HomeMy WebLinkAboutCCB0057SwiftCreek_INSP_20170929FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: Nash Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: CCB0057 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: August 8, 2017 and September 29, 2017 Date of Last Inspection: May 19, 2014 FACILITY NAME AND ADDRESS: Swift Creek CCB Fill Site 8097 North US 301 Battleboro, North Carolina GPS COORDINATES: N: -77.74629 W: 36.08194 FACILITY CONTACT NAME AND PHONE NUMBER: Robert Waldrop, 706-253-1051, BWaldrop@fcsi.biz David Francina 704-331-7543, dave.franchina@klgates.com FACILITY CONTACT ADDRESS: Robert Waldrop President and CEO Full Circle Solutions P.O. 1924 Jasper, GA 30143 Mr. David Francina on behalf of ReUse Technology Inc. and Goldman Sachs K&L Gates Hearst Tower 214 North Tryon Street 47th Floor Charlotte, North Carolina PARTICIPANTS: Shawn McKee, NCDEQ, Solid Waste Section Mary Whaley, NCDEQ, Solid Waste Section Chris Mears, ERM David McKean, Earnhardt Grading STATUS OF PERMIT: Coal Combustion Products Structural Fill pre-15A NCAC 13B .1700 Solid Waste Rules PURPOSE OF SITE VISIT: Partial Inspection and complaint follow-up STATUS OF PAST NOTED VIOLATIONS: None. OBSERVED VIOLATIONS: None FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 3 ADDITIONAL COMMENTS 1. On November 11, 1991 ReUse Technologies submitted to the Solid Waste Section a request to fill part of a 32.72 acre tract parcel ID# 387500004570. 2. On November 4, 2004 the Section was provided with a Closure Notice for the site. 3. Per the Groundwater Corrective Action Plan for the Former Swift Creek Coal Combustion By Product (CCB) Structural Fill, CCB0057 approved by NCDEQ – Division of Waste Management on March 12, 2015, corrective action onsite activities began full time on April 24, 2017. Grading and ash moving were occurring at the site at the time of the site visit. 4. A full history of the site, including the Monthly Project Updates for the Swift Creek Corrective Action Plan Implementation, can be found in the Waste Management Online Documents system at https://deq.nc.gov/about/divisions/waste-management/waste-management-rules-data/e-documents 5. Water trucks are utilized to control road dust, as needed. No windblown dust from onsite activities or roadways was noted during the inspection. Weather conditions were overcast with light rain during the inspection. 6. Completion of the project is expected by mid to late November depending on weather conditions. 7. The final slopes will be 4:1 with storm water breaks every 25 feet. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 Please contact me if you have any questions or concerns regarding this inspection report. ___ Phone: 919-707-8284 _ Environmental Senior Specialist Regional Representative Sent on: November 3, 2017 Email X Hand delivery US Mail Certified No. [ _] Copies: Dave Wasiela, ERM, Dave.Wasiela@erm.com Ellen Lorscheider, Section Chief, Solid Waste Section Ed Mussler, Permitting Branch Head, Solid Waste Section Jason Watkins, Field Operations Branch Head, Solid Waste Section Jackie Drummond, Hydrogeologist, Solid Waste Section Shannon Aufman, Permitting Engineer, Solid Waste Section