Loading...
HomeMy WebLinkAbout7606_GoldHillRdCDLF_Phase2AClosureCoverCertification_ResponsetoComments_DIN28521_201710041 Chao, Ming-tai From:Raup, Michael <Michael.Raup@amecfw.com> Sent:Wednesday, October 04, 2017 3:54 PM To:Chao, Ming-tai; Al Morton Cc:Garrett, David Subject:[External] RE: Gold Hill CDLF Final Cover Certification Report, DIN 28486 Attachments:Final Cover Certification Response to Comments 10-4-17.pdf CAUTION: This email originated from outside of the organization. Do not click links or open attachments unless you verify that the attachment and content are safe. Send all suspicious email as an attachment to report.spam@nc.gov. Mr. Chao, Please find the Final Cover Certification Response to Comments made on 9-21-17. Michael Raup, P.E. Geotechnical Engineer, Amec Foster Wheeler Environment & Infrastructure 4021 Stirrup Creek Drive – Suite 100, Durham, North Carolina 27703, USA T +01 919 381 9343 M +01 423 943 1038 michael.raup@amecfw.com amecfw.com From: Chao, Ming-tai [mailto:ming.chao@ncdenr.gov] Sent: Thursday, September 21, 2017 4:30 PM To: Al Morton <goldhill@embarqmail.com> Cc: Garrett, David <david.garrett2@amecfw.com>; Raup, Michael <Michael.Raup@amecfw.com>; Mussler, Ed <ed.mussler@ncdenr.gov>; Patrone, John <john.patrone@ncdenr.gov>; Aja, Deborah <deborah.aja@ncdenr.gov> Subject: FW: Gold Hill CDLF Final Cover Certification Report, DIN 28486 Dear Mr. Morton: DIN 28486 The Solid Waste Section (the SWS) completes a review of the Final Cover Certification Documentation (the Report) for the Gold Hill Road C&DLF, Permit # 7606-CDLF-2001 (DIN 28479). Based on the narratives and survey as-built in the Report, the acreage of the certified closure is five (5) acres including 2.1-acre closed area according to Rule 15A NCAC 13B .0543 and 2.9-acre closed area according to Rule 15A NCAC 13B .0505. Please note that the CQA testing frequency and closure requirements stated in the Report are not consistent with the approved Plan (DIN 11912 and 19992). Because the vital information about how to conduct the closure at the Phase 2A area is lost due to personnel changed inside the SWS, the SWS will not pursuit any further on this matter and will accept the certified Report for close-out area at Phase 2A, approximately 5 acres. However, the CQA requirements for the future landfill cell construction and closure shall not be lapsed due to this exceptional circumstance. 2 The Permit to Operate for the C&DLF (DIN 26592) dated October 25, 2016 allows the C&DLF -Phase 2, encompassing approximately 8.33 acres, for disposal of permitted wastes. Phase 2 comprises of two subcells – Phase 2A and 2B encompass 6.34 acres and 1.99 acres, respectively. The Construction Quality Control Documentation (CQA Report) for C&DLF – Phase 1A-1 (DIN 28151) certified the 4.7-acre was completed constructed according to the Rule 15A NCAC 13B .0541, the Permit Conditions (DIN 26592), and the approved CQA Plan (DIN 26596). According to the Administrative Order on Consent Amendment # 1 dated October 6, 2016 (Amendment # 1), The C&DLF shall close and open sub-phases as needed that will be no larger than 6.1 acres at any given time. So, the new Permit Approval To Operate (PTO) for the Gold Hill Road C&DLF will only allow Morton and Sewell Land Company, LLC (Permit Holder/Permittee) to operate 6.1-acre disposal area, which breaks down as below: C&D Phase Acreage Capacity (CY) Note Phase 2A 5.0 305,2453 Permanent closure 1.34 Inactive Phase 2B 1.99 60,926 Constructed & Permitted for disposal of wastes Phase 1A-1a 2.77 ?? (please provide data) To satisfy the Amendment # 1, the new disposal area of the C&DLF will be 6.1 acres including un- closed/inactive Phase 2A (1.34 acres), active Phase 2B (1.99 acres), and portion of the constructed 4.7-acre Phase 1A-1 (2.77 acres). The permittee must provide the following tasks prior to receiving a new PTO: 1. The gross capacity of the Phase1A-1a. The drawings (including layout and cross-section drawings) to show the waste footprint and interim final grade of Phase 1A-1a, which match the gross capacity of this sub-cell. 2. The physical boundary of the 2.77-acre sub-cell, Phase 1A-1a must be shown on the drawing. The edge markers to distinctively separate the footprint of Phase1A-1a (2.77 acres) from the remnant of Phase 1A- 1 (1.93 acres) must be properly established in the field. Upon completion of the edge marker installation, please inform the SWS to conduct the site visit and observe the completion of this task prior to issue the new PTO. The Report states that the permittee requests 5-year permit. During the 5-year permit cycle, if the additional portion of the Phase 2A and/or Phase 2B are closed, the permittee can request a new permit to operate the remnant of Phase 1A-1 (1.93 acres). Please provide the requested data, so the new permit can be issued in a timely manner. Thank you for your cooperation on this matter. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 3 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Chao, Ming-tai Sent: Tuesday, September 19, 2017 6:05 PM To: Raup, Michael <Michael.Raup@amecfw.com> Cc: Garrett, David <david.garrett2@amecfw.com>; Al Morton <goldhill@embarqmail.com>; Mussler, Ed <ed.mussler@ncdenr.gov> Subject: RE: Gold Hill CDLF Final Cover Certification Report Hi Michael: The submitted CQA report for partial closure at Gold Hill Road CDLF, 76-06 is uploaded to the document tracking system with a DIN 28479. Have a wonderful evening. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Chao, Ming-tai Sent: Tuesday, September 19, 2017 4:26 PM To: Raup, Michael <Michael.Raup@amecfw.com> Cc: Garrett, David <david.garrett2@amecfw.com>; Al Morton <goldhill@embarqmail.com>; Mussler, Ed 4 <ed.mussler@ncdenr.gov> Subject: Re: Gold Hill CDLF Final Cover Certification Report Hi Michael: I am in training class for today and tomorrow, and will start reviewing the report later this week. Ming Chao From: Raup, Michael <Michael.Raup@amecfw.com> Sent: Tuesday, September 19, 2017 3:14:57 PM To: Chao, Ming-tai Cc: Garrett, David; Al Morton Subject: Gold Hill CDLF Final Cover Certification Report Mr. Chao, Please find the attached Final Cover Certification Report for Gold Hill CDLF Michael Raup, P.E. Geotechnical Engineer, Amec Foster Wheeler Environment & Infrastructure 4021 Stirrup Creek Drive – Suite 100, Durham, North Carolina 27703, USA T +01 919 381 9343 M +01 423 943 1038 michael.raup@amecfw.com amecfw.com This message is the property of Amec Foster Wheeler plc and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorised use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system. If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@amecfw.com and include “Unsubscribe” in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications. Please click http://amecfw.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France.