Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAbout2010Aug.26 PFOA phase out mtgBelnick, Tom
From: Michael E Johnson [Michael.E.Johnson@USA.dupont.com]
Sent: Thursday, July 22, 2010 8:30 AM
To: Belnick, Tom
Cc: Henson, Belinda; Brower, Connie; Poupart, Jeff; Moore, Sandra; Chernikov, Sergei
Subject: RE: Meeting with DuPont - Available Dates & Times
-� �� •Oberlin Road for Thursday,, rugust �26th,, a
I
oom on the second f
If you park in the parking lot at that building, you need to
to get a parking pass and then place it on your dashboard.
the Cameron V 1!gZp. Sll ppin Center, then you save that step
walk.
Belinda: I will ask DWM to have a conference phone
Thank you for agreeing to meet with DuPont:
Mike
Michael E. Johnson
Environmental Manager
DuPont Company
Fayetteville Works
(910) 678-1155
r of their building at 401
go into the DWM reception area
fyou park across the street in
but you ave a little longer
sit up for you to call
This communication is for use by the intended recipient and contains information that may be
Privileged, confidential or copyrighted under applicable law. If you are not the intended
recipient, you are hereby formally notified that any use, copying or distribution of this e-
mail, in whole or in part, is strictly prohibited. Please notify the sender by return e-mail
and delete this e-mail from your system. Unless explicitly and conspicuously designated as
"E -Contract Intended", this e-mail does not constitute a contract offer, a contract
amendment, or an acceptance of a contract offer. This e-mail does not constitute a consent to
the use of sender's contact information for direct marketing purposes or for transfers of
data to third parties.
Francais Deutsch Italiano Espanol Portugues Japanese Chinese Korean
http://www.DuPont.com/corp/einail disclaimer html
1
Al M
Aja�o J44)
rhar- 6/,(
Belnick, Tom
Subject: Meeting with DuPont
Location: DWM Oberlin Rd
Start: Thu 8/26/2010 1:00 PM
End: Thu 8/26/2010 3:00 PM
Recurrence: (none)
Meeting Status: Meeting organizer
Organizer: Belnick, Tom
Required Attendees: Chernikov, Sergei; Brower, Connie; Moore, Sandra; Poupart, Jeff; Henson, Belinda
Meeting with DuPont Fayetteville Worl<s (Mike Johnson) at DWM to discuss PFOA phase-out and replacement.
Belinda- we will voice you in from DWM.
1
From: Belnick, Tom
Sent: Wednesday, July 21, 2010 7:23 AM
To: 'Michael E Johnson'
Cc: Henson, Belinda; Brower, Connie; Poupart, Jeff; Moore, Sandra; Chernikov, Sergei
Subject: RE: Meeting with DuPont - Available Dates & Times
Mile- this should work ol<. If DWM cannot get a conference room, let me know so I can look at
what might be available in the Archdale Building,
Tom Belnick
Supervisor, Complex NPDES
1617 Mail Service Center,
(919) 807-6390; fax (919)
Permitting Unit NC DENR/Division of Water Quality
Raleigh, NC 27699-1617
807-6495
E-mail correspondence to and from this address may be subject to the North Carolina Public
Records Law and may be disclosed to third parties.
-----Original Message...
From* Michael E Johnson [mailto:Michael.E.Johnson@USA.dupont.com]_
Sent: Tuesday, July 20, 2010 1:56 PM
in: Belnick, Tom
Cc: Henson, Belinda; Brower, Connie; Poupart, Jeff; Moore, Sandra; Chernikov, Sergei
Subject: RE: Meeting with DuPont - Available Dates & Times
Tom, et al:
Thank you for the very quick response.
Would the afternoon of August 26th be okay with everyone, say starting at 1:00 p.m.?
Assuming there is an available conference room there, would you all be agreeable to meet at
the DWM Bldg at 401 Oberlin Road (across the street from the Cameron Village Shopping
Center)?
Mike
Michael E. Johnson
Environmental Manager
DuPont Company
Fayetteville Works
(910) 678-1155
"Belnick, Tom"
<torn. Belnick@ncde
nr.gov>
07/19/2010 03:56
PM
To
Michael E Johnson/CL/DuPont@DuPont
cc
"Poupart, Jeff"
<jeff.poupart@ncdenr.gov>,
"Chernikov, Sergei"
<sergei.chernil<ov@ncdenr.gov>,
'3rower, Connie"
<connie.brower@ncdenr.gov>, "Moore,
Sandra" <sandra.moore@ncdenr.gov>,
"Henson, Belinda"
<belinda.henson@ncdenr.gov>
Subject
RE: Meeting with DuPont -
Available Dates & Times
Mike- it has been along time! Looks like Aug 26 or Aug 30 would be preferable, with Aug 18
a possibility. DWQ staff would include Jeff Poupart (Point Source Branch), Sergei Chernikov
and myself (NPDES), Connie Brower and Sandra Moore (Standards), and Belinda Henson
(Fayetteville Regional office). Belinda would prefer to be voiced in. Let me Know if this
works out.
Tom Belnick
Supervisor, Complex NPDES Permitting Unit NC DENR/Division of Water Quality
1617 Mail Service Center, Raleigh, NC 27699-1617
(919) 807-6390; fax (919) 807-6495
E-mail correspondence to and from this address may be subject to the North Carolina Public
Records Law and may be disclosed to third parties.
-----Original Message -----
From: Michael E Johnson [mailto:Michael.E
Sent: Monday, July 19, 2010 2:23 PM
To: Belnick, Tom
Johnson@USA.dupont.com]
Subject: Meeting with DuPont - Available Dates & Times
Tom:
Hello. It has been a long time since we have talked. I see you are the supervisor of the
NPDES Permitting Unit, so congratulations on that new position.
The DuPont Company would like to have a meeting with NCDENR to discuss how the company is
progressing on its goal to cease manufacturing PFOA at the Fayetteville Works site by 2015,
and to discuss the PFOA replacement compound that is being produced at the Fayetteville Works
site.
The two divisions with the greatest interest in these topics would be DWQ because of (1) the
current activity of the NC Science Advisory Board to propose a permanent 2L standard for
PFOA, (2) the DuPont - Fayetteville Works' current monitoring requirement for PFOA on our
NPDES Permit, and (3) general interest in the toxicology of the replacement compound; and
the Division of Waste Management ("DWM") because of (1) the current groundwater monitoring
program for PFOA and (2) general interest in the toxicology of the replacement compound.
2
I
Therefore, I am attempting to schedule a joint meeting with DuPont, DWQ, and DWM at a
mutually convenient date, time, and location in Raleigh.
From the DWQ standpoint, I would think personnel from the NPDES unit would be appropriate
because of the potential permitting subject matter, and personnel dealing with toxicology
(Connie Brower and/or Sandra Moore) would be appropriate because of the 2L rule. Obviously
this meeting would be open to anyone in DWQ that would have interest in these topics, such as
Coleen Sullins.
The dates when the DuPont personnel are available are:
August 13
August 18
August 20
August 26
August 27
August 30
Please let me Know which of the above dates (and times) that would be convenient for DWQ, and
I will work with DWM to pin down a date, time, and location. Also give me an idea of the
number of DWQ personnel to expect to help with the meeting room.
Thanks for your assistance.
Mike
Michael E. Johnson
Environmental Manager
DuPont Company
Fayetteville Works
(910) 678-1155
This communication is for use by the intended recipient and contains information that may be
Privileged, confidential or copyrighted under applicable law. If you are not the intended
recipient, you are hereby formally notified that any use, copying or distribution of this e-
mail, in whole or in part, is strictly prohibited. Please notify the sender by return e-mail
and delete this e-mail from your system. Unless explicitly and conspicuously designated as
"E -Contract Intended", this e-mail does not constitute a contract offer, a contract
amendment, or an acceptance of a contract offer. This e-mail does not constitute a consent to
the use of sender's contact information for direct marketing purposes or for transfers of
data to third parties.
Francais Deutsch Italiano Espanol Portugues Japanese Chinese Korean
http*//www.DuPontocom/corp/emall_disclaimer.html
This communication is .for use by the intended recipient and contains information that may be
Privileged, confidential or copyrighted under applicable law. If you are not the intended
recipient, you are hereby formally notified that any use, copying or distribution of this e-
mail, in whole or in part, is strictly prohibited. Please notify the sender by return e-mail
and delete this e-mail from your system. Unless explicitly and conspicuously designated as
"E -Contract Intended", this e-mail does not constitute a contract offer, a contract
3
amendment, or an acceptance of a contras offer. This e-mail does not constitute a consent to
the use of sender's contact information for direct marketing purposes or for transfers of
data to third parties.
Francais Deutsch Italiano Espanol Portugues Japanese Chinese Korean
http://WWW.uuront.com/corp/email_dis.claimer.html
1 9
2
OOD O� co l0C) 't co N O O
Woissiw3 dp:Jd swea6ol!N jo spuesnoyl
0
O
O
N
O
O
O
N
O
O
O
N
It
O
O
N
M
O
O
N
N
O
O
N
r
O
O
N
0
0
0
N
O
T-
CD
N
O
N
El
El
1
C)
T-
0 0
N
CO
N
20
r-
cn
CD
N
N
O
O
i
El
m
El
\�
2
p
0
�
0
N
(
N
�
_
�
_
20
0
O
O
N
(
N
U)
_
�
_
E0
�
#}
�
_
®
s�
2
,
-
�
� z
m
.�
\
_
�
:
..
�
.
y
wx
©
�
.
w
:
.
.
�
O
O
N
(
N
U)
_
�
_
E0
DuPont, DWM and DWQ Meeting Summary
August 26, 2010
Attendees:
DWM: Linda Culpepper, Larry Stanley, Carl Utterback, Bud McCarty, Vance Jackson, Kathy Akroyd
DWQ: Connie Brower, Sandra Moore, Matt Matthews, Belinda Henson, Sergei Chernikov, Tom Belnick
DuPont: Michael Johnson, Jenny Lui, John Nash, Jamie Van Buskirk, Jim Hoover, Gary Jepson
Purpose of Meeting: To provide an update on DuPont's progress on its USEPA 2010/15 PFOA
Stewardship Program commitment; share information on GenX processing aid technology (to replace
PFOA); establish a dialogue with NCDENR regarding the use of GenX technology at DuPont Fayetteville
Works.
DuPont gave an update on the 2010/15 PFOA Stewardship Program, an EPA sponsored program in which
companies commit to reduce global facility emissions and product content of PFOA and related
chemicals by 95 percent by 2010, and to work toward eliminating emissions and product content by
2015.
http://www2.dupont.com/PFOA2/en US/pfoa stewardship.html
http://www.epa.gov/opptintr/pfoa/
PFOA is only manufactured at DuPont's Fayetteville Facility but is used at other places in manufacturing.
PFOA is used to make fluoropolymer material (resins and dispersions) that are then used to make
products such as Teflon cookware.
PFOA is a global contaminant found at low levels in the environment and in the blood of the US general
population (average blood level of 5ppb). It is persistent in the environment and remains in people a
long time. It has been shown to cause adverse health effects in animals and is suspected to cause
adverse health effects in people.
DuPont is currently testing a new product called GenX, to replace PFOA. DuPont stated that this new
processing aid has a favorable toxicological profile and rapid bio -elimination and that DuPont's planned
environmental exposure control technologies will reduce the potential for environmental release and
exposure.
GenX has been reviewed by USEPA through the Premanufacture Notification process and the USEPA
TSCA Office granted DuPont approval to commercially manufacture, process, and distribute GenX under
conditions set forth in a Consent Order.
GenX Characteristics:
• Low potential for accumulation in the body (elimination in 12-24 hours compared with months
for PFOA);
• low acute toxicity in mammalian and aquatic testing;
• low repeated dose toxicity in mammalian testing;
• it is not mutagenic or genotoxic;
• it is not a skin sensitizer
GenX technology will enable the production of fluoropolymer resins, and end-use articles made from the
resin, that contain extremely low to non-detectable residual processing aid content.
Goal is to contain the new processing aid within the manufacturing site and to minimize worker
exposures through the use of scrubbers, PPE and point source exhaust trucks.
DuPont has begun investing in their production facilities, have started customer conversions and expects
to meet the 2015 commitment to phase out PFOA.
2