HomeMy WebLinkAboutRoxboro Proposed Permanent Water Solution_20161118Permanent Water Supply Proposal to DEQ - Roxboro Roxboro Steam Station Person County 91 eligible households Duke Energy has evaluated the feasibility and costs of providing a permanent replacement water supply to eligible households, as required under G.S. 130A-309.21 1 (cl) of House Bill 630. Households were designated as "eligible" if any portion of a parcel of land crossed the mile compliance buffer described in HB630 and if the household currently utilized well water or bottled water (under Duke Energy's bottled water program) as the drinking water source. Although HB630 indicates that households are to be covered, Duke Energy has included one (1) school and one (1) business as eligible locations. Undeveloped parcels were identified but were not considered "eligible" because groundwater wells are not currently utilized as a drinking source. Dewberry, a respected outside vendor, conducted the Potable Water Programmatic Evaluation (attached); the evaluation consisted of a survey of eligible households and a preliminary engineering evaluation, cost estimate and schedule. Dewberry's report, for the most part, assumes one metered connection per parcel; therefore, multiple homes may be serviced by one connection. The total count in this proposed plan includes all final connections. During their evaluation, Dewberry recommended that seven (7) of the eligible households be excluded from the municipal water line evaluation. In order to connect those households, the public water supply line would require crossing the plant intake canal and a railroad, both of which would be technically complicated, time consuming and costly. These seven homes were excluded from the Dewberry cost estimate. The closest existing City of Roxboro municipal line is located near the intersection of Chub Lake Road and Country Club Lane. The closest household is located on Concord Ceffo Road and is approximately 19,160 feet (3.6 miles) from the current line. The furthest household along the southern route is located on Semora Road and is approximately 33,000 feet (6.3 miles) from the current line. The furthest household along the northern route is located on McGhees Mill Road and is approximately 29,000 feet (5.5 miles) from the current line. Since system pressure may be of concern during fire flow, Dewberry included an elevated storage tank in the cost estimate. Although automatic flushing hydrants are planned along the route to assist in maintaining water quality and water disinfection, the City of Roxboro indicated that they had water quality concerns related to residual disinfection concentration and disinfection by-product formation. The estimated cost to provide a municipal line to the 84 households is $10,980,000 or $131,000 per household. The Dewberry evaluation includes a project schedule based on their past experience installing public water systems. The preliminary project schedule indicates that a public water supply could be available through the City of Roxboro by September 2019, which does not meet the October 2018 deadline. ,& DUKE ENERGY: Permanent Water Supply Proposal to DEQ - Roxboro Due to the excessively long pipeline required for the City of Roxboro to serve the eligible households, Dewberry also evaluated the installation of a new community well system outside the'/2 mile compliance boundary. The preliminary design, based upon hydrogeologic information provided by SynTerra, assumes that four wells at 250 feet deep would be able to service the eligible households. If this option were to be chosen, a private well supplier would need to be identified and a test well would be installed to confirm water quality and well capacity. The estimated cost to provide a community well system and lines to the 84 households is $5,140,000 or $61,000 per household. The Dewberry evaluation includes a project schedule based on their past experience installing community well systems. The preliminary project schedule indicates that a community well system could be available by August 2018, which meets the October 2018 deadline. Based on the results of the Dewberry evaluation of both the municipal water line and the community well system, the concerns over water line pressure and the additional disinfection needed, the uncertainty over groundwater quality and well capacity, and the overall construction costs, Duke Energy proposes that all 91 households be offered a water treatment system. The performance standard for the public water system is the Federal MCLs. The performance standard for the water treatment system is also the Federal MCLs except for those constituents identified in 2015 as having potential health concerns: arsenic, hexavalent chromium, cobalt, iron, lead, manganese, sulfate and vanadium. For these constituents, the performance standard will be either one-half of the MCL or the appropriate state standard, whichever is more protective. Duke Energy is currently evaluating an ion filtration treatment system; this system has been successfully installed in other parts of the state, and initial results show it performs well in reducing vanadium and hexavalent chromium, among other constituents. The costs shown below are for a conceptual ion filtration treatment system. The final water treatment system will be based upon the results of field studies. Duke Energy has made efforts to identify all eligible households, but it is anticipated that a nominal number of additional households will be identified during the initial outreach effort conducted upon approval of this plan by NCDEQ. If the final number of households results in a conclusion different than those stated in this preliminary plan, Duke Energy will revise and submit the new plan to NCDEQ for evaluation and approval. Well owners will be responsible for making the decision for their parcels. Only households within the'/2 mile boundary and served by well water at the time of the submittal of this plan will be eligible for a permanent water supply as part of HB630. ,& DUKE ENERGY: Permanent Water Supply Proposal to DEQ - Roxboro Ion Filtration Water Treatment System Total Number Recommended 91 Water Quality Criteria Meets applicable water quality Yes standards Federal MCLs Completion Schedule f Estimated completion date 12/2017 Contingency factors N/A Operational Considerations Required acceptance level to achieve consistent water N/A quality and supply Required acceptance level to N/A achieve targeted cost per eligible household (<$35k/household) Location of households relative to existing municipal N/A water lines I _ $637,000 - $910,000 Other considerations Costs Total Installation Costs Approximate cost per eligible $7,000 - $10,000 household Annual Maintenance Costs $45,500 - $182,000 - $2,000 Maintenance cost per household annually$500 Non -Duke Costs Total estimated water bills N/A monthly Estimated water bills monthly N/A per household Ongoing municipality costs for maintenance and flushing due N/A to low-flow/low-usage Total Costs (Duke and Non -Duke) i Total estimated cost for all eligible neighbors over 10 $1,092,000 - $2,730,000 years Total estimated cost for each eliqible neiqhbors over 10 $12,000 - $30,000 years (� DUKE ENERGY,. Dewberry:. Roxboro Steam Station Phase II Potable Water Programmatic Evaluation Duke Energy November 18, 2016 SUBMITTED BY: Dewberry 2610 Wycliff Road Suite 410 Raleigh, NC 27607 SUBMITTED TO: Duke Energy Table of Contents Executive Summary...............................................................................................2 1. Introduction and Project Approach..............................................................4 2. Phase II Basis of Design................................................................................7 2.1 Potable Water Connection Mapping.............................................................. 7 2.2 Municipal Potable Water Connection Opinion of Probable Cost ................. 7 2.3 Community Well Water System Opinion of Probable Cost ..........................8 2.4 Community Well Water Quality Basis of Design .......................................... 8 3. Site Analysis...................................................................................................9 3.1 Municipal Potable Water: Station Mapping and Household Data...............9 3.2 Municipal Potable Water: Field Observations .............................................. 9 3.3 Municipal Potable Water: Other Considerations ........................................ io 3.4 Community Well Water System: Station Mapping and Household Data... ii 3.5 Community Well Water System: Field Observations .................................. ii 3.6 Community Well Water System: Other Considerations ............................. 12 4. Regulatory Permitting..................................................................................13 5. Schedule........................................................................................................14 6. Opinion of Probable Cost............................................................................15 Appendix A.1: Roxboro Station Phase II Mapping - Municipal Potable Water Option Appendix A.2: Roxboro Station Phase II Mapping - Community Water Well System Option Appendix B: Roxboro Station Household Data Spreadsheet Appendix C.1: Roxboro Station Schedule - Municipal Potable Water Option Appendix C.2: Roxboro Station Schedule - Community Well Water System Option Appendix D.1: Roxboro Station Opinion of Probable Cost - Municipal Potable Water Option Appendix D.2: Roxboro Station Opinion of Probable Cost - Community Well Water System Option Appendix E: Community Well Water System: Basis of Design and Block Flow Diagram N. ,t,�S Dewberry Duke Energy Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 1 Executive Summary This Phase II evaluation is structured to comply with the requirements of North Carolina House Bill 630: Section 13oA-309.211.(c1) of House Bill 63o requires provision of permanent water supply for each household that has a drinking water supply well located within a 1/2 mile radius from the established compliance boundary of a coal combustion residuals impoundment, and is not separated from the impoundment by the mainstem of a river, or other body of water that would prevent the migration of contaminants through groundwater from the impoundment to a well. To address the provisions of House Bill 63o, Dewberry performed this Phase II preliminary engineering evaluation to supply potable water to residents within a 1/2 mile of the compliance boundary. Preparation of this report is intended to comply with the House Bill 63o requirement to make a report submittal to the North Carolina Department of Environmental Quality (DEQ) by December 15, 2016. For this study, Dewberry evaluated two alternative potable water supplies: 1. Municipal potable water from the City of Roxboro and 2. Installation of new community well water system with wells located outside of the 1/2 mile buffer The new community well water supply option was evaluated due to the excessively long pipeline (approximately 10 miles) required from Roxboro to serve the Steam Station area. On August 18, 2016 a project review meeting was held at the Duke Energy Line and Service Operations Center in Roxboro, NC. Representatives from Duke Energy, Dewberry, and the City of Roxboro attended the meeting. Detailed Phase II mapping was developed using Person County, NC property maps that show each household in the 1/2 mile compliance buffer. Dewberry visually observed the households shown on the Phase II mapping on August 12, 2016. A household database was developed using Person County, NC tax records tied to the GIS shape file which identifies the property owner and the address for each household within the 1/2 mile compliance buffer. Based on our site observations and the Phase II mapping, it appears to be technically feasible to install the potable water main in the public road right of way or along private roads using conventional construction methods. Rock outcroppings were noticed and rock excavation is accounted for in this evaluation. Additionally, due to the overall length of the municipal water main option a community well water system was evaluated. The community well water system includes wells, treatment, and distribution. A schedule was prepared in part to show milestone dates needed to comply with House Bill 630 which states the following: • Report submittal to the North Carolina DEQ no later than December 15, 2016. • DEQ renders a final decision to approve or disapprove the report no later than January 15, 2017. • Permanent replacement water supplies are provided no later than October 15, 2018. If each of the scheduled milestone dates are met, the schedule indicates that project completion can occur in September of 2019 and August of 2018 for the municipal potable water connection and the community well water system, respectively. Dewberry Duke Energy ; Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 2 An opinion of probable cost was developed to provide potable water connection to 84 households within the 1/2 mile compliance buffer. The 84 households are served from 82 water line connections as multiple parcels have more than one household per connection. The estimated costs are summarized below: Roxboro Steam Station Municipal Potable Water Connection Units 84 Households Opinion . Cost $10,980,000 Municipal Potable Water Connection per household Community Water Well System Community Water Well System per household 1 $131,000 84 Households $5,140,000 1 $61,000 Each cost estimate includes a 25% contingency which is deemed consistent with a project at the preliminary engineering level of detail. The City of Roxboro has water quality concerns related to residual disinfection concentration and disinfection by-product formation. Additionally, in order to serve a small group of households and one commercial site directly north of the Steam Station along Shore Road, it will be necessary to construct a deep bore and jack to cross the railroad and a bridge crossing over the plant intake canal. Due to these physical conflicts, associated costs, and anticipated water quality degradation at the Roxboro system extremities, this report recommends installation of individual filter systems for the seven connections along Shore Road. This report provides additional detail on the Project Approach, Basis of Design, and Site Analysis. Phase II mapping is provided in Appendix A. The household database is provided in Appendix B. The projected schedules are provided in Appendix C, the Opinions of Probable Cost are provided in Appendix D, and the Community Well Water System Basis of Design and Block Flow Diagram are provided in Appendix E. Dewberry Duke Energy ; Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 3 1. Introduction and Project Approach PROJECT INTRODUCTION During the Phase I programmatic potable water evaluation desktop study, concept level mapping was developed showing the Roxboro Steam Station location, the potential potable water tie-in location, and potential pipe routing to residents within a 1/2 mile of the compliance boundary. We used the Phase I mapping to develop a concept level cost estimate with a 40% contingency. During this Phase II evaluation sufficient preliminary design work has been performed to prepare a cost estimate with a 25% contingency. This Phase II evaluation is structured to comply with the requirements of North Carolina House Bill 630: Section 13oA- 309.211.(ci), which requires provision of permanent water supply for each household that has a drinking water supply well located within a 1/2 mile radius from the established compliance boundary of a coal combustion residuals impoundment, and is not separated from the impoundment by the mainstem of a river, or other body of water that would prevent the migration of contaminants through groundwater from the impoundment to a well. To address the provisions of House Bill 63o referenced above, Dewberry has performed a Phase I screening level evaluation and this Phase II preliminary engineering evaluation of the technical and economic feasibility to supply potable water to residents within a 1/2 mile radius of the compliance boundary. Preparation of this report is intended to comply with the House Bill 63o requirement to make a report submittal to the North Carolina Department of Environmental Quality (DEQ) by December 15, 2016. For this study, Dewberry evaluated two alternative potable water supplies: i. Municipal potable water from the City of Roxboro and 2. Installation of new community well water system with wells located outside of the 1/2 mile buffer The new community well water supply option was evaluated due to the excessively long pipeline (approximately io miles) required from Roxboro to serve the Steam Station area. Using publicly available information, Dewberry evaluated the following criteria to perform the Phase II Roxboro Steam Station preliminary engineering study: • Identified public road right-of-way widths and ownership along the pipe route • Evaluated feasibility to install the proposed water main within the unpaved shoulder of an NC DOT roadway • Documented approximate location of U.S. waters, including possible wetlands shown in the U.S. Fish & Wildlife Service National Wetlands Inventory (as applicable) • Identified potential jurisdictional and permitting authorities to establish permitting needs • Estimated potential easement acquisition areas (estimated square footage and number of parcels affected) • Evaluated potential conflicts with known existing utilities • Estimated the pipeline length and pipe diameter(s) for the water main and the individual service lines • Evaluated the potential need for a water booster pump station or elevated tank to sustain adequate water pressure • Evaluated the water age and potential need for supplemental disinfection • Evaluated the potential need/requirement for fire hydrants and hydrant quantity • Evaluated potential construction methods and challenges • Evaluated potential municipal water system future improvements based on published Capital Improvement Plan (CIP) or published Master Plan Dewberry Duke Energy ; Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 4 PROJECT APPROACH Municipal Potable Water Project Approach Dewberry contacted the Duke Energy Community Relations District Manager to discuss the information needed to execute the Phase II evaluations, and to arrange for a subsequent meeting with the local water purveyor, the City of Roxboro. On August 18, 201.6 a project review meeting was held at the Duke Energy Line and Service Operations Center in Roxboro, NC to discuss execution of this Phase II preliminary evaluation and subsequent project execution. Representatives from Duke Energy, Dewberry, and the City of Roxboro attended the meeting. The primary purpose of the meeting was to confirm the water distribution system tie-in location, system pressure, pipe size, water quality at the tie -location, capacity limitations, and whether there are future planned water system projects that could impact the Phase II evaluation. Dewberry also inquired as to whether any households within a 1/2 mile of the compliance boundary were presently being served by municipal potable water. Following the meeting, Dewberry performed a drive -by observation of the potable water pipe route. During Phase I Dewberry obtained municipality mapping of the potable water distribution system and then developed draft maps showing the Roxboro Steam Station, the respective potable water distribution system tie-in location, and the water main pipe routing. We used the Duke Energy Drinking Water Receptor Surveys for Coal-fired Power Stations developed in 2014 to show compliance boundaries and the water supply wells within a 1/2 mile of the compliance boundary. The maps were prepared using GIS as the native software. During Phase II we developed more detailed municipal potable water mapping based on Person County, NC property maps to identify property owners, property parcels, and household addresses within the 1/2 mile compliance buffer. For the Phase II analysis property parcels that were wholly or partly within the compliance buffer were included in the evaluation. These maps show the water distribution system from the City of Roxboro tie-in location to the households within the buffer. Using the Phase II mapping a database of property owners and household locations was developed. We also prepared a municipal potable water project schedule. Dewberry then developed an opinion of probable cost for the installation of piping infrastructure to the municipal potable water tie-in location. We used vendor budgetary costs for the primary capital equipment and used cost factors to estimate the installation costs. We did not obtain contractor installation cost estimates for this evaluation. Dewberry reviewed the cost data with Duke Energy to obtain concurrence on the methodology and the allowances applied. Community Well Water System Project Approach Per direction from Duke Energy, Dewberry worked with SynTerra Corporation (SynTerra) to identify a water supply well site location, an estimate of the well yield, well depth, and well installation cost. Dewberry then performed a water quality basis of design analysis as a mechanism to project the groundwater treatment requirements. We developed Phase II detailed community well water system mapping showing the proposed well location and the water distribution system to serve the households within the 1/2 mile compliance buffer. We used Person County, NC property maps to identify property owners, property parcels, and household addresses within the 1/2 mile compliance buffer. For the Phase II analysis property parcels that were wholly or partly within the compliance buffer were included in the evaluation. The property owner database is the same for the municipal potable water and the community well water system. We also prepared a community well water system project schedule. Dewberry Duke Energy ; Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 5 Dewberry then developed an opinion of probable cost for the installation of a new community well water system, which includes water supply wells, water treatment infrastructure, and the distribution system. We used vendor budgetary costs for the primary capital equipment and used cost factors to estimate the installation costs. We did not obtain contractor installation cost estimates for this evaluation. Dewberry discussed the design and construction standards with Aqua North Carolina, a private water supply company, to ascertain the overall magnitude and feasibility of development. Dewberry Duke Energy ; Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 6 2. Phase II Basis of Design The purpose of this section is to document basis of design assumptions that were used to prepare the Roxboro Steam Station mapping, opinion of probable cost, and schedule for the municipal potable water supply and the community well water system. 2.1 POTABLE WATER CONNECTION MAPPING Key assumptions for the municipal potable water and the community well water system mapping are as follows: Potable water piping is routed along state roads and may use municipality/county existing easements, where possible. Water service line piping for both options will require private easements in four locations. Six households and one industry located north of the Roxboro Steam Station are proposed to receive individual filtration systems. Power transmission line easements will not be used for installation of the potable water piping. 2.2 MUNICIPAL POTABLE WATER CONNECTION OPINION OF PROBABLE COST Key assumptions for the municipal potable water connection cost estimate are as follows: Item 1 on the municipal potable water cost estimate shows 8 inch Ductile Iron for the potable water main pipe. The 8 inch diameter is considered a conservative pipe size to meet the water demand of the households within the compliance buffer and complies with the City of Roxboro standards. The City of Roxboro municipal water system design standards require fire hydrants be installed. Items 1 through 7 on the cost estimate show material cost for the piping, valves, and associated fittings. The sum of Items 1 through 7 is shown as a separate line item. A 30% cost factor is then applied to the summed value to estimate the cost to install the pipe, valves, and fittings. The cost estimate quantities are based on the Roxboro Steam Station mapping and assumptions stated on the cost estimate. The unit costs are based upon vendor budgetary costs and cost data we have from recent similar projects. • Items 23 and 24 on the cost estimate indicates there are 76 potable water connections with 3/4 inch service taps close to the proposed water main connection and 6 potable water connections with 2 inch service taps for service connections exceeding 1,000 feet or parcels with multiple connections. • The number of household connections shown in the cost estimate is based upon the Person County, NC property maps, drive -by observations, and from exclusion of seven connections to be served with individual filtration systems. Items 8 through 19 and items 23 through 27 are installed cost, so a 30% installation cost factor was not applied. Items 20 through 22 are material cost, so a 30% installation cost factor was applied. Items 1 through 27 are summed and shown as a SUBTOTAL. Cost factors are then applied to the SUBTOTAL to estimate the balance of the project costs. We have applied a 25% contingency which is deemed consistent with a preliminary engineering evaluation. Additional assumptions that Dewberry used to prepare the cost estimates are provided as foot notes on the cost estimate Table. Contractor General Conditions are included for the duration of on -site construction phase activities. Easement acquisition includes the cost to compensate land owners for water or service lines extended down private roads and/or across private property. Dewberry Duke Energy ; Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 7 2.3 COMMUNITY WELL WATER SYSTEM OPINION OF PROBABLE COST Key assumptions for the community well water system cost estimate are as follows: Item 1 on the community well water system cost estimate shows 6 inch PVC for the potable water main pipe. The 6 inch diameter is considered a conservative pipe size to meet the water demand of the households within the compliance buffer and complies with private utility design standards provided by Aqua North Carolina (Aqua). The Aqua design standards are deemed representative of private utilities operating in North Carolina. An allowance for fire hydrant installation is not included as that is not required for private utility potable service. Items 1 through 7 on the cost estimate show material cost for the piping, valves, and associated fittings. The sum of Items 1 through 7 is shown as a separate line item. A 30% cost factor is then applied to the summed value to estimate the cost to install the pipe, valves, and fittings. The cost estimate quantities are based on the community well water system Phase II mapping and assumptions stated on the cost estimate. The unit costs are based upon vendor budgetary costs and cost data we have from recent similar projects. Items 18 through 27 provide allowances for four water supply wells, water treatment for iron and manganese removal, a hydropneumatic tank and related infrastructure. These items comply with private utility design standards. Item 27 provides an allowance for power supply at the well system site. Power would be required for the well pumps, treatment pumps, and basic lighting and mechanical requirements for the treatment building. This allowance is also intended to cover telemetry and controls for the system. Items 31 and 32 on the cost estimate indicates there are 76 potable water connections with 3/4 inch service taps and 6 potable water connections with 2 inch service taps. The number of household connections shown in the cost estimate is based upon the Person County, NC property maps, drive -by observations, and from exclusion of seven households that are proposed to be served with individual filtration systems. Items 8 through 27 and items 31 through 35 are installed cost, so a 30% installation cost factor was not applied. Items 28 through 3o are material cost, so a 30% installation cost factor was applied. Items i through 35 are summed and shown as a SUBTOTAL. Cost factors are then applied to the SUBTOTAL to estimate the balance of the project costs. We have applied a 25% contingency which is deemed consistent with a preliminary engineering evaluation. Additional assumptions that Dewberry used to prepare the cost estimates are provided as foot notes on the cost estimate Table. Contractor General Conditions are included for the duration of on -site construction phase activities. Easement acquisition includes the cost to compensate land owners for water or service lines extended down private roads and/or across private property. 2.4 COMMUNITY WELL WATER QUALITY BASIS OF DESIGN Dewberry reviewed existing groundwater quality data and compared it to the finished water requirements in the North Carolina Rules Governing Public Water Systems to project the groundwater treatment requirements for the proposed community well water system. The results are summarized in a basis of design memorandum submitted to Duke Energy on October 10, 2016 (Appendix E). The memorandum concludes that an allocation in the cost estimate should be included for iron and manganese groundwater treatment. The memorandum also states that the actual treatment requirements are not known at this time and can be established by installing a test well at the well site location. Dewberry Duke Energy ; Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 8 3. Site Analysis 3.1 MUNICIPAL POTABLE WATER: STATION MAPPING AND HOUSEHOLD DATA The municipal potable water Phase II overall map in Appendix A.1 shows the proposed tie-in location to the existing City of Roxboro potable water supply system, indicating that over io miles (~54,000 LF) of new potable water piping is required to serve households within the 1/2 mile compliance buffer. The City of Roxboro would manage and own the water supply, operations and maintenance (O&M), and metering/billing of water use for the new potable well water system and service connections. The Phase II Site map and sheets in Appendix A.i were prepared by overlaying Person County property maps onto the compliance boundaries detailed in the Duke Energy Drinking Water Receptor Surveys for Coal-fired Power Stations developed in 2014. The Appendix A.1 Site map shows the 1/2 mile compliance buffer and 28 rectangular sheet map sections. These 28 sheets illustrate the water main route, individual households, and household service line connections within the 1/2 mile compliance buffer. During the August 12, 2oi6 drive -by, Dewberry visually observed households shown in the Appendix A.1 sheet mapping. The proposed water line will be into the vicinity of the Steam Station from the tie-in point on Sheet 18. The database in Appendix B was created from the Person County, NC tax records tied to the GIS shape file which identifies the property owner and the address for each household within the 1/2 mile compliance buffer, including parcels of land with no residents (empty lot). The parcel data listed on the spreadsheets also includes Parcel ID, Land Use, Easement Requirement, and anticipated Water Demand for each property. Engineering judgment was utilized in cases where homes were located out of sight from the road and/or multiple structures could be seen during an aerial review. Review of the mapping from Appendix A.1 allowed for estimates of the required private easement areas around the Roxboro Steam Station. The potable water main proposed to serve residents around the Roxboro Steam Station will require private easement acquisition along four service line extensions. Standard municipal easement guidelines were followed around the Roxboro Steam Station, which includes multiplying the length of the water main or service line on private property by 20 feet to obtain the area. The area was then multiplied by 50% of the average land value (per acre) as indicated by public tax assessment for properties around the Roxboro Steam Station, providing an estimate of the easement cost. Temporary easements were not included in the calculation. 3.2 MUNICIPAL POTABLE WATER: FIELD OBSERVATIONS As shown in Appendix A.1, the water main piping will be installed along state roads, where possible. During the August 12, 2016 drive -by Dewberry noticed several areas where large boulders and rock outcroppings exist in the vicinity of the water main routes. We have included an allowance for rock excavation within the schedule and cost estimate. Based on observations in the drive -by as well as the Phase II mapping, it appears to be technically feasible to install the potable water main in the public road right of way or along the side of the private roads using conventional construction methods, such as an open trench with pipe bedding material. Approximately 12 water main road crossings and 31 service line road crossings will be required. Road crossings will be performed by subsurface boring to avoid open road cuts, and traffic impacts. It should be noted that the crossing count could be modified based upon final design and which side of the road the water main is installed. Dewberry- Duke Energy ; Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 9 Dewberry observed two major water crossings as summarized below: • Bridge crossing on Shore Road over the power plant intake water canal. The bridge is approximately too feet above the waterway shown on sheet 26. • Bridge crossing on McGhee's Mill Road near intersection with Chubb Lake Road. The bridge sits at least 15 feet above Chubb Lake shown on sheet 16. The bridge crossing on Shore Road has significant constructability, cost, and schedule impacts to serve a small number of connections; therefore the seven connections beyond the canal are proposed to receive individual filtration systems. The bridge crossing on McGhee's Mill Road crosses a wetland per USGS mapping and USFWS inventory. Dewberry proposes to install the water main via horizontal directional drill underneath the wetlands to minimize impacts. Dewberry observed one railroad crossing on McGhee's Mill Road near the intersection with Shore Road shown on sheet 25. There is an existing traffic bridge constructed approximately 30 feet above the railroad. This bridge crossing has significant constructability, cost, and schedule impacts to serve a small number of connections; therefore the seven connections beyond the canal are proposed to receive individual filtration systems. During the drive -by Dewberry did not observe other potential conflicts with known existing utilities. At present the 91 (including those recommended for individual filtration systems) households within the 1/2 mile radius compliance buffer do not have public water or sewer. Natural gas main and fiber optic markers were not observed during the drive -by, but are typically located within the state road right of way and are typically smaller in diameter than water piping, therefore the potential impact on construction is not deemed significant. Aboveground electric was observed and is not considered an impediment to water main installation. Dewberry observed the public road right-of-way widths and evaluated the feasibility to install the proposed water main within the unpaved shoulder of NC DOT roadway. In areas that we could not determine right of way status (public or not) or areas where private property may have been constructed on right-of-ways, we either provided an allowance for an easement, or the construction impact is accounted for in the cost estimate as a renovation allowance. 3.3 MUNICIPAL POTABLE WATER: OTHER CONSIDERATIONS The City of Roxboro operates a relatively large water system throughout Person County, managing the water supply, and meter/bill for water use. The City of Roxboro sources their water from City Lake and Lake Roxboro. The City of Roxboro estimates the pressure in the system at the proposed tie-in location ranges from 50-6o psi. The City has confirmed they have adequate supply capacity to serve the residents around the Roxboro Steam Station. Therefore based on this preliminary information, the capacity is deemed adequate to serve the 84 households in the 1/2 mile compliance buffer. Based upon USGS topographic mapping, the tie-in location elevation is approximately 530 feet above mean sea level (amsl), and the water main route varies from a low elevation of approximately 48o feet amsl to a high elevation of approximately 630 feet amsl. The required static lift of approximately too feet (530 to 63o amsl) corresponds to a static pressure of approximately 40 psi. The pipe friction pressure loss during normal flow conditions is not deemed significant, however the pipe friction pressure loss during fire flow conditions is deemed significant. Since the pressure at the tie-in location is 50-6o psi and the pressure loss will exceed 40 psi, an increase in system pressure is recommended. Therefore an allowance for an elevated tank is included in the cost estimate. The cost of land for the proposed elevated tank is not included in the estimate of probable cost, as the tank site has not been selected. Dewberry Duke Energy Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 10 The City of Roxboro estimates the water age at the proposed tie-in location to be less than 0.5 days. However, the water age at the compliance buffer point of use will be significantly higher due to the long pipeline and low demand. The estimated demand Of 44,000 gpd for the 84 households in the proposed service area yields an approximate overall water age of approximately 7 to 8 days. Water age above 5 days typically exhibits reduced disinfection residual concentration and increased potential for Disinfection Byproduct (DBP) formation. In order to reduce water age, automatic flushing hydrants are planned along the route. The flushing hydrants are part of Roxboro's normal water system infrastructure and normal operational protocol. These flushing hydrants will help maintain water quality and water disinfection residuals along the route. For this application, the City of Roxboro has expressed water quality concerns related to DBP compliance despite the flushing protocol. 3.4 COMMUNITY WELL WATER SYSTEM: STATION MAPPING AND HOUSEHOLD DATA The community well water system Phase II overall map in Appendix A.2 shows that the new water distribution system from the well head to the households within the 1/2 mile compliance buffer is approximately 5 miles (-25,000 LF). The community well water system would likely be owned by a private utility that would manage and own the water supply infrastructure, O&M, and metering/billing of water use for households served in the compliance buffer. The Phase II Site map and sheets in Appendix A.2 were prepared by overlaying Person County property maps onto the compliance boundaries detailed in the Duke Energy Drinking Water Receptor Surveys for Coal-fired Power Stations developed in 2014. The Appendix A.2 Site map shows the 1/2 mile compliance buffer and 22 rectangular sheet map sections. These 22 sheets illustrate the water supply well location, water main route, individual households, and household service line connections within the 1/2 mile compliance buffer. During the August 12, 2016 drive -by, Dewberry visually observed households shown in the Appendix A.2 mapping. The household database in Appendix B was created as stated in Section 3.1 of this report and is the same for the community well water system. The private easement allocation was calculated as stated in Section 3.1 of this report. The community water main will require private easement acquisition along four service line extensions. 3.5 COMMUNITY WELL WATER SYSTEM: FIELD OBSERVATIONS The field observations for the community well option are the same as those stated in Section 3.2 with two exceptions. The proposed water line needed to serve the 84 households around the Steam Station would not extend southeasterly down McGhees Mill Road, therefore the bridge crossing near the intersection with Chubb Lake Road is not included. Additionally, the well site will require a driveway off the main road (McGhee's Mill Road). Sheet 16 of the Phase II community well water system mapping (Appendix A.2) shows the proposed well site location which is on Duke Energy property adjacent to and north of a power transmission line. It appears that there is adequate space for installation of the potable water line and a service access road on the south side of the power line right of way. It is assumed that a perpendicular crossing of the power line right of way can be approved within Duke Energy. The proposed well system area will require surveying for subdivision and will ultimately be deeded to the private water supplier. Dewberry Duke Energy Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 11 3.6 COMMUNITY WELL WATER SYSTEM: OTHER CONSIDERATIONS The preliminary design for the well system is based on information provided by SynTerra, a hydrogeology firm recommended by Duke Energy that is familiar with groundwater characteristics in the area and with local drillers. SynTerra roughly estimates that a six inch well advanced to a depth of 250 feet will have a yield of approximately 8 to io gallons per minute. Therefore four wells would likely be required to meet the estimated demand 44,000 gallons per day for the proposed service population. The well layout shown on Sheet 16 is based on an assumed minimum well spacing of ioo feet. For purposes of preliminary well pump sizing, the static water level was assumed to be 50 feet below grade, and that the well pumps would create a drawdown Of 35 feet. Wells would be cased in Schedule 8o PVC and well pumps would be submersible. Preliminary pump sizing is based on providing 6o psi at the hydropneumatic tank, plus losses through the treatment system and the static lift required under drawdown conditions. As discussed previously in Section 2.4 and Appendix E, groundwater treatment for iron (Fe) and manganese (Mn) would likely be required to meet water quality requirements and is included in this Phase II evaluation. An Fe/Mn treatment system utilizes an oxidizing granular media filter (greensand or similar) which causes precipitation of the iron and manganese and removal by physical filtration. We assume that the oxidizing capacity for the filters will be provided by the sodium hypochlorite used for disinfection of the water supply. This means that additional processes are not required for regeneration of the media. The filters must be backwashed periodically to remove the iron and manganese solids captured on the filter. Backwash water is directed to a tank where solids are settled out by gravity and a portion of the backwash water can then be recycled to the treatment system. Settled sludge is transferred to a sludge holding tank where it is accumulated for periodic disposal off site. Treated water is directed to a hydropneumatic tank. This tank provides storage to manage peak demand and maintains system pressure. A block flow diagram of the proposed well and treatment system is shown in Appendix E. As discussed in the water quality basis of design memorandum, a test well is recommended to confirm well capacity and water quality prior to final design of the well pumps and treatment system. The test well results can impact the number of wells installed, the well depth, well size, and the treatment system. If Duke Energy desires, the test well can eventually become one of the final production wells. Dewberry Duke Energy Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 12 4. Regulatory Permitting The municipal potable water and community well water system designs will be required to adhere to requirements of the following agencies and permitting authorities. Each permit will require a separate set of documentation and will be submitted individually to the respective permitting agency. The timeline for submittal and approval is presented in the Roxboro Steam Station Potable Water Schedules detailed in Appendix C. • NCDOT Right-of-way Encroachment Agreement, Primary and Secondary Roads • NCDEQ, Division of Land Quality, Erosion and Sedimentation Control Permit • NCDEQ, Division of Water Resource, Public Water Supply Permit • NCDEQ Water Quality Certification Pre Construction Notification* ( includes nationwide 12 permitting for wetland impacts) *Required for the Municipal Potable Water Option only Dewberry Duke Energy Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 13 5. Schedule The Phase Il municipal potable water project schedule and the community well water system project schedule is provided in Appendix C. The schedules were prepared in part to show milestone dates needed to comply with House Bill 630 which states the following: • "No later than December 15, 2016 an impoundment owner shall submit information on permanent replacement water supplies proposed to be provided to each household" • "The Department shall evaluate information submitted by the impoundment owner and render a final decision to approve or disapprove the plan, including written findings of fact no later than January 15, 2017" • "As soon as practical, but no later than October 15, 2018 the owner of a coal combustion residual surface impoundment shall establish permanent replacement water supplies" The municipal potable water schedule (Appendix C.i) indicates DEQ report submittal on December 15, 2016 and DEQ approval by January 15, 2017. The schedule includes an initial 90 day negotiation period for development and execution of a Water Authority/Duke memorandum of understanding (MOU). The schedule is subject to change dependent upon the milestone dates for the MOU, the approval/comments from DEQ, and the resident input regarding permanent water supply choice. The balance of the municipal potable water schedule is deemed typical for a public sector design -bid -build water line improvement project and plans for all households to connect to public potable water. The schedule indicates an end date of September 2019 which does not meet the October 15, 2018 deadline. The community well water system schedule (Appendix C.2) indicates DEQ report submittal on December 15, 2016 and DEQ approval by January 15, 2017. The schedule includes an initial 90 day negotiation period for development and execution of a Private Utility/Duke memorandum of understanding (MOU). The schedule is subject to change dependent upon the milestone dates for the MOU, the approval/comments from DEQ, and the resident input regarding permanent water supply choice. The balance of the community well water system schedule is deemed typical for a privately executed design -build community well water system project and plans for all households to connect to public potable water. The schedule indicates an end date of August 2018 which meets the October 15, 2018 deadline. Dewberry Duke Energy Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 14 6. Opinion of Probable Cost The Phase II municipal potable water project opinion of probable cost and the community well water system project opinion of probable cost are provided in Appendix D. Each opinion of probable cost was prepared in accordance with the basis of design criteria in Section 2.2 of this report. The municipal potable water project (Appendix D.i) opinion of probable cost indicates that the total estimated construction cost is approximately $1o,98o,000, which equates to approximately $131,000 per household. A 25% contingency is included. The Phase II municipal potable water project opinion of probable cost includes individual allocations for the service connection lines and meters (items 20 through 27) that equates to approximately $8,00o per new connection. We arrived at that allocation as follows: For items 20 and 21 the service line lengths were measured for each household using the Phase II sheet mapping. Item 22 is for miscellaneous fittings associated with the service line connections. For items 23 and 24 the meter/meter box allowance was developed from vendor quotations and from recent bid tabulations for similar projects. Item 25 is for road crossings where the household to be served is on the opposite side of the road from the water main. Items 26 and 27 represent site costs associated with approximately 17,000 feet of new service line piping. The community well water s sy tem project (Appendix D.2) opinion of probable cost indicates that the total estimated construction cost is approximately $5,140,000, which equates to approximately $61,000 per household. A 25% contingency is included. The Phase II community well water system project opinion of probable cost includes individual allocations for the service connection lines and meters (items 28 through 35) that equates to approximately $8,00o per new connection. We arrived at that allocation as follows: • For items 28 and 29 the service line lengths were measured for each household using the Phase II sheet mapping. Item 29 is for miscellaneous fittings associated with the service line connections. • For items 31 through 32 the meter/meter box allowance was developed from vendor quotations and from recent bid tabulations for similar projects. Item 33 is for road crossings where the household to be served is on the opposite side of the road from the water main. Items 34 and 35 represent site costs associated with approximately 17,000 feet of new service line piping. Dewberry Duke Energy Roxboro Steam Station Phase 11 Potable Water Programmatic Evaluation 15 Appendix A.1: Roxboro Station Phase II Mapping - Municipal Potable Water Option www.dewberry.com November 18, 2016 iqueDewberry- Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Overall Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary E Existing Potable Water Line (City of Roxboro) Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System N 1 in = 2,500 feet 0 2,500 5,000 Feet _ 72 N November 18, 2016 gelidgelid ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 1 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet OF r 87 N CO November 18, 2016 gelidgelid ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 2 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet duke Prepe�Y - - ..r : 69 I �E� ,. D.� Semora Rd N M —.Z_Z m--- wCO }' r mm J r = r s2 j 1 1 4s YI 114 r ' I FINAL - November 18, 2016 � ; Dewberry - Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 3 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) -�' X 1 in = 200 feet 0 200 400 Feet Ste;• r Semora Rd E SHEET'-6--- SHEET November 18, 2016 ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 4 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) "�' 11�* 1 in = 200 feet 0 200 400 Feet DI D r-r z' z m m. NO im tm November 18, 2016 i_ : Dewberry- .. Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 5 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands ■F Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) "�' 11�* 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 6 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) 'V 1 in = 200 feet 0 200 400 Feet Da"7 -z— Duke, Pry�o� Perty-2_,, Q,Q PA November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 7 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 7L 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 8 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) `V 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 9 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) ^�' X 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 10 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) )( -11, 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 11 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet o ,_ 11 uj LI Lu, . 4 "-!� Am i� •7 � r. �� L, R •u a w .9t _ rr_ ZZ m m 22 mm November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 12 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 13 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 200 feet 0 200 400 Feet November 18, 2016 i_ : Dewberry- . . Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 14 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 200 feet 0 200 400 Feet I November 18, 2016 4646-4 11-11OF Dewberry - Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 15 Legend ----- County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) `V 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 16 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet 4 —� --- r_r 73_ _ McGhees Mill Rd N, I November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 17 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 18, 2016 i_ : Dewberry- . . Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 18 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands ■F Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 2 it 1 in = 200 feet 0 200 400 Feet ees W—AM McGf; 115 I 101 I 103 fll 105 II 104 I 121 128 @ November 18, 2016 I�e�nrl��rry� Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 19 Legend ----- County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 20 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) - 1 in = 200 feet 0 200 400 Feet "r .. Dunmaw.ay`Dr co(0 39 Q 77 f77 ! ym i y i v � i o j ! 108 November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 21 Legend ----- County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 200 feet 0 200 400 Feet io 37 MCC k.e 82 '77 Sy - i 83 O 18 �r— —T— _ 28 r 16 59 33 a , - i 73 FINAL November 18, 2016 -Y Dewberr - Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 22 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) ali '::: Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 18, 2016 is Dewberry - gelid, .. Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 23 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) -4+ 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 24 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet November 18, 2016 i_ : Dewberry- . . Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 25 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands ■F Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 200 feet 0 200 400 Feet _w ~� "TO November 18, 2016 100. Dewberry - Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 26 Legend ----- County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System -, Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 200 feet 0 200 400 Feet November 18, 2016 i_ : Dewberry- . . Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 27 Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands ■F Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 200 feet 0 200 400 Feet iii ON - td I A� 0 -J FINAL November 18, 2016 %646y.*, ipt Dewberr Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 28 Legend ----- County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Existing Potable Water Line (City of Roxboro) Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 200 feet 0 200 400 Feet Appendix A.2: Roxboro Station Phase II Mapping - Community Water Well System Option www.dewberry.com November 18, 2016 iqueDewberry- Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Overall Community Well Option Legend Proposed Water Supply Well County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands 4 Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System N 1 in = 2,500 feet 0 2,500 5,000 Feet cv 4t 72 µ November 18, 2016 46r� , Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 1 Community Well Option Legend ----- County Boundary Proposed Potable Water Line (Duke) - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands t Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System ® Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 201 feet 0 200 400 Feet i 0 Q _ Duke Property � /O� - Duke Property - - ti 00 o w LU 69-- Semora Rd -_ -_ u w w 1 ,1 r + I 46 , 81 o _ � o _< _ it o 145 0 November 18, 2016 Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 2 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 201 feet 0 200 400 Feet — e • — a _ - _ Y J "I Duke Pr�pertY 69 I D D Semor- m m— w w �Cn r I f mm 47 w r - 32 � II 1{' I 99 I 45 69 f 114 +1 I f I +ti I II �1 I : FINAL-� November 18, 2016 � ; Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 3 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #� Parcel Reference Number (Refer to spreadsheet for parcel details) -�' X 1 in = 201 feet 0 200 400 Feet f. MAT.CH,LINE SHEET 6 ►' MATCH LINE SHEET by ) 69 1 p _:_ 5I zz - m m ti M m Semora Rd November 18, 2016 gelid-ov' , t Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 4 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #� Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 201 feet 0 200 400 Feet November 18, 2016 .. Dewberry, Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 5 Community Well Option Legend ----- County Boundary Proposed Potable Water Line (Duke) - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System ® Parcel Reference Number (Refer to spreadsheet for parcel details) `�' 'III* 1 in = 201 feet 0 200 400 Feet November 18, 2016 46r� , Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 6 Community Well Option Legend ---- County Boundary Proposed Potable Water Line (Duke) - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands t Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System ® Parcel Reference Number (Refer to spreadsheet for parcel details) `V 1 in = 201 feet 0 200 400 Feet November 18, 2016 46r� , Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 7 Community Well Option Legend ----- County Boundary Proposed Potable Water Line (Duke) - - - Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands t Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System ® Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 201 feet 0 200 400 Feet VINN -1 106 ti - yL411 vrq Cello Rd -Now 127 00 wn �M 1 November 18, 2016 gelidgelid ipt Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 8 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) `V 1 in = 201 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 9 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) ^�' X 1 in = 200 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 10 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) )( -11, 1 in = 200 feet 0 200 400 Feet November 18, 2016 ipt Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 11 Community Well Option Legend ----- County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 201 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 12 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) - 1 in = 200 feet 0 200 400 Feet I ��1r4w� lop LDunnaW_,3V_,Dr_, 0 jr i 27 f. . 25 �To�� 77 78 4% r � nyy 39 mmmf77 w N 108 November 18, 2016 100. Dewberry - Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 13 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant .�� Railway State Route Stream/Lake Recommended Individual Filtration System #� Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 201 feet 0 200 400 Feet io Ouko �°r. open 83 McGhees Mill Rd 28 O16 J9 _ _ s 88 Duke Property November 18, 2016 is Dewberry NOR, .. Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 14 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 201 feet 0 200 400 Feet November 18, 2016 is Dewberry NOR, .. Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 15 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #� Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 201 feet 0 200 400 Feet November 18, 2016 gelidgelid-4ipt Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 16 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 201 feet 0 200 400 Feet November 18, 2016 is Dewberry NOR, .. Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 17 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) -4+ 1 in = 200 feet 0 200 400 Feet W W W W __ U- U) W W 63 November 18, 2016 gelidgelid Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 18 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 201 feet 0 200 400 Feet Below Grade ailroad crossing li INE SHEET INE $HEET, November 18, 2016 100. Dewberry - Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 19 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #� Parcel Reference Number (Refer to spreadsheet for parcel details) 1 in = 201 feet 0 200 400 Feet :a. - -T-%' -.7- -.Tw-161-7-7- 1r:. - 9 r".� 'r'r 3, J • F- r. F- -m- November 18, 2016 100. Dewberry - Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 20 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 201 feet 0 200 400 Feet U 96 0 I k.. •.. k 96 1 Rd i4---_ m m'-- -� 1rt µ- — N -- n t•T pop 4 S 2 r r- November 18, 2016 iique s Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 21 Community Well Option Legend County Boundary Proposed Potable Water Line (Duke) — — Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 201 feet 0 200 400 Feet -- ---F A- t -01 0 = F IN AL mm MOD mm November 18, 2016 gelidgelid ipt Dewberry Duke Energy Dewberry Proj. No. 50081775 Proposed Potable Water Site Preliminary Evaluation Roxboro Steam Station Sheet 22 Community Well Option Legend ----- County Boundary Proposed Potable Water Line (Duke) Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake Recommended Individual Filtration System #J Parcel Reference Number (Refer to spreadsheet for parcel details) N 1 in = 201 feet 0 200 400 Feet Appendix B: Roxboro Station Household Data Spreadsheet www.dewberry.com Roxboro Steam Station Parcel Spreadsheet Easement Label Parcel ID Site Address Type of Service Land Use Owner Tax Address City State Req' Daily Flow Required 1 9989-02-96-2190.000 MCGHEES MILL RD N/A Empty Lot CARVER DORIS/GILLIAM VICKI B PO BOX 560 ROXBORO NC 2 9988-01-36-3399.000 462 ARCHIE CLAYTON RD N/A Empty Lot BARTS EUGENE 462 ARCHIE CLAYTON RD ROXBORO NC - 3 9988-01-36-5373.000 462 ARCHIE CLAYTON RD Residential In Use BARTS EUGENE 462 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 4 9988-01-36-4582.000 462 ARCHIE CLAYTON RD N/A Empty Lot BARTS EUGENE 462 ARCHIE CLAYTON RD ROXBORO NC - 5 9989-04-60-5255.000 MCGHEES MILL RD N/A Empty Lot CLAYTON JANIE C & OTHERS 424 ROY CARVER RD SEMORA NC - 6 9978-04-84-3464.000 6601 SEMORA RD Residential In Use CLAYTON RODNEY MERRILL 6601 SEMORA RD SEMORA NC 480 Gallons/connection 7 9988-01-36-0728.000 520 ARCHIE CLAYTON RD Residential In Use CLAYTON RANDY WILKINS 1027 COUNTRY CLUB RD ROXBORO NC 480 Gallons/connection 8 9978-04-84-1371.000 SEMORA RD Residential In Use DUNCAN CARL D & HILDA D 41 ZION LEVEL CHURCH RD SEMORA NC 480 Gallons/connection 9 9989-04-73-0508.000 4094 MCGHEES MILL RD Residential In Use CRAWLEY CHRISTOPHER L 4094 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 10 9989-04-73-0609.000 4114 MCGHEES MILL RD Residential In Use CRAWLEY MAE CHAMBERS LIFE EST 4114 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 11 9989-04-62-7168.000 3830 MCGHEES MILL RD Residential In Use MCDANIEL PEGGY D & DONALD W JR 1790 MCGHEES MILL RD ROXBORO NC 480 Gallons/connection 12 9988-02-59-1781.000 3291 MCGHEES MILL RD Residential In Use ESTES LARRY THOMAS & FAYE 3291 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 13 9989-04-63-4241.000 MCGHEES MILL RD N/A Empty Lot HINTON ADA E & FREDERICK H 255 OAK GROVE MOUNT ZION RD ROXBORO NC - 14 9988-01-35-5289.000 ARCHIE CLAYTON RD Residential In Use SMALLWOOD DELMA 2225 SPARGER RD DURHAM NC 480 Gallons/connection 15 9989-04-62-8666.000 3924 MCGHEES MILL RD Residential In Use FAULKNER ELIJAH 3924 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 16 9989-04-51-9175.000 3599 MCGHEES MILL RD Residential In Use FIFE SUE H 3599 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 17 9989-04-62-8786.000 MCGHEES MILL RD N/A Empty Lot LUNSFORD BONNIE R & JUDY N 1055 HALIFAX RD ROXBORO NC - 18 9989-04-61-3029.000 3614 MCGHEES MILL RD Residential In Use GARLAND LORRAINE 315 NICHOLS AVE ROXBORO NC 480 Gallons/connection 19 9988-02-59-8579.000 3773 MCGHEES MILL RD Residential In Use GRAY BOBBY R LIFE ESTATE 3276 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 20 9988-02-57-4390.000 2897 MCGHEES MILL RD N/A Empty Lot HAMLETT LAMBERTH & EVELYN 2897 MCGHEES MILL RD SEMORA NC - 21 9989-04-74-0333.000 4236 MCGHEES MILL RD Residential In Use HESTER EVA JEAN LIFE ESTATE 4236 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 22 9989-04-64-8345.000 2437 MCGHEES MILL RD Residential In Use HUGHES DENISE D 5519 SPINDLEWOOD CT DURHAM NC 480 Gallons/connection 23 9989-04-63-7897.000 MCGHEES MILL RD N/A Empty Lot HUGHES LEX LEWIS & RACHEL 4164 MCGHEES MILL RD SEMORA NC - 24 9989-04-63-9887.000 4164 MCGHEES MILL RD Residential In Use HUGHES LEX LEWIS & RACHEL 4164 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 25 9988-01-39-8619.000 285 DUNNAWAY RD Residential In Use JEFFERS HOWARD JR 285 DUNNAWAY RD SEMORA NC 480 Gallons/connection 26 9989-04-62-5459.000 3893 MCGHEES MILL RD Residential In Use DEAL OF PERSON LLC 34 LOCHRIDGE DR ROXBORO NC 480 Gallons/connection 27 9988-01-39-4609.000 DUNNAWAY RD N/A Empty Lot JORDAN FRANK & BETTIE 714 LONGS STORE RD ROXBORO NC - 28 9989-04-61-0224.000 3617 MCGHEES MILL RD Residential In Use KELLY EARL CLYDE PO BOX 84 SEMORA NC 480 Gallons/connection 29 9988-01-36-6080.000 395 ARCHIE CLAYTON RD Residential In Use LEWIS L MICHAEL 395 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 30 9988-01-35-5942.000 395 ARCHIE CLAYTON RD Residential In Use LEWIS L MICHAEL 395 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 31 9988-01-35-9665.000 311 ARCHIE CLAYTON RD Residential In Use LOFTIS JIMMIE & GLADYS 311 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 32 9978-04-74-6072.000 SEMORA RD N/A Empty Lot LONG L D ESTATE 623 YOUNG CHAPEL CHURCH RD ROXBORO NC - 33 9989-04-50-7893.000 3535 MCGHEES MILL RD Residential In Use MCCAIN JOHN N 3535 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 34 9989-04-60-9846.000 MCGHEES MILL RD N/A Empty Lot MCCAIN MILLIE EST 6080 LEASBURG RD ROXBORO NC - 35 9989-04-63-9590.000 4072 MCGHEES MILL RD Residential In Use MAJORS SANDRA C 4072 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 36 9988-01-35-4849.000 461 ARCHIE CLAYTON RD N/A Empty Lot MARTIN HOWARD T & MARY 0 461 ARCHIE CLAYTON RD ROXBORO NC - 37 9989-04-61-6844.000 3770 MCGHEES MILL RD Residential In Use CRAWLEY MICKEY RAYE 3770 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 38 9989-01-07-3790.000 224 MARTHA ROYSTER RD Residential In Use LONG SALLIE DELORIS 1665 MONROE AVE APT 113 BRONX NY - 39 9988-01-49-7632.000 101 DUNNAWAY RD Residential In Use FARMAN DAVID & JANIE 101 DUNNAWAY RD SEMORA NC 480 Gallons/connection 40 9988-01-49-5741.000 DUNNAWAY RD N/A Empty Lot WELBORNE ENIDA P & ANTHONY M 5139 RANDLEMAN RD GREENSBORO NC - 41 9989-04-74-0104.000 4180 MCGHEES MILL RD Residential In Use ZIMMERMAN CARROLL MERRITT L/ES 4180 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 42 9989-04-62-9806.000 3962?? MCGHEES MILL RD Residential In Use LUNSFORD BONNIE R & JUDY N 1055 HALIFAX RD ROXBORO NC 480 Gallons/connection 43 9989-04-63-9046.000 3976 MCGHEES MILL RD N/A Empty Lot POWELLJOHN 9215 NC HIGHWAY 49 ROXBORO NC - ' 44 9989-04-62-9926.000 3962 MCGHEES MILL RD Residential In Use POWELLJOHN L & GLADYS 9215 NC HIGHWAY 49 ROXBORO NC 480 Gallons/connection 45 9978-04-73-6564.000 SEMORA RD N/A Empty Lot RUDDER JEFFERSON 126 NORTHMONT CT DANVILLE VA - . 46 9978-02-75-6424.000 SEMORA RD N/A Empty Lot RUDDER JEFFERSON 126 NORTHMONT CT DANVILLE VA - 47 9978-04-84-5320.000 6628 SEMORA RD Residential In Use RUDDER JEFFERSON 126 NORTHMONT CT DANVILLE VA 480 Gallons/connection 48 9988-01-35-8832.000 345 ARCHIE CLAYTON RD Residential In Use RUSSELL H LEE & FLORELLA M 345 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 49 9989-04-62-7287.000 3854 MCGHEES MILL RD Residential In Use RUSSELL NOEL R 3854 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 50 9989-04-62-8317.000 3854 MCGHEES MILL RD N/A Empty Lot RUSSELL NOEL R 3854 MCGHEES MILL RD SEMORA NC - 51 9989-04-62-7038.000 MCGHEES MILL RD N/A Empty Lot BAYLOR EVELYN H & OTHERS 14815 DARBYDALE DR BOWIE MD - 52 9989-04-82-4547.000 4034 MCGHEES MILL RD Residential In Use 5G LLC 2309 EASY HORSE TRL WAKE NC 480 Gallons/connection 53 9989-04-62-8437.000 3892 MCGHEES MILL RD Residential In Use POOLE LLOYD JR 284 TANGLEWOOD CIR ROXBORO NC 480 Gallons/connection 54 9989-04-62-8567.000 3892 MCGHEES MILL RD N/A Empty Lot POOLE LLOYD JR 284 TANGLEWOOD CIR ROXBORO NC - 55 9988-01-05-4153.000 571 DAISY THOMPSON RD Residential In Use ROLISON ROBERTSCOTT 571 DAISY THOMPSON RD ROXBORO NC 480 Gallons/connection 56 9988-01-15-2315.000 DAISY THOMPSON RD N/A Empty Lot ROLISON ROBERT SCOTT 571 DAISY THOMPSON RD ROXBORO NC - 57 9989-04-60-1882.000 3558 MCGHEES MILL RD Residential In Use TUCK MATT L 3558 MCGHEES MILL RD SEMORA NC 480 Gallons/connection Other Notes 1 meter, 2 homes 58 9988-01-36-7254.000 430 ARCHIE CLAYTON RD Residential In Use LEWIS LARRY M & JOAN T 395 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 59 9989-04-51-8091.000 3579 MCGHEES MILL RD Residential In Use WILLIAMS BARRY 3579 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 60 9988-01-39-2741.000 381 DUNNAWAY RD Residential In Use WINSTEAD WAYNE B 381 DUNNAWAY RD SEMORA NC 480 Gallons/connection 61 9988-01-39-1733.000 399 DUNNAWAY RD Residential In Use WINSTEAD WILLIE ESTATE 4037 MORTON PULLIAM RD ROXBORO NC 480 Gallons/connection 62 9988-01-35-3935.000 ARCHIE CLAYTON RD Residential In Use WOOD LEE JR & GAIL 507 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 63 9988-01-35-1957.000 507 ARCHIE CLAYTON RD Residential In Use WOOD LEE JR & GAIL 507 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 64 9989-04-63-9166.000 4014 MCGHEES MILL RD Residential In Use 5G LLC 2309 EASY HORSE TRL WAKE NC 480 Gallons/connection 65 9989-04-62-5218.000 3853 MCGHEES MILL RD Residential In Use DAVIS LUCY B 3853 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 66 9989-04-50-2109.000 3291 MCGHEES MILL RD N/A Empty Lot PURYEAR KEVIN PROPERTIES LLC PO BOX 1117 ROXBORO NC - 67 9989-04-62-0379.000 3781 MCGHEES MILL RD N/A Empty Lot BENTLEY PHILLIP ANDREW 3781 MCGHEES MILL RD SEMORA NC 68 9989-01-07-2923.000 224 MARTHA ROYSTER RD Residential In Use ROYSTER MARTHA ESTATE 1665 MONROE AVE APT 1B BRONX NY - 69 9978-04-91-8682.000 5310 SEMORA RD Residential In Use WAGSTAFF FARMS LLC 31 REAMS AVE ROXBORO NC 480 Gallons/connection 70 9988-01-45-1942.000 360 ARCHIE CLAYTON RD Residential In Use SERRANO LILLIE 360 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 71 9989-04-74-0468.000 4268 MCGHEES MILL RD Residential In Use HUGHES ANTOINETTE & J BAILEY 4268 MCGGEES MILL RD SEMORA NC 480 Gallons/connection 72 9978-02-56-5922.000 7391 SEMORA RD Schools In Use PERSON COUNTY NORTH CAROLINA 304 S MORGAN ST RM 219 ROXBORO NC 15 Gallons/student 73 9989-03-40-3472.000 241 DUNNAWAY RD N/A Empty Lot PURYEAR KEVIN PROPERTIES LLC PO BOX 1117 ROXBORO NC - c 74 9989-04-63-6998.000 4165 MCGHEES MILL RD Residential In Use HUGHES PHILLIP 4165 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 75 9989-04-50-4836.000 3469 MCGHEES MILL RD Residential In Use WALKER WILLIAM & WENDY 3469 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 76 9989-04-64-8569.000 4291 MCGHEES MILL RD N/A Empty Lot CRUTCHFIELD SARAH D & MICHAEL 4291 MCGHEES MILL RD SEMORA NC - 77 9988-01-39-9669.000 285 DUNNAWAY RD N/A Empty Lot JEFFERS HOWARD JR & OLLIE 285 DUNNAWAY RD SEMORA NC - 78 9988-01-49-1710.000 225 DUNNAWAY RD Residential In Use JEFFERS DENNIS W & SHONDA BUMP 156 MAGGIE LN ROXBORO NC 480 Gallons/connection 79 9989-04-51-8907.000 135 THE JOHNSON LN Residential In Use CARTER ANGIE 135 THE JOHNSON LN SEMORA NC 480 Gallons/connection 80 9989-04-52-9154.000 154-162 MCGHEES MILL RD Residential In Use BENTLEY PHILLIP ANDREW 3781 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 81 9978-04-74-7593.000 6621 SEMORA RD Residential In Use KNOTT DOUGLAS P 6621 SEMORA RD SEMORA NC 480 Gallons/connection 82 9989-04-61-3835.000 3749 MCGHEES MILL RD Residential In Use JOHNSON BETTY SUSIE 3749 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 83 9989-04-52-5074.000 156 THE JOHNSON LN Residential In Use CUNNINGHAM GLADYS W 156 THE JOHNSON LN SEMORA NC 480 Gallons/connection . 84 9989-04-61-1903.000 65 THE JOHNSON LN Residential In Use CHANDLER WALLACE 65 THE JOHNSON LN SEMORA NC 480 Gallons/connection 85 9989-04-61-0818.000 156 THE JOHNSON LN N/A Empty Lot CUNNINGHAM GLADYS W 156 THE JOHNSON LN SEMORA NC - r 86 9988-01-46-1225.000 38 BENNIE OAKLEY RD Residential In Use OAKLEY CHARLIE MORRIS JR 2809 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 87 9978-04-74-3446.000 SEMORA RD N/A Empty Lot KNOTT DOUGLAS P & KNOTT LOIS 6621 SEMORA RD SEMORA NC - 88 9988-01-25-8938.000 ARCHIE CLAYTON RD N/A Empty Lot BOWEN STEPHANIE 693 MANOR DR TIMBERLAKE NC 89 9989-04-64-6308.000 MCGHEES MILL RD N/A Empty Lot HUGHES DENISE D 5519 SPINDLEWOOD CT DURHAM NC - 90 9988-00-14-0931.000 556 DAISY THOMPSON RD Residential In Use SANFORD CHAD L 556 DAISY THOMPSON RD ROXBORO NC 480 Gallons/connection 91 9989-01-16-5827.000 921 A SHORE RD Industrial In Use CERTAINTEED GYPSUM NC INC 921 A SHORE RD SEMORA NC - Business, Office, Factory 92 9978-02-66-1992.000 7275 SEMORA RD In Use TBS REALTY INC 3808 BURLINGTON RD ROXBORO NC 25 Gallons/shift w/o showers 93 9989-03-40-0170.000 244 DUNNAWAY RD Residential In Use PURYEAR KEVIN PROPERTIES LLC PO BOX 1117 ROXBORO NC 480 Gallons/connection 94 9989-04-64-7851.000 MCGHEES MILL RD N/A Empty Lot CRUTCHFIELD SARAH D 4291 MCGHEES MILL RD SEMORA NC - 95 9989-04-64-3888.000 4165 MCGHEES MILL RD Residential In Use HUGHES PHILLIP 4165 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 96 9989-01-28-0462.000 SHORE ACRES DR Residential In Use R&S CARVER PROP & CLAYTON JANI 1222 MORTON PULLIAM RD ROXBORO NC - 97 9988-01-46-6543.000 38 BENNIE OAKLEY RD Residential In Use OAKLEY MARY C LIFE ESTATE 104 COLD WATER LN GRIFFIN GA 480 Gallons/connection 98 9989-04-64-6613.000 MCGHEES MILL RD Residential In Use HUGHES PHILLIP 4165 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 99 9989-04-64-9710.000 4291 MCGHEES MILL RD Residential In Use CRUTCHFIELD SARAH D & MICHAEL 4291 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 100 9988-01-45-4551.000 246 ARCHIE CLAYTON RD Residential In Use HAMLETT JAM ES & LINDA S 246 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 2255 N WASH AVE APT 101 9988-02-57-1872.000 MCGHEES MILL RD N/A Empty Lot BARNETTE GARLAND CHESTER DALLAS TX - 23TON 102 9988-02-57-1923.000 2971 MCGHEES MILL RD Residential In Use WRENN BRUCE E PO BOX 1352 ROXBORO NC 480 Gallons/connection 103 9988-02-57-2710.000 2931 MCGHEES MILL RD Residential In Use MCCOWAN TIMMY E 3115 COLEY RD DURHAM NC 480 Gallons/connection 104 9988-02-57-2591.000 2897 MCGHEES MILL RD Residential In Use HAMLETT LAMBERTH & EVELYN 2897 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 105 9988-02-57-2549.000 MCGHEES MILL RD Residential In Use HAMLETT LAMBERTH & EVELYN 2897 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 106 9988-00-22-7041.000 436 CONCORD CEFFO RD Residential In Use MORROW REBECCA HOLEMAN PO BOX 3091 ROXBORO NC 480 Gallons/connection 107 9988-02-57-4899.000 2930 MCGHEES MILL RD Residential In Use JAY FRANKIE & JAY TIMOTHY 2930 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 108 9988-01-49-8582.000 67 DUNNAWAY RD Residential In Use CURRIE MAGGIE J 67 DUNNAWAY RD SEMORA NC 480 Gallons/connection 109 9988-02-59-0554.000 DUNNAWAY RD N/A Empty Lot LOVE CYNTHIA MARIE 1409 JACKSON ST ROXBORO NC - 3 Individual filtration system 2 Individual filtration systems 2 Individual filtration system 1 meter. 2 houses Parcel is split by ROW only northern portion is intersected by buffer but house on southern portion is being considered MCGHEES MILL 0 F 9988-02-59-1459.000 N/A Empty Lot C P & L 550 SOUTH TRYON ST DEC 41B CHARLOTTE NC C RD/DUNAWAY RD 111 9988-02-59-0392.000 MCGHEES MILL RD N/A Empty Lot C P & L 550 SOUTH TRYON ST DEC 41B CHARLOTTE NC c 112 9988-01-45-2765.000 ARCHIE CLAYTON RD Residential In Use YANCEY ROBERT L JR 302 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 113 9988-01-45-4732.000 268 ARCHIE CLAYTON RD Residential In Use SATTERFIELD JACQUELINE JAY 268 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 114 9978-04-82-2912.000 SEMORA RD N/A Empty Lot RUDDER JEFFERSON 126 NORTH MONT CT DANVILLE VA - 115 9988-02-58-1036.000 MCGHEES MILL RD N/A Empty Lot WILLIAMS MICHAEL & STELLA B 313 N CHARLES ST ROXBORO NC jr 116 9978-04-63-7806.000 QUAIL HOLLOW DR N/A Empty Lot QUAIL HOLLOW HYCO LLC 31 REAMS AVE ROXBORO NC - 117 9989-04-74-1639.000 4300 MCGHEES MILL RD Residential In Use CHAMBERS DONALD L & DELLA M 4300 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 118 9989-02-75-0340.000 4415 MCGHEES MILL RD Residential In Use HUGHES LEASIE R 4415 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 119 9988-02-56-1467.000 195 BENNIE OAKLEY RD Residential In Use WALLACE DONALD LEE & JEANETTE 903 N MAIN ST ROXBORO NC 480 Gallons/connection 120 9989-04-64-9842.000 MCGHEES MILL RD N/A Empty Lot CRUTCHFIELD SARAH D & MICHAEL 4291 MCGHEES MILL RD SEMORA NC - 121 9988-02-57-3451.000 2869 MCGHEES MILL RD Residential In Use WINSTEAD DAVID E 2869 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 122 9988-01-45-8623.000 ARCHIE CLAYTON RD N/A Empty Lot OAKLEY MORRIS E 104 COLDWATER LN GRIFFIN GA - 123 9988-01-45-6539.000 220 ARCHIE CLAYTON RD Residential In Use LOPEZ SHANNON M 220 ARCHIE CLAYTON RD ROXBORO NC 480 Gallons/connection 124 9988-02-68-2610.000 MCGHEES MILL RD N/A Empty Lot GRAY MICHAEL 3058 MCGHEES MILL RD SEMORA NC - 125 9988-02-58-7273.000 MCGHEES MILL RD N/A Empty Lot GRAY MICHAEL 3058 MCGHEES MILL RD SEMORA NC - 126 9989-02-65-8075.000 4365 MCGHEES MILL RD Residential In Use WILLIAMS IVORY M & FRANCENE P 4365 MCGHEES MILL RD SEMORA NC 480 Gallons/connection 127 9988-02-55-0172.000 1163 CONCORD CEFFO RD Residential In Use HODGKINS JOHN L & SONIA E 302 PRINCESS ANN CIR ELIZABETH NC 480 Gallons/connection c 128 9988-02-56-1953.000 2809 MCGHEES MILL RD N/A Empty Lot OAKLEY CHARLIE M JR & KELLIE M 366 ARCHIE CLAYTON RD ROXBORO NC - Appendix C.1: Roxboro Station Schedule - Municipal Potable Water Option www.dewberry.com ID Task Name Start Finish 1 Roxboro DEQ Report Submittal & Approval Municipality/County Negotiation & Agreement Municipality/County Design Agreement Period Municipality/County System Design (assuming NTP within 30 days of agreement) Field Work/Survey 30% Design Development Development of 30% Construction Documents Review of 30% Design 30% Design Review Meeting 60% Design Development Development of 60% Construction Documents Review of 60% Design 60% Design Review Meeting Final Design Development Development of 100% Construction Documents Review of 100% Design 100% Design Review Meeting Easement Development Deed Research Develop Plats Easement Acquisition Permitting NCDEQ Water Quality Certification Pre Construction Notification NCDEQ Erosion and Sedimentation Control Permit NCDOT Right -of -Way Encroachment Permit (State and District) NCDEQ Water Supply Permit Advertise, Bidding & Contracting NTP Construction of Water Main & Services Substantial Completion, System Testing, & Certification project Completion Thu 12/15/16 Mon 11/14/16 Mon 11/14/16 Mon 2/20/17 Mon 2/20/17 Fri 4/21/17 Fri 4/21/17 Tue 6/27/17 Fri 7/21/17 Mon 7/24/17 Mon 7/24/17 Tue 9/12/17 Fri 10/6/17 Mon 10/9/17 Mon 10/9/17 Tue 11/28/17 Fri 12/22/17 Mon 7/24/17 Mon 7/24/17 Mon 10/9/17 Tue 10/24/17 Mon 12/25/17 Mon 12/25/17 Mon 12/25/17 Mon 12/25/17 Mon 12/25/17 Mon 4/9/18 Mon 7/9/18 Tue 7/10/18 Wed 7/10/19 Mon 9/9/19 Fri 1/13/17 Fri 2/10/17 Fri 2/10/17 Fri 12/22/17 Thu 4/20/17 Fri 7/21/17 Mon 6/26/17 Fri 7/21/17 Fri 7/21/17 Fri 10/6/17 Mon 9/11/17 Fri 10/6/17 Fri 10/6/17 Fri 12/22/17 Mon 11/27/17 Fri 12/22/17 Fri 12/22/17 Fri 11/10/17 Fri 8/11/17 Mon 10/23/17 Fri 11/10/17 Fri 4/6/18 Tue 1/23/18 Fri 2/23/18 Fri 3/16/18 Fri 4/6/18 Mon 7/9/18 Mon 7/9/18 Tue 7/9/19 Mon 9/9/19 Mon 9/9/19 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Project: Roxboro Steam Station Manual Summary Rollup zuartd 1st, Quarte 2ndL 'Quart 3rd Quart 4th Quarto o Dec, Jan Feb Ma�A�rMa%Jun JuI�Au�Seloctko�De, I J 1 2nd Quartd 3 7/9 9/9 Roxboro Steam Station Potable Water Proposed Schedule Appendix C.2: Roxboro Station Schedule - Community Water Well System Option www.dewberry.com Task Name Start (Finish 1 Roxboro DEQ Report Submittal & Approval Thu 12/15/16 Fri 1/13/17 2 Private Water Negotiation & Agreement Mon 11/14/16 Fri 2/10/17 3 Private Water Design -Build Agreement Period Mon 11/14/16 Fri 2/10/17 4 Private Water System Design -Build (assuming NTP within 30 days of Mon 2/20/17 Thu 9/7/17 agreement) 5 Field Work/Survey (including well house boundary & plats) Mon 2/20/17 Wed 4/5/17 6 Test well installation, pumping test, and water quality analysis Mon 2/20/17 Wed 4/5/17 7 30% Design Development Mon 2/20/17 Mon 5/15/17 8 Development of 30% Construction Documents Mon 2/20/17 Thu 4/20/17 9 Review of 30% Design Mon 5/1/17 Mon 5/15/17 10 30% Design Review Meeting Mon 5/15/17 Mon 5/15/17 11 Final Design Development Tue 5/16/17 Thu 9/7/17 12 Development of 100% Construction Documents Tue 5/16/17 Wed 8/23/17 13 Review of 100% Design Thu 8/24/17 Thu 9/7/17 14 100% Design Review Meeting Thu 9/7/17 Thu 9/7/17 15 Easement Development & Platting Tue 5/16/17 Thu 9/7/17 16 Deed Research Tue 5/16/17 Mon 6/5/17 17 Develop Plats Wed 7/12/17 Wed 7/26/17 18 Easement Acquisition Mon 8/21/17 Thu 9/7/17 19 Permitting Tue 6/6/17 Mon 12/18/17 20 NCDEQ Erosion and Sedimentation Control Permit Tue 6/6/17 Mon 8/7/17 21 NCDOT Right -of -Way Encroachment & Drive -way Permit (State and District) Tue 6/6/17 Mon 9/4/17 NCDEQ Water Supply Permit (includes wells) Fri 9/8/17 Mon 12/18/17 22 23 Construction of Wells and Water Main & Services Tue 8/8/17 Tue 7/10/18 24 Substantial Completion, System Testing, & Certification Wed 7/11/18 Fri 8/10/18 25 Project Completion Fri 8/10/18 Fri 8/10/18 Project: Roxboro Steam Manual Summary Rollup Station 4th Quarter I 1st Qt OctINovIDecl Jan R 2nd, Quarter 13rd ,Quarter 14th ,Quarter 11st 3rd Quarter 14th 8/10 Roxboro Steam Station Community Well System Proposed Schedule Appendix D.1: Roxboro Station Opinion of Probable Cost - Municipal Potable Water Option www.dewberry.com FINAL Opinion of Probable Cost Roxboro Potable Steam Station Potable Water Connection Item I Material Unit QQt y Unit Cost Extended Cost Main 1 8-inch DI Pipe LF 54,200 $ 19.00 $ 1,029,800 2 8-inch Tee EA 6 $ 850 $ 5,100 3 8-inch Gate Valve w/Box (assume three at every tee and one per 5,000 LF) EA 29 $ 750 $ 21,800 4 Misc Fittings (Assume 2 fittings per appurtenance plus 1 fitting per 1000 LF pipe times 80# per fitting) LB 9,000 $ 4.00 $ 36,000 5 Automatic Flushing Devices EA 7 $ 8,000 $ 56,000 6 Fire Hydrant EA 100 $ 6,000 $ 600,000 7 1-inch Air Release Valve and Manhole (at highpoints in main) EA 1 $ 2,200 $ 2,200 Subtotal Materials/Equipment: $ 1,750,900 Installation (% of Material/Equipment): 30% $ 525,300 8 Clearing & Grubbing LF 54,200 $ 3.50 $ 189,700 9 Excavation and Backfilling for Trench LF 54,200 $ 18.00 $ 975,600 10 Pipe Bedding Material (#67 Stone - assumed for 25% of pipe) CY 1,260 $ 35.00 $ 44,100 11 Rock Excavation CY 5,020 $ 200.00 $ 1,004,000 12 Wetlands Horizontal Drilling LF 800 $ 200.00 $ 160,000 13 Railroad Crossing (Casing, Piping, Spiders and Installation) EA 0 $ 50,000 $ - 14 Rural Road Crossing for Main (Casing, Piping, Spiders and Installation) EA 12 $ 20,000 $ 240,000 15 Erosion Control Measures (Silt Fence/Check Dams based on feet of pipe) LF 54,200 $ 4.50 $ 243,900 16 Testing, Disinfection, Clean Up, Seed and Mulch (Assume: 25-ft impacted area) LF 54,200 $ 8.50 $ 460,700 17 Connection to Existing Waterline EA 1 $ 5,000 $ 5,000 18 Traffic Control LS 1 $ 15,000 $ 15,000 19 Elevated tank LS 1 $ 400,000 $ 400,000 Services Connections/Lines 20 2-inch PVC Pipe LF 5590 $ 4.75 $ 26,600 21 3/4-inch PVC Pipe LF 11,720 $ 3.00 $ 35,200 22 Misc Fittings for Service Connections (valves, fittings, etc.) EA 82 $ 300 $ 24,600 Subtotal Materials/Equipment: $ 86,400 Installation (% of Material/Equipment): 30% $ 26,000 23 2-inch Services Taps, Meters, Meter Boxes and Misc. Connections to Main Line EA 6 $ 6,000 $ 36,000 24 3/4-inch Services Taps, Meters, Meter Boxes and Misc. Connections to Main Line EA 76 $ 3,000 $ 228,000 25 Road Crossing for Services - (Jetting/bore, Casing, and Installation) EA 31 $ 1,500 $ 46,500 26 Excavation and Backfilling for Service Trench LF 17,400 $ 10.00 $ 174,000 27 Flush, Clean Up, Seed and Mulch (Assume: 5-ft impacted area) LF 17,400 $ 4.00 $ 69,600 SUBTOTAL $ 6,681,000 Sub -Total FOB Allowance (% of Material/Equipment): 2% $ 37,000 Renovation Allowance (% of Material/Equipment): 5% $ 92,000 Sub -Total $ 6,810,000 Contractor Overhead and Profit: 15% $ 1,022,000 Contractor General Conditions: MONTH 14 $ 20,000 $ 280,000 Sub -Total: $ 8,112,000 Contingency: 25% $ 2,028,000 Sub -Total: $ 10,140,000 Design, Bid Phase, and Construction Phase Engineering Services 8% $ 812,000 Easements Acquistion (Permanent) $ 20,000.00 $ 20,000 TOTAL ESTIMATED CAPITAL COST: $ 10,980,000 Notes: 1.) Renovation Allowance to account for private property refurbishment (signs, fences, etc.) 2.) Number of Service Taps taken from field evaluation and property records. 3.) Permanent Easement Acquisition based on 50% of average area property tax value 4.) Temporary easements are not included in this estimate. 5.) Opinion of Probable Cost; cost may vary depending upon escalation at time of construction. 6.) Piping footage may change with final design. 11/18/2016 FINAL Dewberry Appendix D.2: Roxboro Station Opinion of Probable Cost - Community Water Well System Option www.dewberry.com FINAL Opinion of Probable Cost Roxboro Steam Station Community Well System Item Material Unit -0-t( Unit Cost Extended Cost Main 1 6-inch PVC Pipe LF 25,100 $ 7.00 $ 175,700 2 6-inch Tee EA 6 $ 850 $ 5,100 3 6-inch Gate Valve w/Box (assume three at every tee and one per 5,000 LF) EA 24 $ 750 $ 18,000 4 Misc Fittings (Assume 2 fittings per appurtenance plus 1 fitting per 1000 LF pipe times 80# per fitting) LB 5,900 $ 4.00 $ 23,600 5 Automatic Flushing Devices EA 7 $ 8,000 $ 56,000 6 Fire Hydrant EA 0 $ 6,000 $ - 7 1-inch Air Release Valve and Manhole (at highpoints in main) EA 1 $ 2,200 $ 2,200 Subtotal Materials/Equipment: $ 280,600 Installation (% of Material/Equipment): 30% $ 84,200 8 Clearing & Grubbing LF 25,100 $ 3.50 $ 87,900 9 Excavation and Backfilling for Trench LF 25,100 $ 18.00 $ 451,800 10 Pipe Bedding Material (#67 Stone - assumed for 25% of pipe) CY 581 $ 35.00 $ 20,400 11 Rock Excavation CY 2,324 $ 200.00 $ 464,900 12 Railroad Crossing (Casing, Piping, Spiders and Installation) EA 0 $ 50,000 $ - 13 Rural Road Crossing for Main (Casing, Piping, Spiders and Installation) EA 5 $ 20,000 $ 100,000 14 Erosion Control Measures (Silt Fence/Check Dams based on feet of pipe) LF 25,100 $ 4.50 $ 113,000 15 Testing, Disinfection, Clean Up, Seed and Mulch (Assume: 25-ft impacted area) LF 25,100 $ 8.50 $ 213,400 16 Connection to Existing Waterline EA 0 $ 5,000 $ - 17 Traffic Control LS 1 $ 15,000 $ 15,000 18 Clearing & Grubbing for Well/Treatment House AC 1 $ 7,300 $ 7,300 19 Fine Grading for Well/Treatment House SY 5,000 $ 1.22 $ 6,100 20 Fe & Mn treatment system LS 1 $ 200,000 $ 200,000 21 Well/Treatment House LS 1 $ 65,000 $ 65,000 22 Well Pumps LS 4 $ 7,500 $ 30,000 23 Well Drilling LS 4 $ 7,500 $ 30,000 24 Hydropneumatic Tank (12,000 gallons) LS 1 $ 90,000 $ 90,000 25 Road Access Grading (12' wide, 1,500' long) SY 2,000 $ 2 $ 4,020 26 Road Access Gravel (12' wide, 1,500' long) SY 2,000 $ 9 $ 17,500 27 Electrical Allowance LS 1 $ 50,000 $ 50,000 Services Connections/Lines 28 2-inch PVC Pipe LF 5590 $ 4.75 $ 26,600 29 3/4-inch PVC Pipe LF 11,720 $ 3.00 $ 35,200 30 Misc Fittings for Service Connections (valves, fittings, etc.) EA 82 $ 300 $ 24,600 Subtotal Materials/Equipment: $ 86,400 Installation (% of Material/Equipment): 30% $ 26,000 31 2-inch Services Taps, Meters, Meter Boxes and Misc. Connections to Main Line EA 6 $ 6,000 $ 36,000 32 3/4-inch Services Taps, Meters, Meter Boxes and Misc. Connections to Main Line EA 76 $ 3,000 $ 228,000 33 Road Crossing for Services - (Jetting/bore, Casing, and Installation) EA 31 $ 1,500 $ 46,500 34 Excavation and Backfilling for Service Trench LF 17,400 $ 10.00 $ 174,000 35 Flush, Clean Up, Seed and Mulch (Assume: 5-ft impacted area) LF 17,400 $ 4.00 $ 69,600 SUBTOTAL $ 2,998,000 Sub -Total FOB Allowance (% of Material/Equipment): 2% $ 8,000 Renovation Allowance (% of Material/Equipment): 5% $ 19,000 Sub -Total $ 3,025,000 Contractor Overhead and Profit: 15% $ 454,000 Contractor General Conditions: MONTH 12 $ 20,000 $ 240,000 Sub -Total: $ 3,719,000 Contingency: 25% $ 930,000 Sub -Total: $ 4,649,000 Design, Bid Phase, and Construction Phase Engineering Services 10% $ 465,000 Easements Acquistion (Permanent) $ 20,000.00 $ 20,000 TOTAL ESTIMATED CAPITAL COST: $ 5,140,000 Notes: 1.) Renovation Allowance to account for private property refurbishment (signs, fences, etc.) 2.) Number of Service Taps taken from field evaluation and property records. 3.) Permanent Easement Acquisition based on 50% of average area property tax value 4.) Temporary easements are not included in this estimate. 5.) No significant water crossings, wetlands, or other abnormal working environment included. 6.) Opinion of Probable Cost; cost may vary depending upon escalation at time of construction. 7.) Piping footage may change with final design. 8.) Access road/site improvement estimates may change with location change. 11/18/2016 FINAL 9 Dawbeny Appendix E: Community Well Water System: Basis of Design and Block Flow Diagram www.dewberry.com TO DISPOSAL TO DISTRIBUTION SYSTEM WELLS WITH PUMPS WELL WATER FILTRATION SYSTEM DETAIL N.T.S. PRELIMINARY NOT FOR CONSTRUCTION ® DATE TITLE WELL WATER SHEET NO. ew erry 09/23/16 FILTRATION SYSTEM DETAIL $' Dewberry Engineers Inc. PROJ. NO. PROJECT ROXBORO COMMUNITY WELL 2610 WYCLIFF ROAD SUITE 410 SUIT RHONE'HONEH,NC 27807 : 1.9A39 50081775 CONCEPTUAL DESIGN FAX: 919.881.9923 Dewberry MEMORANDUM Date: October 10, 2016 To: Jessica Bednarcik, Ryan Czop; Duke Energy From: Dan Wilkinson, Ryan Ames, Larry Mitchell; Dewberry Subject: Phase 2 Roxboro Community Well Water Quality Basis of Design Message: Dewberry Engineers Inc. (Dewberry) has performed a preliminary screening level evaluation of the technical feasibility to supply potable water to residents within one-half mile of the compliance boundary at the Roxboro Steam Station. The households within one-half mile of the compliance boundary at the Roxboro Steam Station are approximately 12 miles from the closest municipal water supply connection. Due to the length of potable water service pipeline that would be required, a community water system is being evaluated as an alternative to a municipal potable water connection. As an initial step in this evaluation, Dewberry has reviewed existing groundwater quality data and compared it to the North Carolina Rules Governing Public Water Systems for a community water system to project the water treatment requirements. This memorandum summarizes findings of the initial evaluation. Figure 1 shows the proposed well location for the new community water system. Groundwater data at this location is not available at this time, therefore the well data around the Roxboro Steam Station collected from "Original Data -Duke Request" spreadsheet dated March 15, 2016 was used as a representation of nearby groundwater quality. Dewberry calculated average, maximum, and standard deviation values for the 39 parameters in this data set. For data points with values below the detection limit, Dewberry used EPA's guideline on taking half the value for calculation purposes. The average and maximum values were used as the raw well water quality basis of design. The finished water quality requirements for a community water system were obtained from the North Carolina Administrative Code (NCAC) in Title 15A: 18C .1500 where contaminant levels are derived from EPA's Primary and Secondary Drinking Water Regulations. These regulations establish levels for the following inorganic contaminants in water supplied by a public water system: fluoride, asbestos, barium, cadmium, chromium, mercury, nitrate, nitrite, total nitrate & nitrite, selenium, antimony, beryllium, cyanide (as free cyanide), thallium, arsenic, lead, copper, iron, and manganese. The levels for lead and copper are based on the "Lead and Copper Rule" and are established as action levels (AL) or Maximum Contaminant Level Goals (MCLG) and are discussed in 40 CFR Paragraphs 141.80 through 141.91, which are adopted by reference into NCAC Title 15A: 18C .1507. The levels for iron and manganese are established as water quality requirements by NCAC Title 15A: 18C .1511 and .1512. The levels for other inorganic contaminants are established by NCAC Title 15A: 18C .1510 and summarized in a table in that section. These levels served as the finished water basis of design. The groundwater quality data was compared to the water quality requirements to determine whether additional treatment of the groundwater would be required. The results of this comparison are summarized in Table 1- Roxboro Community Well Water Quality Basis of Design, which provides water quality data for 20 water supply wells within the'/2 mile compliance buffer. Of the 39 parameters for which Memorandum 11 of 2 Dewberry MEMORANDUM there is data, three parameters have maximum concentrations above the community water system levels: iron, lead, and manganese. Three samples (15%) for iron, one sample (5%) for lead, and six samples (32%) for manganese are above the standards for community water systems. Manganese is the only parameter for which the average concentration is above the standard for a community water system. The "Original Data -Duke Request' spreadsheet dated March 15, 2016 does not contain data for the following inorganic parameters that have maximum contaminant levels (MCL) established by NCAC 15A: 18C .1500: asbestos, cyanide, fluoride, nitrate, and nitrite. In addition, the data set does not include data for regulated organic contaminants, microbiological contaminants, radioactive contaminants, or disinfection by products. The ground water data from the current analysis indicates that a community water system would need to include treatment for iron, manganese and lead to comply with Rules Governing Public Water Systems. Chemical dosing for disinfection would also be required for the water system. Since ground water data are not available at the preliminary well site location the actual treatment requirements are not presently known. To determine the treatment requirements a test well can be installed in the vicinity of the proposed community wells and samples can be collected and analyzed to characterize the ground water quality and verify the treatment requirements. This is typically performed prior to detail design. For the purpose of this evaluation, we recommend including treatment for iron and manganese removal, and for disinfection. Based on ground water quality of the 20 wells within the compliance buffer and ground water quality in the Person County area, there is a significant probability that iron and manganese removal will be required. The probability that lead removal will be required is less certain. Of the 20 wells within the compliance buffer 19 have lead concentrations of 2.4 pg/I or less, which is well below the MCL of 15 pg/I. One well (R08) has a lead concentration of 40.3 pg/l. Well R08 also has very high concentrations for calcium, magnesium, potassium, and sodium compared to the 19 other wells. Since R08 has ground water quality that is not representative of the other 19 wells, we recommend that treatment for lead not be included in this preliminary evaluation. Memorandum 12 of 2 - Shore Rd le moo r` f i Coro Steam Station �°�' f ar Y -o 77 ., . _ = s �� -e � ` w' s �o 2 � C���o J GO\\ . 1 4 , November 18, 2016 sups; Dewberry - Duke Energy Dewberry Proj. No. 50081775 Potable Water Site Evaluation Roxboro Steam Station Figure 1 Legend Proposed Water Supply Well County Boundary Compliance Boundary 1/2 Mile Buffer Compliance Boundary Wetlands + Duke Energy Plant Railway State Route Stream/Lake N 1 in = 2,000 feet 0 2,000 4,000 Feet Table 1 - Roxboro Communitv Well Water Oualitv Basis of Desian Total Total Total Specific p Dissolved Oxidation - Aluminum Antimony Arsenic Barium Beryllium Boron Cadmium Calcium Chromium Cobalt Copper Lead Magnesium Manganese Mercury Molybdenum Nickel Potassium Selenium Sodium Strontium Thallium Vanadium Zinc Chloride Sulfate Bicarbonate Carbonate Dissolved Suspended Turbidity Temperature Reduction (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (ug/L) (mg/L) Iron Iron (ug/L) Chromium (ug/L) (ug/L ) u (g2) (ug/L) ( (ug/L) (ug/L ) (ug/L ) (ug/L) (ug/L) (ug/L ) (ug/L ) (ug/L ) m L ( 8/) (mg/L) 8 ) m (mg/L) Alkalinity (mg/L) (mg/L) Solids Solids (N ) PH (so) (�� Conductance Oxygen Potential (ug/L) (mg/L) (m (m (umhos/cm) (mg/L) (mV) Average 20.4 1.24 1.21 78.7 0.60 21.5 0.20 62,870 2.46 1,66 0.02 231.44 1.45 3.20 25,035 177 0.12 2.56 1.87 3,782 1.21 46,020 297 0.35 5.43 0.04 66.7 37.4 214 200 2.25 386 2.01 1.77 6.62 19.0 471 3.19 166 Raw Water Max 155 5.00 5.00 300 2.50 86.0 0.50 150,000 6.20 5.00 0.09 1,280 10.0 40.3 61,200 1,010 0.25 5.90 5.00 6,800 2.50 370,000 936 1.00 16.1 0.24 335 77.6 376 317 2.50 999 7.80 8.90 7.20 23.6 799 5.40 259 6TD6V 34.8 L36 1.36 68.5 0.70 23.9 0.20 37,316 2.02 1.93 0.02 377.61 2.62 8.77 14,890 316 0.06 2.03 1.78 1,896 1.08 77,568 203 0.38 3.73 0.05 88.5 23.1 80.4 75.3 0.68 186 1.83 2.79 0.37 3.42 216 1.55 83.4 Results Sample# 20 20 20 20 20 20 20 20 20 20 20 20 16 20 20 19 20 20 20 20 20 20 20 20 20 20 20 20 20 16 16 17 16 17 20 17 17 16 14 # Under Detection 1 18 1 20 19 1 2 1 20 1 17 1 19 1 1 1 13 1 19 1 7 13 1 5 1 5 1 1 5 20 1 11 1 13 1 1 1 17 1 0 1 1 1 20 1 8 1 5 0 1 0 1 0 1 0 1 16 1 0 1 14 12 1 0 1 0 1 0 1 0 NCAC 15A: Result 6 10 2000 4 5 100 1.3 300 15 2 50 2 6.5 - 8.0 18Clords No No No No No No Standard No Standard No No No No No No No No No No StandardStandard No No No No No StandardStandard No IN. Standard MCL MCL MCL MCL MCL MCL MCL SMCL MCL SMCL MCL MCL MCL SMCL Standards Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standard Standazd Standard Standard S Notes 1. Raw Water Results provided by Duke Energy spreadsheet titled'Original Data - Duke Request 3-15-16'. 2. The following inorganic parameters were not measured: asbestos, bromate, chloramines, chlorine, chlorine dioxide, chlorite, cyanide, fluoride, nitrate, .& nitrite. 3. Standards determined from DENR's Public Water Supply Section (15A: 18C .1500): MCL (Federal Maximum Contaminant Level), SMCL (Federal Secondary Maximum Contaminant Level) Average concentration greater that the regulatory standard Maximum concentration greater that the regulatory standard Well Data Well Owner ID Aluminum Aluminum (ug/L) Antimony (ug/L) Arsenic (ug/L) Barium (ug/L) Beryllium (ug/L) Boron (ug/L) Cadmium (ug/L) Calcium (ug/L) Chromium (ug/L) Cobalt (ug/L) Copper (mg/L) Iron (ug/L) Chromium (ug/L) Lead (ug/L) Magnesium (ug/L) Manganese (ug/L) Mercury (ug/L) Molybdenum (ug/L) Nickel (ug/L) Potassium (ug/L) Selenium (ug/L) Sodium (ug/L) Strontium (ug/L) Thallium (ug/L) Vanadium (ug/L) Zinc (mg/L) Chloride (mg/L) Sulfate (mg/L) 'total ' -9/L) (mg/L) Bicarbonate (mg/L) Carbonate (mg/L) Total Dissolved Solids (mg/L) Total Suspended Solids (mg/L) Turbidity (NTU) PH (au) Temperature („C) Specific P Conductance (umhos/cm) Dissolved Oxygen (mom) Oxidation - Reduction Potential (mV) ROl < 50 13 < 10 3.62 J < 1 < 100 < I 75400 < 10 <5 < 0.01 <50 <20 1.73 J 32900 8.29 J <0.2 110 < 10 1620 2.39 J 22900 390 < I 2.84 J 0.0147 39.4 51 274 274 < 1 405 < 5 < 1 6.91 16.3 505 4.01 NA ROI <50 <10 <2 <10 <5 <50 <0.5 83000 <10 <10 <0.002 <50 NA <2 34000 <10 <0.2 <10 <2 1800 <5 25000 410 <2 125. 0.014 41 51 250 250 <1 404 NA <1 6.29 16.6 114 NA NA R02 < 100 D3 < 5 D3 < 5 D3 64.4 < 2 D3 < 50 D3 < 0.8 D3 50700 <5 D3 < 5 D3 0.0391 < 500 D3 0.1 I Ml 1.8 25100 < 5 D3 <0.2 < 5 D3 < 5 D3 3500 < 5 D3 34000 191 < I D3 I < 10 D3 0.0874 24 71 1 204 204 < 5 383 5.1 < 1 6.63 17.2 640 5.1 259.3 R03 <50 < I < 1 65 < 1 86 J 0.072 J 63000 <I < 1 0.0061 <50 < 10 0.19 J 25000 <5 <.0.2 2.5 0.54 J 5100 < 1 34000 180 < 1 2 J 0.016 47 71 190 190 <5 410 <3.3 0.15 J 6.3 15.4 542 5.4 160 R03R <10 10.5 10.5 79.1 10.2 8.7 <0.08 66200 <0.5 10.5 0.0228 <50 0.17 0.44 26200 <0.5 <0.2 0.96 1.3 5260 <0.5 32300 206 <0.1 2.8 0.0452 46.8 77.6 203 203 <5 465 <2.5 <1 6.34 20.2 692 2.95 181.5 R04 < IO J <0.4 J 0.2 J 66.1 <0.11 J <20 J <0.06 J 47800 2.69 0.25 J 0.00227 228 2.69 0.43 J 10800 144 <0,01 J 0.38 J 1.35 2750 0.511 16400 260 <0.06 J 1.38. 0,0196 17 7 164 - NA NA 267 <2.5 < 1 6.77 12.9 400 4.72 NA R07 <10 <0.5 <0.5 67.8 <0.2 15 <0.08 30000 6.2 <0.5 0.0101 53.8 0.57 0.25 10700 29.4 <0.2 <0.5 1.9 1960 <0.5 16300 268 <0.1 5.9 0.0407 19.4 7.1 ill Ill <5 200 <2.5 <1 6.18 22.3 260.5 4.12 180.5 R08 <10 <0.5 <0.5 51 <0.2 <5 <0.08 59700 M1 <0.5 <0.5 0.0254 <50 0.19 40.3 22400 MI 1.9 <0.2 0.74 <0.5 4310 MI <0.5 18400 M1 211 <0.1 4.5 0.0409 44.2 29.2 178 MI 178 <5 366 <2.5 <1 6.69 13.2 594.2 2.2 257.7 R08R <10 <0.5. <0.5. 54.3 <0.2 <5 <0.08 54000 0.6 <0.5. 0.0189 <50 0.28 2.4 22300 1.6 <0.2 0.76 <0.5 4200 <0.5 19600 237 <0.1 5.2 0.0414 42.5 29.3 162 162 <5 351 <2.5 <1 6.45 21.6 536 3.3 164.7 R010 <100 D3 <5 D3 <5 D3 300 <2 D3 <50 D3 <0.8 D3 145000 <5 D3 <5 D3 <0.01133 <500133 0.062 <I D3 61200 1010 <0.2 <5 D3 <5D3 6460 <5 D3 59800 936 <I D3 <10133 <0.05D3 335 17.3 259 259 <5 999 <2.5 1.5 6.48 21.8 184.2 3.8 205.3 RO10 155 <5 D3 <5 D3 119 <2 D3 <50 D3 <0.8 D3 66600 <5 D3 <5 D3 <0.01 D3 1280 <0.03 1.7 21900 358 <0.2 <5 D3 <5 D3 4270 <5 D3 25500 263 <1 D3 <1OD3 <0.05 D3 30.3 27 214 214 <5 369 7.8 6.2 6.65 19.2 631 0.61 219.2 ROI OR < 10 < 5 < 5 200 < 3 < 100 <y 150000 <10 < 10 < 0.05 200 NA < 5 50000 360 <0.5 <10 110 6800 < 5 44000 705 < 2 < 10 < 0.05 230 26 268 NA NA NA NA NA 7.2 NA NA NA NA ROI OR < 10 <5 <:5 100 <3 < 100 < 1 83000 < 10 < 10 < 0.05 140 NA 15 26000 920 < 0.5 < 10 < 10 4390 < 5 32000 331 < 2 < 10 < 0.05 37 36 271 NA NA NA NA NA 7.1 NA NA NA NA ROTOR <10 <5 <5 <100 <3 <100 <I <1000 <10 <10 <0.05 <100 NA <5 <1000 <30 <0.5 <10 <10 <1000 <5 370000 <50 <2 <10 <0.05 230 24 376 NA NA NA NA NA 7.1 NA NA NA NA ROIL <10 <0.5 <0.5 125 <0.2 <5 <0.08 43800 1.7 <0.5 0.0195 <50 1.2 2.3 25700 15 <0.2 2 0.56 3540 <0.5 25300 236 <0.1 10.6 0.0363 31-2 31l 196 196 <5 326 <2.5 <1 6.4 22.7 470.1 3.42 172.4 R012 <10 <0.5 <0.5 67.1 <0.2 6.1 <0.08 84200 <0.5 <0.5 0.0013 1100 <0.03 0.24 28200 494 <0.2 5.9 <0.5 5900 <0.5 36500 326 <0.1 <1 0.0122 26.7 71.8 286 MI 286 <5 463 <2.5 8.9 6.82 21.3 662 0.89 -20 R013 <10 <0.5 <0.5 30.9 <0.2 <5 <0.08 14700 M1 1.3 <0.5 0.0932 <50 0.92 M6 1.3 5250 M1 3.7 <0.2 <0.5 <0.5 1240 <0.5 9990 M1 166 <0.1 3.1 0.0511 8.4 2.6 63.3 63.3 <5 138 <2.5 <1 5.98 23.1 145.1 5.07 193.3 R014 <10 <0.5 <0.1 48.6 <0.2 <5 <0.08 74000 <0.5 <0.5 0.0076 827 <0.03 0.76 27000 59 <0.2 0.52 <0.5 6640 1.1 16500 244 <0.1 5.6 0.0299 31 52.3 241 241 <5 382 <2.6 7.4 D6 7.07 23.6 647 0.95 -13.8 RO 15 12.7 <0.5 <0.5 59 <0.2 <5 <0.08 50700 1.3 <0.5 0.0134 <50 .83 H3,M 0.64 41300 0.62 <0.2 4.2 0.61 3610 <0.5 64700 190 <0.1 16.1 0.243 44.5 47.1 317 317 <5 456 <2.5 <1 7 18A 799 2.14 176.7 R016 <10 <0.5 <0.5 18.7 <0.2 <5 <0.08 15100 1.4 <0.5 0.0078 <50 1.2 H3 0:56 4240 0.98 <0.2 <0.5 1.4 1780 <0.5 17200 121 <0.1 5.5 0.0289 7.8 19.2 52.2 52.2 <5 175 s2.5 <I 6:05 17:2 188.4 2.4 191 8/30/2016 DRAFT 9 D"Wb&Pr