Loading...
HomeMy WebLinkAbout43F_WeeksLCIDCell2Certification_DIN25855_20160329.pdf                March 29, 2016 NC Department of Environment and Natural Resources Division of Waste Management - Solid Waste Section Attn: Elizabeth S. Werner 1646 Mail Service Center Raleigh, NC 27699-1646 RE: Cell 2 Certification Weeks LCID Landfill SWS Permit No. 43F (via email and UPS) Draper Aden Associates Project No. R14499N-01G Dear Ms. Werner: On behalf of the Weeks LCID Landfill, the purpose of this letter is to meet the Condition of the Permit to Construct, Item 3.a (page 5 of 9) as included in the Permit to Construct Cell 2 and Operate Cells 1 and 2 as issued on June 2, 2015. Based on our onsite inspections, the operator of this facility has prepared Cell 2 in substantial compliance with the design drawings dated November 6, 2013 by C. T. Clayton, Sr., PE, Inc. (photos attached) In addition, based on our conversations with you, Liz Patters and Drew Hammonds, attached are updated drawings of the facility. In particular, the following updates have been made: 1. Existing topography has been updated within the limits of the landfill per the January 2016 survey. 2. Additional information has been included concerning material storage and processing areas on Sheet 3 of the drawings, with reference made to the approved operational plan. We hope that this information is sufficient to allow for waste disposal within Cell 2. Should you have any questions, concerns, or need additional information, please do not hesitate to contact our office at the numbers below. Sincerely, DRAPER ADEN ASSOCIATES C. Tyrus Clayton, Jr., PE Senior Project Manager attachments (photos and drawings) cc: file Liz Patterson (via email) Weeks LCID (via email) Ms. Elizabeth Werner March 29, 2016 Page 2 of 3 Pictures below are from an onsite inspection on January 28, 2016. Ms. Elizabeth Werner March 29, 2016 Page 3 of 3