HomeMy WebLinkAbout7904_CORR_20170707 July 7, 2017, Update Joyce Engineering Rockingham County – 7904 Page 1 July 2017 Reporting Period: July 1 – 7, 2017 • Approximately 4 acres of the southeast side slope have been prepared for hydroseeding during the week of July 10, 2017. • In addition, the eastern entrance is being prepped for hydroseeding. • Rockingham County hired a second contractor to perform stormwater ditch repairs. During this reporting period, the second contractor worked on repairing the stormwater ditch at the location of the undercut road as well as repairing the collapsed stormwater pipe at the closed landfill. Daily Cover The working face continues to be covered on a daily basis. Photo shows working face at closure on July 5, 2017. July 7, 2017, Update Joyce Engineering Rockingham County – 7904 Page 2 July 2017 Southeast Side Slope Repair Preparing southeastern side slope for hydroseeding by dumping and spreading soil on southeast slopes below working face. Spreading seed bed / cover at southeast corner of landfill. July 7, 2017, Update Joyce Engineering Rockingham County – 7904 Page 3 July 2017 Southern slopes tracked in and ready to hydroseed. Eastern Entrance Prepping eastern entrance for seeding. July 7, 2017, Update Joyce Engineering Rockingham County – 7904 Page 4 July 2017 Stormwater Ditch Repair Riprap staged along road, ready for excavator to work into washed out V-ditch area where the perimeter access road has been undercut. Riprap formed into V-ditch. Flowable fill (low grade grout) will also be added to support the road undercut areas. July 7, 2017, Update Joyce Engineering Rockingham County – 7904 Page 5 July 2017 Erosion control matting was installed near drop inlet on the north side of landfill. Collapsed Culvert (closed landfill) New inlet was installed at wood yard area above the collapsed culvert. Contractor is also working on restoration of collapsed culvert.