Loading...
HomeMy WebLinkAbout20160981 Ver 2_Revised UMBI_20181220ID#* 20160981 Select Reviewer:* Katie Merritt Initial Review Completed Date 12/20/2018 Mitigation Project Submittal - 12/20/2018 Version* 2 Is this a Prospectus, Technical Proposal or a New Site? * r Yes r No Type of Mitigation Project:* r Stream r Wetlands PF Buffer PF Nutrient Offset (Select all that apply) Project Contact Information Contact Name:* Email Address:* Bob White bwhite@res.us Project Information Existing 20160981 Existing 2 (DWR) (nunbersonly ...nodash) Version: (nurrbersonly) I D#: * Project Name: RES Poplar Creek Buffer and Nutrient Offset Umbrella Mitigation Banking Instrument County: Johnston Document Information Mitigation Document Type:* Mitigation Bank Instrument File Upload: RES Poplar Creek UMBI - FINAL.pdf 278.16KB Rease upload only one RDF of the conplete file that needs to be subr itted... Signature Print Name:* Megan Engel Signature:* AGREEMENT TO ESTABLISH THE RES POPLAR CREEK BUFFER AND NUTRIENT OFFSET UMBRELLA MITIGATION BANKING INSTRUMENT IN THE NEUSE RIVER BASIN FOR RIPARIAN BUFFER AND NUTRIENT OFFSET MITIGATION CREDITS PURSUANT TO THE NEUSE NUTRIENT MANAGEMENT STRATEGY TABLE OF CONTENTS I. PREAMBLE....................................................................................................................... 2 IL LOCATION AND GEOGRAPHIC SERVICE AREA ...................................................... 2 III. AUTHORITIES.................................................................................................................. 3 IV. ESTABLISHMENT OF BANK PARCELS....................................................................... 3 V. BANK PARCEL DEVELOPMENT PACKAGE.............................................................. 5 VI. POST CONSTRUCTION DOCUMENTATION FOR EACH BANK PARCEL ............. 7 VII. CALCULATION OF MITIGATION CREDITS FOR EACH BANK PARCEL .............. 9 VIII. CREDIT RELEASE SCHEDULE.................................................................................... 10 IX. PROCEDURE FOR DEBITING AND CREDITING MITIGATION CREDITS ........... 11 X. BANK PARCEL CLOSURE............................................................................................ 13 XI. GENERAL PROVISIONS FOR EACH BANK PARCEL .............................................. 13 ATTACHMENTS A — Division of Water Resources Authority Document B — Rule Text 15A NCAC 02B .0240 C — Rule Text 15A NCAC 02B .0295 (Effective November 1, 2015) D — Buffer Ledger Template E — Nutrient Offset Ledger Template 1 I. PREAMBLE This RES Poplar Creek Umbrella Mitigation Banking Instrument ("Instrument") regarding the establishment, use, operation, and maintenance of two (2) Nutrient Offset and Buffer Mitigation Bank Parcels, identified in Section II, is to provide Neuse Riparian Buffer mitigation credits ("Riparian Buffer Credits") and Neuse Nutrient Strategy nutrient load reduction credit ("Nutrient Offset Credits") is made and entered into by and among EBX- Neuse I, LLC acting as the Bank Sponsor ("Sponsor"), and the North Carolina Department of Environmental Quality — Division of Water Resources ("DWR"). This Instrument is in accordance with 15A NCAC 0213.0240 and the Consolidated Mitigation Rule 15A NCAC 02B .0295, which became effective on November 1, 2015 (Attachments B and C). This instrument is for two individual bank sites, Poplar Creek and Uzzle. The purpose of these Bank Parcels is: A. To restore, enhance and preserve riparian vegetation adjacent to streams and/or agricultural ditches with the intent to improve water quality within the Neuse River Basin (8 -digit HC 03020201), excluding the Falls Lake Watershed. B. To convert agricultural land uses within riparian areas adjacent to streams and/or agricultural ditches into a dense, hardwood vegetated state with the intent to significantly reduce nutrient loadings associated with agricultural practices into streams and ditches. C. To provide mitigation and sell any resulting Riparian Buffer Credits and/or Nutrient Offset Credits to third parties in the Neuse River Basin, for development (both existing and proposed) requiring such mitigation. IL LOCATION AND GEOGRAPHIC SERVICE AREA A. The Geographic Service Area ("GSA") is the designated area wherein a Bank can reasonably be expected to sell Riparian Buffer Credits and/or Nutrient Offset Credits for impacts due to development activities. B. The GSA for this instrument is limited to the Neuse River Basin in the State of North Carolina, United States Geological Survey ("USGS") 8 -digit Hydrologic Unit Code ("HUC") 03020201. C. Sale or transfer of Riparian Buffer Credits shall be limited to the Neuse River Basin (8 - digit HUC 03020201), excluding the Falls Lake Watershed, unless otherwise authorized by the DWR or delegated local government in accordance with 15A NCAC 02B .0295. D. Sale or transfer of Nutrient Offset Credits shall be limited to Neuse River Basin (8 -digit HUC 03020201) excluding the Falls Lake Watershed in accordance with 15A NCAC 02B .0240. E. The following table provides site-specific details of each of the two Bank Parcels proposed under this Instrument, all are within the Neuse River Basin (8 -digit HUC 03020201); Table 1.0 — Site-specific Details Bank Parcel 8 -Digit DWR Project Named Name County USGS Project # Location Receiving Primary Land Use/s HUC Stream Mature natural forest Poplar Creek Johnston 03020201 20160979 35.5521, Poplar Creek grazed by cattle, v2 -78.3568 cattle pasture Uzzle Johnston 03020201 20160981 35.5851, Little Poplar Mature natural forest v2 -78.3935 Creek grazed by cattle III.AUTHORITIES A. The Bank will be used to provide Riparian Buffer Credit and Nutrient Offset Credit in accordance with the requirements in the DWR Authority document referenced herein as "Attachment A" and attached to this Instrument. B. Projects eligible for utilization of the credits are those requiring authorization under the requirements of Attachment A and any new approved North Carolina ("State") statutes and rules for the Neuse Nutrient Sensitive Waters Management Strategy. C. The sale of mitigation credits generated from the Bank Parcels approved under this Instrument, shall be consistent with approved North Carolina ("State") statutes and rules for the Neuse Nutrient Sensitive Waters Management Strategy. D. Mitigation activities proposed under this Instrument and corresponding Bank Parcel Development Packages (BPDP) to generate Riparian Buffer Credits and Nutrient Offset Credits shall be consistent with North Carolina ("State") statutes and rules for the Neuse Nutrient Sensitive Waters Management Strategy that are in place at the time a complete BPDP is submitted to DWR. IV. ESTABLISHMENT OF BANK PARCELS A. In accordance with 15A NCAC 02B .0295 and 15A NCAC 02B .0240, DWR has provided a "Site Viability Letter" for each of the Bank Parcels proposed under this Instrument. The site viability letter is not an approval of the site to generate mitigation credits, but is a preliminary review of the Bank Parcel that details and confirms existing land -use conditions, defines the riparian zone sites (Restoration, Enhancement or Preservation), and identifies features (streams, ditches, ponds, etc.) that meet general criteria to be suitable to generate mitigation credits. Table 2.0 below outlines when a Site Viability Letter was issued by NCDWR for the mitigation sites proposed under this Instrument: Table 2.0 — Site Viability Letter Details Bank Parcel NC DWR Site Visit Viability Letter Received Viability Letter Expiration Date Poplar Creek October 181, 2016 December 6th, 2016 None noted Uzzle January 131, 2017 January 13th, 2017 None noted B. A valid Site Viability Letter is required prior to submittal of each BPDP. Site Viability Letters will either expire upon the submittal of a BPDP to the DWR. If a Site Viability Letter expires prior to submittal of a complete BPDP as described in Section V to DWR, then the Sponsor must submit a formal request to DWR for a new Site Viability Letter for that Bank Parcel. C. The Bank Parcels proposed for inclusion under this Instrument shall require a Bank Parcel Development Package (`BPDP") be submitted to, and approved by, the DWR prior to use of the individual Bank Parcel for mitigation purposes or for any sale or transfer of any associated credits. The contents of the BPDP are provided in Section V. D. These two (2) Bank Parcels are part of the Neu -Con Stream and Wetland Umbrella Mitigation Bank, Poplar Creek Army Action ID #SAW -2016-01985, Uzzle Action ID #SAW -2016-01973. These mitigation plans have been submitted to the Interagency Review Team (IRT) for review and approval. E. Each BPDP submitted under this instrument will be placed on public notice and made available for public commenting for 15 calendar days. F. Most of the Riparian Buffer Credits on these Bank Parcels will be generated along stream channels that are proposed for stream mitigation. Stream Mitigation Plans will be submitted under the Neu -Con Stream and Wetland Umbrella Mitigation Bank referenced in "D" in this section. Additionally, all activities conducted within riparian buffers and adjacent riparian areas for purposes of generating Riparian Buffer Credits will be conducted in concurrence with stream mitigation activities. Riparian Buffer Credit may be achieved through restoration, enhancement and preservation of DWR riparian buffers as they are defined in 15A NCAC 02B .0233, and other riparian areas allowed per 15A NCAC 02B .0295 (n) and (o) on the Bank Parcel. Riparian Buffer Credits are only attainable if the width of the restoration site, enhancement site, and preservation site is at least 20 feet from top of bank. G. The Bank Parcels are intended to provide Neuse Riparian Buffer mitigation as follows: 1. Planting on a Restoration Site as defined in 15A NCAC 02B .0295(b). 2. Maintaining a Preservation Site as defined in 15A NCAC 02B .0295 (o) by placing a conservation easement around riparian areas. 3. Enhancing riparian areas that are being grazed by cattle by installing fencing to permanently exclude cattle from the streams and their associated riparian areas as allowed in 15A NCAC 0213 .0295 (0)(6). 4. Diffused flow will be maintained onsite to the maximum extent practicable. al H. Nutrient Offset Credit may be achieved on these Bank Parcels through restoration of the riparian areas, where agriculture is the predominant land use. The width of the restoration area begins at the most landward limit of the top of bank or the rooted herbaceous vegetation and extends landward a minimum of 50 feet and a maximum of 200 feet on all sides of the surface waters. I. The Bank Parcels are expected to provide Nutrient Offset Credits in accordance with 15A NCAC 02B .0240 and are expected to provide Nutrient Offset Credit as follows: I. Converting agricultural land uses within riparian areas to non-agricultural land uses. 2. Installing fencing to permanently exclude livestock from the riparian areas and streams. 3. Planting hardwood trees and shrubs on a Restoration Site as defined in 15A NCAC 02B .0295 (b) adjacent to streams where agriculture has been determined to be the predominant land -use. F. The two Bank Parcels submitted for review under this Instrument are anticipated to begin construction of stream mitigation activities in Spring 2019. V. BANK PARCEL DEVELOPMENT PACKAGE A. All Bank Parcel Development Packages (BPDP) submitted under this Instrument shall be submitted to DWR for review and must be approved by DWR prior to any construction on the Bank Parcel. The BPDP must describe any changes that have occurred to the site between the date of the Site Viability Letter and the date the BPDP is submitted to DWR. The BPDP shall include detailed information consistent with the sections below concerning; 1) site location (8 -digit HUC is required); 2) existing conditions with current photos; 3) proposed buffer mitigation and nutrient offset activities including a detailed vegetation plan; 4) monitoring and maintenance plans; 5) financial assurances; 6) associated buffer mitigation/nutrient credit calculations, which shall include credit generation, service area, and accounting as appropriate for each regulatory authority; 7) stream buffer determination letter from DWR, and 8) Site Viability Letter from DWR; 9) a figure depicting the proposed stream mitigation areas; and 10) service area figure for each mitigation type B. The Sponsor will obtain all applicable federal, state, and local documentation, permits, or authorizations needed to construct and maintain the Bank Parcel. This Instrument does not qualify as, or substitute for, such documentation, permit, or authorization. C. Any restoration or enhancement activities or proposed construction within riparian buffers and other riparian areas on the Bank Parcels to produce Riparian Buffer Credit or Nutrient Offset Credit must be approved by DWR in writing prior to implementation. The failure of the Sponsor to comply with this requirement may result in a revised or reduced credit release schedule for that specific mitigation site. All restoration and enhancement activities must be performed in concurrence with any stream mitigation activities and not before. 5 D. Requests for deviation from the approved BPDP must be submitted to DWR in writing. Written approval from the DWR must be received prior to implementing any deviation from the approved BPDP. Property Disposition & Long -Term Management for Each Bank Parcel E. Prior to the release of any credits, the Sponsor shall record permanent conservation easements at the County Register of Deed's office in the county in which the Bank Parcel is located that is sufficient to ensure protection, operation and maintenance of restored riparian buffers and other riparian areas for the duration specified in the approved BPDP. F. The form of the conservation easement shall be consistent with the standards employed by the State of North Carolina in the protection of restored riparian buffers and riparian areas and shall be approved by the DWR and Army Corps of Engineers (ACOE) prior to the release of any credits. G. The Sponsor shall not grant additional easements, right of ways, or any other property interest in or to the project areas, without prior approval from the DWR. H. The Sponsor agrees to transfer or assign the conservation easement and its interests in perpetuity to a qualified holder under NC General Statute ("GS") 121-34 et seq. and 170(h) of the Internal Revenue Code prior to the submittal of the Year 4 Monitoring Report. The holder shall be a land trust or stewardship program that will hold and enforce the conservation easement and the interests in perpetuity. The Sponsor shall choose a land trust or stewardship program that is accredited by the Land Trust Accreditation Commission and/or has been approved by DWR prior to the end of the fourth-year monitoring period. A land trust must be certified under 501(c)(3) of the Internal Revenue Code. I. In the event the Sponsor is also the owner of the underlying fee interest in the property, the conveyance of the conservation easement to a land trust or stewardship fund must be arranged at the outset of the approved BPDP. Financial Assurances for Each Bank Parcel J. Following approval of the BPDP for each Bank Parcel, the Sponsor shall provide Performance/Maintenance Bonds from a surety company that is rated no less than an "A-" as rated by A.M. Best, to construct the sites according to the approved BPDPs. It is the Sponsor's responsibility to confirm that the surety company is rated no less than an "A-" with each annual bond renewal. K. The amount of each Performance Bond shall be 100% of the estimated cost for implementation of the mitigation activities of the Bank Parcel as described in the approved BPDP. No bond shall be less than $150,000.00 to cover construction costs. Con L. Alternatively, in lieu of posting Performance Bonds, the Sponsor may elect to construct the projects prior to the first credit releases. M. For each Bank Parcel, once DWR has released all credits for completion of all the items listed below, then the Bank Sponsor will be released from its performance obligations under the performance bond required in Item J and K of this section: 1. Instrument and BPDP approved by DWR, Conservation Easement recorded, Financial Assurance posted; 2. Mitigation site earthwork and planting and installation of monitoring devices completed; 3. As -Built Report as described in Section VI has been received by DWR; and 4. DWR has submitted a written approval of the As -Built Report. N. To comply with this section, DWR must be the Obligee on all performance bonds. VI. POST CONSTRUCTION DOCUMENTATION FOR EACH BANK PARCEL As -Built Report A. The Sponsor agrees to perform all necessary work, in accordance with the provisions of this Instrument and corresponding BPDP, to establish, maintain, and monitor Neuse Riparian Buffers or other riparian areas until Item B (1) and (2) of Section X have been satisfied. B. When all stream mitigation activities have commenced, the Sponsor will submit an as -built plan and report for the Bank Parcel within 30 calendar days after completing the establishment of the buffer and nutrient offset mitigation areas. The as -built report will describe any deviation from the approved BPDP and will document the following: Buffer restoration and planting details, invasive species control, confirmation of fence installation, monitoring device locations, vegetation plot locations, photo point locations, surface and groundwater elevations, as appropriate. 2. Provide confirmation that the construction of all stream mitigation activities have been completed. 3. Boundary Survey of the conservation easement area, signed and sealed by a licensed surveyor, including an inventory of the final mitigation areas for riparian buffer and/or nutrient offset mitigation credits in both square feet and acres. 4. As -built map of the mitigation area showing where riparian restoration, enhancement and preservation was performed and any deviations to the Bank Parcel from what was approved in the BPDP. 5. As -Built map of the stream mitigation areas. 7 6. Aerial map of the mitigation area that was included in the approved BPDP. Financial Assurance for each Bank Parcel C. After completion of the restoration/construction on each Bank Parcel, a separate Performance/Maintenance Bond will be secured for 100% of the estimated cost to implement the monitoring and maintenance plan as described in the approved BPDP and As -Built Report applicable for each site. The Bond must be from a surety company that is rated no less than an "A-" as rated by A.M. Best, and it is the Sponsor's responsibility to confirm that the surety company is rated no less than an "A-" with annual bond renewal. D. A Performance/Maintenance Bond shall be secured each year for a minimum of five years, and until DWR has released all mitigation credits to the Bank Sponsor. Upon DWR approval, the bond may be lowered each year based on the adjusted cost to complete the monitoring. No bond shall be less than $100,000 initially, to cover monitoring and maintenance costs. E. For each Bank Parcel, once DWR has released 100% of all credits for completion of all Bank Parcel milestones described in Table 3 of Section VIII and in the corresponding BPDP, the Bank Sponsor will be released from its performance obligations under the performance bond required in "C -D" of this Section. F. To comply with this section, DWR must be the Obligee on all performance bonds. Monitoring and Maintenance Reports G. The Sponsor shall monitor the Bank Parcel as described in the BPDP until such time as DWR determines that the performance standards described below have been met. The monitoring period shall be a minimum of five consecutive years. H. Performance Standards for Vegetation: Native hardwood trees or native hardwood tree and shrub species should be planted at a density sufficient to provide 260 stems per acre after five years. A minimum of four (4) native hardwood trees or four (4) native hardwood tree and shrub species must be planted. No one species shall be greater than 50% of the planted stems. A list of species for planting will be detailed in the BPDP for approval. Native hardwood tree volunteer species may be included to meet performance standards as determined by the DWR. I. A "stem" means a woody seedling, sapling, shrub or tree, no less than 10 centimeters in height. J. If the performance standards of the vegetation are not met, supplemental plantings may be required. Supplemental plantings will be utilized until the required densities have been achieved and maintained for five years. Bank Parcel maintenance, such as ensuring diffuse flow, managing invasive species, and pest control will be included in the BPDP. N. K. Monitoring Reports for Riparian Buffer Credit or Nutrient Offset Credit: Reporting criteria of the vegetation shall be based on the Carolina Vegetation Survey (CVS) — EEP Protocol for Recording Vegetation Level 2 Plot Sampling only version 4.0 or any updated versions of this protocol in place on the date of acceptance of the BPDP. The Sponsor shall submit to the DWR an annual monitoring report no later than December 31 of each year for a minimum of five consecutive years after the first full growing season. This report will describe the conditions of each Bank Parcel, including an evaluation of the performance standards of the vegetation contained within the approved BPDP. Reports shall contain the following: 1. A U.S. Geological Survey map showing location of the Bank Parcel; 2. A detailed narrative with supporting photos summarizing the condition of the Bank Parcel along with any maintenance or remediation performed that year; and 3. A map, survey, or other figure showing locations of sampling plots, permanent photo points, location of transects, etc.; and 4. Monitoring data, including specific vegetative counts showing that the trees or tree and shrub species planted are meeting performance standards and updated photographs; and 5. A copy of the most recent Bank credit/debit ledgers; and 6. Corresponding verification letters from designated local governments upon request; and 7. Corresponding Mitigation Transfer Certificates upon request. 8. Proof of performance bond renewal to cover the next monitoring year (if applicable) Contingency Plans/Remedial Actions L. In the event the Bank Parcel fails to achieve the performance criteria described in this Instrument and the approved BPDP, the Bank Sponsor shall develop necessary contingency plans in coordination with the DWR and implement appropriate remedial actions for the Bank Parcel and the Bank. Depending on the degree of remedial actions required, the DWR may modify the monitoring period. VII. CALCULATION OF MITIGATION CREDITS FOR EACH BANK PARCEL Riparian Buffer Credits A. All Riparian Buffer Credits shall be determined based on the ratios and percentages provided in 15A NCAC 0213 .0295 (m) and (n). B. Riparian buffer restoration on the Bank Parcels, as described in 15A NCAC 0213.0295 (n), and defined in 15A NCAC 02B .0295 (b) that is performed on agriculture lands within the Bank Parcels, may be used for either Riparian Buffer Credit or Nutrient Offset Credit, but not both. I C. Riparian buffer restoration on the Bank Parcel, as described in 15A NCAC 02B .0295 (n) and 15A NCAC 02B .0295 (0)(3) and defined in 15A NCAC 02B .0295 (b) that is performed on agriculture lands within the Bank Parcels, may be used for either Riparian Buffer Credit or Nutrient Offset Credit, but not both. D. Riparian buffer enhancement on the Bank Parcel, as described in 15A NCAC 02B .0295 (0)(6) can only be used for Riparian Buffer Credit. E. Riparian buffer preservation on the Bank Parcel, as described in 15A NCAC 02B .0295 (o) and defined in 15A NCAC 02B .0295 (b), can only be used for Riparian Buffer Credit. F. Riparian Buffer Credit is defined as one (1) buffer credit per one square foot or 43,560 buffer credits per one acre. G. Pursuant to 15A NCAC 02B .0295 (1)(6)(B), "Buffer mitigation credit shall not be generated within wetlands that provide mitigation credit required by 15A NCAC 02H .0506". Nutrient Offset Credits H. The acreage of Nutrient Offset Credits on the two (2) Bank Parcels submitted under this Instrument is determined by applying the applicable ratio as provided in 15A NCAC O2B .0295 (m) for a Restoration Site. All riparian areas proposed for Nutrient Offset Credits must be a minimum of fifty (50) feet from the top of the stream or ditch banks on land noted in a Site Viability Letter as agriculture. I. Nutrient Offset Credits cannot be achieved through the preservation activities performed on these Bank Parcels. J. Nutrient Offset Credits cannot be achieved through enhancement activities performed on this Bank Parcel under 15A NCAC 02B .0295 (0)(6). K. Nutrient Abatement of Restored Riparian Area/Buffers: The Sponsor and DWR agree to the following: 1. The pounds of nitrogen offset per acre of restored riparian areasibuffers shall be 2,273.02 pounds per acre. L. The Sponsor and DWR agree the methodology and calculations for determining nitrogen reduction, associated with restoration and enhancement of riparian areas as described in Section IV of this Instrument, shall be fixed as part of the approval of this Instrument, with the fixed amount not changing during the Bank Parcel Development or credit release schedule for each Bank Parcel unless the viability letter for that Bank Parcel has expired VIII. CREDIT RELEASE SCHEDULE 10 A. Upon submittal of all appropriate documentation by the Sponsor, and subsequent approval by DWR, it is agreed that the mitigation credits associated with each individual Bank Parcel will become available for sale to a third party in accordance with Credit Release Schedules. B. A Credit Release Schedule shall be provided in each site-specific BPDP included in this Instrument and shall outline Bank Parcel milestones expected to be completed for each mitigation bank. Credit Release Schedules approved in the BPDP will be based on the completion of these Bank Parcel milestones. C. In general, Bank Parcel milestones and the percentage of credits most often released upon completion are described in Table 5.0 below: Table 3.0 - Credit Release Schedule for Riparian Buffer and Nutrient Offset Credits Task Project Milestone % Credit Available for Sale 1 Instrument and BPDP Approved by DWR, Conservation Easement Recorded* and Financial Assurance Posted 20 2 Mitigation Site Earthwork, Planting and Installation of Monitoring Devices Completed 20 3 Monitoring Financial Assurance Posted and Approval of As -Built Report 10 4 Monitoring Report #1: Approved by the DWR** & financial assurance renewed 10 5 Monitoring Report #2: Approved by the DWR** & financial assurance renewed 10 6 Monitoring Report #3: Approved by the DWR** & financial assurance renewed 10 7 Item B (1) of Section X in this Instrument has been completed and approved by DWR. 5 No remaining credits will be released until the conservation easement has been assigned to an approved land trust or stewardship 8 Monitoring Report #4: Approved by the DWR** & financial assurance renewed 5 9 Monitoring Report #5: Approved by the DWR** and final site visit by DWR has been conducted 10 Total 100% * For specification, please see Section V in this Instrument ** DWR Approval provided upon a determination that the site is meeting success criteria contained within the approved BPDP D. DWR may modify credit release schedules based on the information submitted or the order in which required information is received. DWR will notify the Sponsor of any modification to the credit release schedule. E. DWR may consider a Credit Release Schedule for a Bank Parcel based on the extent of change between current onsite conditions and proposed post construction conditions. F. The Sponsor must initiate implementation of the approved BPDP for each site under this Instrument in concurrence with all stream mitigation activities proposed in the approved Mitigation Plans referenced in Item D of Section IV of this Instrument. IX. PROCEDURE FOR DEBITING AND CREDITING MITIGATION CREDITS Credit Ledgers 11 A. The Bank Sponsor shall maintain a credit ledger for each mitigation type for each Bank Parcel under this Instrument: Credit ledgers shall provide the accounting for buffer mitigation credits in square feet and acres, and Nutrient Offset Credits in pounds and acres. B. Each credit ledger shall be submitted on a separate 8 t/2 inch by 11 -inch spreadsheet with legible font style and font size. All ledgers shall be submitted using the templates provided in Attachments D and E of this Instrument or any updated versions to these templates as provided by DWR. Credit Processing C. Riparian Buffer Credits generated on these Bank Parcels will be used to provide mitigation for authorized buffer impacts within the Neuse River Basin according to 15A NCAC 02B .0295 (g). D. Nutrient Offset Credits generated on these Bank Parcels will be used to offset nitrogen nutrient loads within the 03020201 HUC of the Neuse River Basin, excluding Falls Lake Watershed, in accordance with 15A NCAC 02B .0240. E. Available mitigation credits (credits that have been released by DWR but not sold by the Sponsor) that are generated from riparian buffer restoration, as defined in 15A NCAC 02B .0295 (b) and described in 15A NCAC 02B .0295 (n) and 15A NCAC 02B .0295 (0)(3), on agriculture land can be converted and transferred from Riparian Buffer Credits to Nutrient Offset Credits and from Nutrient Offset Credits back to Riparian Buffer Credits upon written approval from DWR. F. Riparian Buffer Enhancement (generated under 15A NCAC 02B .0295 (0)(6)) and Preservation credits generated on these two (2) Bank Parcels are not transferrable into nutrient offset credits. G. The Bank Sponsor shall obtain verification of nutrient offset need from a designated local government in the Neuse River Basin outside of the Falls Watershed, prior to debiting Nutrient Offset Credits from the Bank Parcel. H. The Bank Sponsor shall obtain verification of buffer mitigation required from the delegated local government in the Neuse River Basin outside of the Falls Watershed or DWR prior to debiting Riparian Buffer Credits from the individual Bank Parcel. I. All credit and debit transactions for each Bank Parcel under this Instrument shall be accurately depicted in the credit ledgers. The Bank Sponsor shall provide DWR up-to-date credit ledgers for each Bank by the tenth (10th) of each month. At a minimum and upon request DWR shall receive a hard copy of updated credit ledgers along with the corresponding Mitigation Credit Transfer Certificates ("Certificate") and all corresponding letters from the designated local governments or DWR where applicable once a year. 12 Notification of all credit sales shall be provided to DWR until all credits that have been released have been sold. Mitigation Credit Transfer Certificates J. All credit sales will include a Mitigation Credit Transfer Certificate ("Certificate") that is required to be provided to the buyer of Riparian Buffer and/or Nutrient Offset credits, that will include, at a minimum, the following information: 1. Bank Details: (1) sponsor, (2) bank parcel as it appears in this Instrument, (3) DWR project number for the BPDP as it appears in Table 10. 2. Credit Details: (1) date of receipt, (2) identify if full or partial payment, (3 — when applicable) amount of nitrogen credits purchased in pounds and confirmation from the designated local government of the amount required, and (4 — when applicable) amount of Riparian Buffer Credits purchased in square feet and the confirmation from DWR or the local government of the amount required. 3. Project Details: (1) project name as it appears on DWR or local government permits and/or certifications, (2) 8 -digit HUC, (3) river basin, (4) nutrient strategy applicable to the project, (5 — when applicable) designated local government requiring Nutrient Offset Credits, and/or (6) DWR authorization number or delegated local government requiring Riparian Buffer Credits for this project. G. If the DWR determines that the Bank is operating at a deficit (e.g. the Sponsor is closing on sales and/or transferring credit that is not available), or the Bank is selling credits out of compliance with statutes, rules or this Agreement, the sale/transfer of credits will immediately cease, and the DWR, in consultation with the Sponsor, will determine what remedial actions are necessary. X. BANK PARCEL CLOSURE A. Bank Parcel Closure shall be identified as the event when the Sponsor is relieved of all of its responsibilities to the Bank Parcel and there are no mitigation credits left to sell. B. Bank Parcel Closure shall commence only after all of the following events have occurred: Transfer or assign the conservation easement and all of its interests, in perpetuity, to a land trust or stewardship program as described in Section V of this Instrument. 2. All five years of monitoring completed, and all monitoring reports submitted and approved by DWR. 3. All credits have been released and debited and updated ledgers showing zero credit balances have been submitted and approved by DWR. XI. GENERAL PROVISIONS FOR EACH BANK PARCEL 13 A. Upon the presentation of proper credentials, and during normal business hours, the Sponsor and the landowner shall grant permission to the Director of DWR, or authorized representative of the Director of DWR, to enter the property containing the Bank Parcel(s). B. Amendments: This Banking Instrument may be amended or modified only with written approval of all signatory parties, including the USACE if it is applicable to the amendment. C. Any transfer of the Sponsor's rights or obligations outlined in this Instrument or any other agreement referenced in this Instrument to a third party must be approved by DWR prior to the transfer. D. Force Majeure: After 100% of all of the credits have been released according to the credit release schedule in the BPDP and confirmation has been received by the DWR that the Conservation Easement has been successfully assigned in compliance with Item H of Section V, the Sponsor will not be responsible for Bank failure that is attributed to natural catastrophes including but not limited to flood, drought, disease, regional pest infestation, etc. that are beyond the control of the Sponsor. E. However, if an event occurs before 100% of all of the credits have been released according to the credit release schedule in Section VIII, the Sponsor shall take remedial action to restore the property to its condition prior to the event, in a manner sufficient to provide adequate mitigation to cover credits that were sold prior to the occurrence of the event. Such remedial action shall be taken by the Sponsor only to the extent necessary and appropriate, as determined by DWR and the Sponsor. DWR must concur in writing that a force majeure event has occurred for this provision to apply. F. Oversight: Actions taken by DWR may include, but are not limited to, the following: 1. Site visits, 2. Issuance of Site Viability Letters, 3. BPDP review and approval of items listed in Section V of this Instrument, 4. As -Built Report review, and approval of items listed in Section VI of this Instrument, 5. Monitoring Report review, and approval of items listed in Section VI of this Instrument, 6. Credit Ledger review and approval of items listed in Section IX of this Instrument, 7. Certificate review of items listed in Section IX of this Instrument and cross analysis to credit ledgers and, 8. Information requests, file reviews and audits Reports, ledgers, files and other information shall be made available to DWR upon request, unless otherwise specified in this or any other document. G. Validity of the Banking Instrument: This Instrument will become valid on the date of the last party's signature. 14 H. Specific Language of Banking Instrument Shall Be Controlling: To the extent that specific language in this document changes, modifies, or deletes terms and conditions contained in those documents that are incorporated into the Instrument by reference, and that are not legally binding, the specific language within the Instrument shall be controlling. I. Any disputes over decisions regarding this Instrument, shall be referred to the Director of DWR for a decision. The Director's decision is subject to review as provided in Articles 3 and 4 of G.S. 150B. J. This Agreement shall be binding upon the parties and is entered into knowingly, intelligently, and voluntarily. K. Notices: All notices and other communications which may be or are required to be given or made by any party to the other shall be in writing and shall be deemed to have been properly given and received on the date delivered in person or deposited in the United States mail, registered or certified, electronic mail, return receipt requested, to the addresses set out below, or at such other addresses as specified by written notice delivered in accordance herewith. If to Bank Sponsor: EBX —Neuse I, LLC Attention: Mr. Bob White 302 Jefferson Street Suite 110 Raleigh, North Carolina 27605 Bob White bwhite@res.us If to DWR: NC Division of Water Resources — 401 & Buffer Permitting Branch Attn: Nutrient Offset Banking Coordinator 1617 Mail Service Center Raleigh, NC 27699-1617 L. Applicable Law: This Agreement shall be construed under the laws of the State of North Carolina. 15 EBX-Neuse I, LLC By: (Print) (Signature) Title: Date: NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY -DIVISION OF WATER RESOURCES By: (Print) (Signature) Title: Date: 16