js.1
Culvert #13 Diversion - diversion blowout around dike into old js
Culvert #13 Diversion - downstream.crossing
Ditch and JS vicinity
Ditch discharge into JS area
Ditch discharging to stream
Ditch Washout Y32 STA 19+00
ExtentofSediment
Filling Old JS
Fuel Area 7.21.2023
Fuel Area 7.21.2023 (2)
FW_ [External] C204553 Turbidity
FW_ [External] C204553 Turbidity (Hampstead Bypass R-3300B)
FW_ [External] CFPUA dewatering. 1 of 2
FW_ [External] RE_ C204553 78_ RCP As-built
FW_ [External] Site39 C203980 U-4751
FW_ Borrow Pit _G_ Turbid Discharge
FW_ C204553 - JS Turbidity
FW_ C204553 (R-3300B) Pipe Crossings _ Parcel 82&87 Reclamation Plan
FW_ C204553 Erosion Issues 1_23_2023
FW_ C204553 Sediment Losses - Storm Event 3_27_2023
FW_ C204553 Turbidity
FW_ C204553 Turbidity in US17 JS 12.12.2022
FW_ R-3300B Hampstead Bypass Sediment Losses
FW_ R-3300B May 19, 2023 rain event
Ground View
IMG_2271
IMG_2272
IMG_2970_reduced
IMG_2971_reduced
IMG_2972_reduced
IMG_2973_reduced
IMG_8880
IMG_8883
IMG_8892
IMG_8893
IMG_8910
IMG_8911
IMG_9381
IMG_9383
IMG_9400
IMG_9416
IMG_9419
IMG_9425
IMG_9517
IMG_9533
IMG_9545
inlet of 78inch pipeIMG_6454
inletTempPipe
IP_condition8_borrow
JS at Air Bridge
JS at Air Bridge 2
JS downstream of air bridgeIMG_6451
JS upgradient from US 17 culvert
Military Cutoff 1
Military Cutoff 2
NXWF8436
Old JS Entry
Pender R-3300B Hampstead Bypass - Report of Losses and Compliance Issues
photo 1_Idalia_SR6 Pipe Outlet_after
photo 2_Idalia_SR6 sediment in pond after
photo 3_Culvert 13 inlet wing wall bank after
photo 4_Culvert 13 inlet area sediment in stream
Pipe discharge for Pit G basin
PKLX5929
R-3300B - Hampstead Bypass
R-3300B Field Review Summary 20230329
R-3300B Hampstead Bypass sediment losses
R-3300B Loss Y30 DET
R-3300B Permit Packet_20211220_ CM Mitchell Clearing Beyond LOD
R-3300B Permit PSH 23 - Location of Pit G Dischange
R-3300B Update on 1_23_23 Erosion Issues
RE_ [External] C204553 Borrow Pit D3 Tubidity
RE_ [External] C204553 Turbidity (Hampstead Bypass R-3300B)
RE_ [External] RE_ C204553 (R-3300B) Hampstead Rain Event 7_20_2023 Fuel Spill & Sediment Losses
RE_ [External] RE_ C204553 (R-3300B) Hampstead Rain Event 7_20_2023 Fuel Spill & Sediment Losses (2)
RE_ [External] RE_ C204553- Erosion Inspection 04_10_2023
RE_ [External] RE_ C204553 Parcel82&87 Borrow Pit Fire 4_6_2023
RE_ [External] RE_ Pender R-3300B Hampstead Bypass - Report of Losses and Compliance Issues
RE_ Borrow Pit _G_ Turbid Discharge
RE_ C204553 (R-3300B) Pit D Turbid Discharge
RE_ C204553 (R-3300B) Pit D Turbid Discharge (2)
RE_ C204553 Clearing Outside of Permitted LOD
RE_ C204553 Clearing Outside of Permitted LOD (Site #7)
RE_ C204553 Turbidity in US17 JS 12.12.2022
RE_ Hampstead Bypass Oil Spill
RE_ Pender R-3300B Hampstead Bypass - Report of Losses and Compliance Issues
RE_ R-3300B Hampstead Bypass Sediment Losses
RE_ R-3300B Hampstead Bypass sediment losses (2)
Re_ R-3300B Hampstead Bypass sediment losses (from 12_11_2023 inspection)
RE_ R-3300B Hampstead Bypass -Turbid Release
RE_ R-3300B Hampstead Bypass -Turbid Release (2)
RE_ R-3300B Hampstead Bypass -Turbid Release)
RE_ R-3300B May 19, 2023 rain event
RestorationEfforts
Rock check at 42in
RPW
RPW (2)
Side Ditch Washout Y32RPBI 78in Outlet
Skimmer
Skimmer (2)
Sta. 10+50 Lt. -SR6- Hidden Bluff Pond
Sta. 10+50 Lt. -SR6- Hidden Bluff Pond 2
Sta. 16+50 Lt. -Y30DET-
Sta. 25+00 Lt. -SR6- _ 8CY
temp channel berm near JS IMG_6452
temp pipe inlet near inlet of 78 inchIMG_6458
temp pipe outlet near inlet of 78 inchIMG_6456
Turbid water from ditch and clear water from stream
Turbid water from ditch mixing with water from stream
Turbidity 02-27-2023
Turbidity 02-27-2023 (2)
Turbidity 03-09-2023
Turbidity and clear water of JS
unauthorizedImpactArea
underminedSiltFence
Upstream of 78in
Upstream of 78in (1)
Upstream of 78in (2)
Washout at Culvert 10 from Sed Basin
Waters Enters Basin from D3
Waters Enters Basin from D3 (2)
West side of A