Loading...
HomeMy WebLinkAbout4903_IredellMSW_Phase6PrelimBoringPlanEmail_DIN28088_201706301 Sugg, William P From:Sugg, William P Sent:Friday, June 30, 2017 2:17 PM To:'Jonathan Pfohl' Subject:RE: Iredell Co MSWLF (49-03) Proposed Ph 6 Design Hydro Boring Plan Review Request Attachments:4903 - Iredell Ph 6 Prelim Boring Plan Sheets 1 and 2.pdf Jonathan, I’ve reviewed your preliminary spacing and total number of borings proposed for Phase 6 as depicted on the figures (attached) you submitted in your email request on June 6, 2017. Note that boring clusters (ie, adjacent deep and shallow borings) are considered as one boring location for spatial density determinations. Also, for purposes of planning the required number of borings per .1623(b)(1), the 'area of investigation' for most sites will generally be comprised of the landfill footprint unless otherwise determined by the Division. In the proposed boring plan for Phase 6, there are 29 boring locations within the 41-acre footprint, for a boring density of about 0.7 borings/acre (or, one boring location/1.4 acres). This boring density remains consistent when extending the area out to the 125-ft review boundary. For an appropriate boring density less one boring/acre, the Section can consider other factors. For this site, we reviewed and considered: previous design data collected at the facility for adjacent landfill units Phases 1-5; information on subsurface conditions exposed during past construction grading for these phases; and the proximity of Phase 6 to these constructed phases. Based on these factors, the proposed boring plan appears to be appropriate for the site. Note that SWS reserves the right to request additional information upon review of the Design hydro report, as each site can contain its own extraneous circumstances. Regardless of minimum boring density requirements, it is ultimately incumbent upon the design engineer and hydrogeologist to adequately evaluate the hydro and subsurface site conditions for design considerations consistent with rules requirements (including vertical separation, foundation standards, effective water quality monitoring system and more). If you have any further questions, please feel free to call. Thank you.     Perry Sugg, PG Permitting Hydrogeologist Division of Waste Management – Solid Waste Section NC Department of Environmental Quality Phone: (919) 707.8258 perry.sugg@ncdenr.gov Physical Address: 217 West Jones St / Raleigh, NC / 27603 Mailing Address: 1646 Mail Service Center / Raleigh, NC / 27699-1646 http://portal.ncdenr.org/web/wm/sw The NC DEQ’s primary mission is to protect North Carolina's environment and natural resources. In executing this mission, DEQ operates with the broad-based understanding that the following three fundamental principles are integral components of its protective mandate: Fundamental Philosophy, Fundamental Economics, and Fundamental Science. Ultimately, a collaborative stewardship among the citizens, government regulators, and the business community will maintain and enhance North Carolina's environment and natural resources for the benefit and enjoyment of everyone living in or visiting our Great state. E-mail correspondence to and from this addresss may be subject to the North Carolina Public Records Law and therefore may be disclosed to third parties.   2 From: Jonathan Pfohl [mailto:jpfohl@mesco.com]   Sent: Tuesday, June 06, 2017 4:26 PM  To: Sugg, William P <perry.sugg@ncdenr.gov>  Subject: Iredell Co MSWLF (49‐03) Proposed Ph 6 Design Hydro Boring Plan Review Request  I am sending you this email on the premise that you expect to be (> year from now) the reviewer of a hydrogeologic Design Study (HGDS) report for Iredell County proposed Ph 6. If you expect not to review this report would you please let us know whom will and/or forward this email to them. Attached is a preliminary boring plan layout Sheet 1 (Topo) and Sheet 2 (Aerial) proposed for Ph 6 HGDS which is planned to encompass 41 acres. In 2010 a HGDS was performed for Phase 5 and ~21 acres of Phase 6. However, only Ph 5 was constructed and is in operation. We plan to expand the study area another ~20 acres in the northern direction for Ph 6 which will comprise 41 acres. The plan includes 55 borings (a mix of abandoned, existing & proposed new wells). We seek assurance from the SWS that the density and locations appear to be sufficient. Rule 15A NCAC13B.1623 (b) (1) indicates the required boring density is based upon "area of investigation" which is open for your interpretation. We want to proactively avoid a situation that after the HGDS is submitted that the SWS ultimately finds the density to be deficient leaving us to install more wells and continue the study. Total observation wells planned to use in HGDS=55 Proposed footprint=~41 acres (1.34 boring/acre density) Proposed footprint plus 125' review boundary =57 acres (0.97 boring/acre density) Of the 55 borings 12 are abandoned wells, 29 are existing wells & 14 new wells are proposed. The study will entail 10 cluster pairs (vertical hydraulic gradients), Rock cored > 10 feet at 8 locations, additionally bedrock will be tagged at 6 locations. At least 14 soil samples will be lab tested from both vadose and within the uppermost aquifer. A soil stockpile and mulching operations exists within the proposed footprint. Some of the boring locations (ie OW6-9S/D) may need to be moved slightly depending upon status of the stockpiles but the density plans to remain. Please let me if the SWS considers this boring plan satisfactory in terms of density and spacing so we can mobilize. Simply call anytime if you have any questions, need any clarifications or would like to provide any recommendations that will aid in this impending HGDS. Thanks, Jonathan -- Jonathan Pfohl Municipal Engineering Services, Co. PA PO Box 97 Garner NC 27529 68 Shipwash Dr. Garner NC 27529 Office: (919) 696-1383 Mobile: (919) 696-1383 MW-1C P2-1S PZ-1S PZ-1D (R) P5-1 LINED MSWLF PHASE 5 MW-35 P-77 P5-4 P5-2S P5-7 P5-13 P5-6 MW-34 P5-15S P5-15D (CR) P5-19 P5-20 MW-33S MW-33D (CR) P5-2D (CR) P5-3 P5-8 P5-9SP5-9D (CR) POND ACTIVE PTO 11/18/14 MW-1A P2-1D (R) P-78SP-78D (CR)P5-18 P5-17OW6-1 OW6-2 OW6-3 OW6-4 OW6-5 OW6-6 P-2 (R) OW6-8S OW6-9 OW6-8D (CR)OW6-10 OW6-11 (R) OW6-12 OW6-13 (CR) OW6-7D (CR) SOIL STOCKPILE #2 (EXISTING) P2-3D (R) P2-3 (C) (R) Preliminary boring density summary TOTAL WELLS PROPOSED TO BE USED IN PH 6 STUDY55 PROPOSED PH 6 FOOTPRINT (FP) (41 ACRES) TOTAL WELLS IN FP 11 20 4 35 REVIEW BOUNDARY (RB) (125' from FP) (57 ACRES) 3 6 4 13 COMPLIANCE BOUNDARY (CB) (<300' OF FOOTPRINT) (76 ACRES) TOTAL WELLS WITHIN CB 0 3 4 7 Iredell Co. MSWLF, Ph 6 Proposed NEW WELLS PROPOSED IN FP EXISTING WELLS STILL IN FP ABANDONED WELLS IN FP NEW WELLS PROPOSED IN RB EXISTING WELLS STILL IN RB ABANDONED WELLS IN RB NEW WELLS PROPOSED IN CB EXISTING WELLS STILL IN CB ABANDONED WELLS IN CB TOTAL WELLS WITHIN RB P5-11 P5-10 MW-1C P2-1S PZ-1S PZ-1D (R) P5-1 LINED MSWLF PHASE 5 MW-35 P-77 P5-4 P5-2S P5-7 P5-13 P5-6 MW-34 P5-15S P5-15D (CR) P5-19 P5-20 MW-33S MW-33D (CR) P5-2D (CR) P5-3 P5-8 P5-9SP5-9D (CR) POND ACTIVE PTO 11/18/14 MW-1A P2-1D (R) P-78SP-78D (CR)P5-18 P5-17OW6-1 OW6-2 OW6-3 OW6-6 P-2 (R) OW6-8S OW6-9 OW6-8D (CR)OW6-10 OW6-11 (R) OW6-12 OW6-13 (CR) OW6-7D (CR) SOIL STOCKPILE #2 (EXISTING) P2-3D (R) P2-3 (C) (R) Preliminary boring density summary TOTAL WELLS PROPOSED TO BE USED IN PH 6 STUDY55 PROPOSED PH 6 FOOTPRINT (FP) (41 ACRES) TOTAL WELLS IN FP 11 20 4 35 REVIEW BOUNDARY (RB) (125' from FP) (57 ACRES) TOTAL WELLS WITHIN RB 3 6 4 13 COMPLIANCE BOUNDARY (CB) (<300' OF FOOTPRINT) (76 ACRES) TOTAL WELLS WITHIN CB 0 3 4 7 Iredell Co. MSWLF, Ph 6 Proposed NEW WELLS PROPOSED IN FP EXISTING WELLS STILL IN FP ABANDONED WELLS IN FP NEW WELLS PROPOSED IN RB EXISTING WELLS STILL IN RB ABANDONED WELLS IN RB NEW WELLS PROPOSED IN CB EXISTING WELLS STILL IN CB ABANDONED WELLS IN CB OW6-4 OW6-5 P5-11P5-11 P5-10 B-79