Loading...
HomeMy WebLinkAbout9231_INSP_20170629FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 4 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost SLAS COUNTY: WAKE Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 9231-CDLF-2012 CDLF X Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: June 29, 2017 Date of Last Inspection: July 12, 2016 FACILITY NAME AND ADDRESS: Material Recovery C&D Landfill 2600 Brownfield Road Raleigh, NC 27610 GPS COORDINATES: N: 35.71038 E: -78.49949 FACILITY CONTACT NAME AND PHONE NUMBER: Donald Plessinger, General Manager Waste Industries, Inc. w. 919-557-9583, c. 919-201-1434, f. 919-557-9523 Donald.Plessinger@wasteindustries.com FACILITY CONTACT ADDRESS: Wake Reclamation, LLC (Subsidiary of Waste Industries USA, Inc) 2600 Brownfield Road Raleigh, NC 27610 PARTICIPANTS: Liz Patterson - NCDEQ – Solid Waste Section (SWS) Drew Hammonds - NCDEQ – Solid Waste Section (SWS) Charlie Jarboe - Waste Industries, Inc. STATUS OF PERMIT: Permit To Operate (PTO) issued January 28, 2011 Permit To Construct (PTC) issued in conjunction with PTO PTC Phase B issued in conjunction with PTO August 18, 2016 Permit expires January 28, 2021 PURPOSE OF SITE VISIT: Partial Inspection STATUS OF PAST NOTED VIOLATIONS: NONE FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 4 OBSERVED VIOLATIONS: 15A NCAC 13B .0542(k)(2) states that: “Adequate sediment control measures consisting of vegetative cover, materials, structures or devices must be utilized to prevent excessive on-site erosion of the C&DLF facility or unit” Drainage ditches full of sediment on south side of landfill and need cleaning Erosion on southern side slopes of Phase 2A Cell 2 The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 4 ADDITIONAL COMMENTS 1. The facility is a construction and demolition (C&D) debris landfill. PTC Phase B issued in conjunction with PTO issued August 18, 2016. Permit expires January 28, 2021. 2. The facility is permitted to receive C&D debris, inert debris, land clearing debris (LCD), and (used) asphalt from Alamance, Caswell, Chatham, Durham, Franklin, Granville, Harnett, Johnston, Lee, Nash, Orange, Person, Vance, Wake, Warren, and Wilson and the municipalities contained within those counties. The facility does not currently accept LCD. Concrete block is stockpiled and crushed for facility maintenance/alternative use. 3. The facility is in operation Monday through Friday, 7:00 am – 4:00 pm. 4. The facility is secured by locked gate. The facility has proper signage. Facility personnel are on site during operating hours. 5. The facility is prohibited from receiving for disposal (but not limited to) hazardous waste, municipal solid waste (MSW), liquid waste, industrial waste, and yard trash. 6. Records were not reviewed at this inspection. 7. A perimeter road has been established around the entire footprint of the landfill. The perimeter road is being well maintained. 8. No unacceptable waste streams were noted in the working face. Six inches of earthen material should be properly applied once weekly or when the working face reaches ½ acre. Erosion rills on side slopes need repairs. Working face facing south from facility road FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 4 9. Side slopes in need of mowing and trees need to be removed within 30 days. Vegetation and trees on south side of landfill 10. Edge of waste is marked by temporary wooden stakes adjacent to the active cell and green metal stakes in the inactive areas. These are well maintained. 11. Windblown litter is well managed and no windblown litter was observed outside of the active working area during this inspection. 12. The facility has a water truck to control dust as needed. It is not used during times in which temperatures are below freezing. 13. Corrective measures are necessary at this facility. Measures to bring the facility into compliance must be completed within 30 days of receipt of this report. The SWS will conduct a follow-up inspection in 30 days to ensure issues noted in this inspection report have been addressed. Please contact me if you have any questions or concerns regarding this inspection report. Phone: 919-707-8286(O) 919-805-6499 (C) Elizabeth.Patterson@ncdenr.gov Liz Patterson Environmental Senior Specialist Regional Representative Sent on: 7-25-2017 X Email Hand delivery US Mail Certified No. [ _] Copies: Jason Watkins, Field Operations Branch Head – Solid Waste Section Andrew Hammonds, Eastern District Supervisor - Solid Waste Section Jessica Montie, Compliance Officer - Solid Waste Section