Loading...
HomeMy WebLinkAbout20020094 Ver 1_COMPLETE FILE_20020117F WATF Q 9 Michael F. Easley \O? QG Governor Cq r William G. Ross, Jr., Secretary Department of Environment and Natural Resources p Gregory J. Thorpe, Ph.D., Acting Director Division of Water Quality March 14, 2002 DWQ Project # 02-0094 Craven County Page 1 of 2 Judith Raburn 3118 South Julia Circle Tampa, Florida 33629 Re: Raburn Property, Hwy 45, V2 mile west of US 264, Ponzer, Hyde Co., NC Man-made Canal, Pungo River [03-03-07, 29-34-(5), SC NSW) APPROVAL of 401 Water Quality Certification and Authorization Certificate per the Tar-Pamlico River Buffer Protection Rules (15A NCAC 2B.0259) with ADDITIONAL CONDITIONS (CAMA) Dear Ms. Raburn, You have our approval, in accordance with the attached conditions and those listed below, to dredge/excavate approximately 903 square feet of wetlands/waters to construct the proposed boat basin as you described within your CAMA application. After reviewing your application, we have decided that this fill is covered by the Division of Water Quality (DWQ) General Water Quality Certification Number 3274. This Certification allows you to use Regional General Permit No. 198000291 when issued by the US Army Corps of Engineers (USAGE). This letter shall also act as your approved Authorization Certificate for impacts to the protected Tar-Pamlico riparian buffers as required under 15A NCAC 2B .0259(8). In addition, you should get any other required federal, state or local permits before you go ahead with your project including (but not limited to) CAMA Major Permit, Coastal Stormwater Permit, and Sediment and Erosion Control Permit. Also, this approval will expire when the accompanying 404 permit expires unless otherwise specified in the General Certification. This approval is only valid for the purpose and design that you described in your application except as modified below. If you change your project, you must notify us and you may be required to send us a new application. If the property is sold, the new owner must be given a copy of this Certification and approval letter and is thereby responsible for complying with all conditions. If total fills for this project (now or in the future) exceed one acre of wetland, compensatory wetland mitigation may be required as described in 15A NCAC 2H .0506 (h). For this approval to be valid, you must follow the conditions listed in the DWQ General Certification No. 3274 and any additional conditions listed below. 1. Within. your pre-construction project area, the 50-foot protected Tar-Pamlico Buffers begin at the CAMA wetlands line or normal water line of any surface water (whichever is more landward). Once work is complete and the "plug" is removed, buffers will apply along the new shoreline (i.e., bulkhead) of the boat basin and the normal waterline on the boat ramp. No new impervious surface (including [but not limited to] concrete, asphalt, gravel, buildings, decking, etc.) shall be added within 50 feet of the new shoreline as described above (except for "exempt' activities identified within 15A NCAC 213 .0259(6)), unless otherwise approved in writing by the DWQ. This area must remain vegetated except for impacts approved within your application and a possible driveway to access the boat ramp. The proposed dwelling must be greater than 50 feet from the new shoreline as described above. 2. Stormwater shall be directed as diffuse flow at non-erosive velocities through the protected stream buffers as identified within 15A NCAC 213 .0259(5). North Carolina Division of Water Quality, 401 Wetlands Certification Unit, 1650 Mail Service Center, Raleigh, NC 27699-1650 (Mailing Address) 2321 Crabtree Blvd., Raleigh, NC 276042260 (Location) 919-733-1786 (phone), 919-733-6893 (fax), http://h2o.enrstate.nc.us/r)cwetiands/ Page 2 of 2 If you do not accept any of the conditions of this certification, you may ask for an adjudicatory hearing. ,You must act within 60 days of the date that you receive this letter. To ask for a hearing, send a written petition, which conforms to Chapter 150B of the North Carolina General Statutes to the Office of Administrative Hearings, 6714 Mail Service Center, Raleigh, NC 27699-6714. This certification and its conditions are final and binding unless you ask for a hearing. This letter completes the review of the Division of Water Quality under Section 401 of the Clean Water Act. If you have any questions, please telephone Mr. Tom Steffens at 252-946-6481 or Mr. Bob Zarzecki at 919-733-9726. Cc Hood Richardson, PA, 110 West Second Street, Washington, NC 27889 Tom Steffens, DWQ Washington Regional Office Raleigh Bland, US Army Corps of Engineers Washington Regulatory Field Office Doug Huggett, DCM Morehead City District, 151-B Hwy. 24, Hestron Plaza II, Morehead City, NC 28557 File Copy Central Files DWQ 020094 Sincerely, r J '► r5 i"` x is - �: ,• N ."`! t ` i . , .,, h dj}rr ''�'r"fY'i.°.::'k, f•�a . .r- s<�'�^s.��;{fir..? 7 --...� ' . �r r w x. F� da J y I'xy,.,� 4 � :s '' e- t 7Jrr y ♦ ; . DWELLING : 1.5r _ o 0 DISPOSAL AREA , 5.1' G� Q• X 1.6' '• " • G�O\) ,o• ��. �2. 5' PSP iti GSC. G � a 5 wo P�G� kp000FO 2.1 NOTE: BULKHEAD ELEVATION NOT TO EXTEND - FR/&cF �" GROUND LEVEL INH MORE THAN 6 N 404 WETLANDS.CHES VE URAL r 404 WETLAND LINT CAMA LINE PILINGS FRSs-+, � s=; • NOTE: (1) TOP OF BULKHE GROUND ELEVATI _ 1 g TO EXTEND N0. ONE FOOT 'ABOVE (2) STABILIZING FILL BULKHEAD IN 4( AREAS NOT TO THAN LOCAL GR Re: WARO Tracking and Tardy Notice, 3/6/02 Subject: Re: WARO Tracking and Tardy Notice, 3/6/02 Date: Wed, 06 Mar 2002 16:51:38 -0500 From: Bob Zarzecki <bob.zarzecki @ncmail.net> Organization: Division of Water Quality; 401 Certification Unit To: deborah. sawyer@ ncmail.net, tom.steffens@ncmail.net CC: Cyndi Karoly <cyndi.karoly@ncmail.net> Deborah and Tom, I'm not comfortable making suggestions on any of these (I already have verbal comments from Deborah on Phil Mitchell's; I would still like a response to my previous email or comments entered into Filemaker). They involve lots of impact, inland marinas or dredge sites. Please provide comments by the end of the week. The Plymouth site hits 60 days on the I Ith! Thanks, Bob Cyndi Karoly wrote: Hi Deborah and Tom. Below is this week's 401 Tracking Notice for the Washington Regional Office. The Central Office has not received your recommendations for these projects as of March 6, 2002. If you have not received any application, please let me know and I will fax it to you. Please take note of the date received in the Central Office and the 60-day clock projection. If we do not have your comments by two weeks before the clock expires, we may have to prepare the 401 without incorporating your comments, in order to avoid waiving the 401. Two weeks from today, the application will be forwarded to the appropriate Central Office staff member (Bob Zarzecki) if we do not have Regional Office comments by then. The CO staff will then consult you if time allows and make a recommendation on the 401 to John Dorney. TRACKING: 401 Applications: DWQ No. Project County Permit Type Received Expires 02-0125 Carolina Coast and Lakes, Pasquotank Co., CAMA 1/28/02 3/28/02 02-134 Wades Point Hunting Campe, Beaufort Co., CAMA 1/29/02 3/29/02 02-0178 Smugglers Cove, Lot 14, Beaufort Co., CAMA 2/4/02 4/4/02 Variance Requests: 02-0173 Phil Mitchell, Beaufort County, received 2/4/02 Please use the staff recommendation sheet in Filemaker Pro, and then notify me that the report has been filed. My e-mail address is Cyndi.Karoly@ncmail.net or you can call me at 919-733-9721. In addition to these projects, there are 3 projects on the attached tardy list. These files have been passed along to Bob Zarzecki. 3/6/02 4:52 PIv ARO Tracking and Tardy Notice, 3/6/02 Thanks very much for your attention. Name: Tardy Projects.doc Tardy Projects.doc Type: Microsoft Word Document (application/msword) Encoding: base64 Download Status: Not downloaded with message Bob Zarzecki NC DENR/DWQ 401 Wetlands Certification Unit 919-733-9726 2 of 2 3/6/ -= ' - 020n94- NCDENR North Carolina Department of Environment and Natural Resources Division of Coastal Management Michael F. Easley, Governor Donna D. Moffitt, Director William G. Ross Jr., Secretary 14 January 2002 MEMORANDUM 3 TO: Mr. John R. Dorney, Environmental Biological Supervisor .??? u Division of Water Quality 20? FROM: Doug Huggett - r Major Permits Processing Coordinator SUBJECT: CAMA/Dredge and Fill Permit Application Review Applicant: Judith Raburn Project Location: Off Hwy 45, 1/2 mile west of US 264 on a man made canal off the Pungo River in Hyde County, near Ponzer, North Carolina Proposed Project: Lengthen existing man made canal, boat basin with slips, finger piers, dock and bulkhead Please indicate below your position or viewpoint on the proposed project and return this form by 3 February 2002 If you have any questions regarding the proposed project, please contact Steve Trowell at 252-946-6481. When appropriate, in-depth comments with supporting data is requested. REPLY This office has no objection to the project as proposed. This office has no comment on the proposed project. This office approves of the proposed project only if the recommended changes are incorporated. See attached. This office objects to the proposed project for reasons described in the attached comments. Signed Date 943 Washington Square Mall, Washington, North Carolina 27889 Phone: 252-946-6481 1 FAX: 252-975-37161 Internet: http://dcm2.enr.state.nc.us An Equal Opportunity 1 Affirmative Action Employer - 50% Recycled 110% Post Consumer Paper 10 DIVISION OF COASTAL MANAGEMENT FIELD INVESTIGATION REPORT 1. APPLICANT'S NAME: Judith Raburn 2. LOCATION OF PROJECT SITE: Off HWY 45,1/2 mile west of US 264 on a man made canal off the Pungo River in Hyde County, near Ponzer, North Carolina. Photo Index - 2000: 122-1450;V-13 1995: 122-1318; T-13 1989: 93-7; J-7 State Plane Coordinates- X: 2,741,425 Y: 676,600 Belhaven Quad. (upper right corner) 3. INVESTIGATION TYPE: CAMA 4. INVESTIGATIVE PROCEDURE: Date of Site Visit -10 October 2001 Was Applicant Present.- No 5. PROCESSING PROCEDURE: Application Received 10 January 2002 Office - Washington 6. SITE DESCRIPTION: (A) Local Land Use Plan - Hyde County Land Classification From LUP - Community (Highground)/Conservation (Water) (B) AEC(s) Involved: PTA, PTS (C) Water Dependent: Yes (D) Intended Use: Private (E) Wastewater Treatment: None Planned - Septic with drain field (F) Type of Structures: Existing - None. : Planned - A new bulkheaded J::40' x ±60' boat basin with three slips, 2 finger piers and a 12'x 36' boat ramp. (G) Estimated Annual Rate of Erosion: Unknown 7. HABITAT DESCRIPTION: [AREA] DREDGED FILLED OTHER (A) Vegetated Wetlands 903 ft2 404 wetlands (B) Non-Vegetated Wetlands canal bottom (C) Other ±3,496 ft2 t l 0,000ft2 Upland (Boat basin) (Spoil disposal) (D) Total Area Disturbed: 14,633 ft2 .34 ac. (E) Primary Nursery Area: No (F) Water Classification: SC NSW Open: No 8. PROJECT SUMMARY: Applicant proposes to lengthen" an existing t 20' wide man made canal ±43' through 404 wetlands to highground then excavate a f 40' x f 60' x -2.5' boat basin with three slips serviced by two 2' x 20' finger piers in the basin as well as a 5' x 55' and a 2' x 32' dock landward of the proposed bulkhead. Both sides of the canal excavated through 404 wetlands will be bulkheaded with the height of the bulkhead flush with the wetland substrate. The entire basin will be bulkheaded. A 12'x 36' boat ramp is also proposed to be located in the basin. Judith Raburn Hyde County Project Setting The project site is located off HWY 45,1/2 mile west of US 264 on a man made canal to the Pungo River located above Leechville near Ponzer in Hyde County, North Carolina. The 13.5 acre tract has a grassed area fronting HWY 45 with the back half wooded to the marsh/upland interface. An upland area in the wooded portion of the tract has been cleared in preparation to construct a residence. A wooded fringe has been left around the cleared area. The highground elevation slopes downward to a 404 wetland fringe before transitioning to marsh vegetated with sawgrass (Cladium jamaicense), black needlerush (Juncus roemerianus)and salt reed grass (S artina cvnosuroides). A 20' wide canal off the Pungo River bisects the marsh and intersects the project site at a point where marsh plant species have been out competed by other wetland shrubs and grasses. This 404 wetland fringe is f 30' wide x f 45' long and is located at the terminus of the canal and transitions on the east and west sides to marsh, and to uplands on the north side in line with the canal and its path to the Pungo River. Water depths in the canal range from 2.0' to 2.5'. The Pungo River is classified as SC NSW by the Environmental Commission. Project Description Applicant proposes to lengthen an existing t 20' wide man made canal ±43' through 404 wetlands to highground then excavate a t 40' x ± 60'x -2.5' boat basin with three slips serviced by two - 2' x 20' finger piers in the basin as well as a 5' x 55' and a 2' x 32' dock :landward of the proposed bulkhead. Both sides of the canal excavated through 404 wetlands will be bulkheaded with the height of the bulkhead flush with the wetland substrate with no backfill. Wooden equipment mats will be used to support the heavy equipment (backhoe) while working in the 404 wetlands. Spoil will be placed in a closed body dump truck and hauled to the upland disposal site. The entire basin will be bulkheaded. A 12'x 36' boat ramp is also proposed to be located in the basin. Spoil material resulting from the excavation is to be stacked on the cleared uplands, allowed to dry then leveled. All excavation is to occur landward of a plug. Once the excavation is complete the plug is to be removed establishing the connection between the basin and the canal to the Pungo River. The final water depth in the basin will be 2.5'. Anticipated Impacts The project as proposed will result in the,excavation of 903 ft2 of 404, wetlands and 3,496 ft2 of uplands. Approximately 10,000 ft2 of uplands will be filled with the excavated material. The project will result in the usage of the canal by boats and impacts associated with boating activity. The project as proposed will provide water access as well as a safe harbor for the mooring of boats. Steve Trowell - Washington Regional Office - 10 January 2002 (252) 975-3472 HOOD RICHARDSON, PA Engineers - Surveyors - Geologists 110 West Second Street Washington, North Carolina 27889 December 31, 2001 Mr. Terry Moore, District Manager Division of Coastal Management Washington Regional Office NC DENR 943 Washington Square Mail Washington, NC 27889 RE: Major Permit Application Judith Raburn Hyde County Dear Mr. Moore: Enclosed are maps and plans for a three-berth boat basin and appurtenances to be constructed near the village of Ponzer, with water access to the Pungo River. One dwelling is proposed for construction on this 13.5-acre tract of land, which has been owned by her family since 1959. These improvements will all be done on high ground after crossing an approximately 900 square foot area of 404 wetland at the head of the gut. There are no areas of CAMA wetlands to be disturbed. I am Very truly rs, ood L. Richardson, PE H LR/sab Enclosure: Check for $400 Application Copy of Deed 18 Maps Copies of Green Card Postal Receipts • Form DCM-NW-1 'APPLICATION (To be completed by all applicants) 1. APPLICANT b. City, town,. community or landmark Near Ponzer, 0.5 miles West of Mt. olive Cnurcn. c. Street address or secondary road number on west side of NC 45, about a. Landowner: Name Judith Raburn Address 3118 South Julia Circle City Tampa State Florida Zip 33629 Day Phone 813-223-3088 pax None b. Authorized Agent: Name Hood Richardson, PA Address 110 West Second Street City Washington, State NC Zip 27889 Day Phone 252-975-3472 Fax 252-975-3751 c. Project name (if any) Judith Rabur.n NOTE.' Pernat will be issued in name of landowrur(s), and/or projed name. 2. LOCATION OF PROPOSED PROJECT a. County Hyde - 1/2 mile west o US 264. d. is proposed work within city limits or planning jurisdiction? Yes X No e. Name of body of water nearest project (e.g. river, creek, sound, bay) Puncfo River 3. DESCRIPTION AND PLANNED USE OF PROPOSED PROJECT a. List all development activities you propose (e.g. building a home, motel, marina, bulkhead, pier, and excavation and/or filling activities. Build home, boat basin, bulkhead, finger piers, and boat ramp. b. Is the proposed activity maintenance of an existing project, new work, or both? New work c. Will the project be for public, private or commercial use? Private. d. Give a brief description of purpose, use, methods of construction and daily operations of proposed project. If more space is needed, please attach additional pages. A boat basin for the protection of boats from wind and water level variations. Construct home and use boat basin for boat- ing. Construction will be by backhoe, end loader, bull dozer, trucks, and dragline. Revised 03/95 4 Form DCM-MP 1 4. LAND AND WATER CHARACTERISTICS a. Size of entire tract 13.5 acres b. Size of individual lot(s) one, one acre lot. c. Approximate elevation of tract above MHW or NWL 5 feet. d. Soil type(s) and texture(s) of tract Sandy loam e. Vegetation on tract Wooded, Oaks and Pines. f. Man-made features now on tract canal to Pungo River. g. What is the CAMA Land Use Plan land classification of the site? (consult the local land use plan.) Conservation Developed Rural Transitional X Community Other h. How is the tract zoned by local government? None. i. Is the proposed project consistent with the applicable zoning? X Yes No (Attach zoning compliance certificate, if applicable) j. Has a professional archaeological assessment been done for the tract? Yes x_ No If yes, by whom? k. Is the project located in a National Registered Historic District or does it involve a National Register listed or eligible property? Yes X No 1. Are there wetlands on the site? X Yes - No Coastal (marsh) Yes Omer 404 wetlands If yes, has a delineation been conducted? Yes . (Attach documentation, if available) m. Describe existing wastewater treatment facilities. None, ground absorption system will be used for the new dwelling. n. Describe location and type of discharges to waters of the state. (For example, surface runoff, sanitary wastewater, industrial/commercial effluent, "wash down" and residential discharges.) surface water from dwelling and lawn. o. Describe existing drinking water supply source. Puhlir- water from Hyde County is available. A well could also be used. 5. ADDITIONAL INFORMATION In addition to the completed application form, the following items must be submitted: • A copy of the deed (with state. application only) or other instrument under which the applicant claims title to the affected properties. If the applicant is not claiming to be the owner of said property, then forward a copy of the deed or other instrument under which the owner clauns title, plus written permission from the owner to carry out the project. • An accurate, dated work plat (including plan view and cross-sectional drawings) drawn to scale in black ink on an 8 1/2" by I white paper. (Refer to Coastal Resources Commission Rule 7J.0203 for a detailed description.) Please note that original drawings are preferred and only high quality copies will be accepted. Blue-line prints or other larger plats are acceptable only if an adequate number of quality copies are provided by applicant. (Contact the U.S. Army Corps of Engineers regarding that agency's use of larger drawings.) A site or location map is a part of plat requirements and it must be sufficiently detailed to guide agency personnel unfamiliar with the area to the Revised 03195 lrorm DCM-MP-1 site. Include highway or secondary road (SR) numbers, landmarks, and the like. • • A Stormwater Certification, if one is necessary. This is a low density pro ect, less th n o acre wi 1 be is rbed. A list of the names an complete a dresses of the adjacent waterfront (riparian) landowners and signed return receipts as proof that such owners have received a' copy of the application and plats by tertified mail. Such landowners must be advised that they have 30 days yin which to submit comments on the proposed project to the Division of Coastal Management. Upon signing this form, the applicant further certifies that such notice has been provided. TO ENTER ON LAND 6. CERTIFICATION AND PERMISSION I understand that any permit issued in response to this application will allow only the development described in the application. The project will be subject to conditions and restrictions contained in the permit. I certify that to the best of my knowledge, the proposed activity complies with the State of North Carolina's approved Coastal Management Program and will be conducted in a manner consistent with such program. Name Terry McCall Address 8 9 38 NC 45 North, Belhaven. NC Phone 252-943-3766_ 27810 Name Melvin Douglas Armstrong Address 8790 NC 45 North, Belhaven, NC Phone 252-943-3240 Name Address Phone • A list of previous state or federal permits issued for work on the project tract. Include permit numbers, peimittee, and issuing dates. None. • A check for $250 made payable to the Department of Environment,' Health, and Natural Resources (DEHNR) to cover the costs of processing the application. • A signed AEC hazard notice for projects in oceanfront and inlet areas. • A statement of compliance with the N.C. Environmental Policy 'Act (N.C.G.S. 113A - 1 to 10) If the project involves the expenditure of public funds or use of public lands,.. attach a statement documenting compliance.with the.North Carolina Environmental Policy Act. I certify that I am authorized to grant, and do in fact, grant permission to representatives of state and federal review agencies to enter on the aforementioned lands in connection with evaluating information related to this permit application and follow-up monitoring of the project. I further certify that the information provided in this application is truthful to the best of my knowledge. 2 coo ? This is the day of e- , Print Name 'J U ? H A R, i? Signature r r Authodl d Agent Please indicate attachments pertaining to your proposed project. - = DCM W-2 Excavation and Fill Information X DCM UP -3 Upland Development X DCM MP-4 Structures Information N1 A DCM MP-5 Bridges and Culverts N /A DCM MP-6 Marina Development NOTE: Please sign and date each attachment in the space provided. at the bottom of each form. Revised 03195 Form DCM-MP-2 EXCAVATION AND FILL (Except bridges and culverts) Attach this form to Joint Application for CAMA Major permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint.Application that relate to this proposed project. Describe below the purpose of proposed excavation or fill activities. All values to be given in feet. 1. EXCAVATION x 1.8(25') x 9/27 = 7.5 cubic yards. a. Amount of material to be excavated from below MHW or NWL in cubic yards 77.5 in the plug b. Type of material to be excavated Loamy Sand Access channel (MLW) or (NWL) Canal Boat basin Boat ramp Rock groin Rock breakwater Other (Excluding shoreline stabilization) c. Does the area to be excavated include coastal wetlands (marsh), submerged aquatic vegetation (SAVs) or other wetlands? - X Yes No See Note (1) d. Highground excavation in cubic yards T7.6 3,496 ftz x 61/27 = 776 2. DISPOSAL OF EXCAVATED MATERIAL a. Location of disposal area on site See ma b. Dimensions of disposal area 100, x 100, c. po you claim title to disposal area? X Yes No if no, attach a letter granting permission from the owner. d. Will a disposal area be available for future maintenance? X Yes No If yes, where? 13 .5 acre site has many high ground places for disposal. Note (1) 43' x 21' (average) 404 wetlands 26' x 9' submerged (plug) Revised 43/95 Average Final Ensft Project Form DCM-M1'-2 e. Does the disposal area include any coastal wetlands (marsh), SAVs or other wetlands? Yes X No . f. Does the disposal include any area in the water? Yes X No 3. SHORELINE STABILIZATION a. Type of shoreline stabilization Bulkhead Riprap b. Length 270 feet c. Average distance waterward of MHW Of NWL New bulkhead in new excavation one foot. d. Maximum distance waterward of MHW or NWL One foot. e. Shoreline erosion during preceding 12 months If yes, (1) Amount of material to be placed in the water N/A (2) Dimensions of fill area N A (3) Purpose of fill N•/ A b. Will fill material be placed in coastal wetlands (marsh), SAVs or other wetlands? _ Yes X No If yes, (1) Dimensions of fill area N/A (2) Purpose of fill N/A 5. GENERAL a. How will excavated or fill material be kept on site and erosion controlled? Fill will be placed behind completed bulkhead. silt fpnng grade and seed all disturbed areas straw bales. (Source ofinformation) Regional average erosion. f. Type of bulkhead or riprap material vinyl or salt treated wood. g. 'Amount of fill in cubic yards to be placed below water level (1) Riprap None (2) Bulkhead backfill 50 270x V x 5/27 = 50 cubic yards h. Type of fill material Loamy sand i. Source of fill material From the boat basin excavation. 4. OTHER FELL ACTIVITIES (Excluding Shoreline Stabilization) a. Will fill material be brought to site? yes X No b. What type of construction equipment will be used (for example, dragline, backhoe, or hydraulic dredge)? trucks. dragline, backhoe, dozer, c. Will wetlands be cr3ssed in transporting equipment to project site? Yes No If yes, explain steps that will be taken to lessen environmental impacts. N/A AppUmnt Project Name PDate Revised 03195 Form DCM-MP 3 UPLAND T D VMEN E EL P (Construction and/or land disturbing activities) Attach this form to Joint Application for CAMA Major Permit, Form DCM-MP-1. Be sure to complete all other sections of the Joint Application that relate to this proposed project. a. Type and number of buildings, facilities, units or structures proposed one dwelling b. Number of lots or parcels one h. Projects that require a CAMA 'Major Development Permit may also require a Stormwater Certification. Has a site development plan been submitted to the Division of Environmental Management for review? Yes X No If yes, date submitted i. Describe proposed method of sewage disposal. On site septic tank and cground absorption. c. Density (give the number of residential units and the units per acre) one dwelling per acre. d. Size of area to be graded, filled or disturbed including roads, ditches, etc. 0.99 acre. e.: If the proposed project will disturb more than one acre of land, the Division of Land Resources must receive an erosion and sedimentation control plan at least 34 days before land disturbing activity begins. If applicable, has a sedimentation and erosion control plan been submitted to the Division of Land Resources? N/A yes N/A No If yes, date submitted N/A f. List the materials (such as marl, paver stone, asphalt, or concrete) to be used for paved surfaces. Marl or granite g. Give the percentage of the tract within 75 feet of MHW or NWL, or within 575 feet in the case of an Outstanding Resource Water, to be covered by impervious and/or built upon surfaces, such as pavement, buildings, rooftops, or to be used for vehicular driveways or parking. None j. Have the facilities described in Item i. above received state or local approval? yes. (Attach appropriate documentation) SEPTIC APPROVAL ATTACHED k. Describe location and type of proposed discharges to waters of the state (for example; surface runoff, sanitary wastewater, industrial/con.,mercial effluent, "wash down" and residential discharges). Surface run-off from dwelling and parking areas. 1. Describe proposed drinking water supply source (e.g. well, community, public system, etc.) Countv water is available, A well may also be used. In. Will water be impounded? Yes X No If yes, how many acres? N/A n. If the project is a oceanfront development, when was the lot(s) platted and recorded? w.4 z, Applicanri jec t Name SignaturDate Revised 03/95 4 IiYDE COUNTY HEALTH DEPARTMENT 1151 Main Street P.O, Box 100 • Swan Quarter, N.C. 27885 Telephone 252/926-3561 DMSION OF ENVIRONMENTAL. HEALTH AUTHORIZATION FOR WASTEWATER SYSTEM CONSTRUCTION n r '?"53rY? Sy`?,' t!x , lY"r ' Installation- A ray ;b !. +gr?i?• ?r? .t. µ.... {( • 4r .!1 v •. 1; •p h Permit 7t i $10. Owner. Judi ` t Address: 3118..Julia 0idie Ta r; .y .. 1 `{r Phone Noy; % ? Property 5 yt?l 1:50 $.4 r. +Y No. of Bedrooms: 3 Business (No. of peopler seatsr etc. System Classification: 11-c, shallow Wastewater Flow: 364 gpd Water Source: community R-.:aja1r: Dat2: AS.ajust 1, 2001 336-29' , ;'COfii[L3Uhit , Linda Mayo Reabb Dinclor HYDE COIJlv3'Y IWALTH I.? 1151 Main Street • P.U. BOX 100 • Swan Quarter, N.C. 27885 Telephone 252/926-3561 IMPROVEMENT PERMIT Permit No: 8101-1 Date: August 1, Permittee: 3udi Raburn Address: 3118 3ulia Circle, Tampa, Fla. 33629 Phone No.: (813) 837-8270 (813) 223-3088 Property Locution: Hwy 401, Ponaer Community Min f Facilities toserved: 3 bedroom house V,5 1 4.. M"• S Water Su 1 4 1n :7"'y?F 5" ti ?j.•.''L' F Y. . •... s r,' s.'t1,4%r ?ti t ar'?" •: 7.191 S S.i:.1,'• . , .. f.,yFf :'hn ?: Wastewater ; ?. a z r Wastewater S m Tjrpe. 91- , shailoi 'placement Wastewater rs em°Re .r 5 ine . Long Term AY'ayX3y'a •x,?rv,"• +7k7+?M^.t:•.ry w ar3 n I`•y 1.11`SRp f n.. ,I :' q, Absorption Area: 450 sq.ft. Septic Tank Capacity: 1000 Aei Pump Tank Capacity: NA Total Bed/Trench Length: 1S Bed/Trench Spacing 9' feet an ce Maximum Bed/Trench Bottom De Linda Mayo Heahb Dtmctor g soil . i IMPROVEMENT PERMIT 7UDI RABURN PAGE 2 CONDITIONS: i. Installation of the wastewater system shall be in strict accordance with the approved site plan and all specifications that are a part of this 2. Place a 60 cap of topsoil over the drainfield to extend 5' past the trenches prior to tapering. Shape to shed surface water and establish a grass cover. Maintain grass height not to exceed 3-V. 3. Use water conserving fixtures i.e.1.6 gallon flush toilets, 2 gpm shower heads, 1 gpm all lavatories. This Improvement Permit shall be valid: For a period of five years upon a showing satisfactory to the Department or the local health department that the site and soil conditions are unaltered, that the facility, design wastewater flow, and wastewater characteristics-are not increased, and that a wastewater system can be installed that meets the permitting requirements in effect on the date this permit was issued. This permit is subject to revocation If site plans or the intended use changes. Authorized Hyde County Health Department Form DCM-MP-4 STRUCTURES (Construction within Public Trust Areas) Attach this form to Joint Application for CAMA Major e. Mooring buoys None Permit, Form' DCM-MP-1. Be sure to complete all (1) Commercial -Community - Private other sections of the Joint Application which relate to (2) Number N/A this proposed,project. (3) Description of buoy (Color, inscription, size, anchor, etc.) d/or Pier(s) k Do (s) an c a. X Private ial Communit r m 1 C y c om e ( ) mber 2 2 N ( ) u (3) Length - 3 2 ' , 551 (4) Width of water body (4) ` Width 2' , 4" - (5) Distance "buoy(s) to be placed beyond (5) Finger Piers X Yes No shoreline (i) Number 2 (ii) Length 23 f. Mooring structure (boadift, mooring pilings, etc.)N/A M Width 21 (1) -Commercial Community _ Private (6) Platform(s) Yes X No (2) Number None (i) Number None (3) Length (ii) Length N/A (4) Width (iii) Width N/A (7) Number of slips proposed 3 g. Other (Give complete dese pr,:; n) of structure to adjacent riparian imit P 8 N /A y rox ( ) lines More than 300' to boundary. e t o r pr y p (9) Width of water body High around boat basin. 12' x -40' be - t ramp, (10) Water depth at waterward end of pier. at 10" concrete, MLW or NWL - 2.5' w b. Boathouse (including covered lifts) None N/A (1) Commercial _ Private (2) Length (3) Width' c. Groin (e.g. wood, sheetpile, etc.) None N/A (1) Number (2) Length(s) d. Breakwater (e.g. wood, sheetpile, etc.) None N/A (1) Length (2) Average distance from MHW, ,NWL or wetlands (3) Maximum distance beyond MHW, NWL or wetlands Revised 03195 Applicant or ject Name signature Date -r it IN REPLY REFER TO Regulatory Division Action ID No. 200210258 Judith Raburn C/O Mr. Hood Richardson, P.A. 110 West Second Street Washington, North Carolina 27889 Dear Mr. Richardson: February 1, 2002 -ry 7 On July 24, 2000, we renewed General Permit No. 198000291 (copy enclosed), which provides Federal authorization for construction activities that receive authorization from the State of North Carolina. A review of your application received January 22, 2002, for Department of the Army (DA) authorization to create a boat basin and construct finger piers, docks; a bulkhead, and a boatramp, on property located off NC Highway 45, adjacent to a.man-made canal to the Pungo River, near Ponzer, in Hyde County, North Carolina, indicates it to be a candidate for Federal authorization under this gene- pernut. Accordingly, the administrative processing of your application will be accomplished by the North. Carolina Division of Coastal Management. Comments from Federal review agencies will be furnished to the State. If your application must be withdrawn from this general permit process for any reason, you will be informed regarding its further management. If there are no unresolved differences in State-Federal positions or policies, the final action taken on your application by the State will result in your receiving written notice from us that your application is consistent with the general permit and you may commence your activity. Only after receiving such confirmation should you begin work. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889-1000 Your application, pursuant to Section 10 of the River and Harbor Act and Section 404 of the Clean Water Act, has been assigned Action ID No. 200210258 and will be coordinated 0, ,. -2- by Mr. Raleigh Bland in our Washington Regulatory Field Office. Mr. Bland is available at telephone (252) 975-1616, extension 23. Sincerely, W-A "-1 Raleigh Bland, P.W.S. Regulatory Project Manager Enclosure Copies Furnished (without enclosure): Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 1638 Mail Service Center Raleigh, North Carolina 27699-1638 ohn Dorney Water Quality Section Division of Environmental Management North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Mr. Garland B. Pardue U. S. Fish and Wildlife Service Fish and Wildlife Enhancement Post Office Box 33726 Raleigh, North Carolina 27636-3726 -3- Mr. Ron Sechler National Marine Fisheries Service Pivers Island Beaufort, North Carolina 28516 Mr. David Rackley NMFS, Habitat Conservation Division 219 Fort Johnson Road Charleston, South Carolina 29412-9110 Mr. Ronald J. Mikulak, Chief Wetlands Regulatory Section Water Management Division U.S. Environmental Protection Agency 61 Forsyth Street, SW Atlanta, Georgia 30303 Mr. Terry Moore, District Manager Washington Regional Office North Carolina Division of Coastal Management 943 Washington Square Mall Washington, North Carolina 27889 f .Iii IN REPLY REFER TO Regulatory Division Action ID No. 200210258 Mr. John Domey Division of Environmental Management North Carolina Department of Environment and Natural Resources 1650 Mail Service Center Raleigh, North Carolina 27699-1650 Dear Mr. Dorney: zjj Please reference the application of Judith Raburn for Department of the Army (DA) authorization and a State Water Quality Certification to create a boat basin and construct finger piers, docks, a bulkhead, and a boatramp, on property located off NC Highway 45, adjacent to a man-made canal to the Pungo River, near Ponzer, in Hyde County, North Carolina. Your receipt of this letter verifies your acceptance of a valid request for certification in accordance with Section 325.2(b)(ii) of our administrative regulations. We are considering authorizing the proposed activity pursuant to Section 404 of the Clean Water Act, and we have determined that a water quality certification is required under the provisions of Section 401 of the same law. A Department of the Army permit will not be granted until the certification has been obtained or waived. In accordance with our administrative regulations, in most cases, 60 days after receipt of a request for certification is a reasonable time for State action. Therefore, if you have not acted on the request, or asked for an extension of time, by April 1, 2002, the District Engineer will deem that waiver has occurred. DEPARTMENT OF THE ARMY WILMINGTON DISTRICT, CORPS OF ENGINEERS Washington Regulatory Field Office P.O. Box 1000 Washington, North Carolina 27889-1000 February 1, 2002 -2- Questions or comments may be addressed to Mr. Raleigh Bland, Washington Regulatory Field Office, Regulatory Division, telephone (252) 975-1616, extension 23. Sincerely, U40U4 Raleigh Bland, P.W.S. Regulatory Project Manager Copies Furnished: Mr. Doug Huggett Division of Coastal Management North Carolina Department of Environment and Natural Resources 1638 Mail Service Center Raleigh, North Carolina 27699-1638 RECOMMENDED CONSTRUCTION IN 404 WETLAND: TOP OF SHEET PILING NOT TO EXTEND (A) DRIVE SHEET PILING, INSTALL DEADMEN, THEN EXCAVATE. MORE THAN 6 INCHES ABOVE NATURAL PROPOSED ALL EQUIPMENT TO TRACK INSIDE AREA TO BE EXCAVATED. GROUND LEVEL. DWELLING (B) NO SPOILS TO BE STACKED OUTSIDE SHEET PILING. 4 z 1.5' 1.5' C NO DISTURBANCE TO CAMA WETLANDS. 0 CAP Y CAP f 4.1 100' DISPOSAL AREA STAINLESSf STEEL ROD /BOTTOM -2.5' p~1 ~p DEADMAN DEADMAN 600 FC 4s\G~~O O a VINYL SHEET p L STAINLESS FFT ' GRG~ tK PILING Z STEEL ROD VINYL SHEET X 1.6' Q ~'VGG~O G Q~~Q X 1.6' PILING G 7/ s CROSS SECTION C-C' 60 tiF ! 0 NO SCALE % ~1 s r o ~,yT pR xl~l Y CAP LAND SURFACE CAP F- 4 -I %EXCAVATE: %3. 3 -11 FILL STAINLESS ' STEEL ROD BOTTOM F ~j R!PARAN OWNER F~ ~/L6' DEADMAN -2 5 FILL DEADMAN VINYL SHEET STAINLESS PILING STEEL ROD MELVIN DOUGLAS ORARMSTRONG w000~0 2.1' X EXTEND VINYL SHEET BELNAVEN, NC 27810 "Y/ At BULKHEAD ELEVATION NOT TO EXTEND A0~ / MORE THAN 6 INCHES ABOVE NATURAL 71 (e" GROUND LEVEL IN 404 WETLANDS. NATURAL PILING JDS. / 1.7' (\C) Ci LAMA MARSH CROSS SECTION A-A' 404 WETLAND LINE ~GPAyO~~ NO SCALE - - o ~Fy A~F ~JG, ~P ~~(E CAMA LINE _ 0~ P~~~~O~P i p cS. ~ OLD PIER V PILINGS Y I All 4.9CAP LAND SURFACE ' - TO PUNGO RIVER CAMP MARSH %``Q' ` m. NOTE: (1) TOP OF BULKHEAD ' GROUND ELEVATIONS BULKHEAD AT ALL EXCAVAT ELEVATIONS BELOW 3.5 FEET y -'.a' TO EXTEND NO MOR END NO MORE THAN STAINLESS FILL - ' ONE FOOT ABOVE L( OT ABOVE LOCAL GRADE. STEEL ROD (2) STABILIZING FILL BE ZING FILL BEHIND -2.5- ' BULKHEAD IN 404 V AD IN 404 WETLAND 'BOTTOM AREAS NOT TO BE h THAN LOCAL GRADE. NOT TO BE HIGHER % OCAL GRADE. DEADMAN VINYL SHEET PILING CROSS SECTION B-B' NO SCALE 4 c LEGEND: -~i CAMA LINE i 404 WETLAND LINE ELEVATION, NCVD 1929 DATUM \ c WATER DEPTH FINISHED GRADE 8" PILING, NEW r . PILING, OLD AMP @e~n ~ '~9°d 5~1117Ib94 NORMAL WATER LEVEL 6 CAP p 3. i QQQf '10 2 TREE INE SEAL 7 43 1 EXCwATE CONCRETE ~~k' ERMIT APPLICATION CO 14~~n~p~~~~ i ; - NOT TO SCALE JUDITH RABURN SITE MOUNT OLM CURRITUCK TOWNSHIP HYDE COU NTY~I CAMA MARSH 2~oy \ / , 264 `"ko NORTH CAROLINA SCALE: 1" = 20' SURVEY DATE: OCTOBER 17, 2001 20 0 20 40 60 SURVEYED BY: HOOD RICHARDSON, P.A. I X11 - $ ENGINEERS-GEOLOGISTS-PLANNERS GRAPHIC SCALE - FEET 1 10 WEST 2ND STREET AREA MAP -A'• , _ J 9 WASHINGTON, N.C. 27889 PHONE: (252) 975-3472 $0 FIFiEtD 01-05-056