Loading...
HomeMy WebLinkAbout3425_WinstonSalemTP_PTO_DIN28042_20170627 Permit No: 3425-TP City of Winston Salem June 27, 2017 Doc ID 28042 Page 1 of 6 North Carolina Department of Environmental Quality ROY COOPER MICHAEL S. REGAN Governor Secretary S t a t e o f N o r t h C a r o l i n a | E n v i r o n me n t a l Q u a l i t y | W a s t e M a n a g e me n t 1 6 4 6 M a i l S e r v i c e C e n t e r | 2 1 7 W e s t J o n e s S t r e e t | R a l e i g h , N C 2 7 6 9 9 -1 6 4 6 9 1 9 7 0 7 8 2 0 0 T STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT - SOLID WASTE SECTION TREATMENT & PROCESSING FACILITY Permit No. 3425-TP-2011 City of Winston-Salem Sanitation Division (owner & operator) & KDM of Wilmington (landowner) are hereby issued a PERMIT TO OPERATE CITY OF WINSTON-SALEM LEAF TRANSFER & PROCESSING SITE Located at 3 W. Thirty-Second Street, Winston-Salem, Forsyth County, North Carolina, in accordance with Article 9, Chapter 130A, of the General Statutes of North Carolina and all rules promulgated thereunder and subject to the conditions set forth in this permit. The legal description of the site is identified on the deed recorded for this property listed in Attachment 1, Part III of this permit. _______________________________ Edward F. Mussler III, PE Permitting Branch Supervisor Solid Waste Section Division of Waste Management Permit No: 3425-TP City of Winston-Salem June 27, 2017 Doc ID 28042 Page 2 of 6 ATTACHMENT 1 PART I: PERMITTING HISTORY Permit Issuance Date Doc ID Permit to Operate, Treatment & Processing - New November 2, 2011 15502 PTO Renewal – Treatment & Processing June 27, 2017 28042 The City of Winston-Salem Sanitation Division operates a leaf transfer and processing facility at the site during the months of October through February. Curbside collection of leaves by the city are stored at the site for short-term prior to loading for offsite transport to permitted compost facilities. The facility is approved under local zoning under a special use permit. The facility was first permitted by the NC Solid Waste Section as a treatment and processing facility in 2011. PART II: LIST OF DOCUMENTS FOR APPROVED PLAN 1. Permitting & Operations Application – Solid Waste Management Transfer & Processing Site. Prepared by City of Winston-Salem Sanitation Division. April 2016. DIN 28041. PART III: PROPERTIES APPROVED FOR THE SOLID WASTE FACILITY Forsyth County, N.C. Register of Deeds Book Page(s) Parcel ID Grantee Size 2631 932 6836-29-0444 KDM of Wilmington, LLC 3.9 acres Permit No: 3425-TP City of Winston-Salem June 27, 2017 Doc ID 28042 Page 3 of 6 PART IV: GENERAL PERMIT CONDITIONS 1. This permit is issued by the North Carolina Department of Environmental Quality, Division of Waste Management, Solid Waste Section (Section). In accordance with North Carolina Solid Waste Management Rule 15A NCAC 13B .0201(d), a solid waste management facility permit shall have two parts: a Permit to Construct and a Permit to Operate. The Permit-to-Construct shall be implemented in accordance with Attachment 2 of this permit, if applicable. The Permit to Operate shall expire November 2, 2021. The Permit to Operate must be implemented in accordance with Attachment 3 of this permit. 2. The persons to whom this permit is issued (“permittee”) are the owners and operators of the solid waste management facility, as well as the landowners (if different). 3. By receiving waste at this facility, the permittee shall be considered to have accepted the terms and conditions of this permit. 4. Construction and operation of this solid waste management facility must be in accordance with the Solid Waste Management Rules, 15A NCAC 13B, Article 9 of Chapter 130A of the North Carolina General Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit, and the approved plan. Should the approved plan and the rules conflict, the Solid Waste Management Rules shall take precedence unless specifically addressed by permit condition. Failure to comply may result in compliance action or permit revocation. 5. This permit is issued based on the documents submitted in support of the application for permitting the facility identified in Attachment 1, “List of Documents for Approved Plan,” which constitutes the approved plan for the facility. Where discrepancies exist, the most recent submittals and the Conditions of Permit shall govern. 6. This permit may be transferred only with the approval of the Section, through the issuance of a new or substantially amended permit in accordance with applicable statutes and rules. In accordance with NCGS 130A-295.2(g), the permittee must notify the Section thirty (30) days prior to any significant change in the identity or business structure of either the owner or the operator, including but not limited to, a proposed transfer of ownership of the facility or a change in the parent company of the owner or operator of the facility. 7. The permittee is responsible for obtaining all permits and approvals necessary for the development of this project including approval from appropriate agencies for sedimentation and erosion control, and a General or Individual National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit, if applicable. Issuance of this permit does not remove the permittee’s responsibilities for compliance with any other local, state, or federal rule, or statute. - End of Section – Permit No: 3425-TP City of Winston-Salem June 27, 2017 Doc ID 28042 Page 4 of 6 ATTACHMENT 2 CONDITIONS OF PERMIT TO CONSTRUCT [N OT APPLICABLE ] - End of Section - Permit No: 3425-TP City of Winston-Salem June 27, 2017 Doc ID 28042 Page 5 of 6 ATTACHMENT 3 CONDITIONS OF OPERATING PERMIT WOOD WASTE MANAGEMENT OPERATION 1. The Permit to Operate shall expire November 2, 2021. Pursuant to 15A NCAC 13B .0201(g), no later than July 2, 2021, the permittee must submit a request to the Section for permit review and must upda1e pertinent facility plans. 2. This permit approves the operation of a leaf treatment and processing operation. The operation must be conducted in accordance with the approved plans (Doc ID 28041). 3. The facility must be adequately secured by means of gates, chains, berms, fences, or other measures approved by the Section to prevent unauthorized entry. 4. A sign must be maintained at the site entrance providing site information including the permit number, prohibited materials, and emergency contact information. 5. An individual with operation responsibilities must be onsite during all operating hours of the facility. 6. This facility is permitted to receive, consolidate and transfer Yard Trash (as defined in 15A NCAC 13B .0101(55)) for storage and removal. Only materials specifically listed in the permit application may be managed at this facility. This includes yard trash, primarily leaves, collected by City of Winston-Salem Sanitation Division. A request must be submitted to receive additional feedstock and may require a permit modification. 7. The treatment and processing area comprises approximately 2.5 acres of the site, as shown on Figure 2 - Site Map of the permit application (DIN 28041). A buffer of at least 50 feet must be maintained between the property line and the wood treatment and processing operation, or as permitted by local zoning. 8. Stockpiling of all leaf debris must be limited to a maximum of 15 feet high and 25 feet wide, with adequate spacing around each side for firefighting equipment access. 9. Feedstock must not be received that are in an anaerobic state 10. Trash and unacceptable wastes received at the site must be separated from the waste stream and removed from the site for proper disposal, as outlined in the approved Operations Plan. 11. Heat generation in the post-processed storage piles must be monitored to prevent elevated temperatures that may lead to spontaneous combustion. 12. Interior roadways must be of all-weather construction and maintained in good condition. All sides of wood waste storage areas must be clear and drivable, to provide vehicular access in the event of a fire. 13. The facility must be operated in a manner that reduces the potential for vector attraction. Permit No: 3425-TP City of Winston-Salem June 27, 2017 Doc ID 28042 Page 6 of 6 14. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 404 of the Clean Water Act, as amended. 15. An appropriate Division of Energy, Mineral and Land Resources (DEMLR) permit for managing any stormwater at the facility must be maintained, if required. Any leachate generated at the facility and any runoff from the facility must be managed in such a manner that ground or surface water quality will not be adversely affected. The facility must be maintained to prevent the accumulation of stormwater and leachate on storage areas and roads. 16. The leaf processing and transfer operation and storage pads must be operated and maintained with sufficient dust control measures to minimize airborne emissions and to prevent dust from becoming a nuisance or safety hazard. Facility operation must meet Division of Air Quality Rules 15 NCAC 2D. Fugitive dust emissions from the facility that contribute to substantive complaints may subject the facility to the Division of Air Quality requirements as listed in 15A NCAC 2D .0540. 17. The odor management procedures must be followed to minimize odors at the facility boundary. Upon receipt of an odor complaint, the facility operator must investigate and take action as necessary to minimize the cause of the complaint. A copy of all written complaints regarding this facility must be maintained for the duration of the permit including the operator’s actions taken to resolve the complaints. 18. Open burning of solid waste is prohibited. Fires must be reported to the regional environmental senior specialist as soon as possible following the time of occurrence. 19. Copies of this permit, the approved plans and drawings, and all records required to be maintained by the permittee must be maintained at the facility, or another site approved by the Section, and made available to the Section upon request during normal business hours. 20. The permittee must maintain records of the amount and types of solid waste received at the facility. An annual report of facility activities for the fiscal year July 1 to June 30 must be submitted to the Section by August 1 of each year on forms provided by the Section. This report must include the amount of materials processed in tons. - End of Permit Conditions -