HomeMy WebLinkAbout7607_INSP_20170324FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 4 UNIT TYPE: Lined MSWLF X LCID YW Transfer Compost SLAS COUNTY: Randolph Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 76-07 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: March 24, 2017 Date of Last Inspection: December 20, 2016 (partial inspection: 02/23/17) FACILITY NAME AND ADDRESS: Great Oak Landfill 3597 Old Cedar Falls Road Randleman, NC 27317 GPS COORDINATES: N: 35.752822 W: -79.755992 FACILITY CONTACT NAME AND PHONE NUMBER: Mike McFeeley, District Manager c. 336-865-3201 mmcfeel1@wm.com FACILITY CONTACT ADDRESS: Waste Management Mike McFeeley, District Manager 3597 Old Cedar Falls Road Randleman, NC 27317 PARTICIPANTS: John Patrone, Environmental Senior Specialist - Solid Waste Section (SWS) Susan Heim, Environmental Senior Specialist - SWS Daniel Moore, Environmental Protection Manager - Waste Management Mike McFeeley, District Manager – Waste Management STATUS OF PERMIT: Permit To Operate (PTO) issued December 29, 2016 Permit To Construct (PTC) issued in conjunction with PTO PTO expiration date January 19, 2026 PURPOSE OF SITE VISIT: Partial Inspection STATUS OF PAST NOTED VIOLATIONS: The following observed violation has been resolved: The facility did not collect all of the windblown material from previous days of operation. Windblown material is required to be picked up daily per the following: 15A NCAC 13B .1626(11)(c), “Methods such as fencing and diking shall be provided within the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 4 windblown material resulting from the operation shall be collected and returned to the area by the owner or operator.” During the inspection, windblown material was observed in, and adjacent to, the sediment basin along the access roadway, in the permanent truck wheel wash, along the creek adjacent to the access roadway, and near groundwater monitoring wells MW-2 and MW-5. The facility has complied with 15A NCAC 13B .1626(11)(c). Windblown material observed on February 23, 2017 has been collected and returned to the working face. During the inspection, facility personnel were collecting windblown material. The facility has ordered portable litter fences to be placed adjacent to the working face and plans to install permanent fencing along the access roadway prior to wooded areas leading towards the creek/neighboring properties. OBSERVED VIOLATIONS: None. ADDITIONAL COMMENTS On March 24, 2017, John Patrone and Susan Heim met with Daniel Moore and Mike McFeeley to conduct a partial inspection of the Great Oak Landfill on Old Cedar Falls Road in Randleman, Randolph County. 1. The Great Oak Landfill is a municipal solid waste (MSW) landfill owned by Randolph County and operated by Waste Management of Carolinas, Inc. 2. This is a new landfill. The facility was issued a permit to operate by the SWS on December 29, 2016. 3. The facility is permitted to operate Phase 1, Cell 1A. 4. The facility is permitted to construct Phase 1, Cell 1B. Construction of the new cell is near completion. 5. The facility shall comply with attachment 2 – conditions of permit approval to construct prior to receiving solid waste in Phase 1, Cell 1B. 6. Groundwater monitoring wells MW-5 and MW-6 were observed and labeled accordingly. 7. Methane monitoring wells MMW-1, MMW-2, MMW-3, and MMW-4 were observed and labeled accordingly. Quick release connectors have been installed. 8. A readily accessible unobstructed path to groundwater wells, surface water locations, and landfill gas wells should be maintained. 9. Phase 1, Cell 1A has leachate sump digital gauges located in a box adjacent to the side slope risers for the leachate collection system (LCS) and the leak detection system (LDS). During the inspection, the primary liner sump was 32.4 inches and the secondary liner sump was 12.5 inches. 10. The facility shall calculate the action leakage rate (ALR) associated with the LDS. The facility will convert the weekly LDS flow rate to an average daily flow rate in gallons/acre/day for each sump. 11. The ALR is 182 gallons/acre/day. If the ALR is exceeded, landfill staff will implement the Response Action Plan as specified in the facility operations plan. 12. Action leakage rate records for February 22 through March 24, 2017 (time of inspection) were reviewed. The leachate flow meter/totalizer was not functioning for much of that period. 13. The LDS does not function as designed. The facility is in discussion with the SWS – Permitting Branch and is actively addressing the issue. 14. Windblown material shall be collected by the conclusion of each day of operation. 15. During the inspection, windblown material was being collected by facility personnel. The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 4 Please contact me if you have any questions or concerns regarding this inspection report. Phone: 336-776-9673 John Patrone Environmental Senior Specialist Regional Representative Sent on: April 4, 2017 X Email Hand delivery US Mail Certified No. [ _] Copies: Deb Aja, Western District Supervisor - SWS Jessica Montie, Compliance Officer - SWS Ming-Tai Chao, Environmental Engineer – SWS Christine Ritter, Permitting Hydrogeologist - SWS Ervin Lane, Compliance Hydrogeologist – SWS Susan Heim, Environmental Senior Specialist - SWS Daniel Moore, Environmental Protection Manager - Waste Management (c. 336-253-0091, dmoore36@wm.com) Bobby Owens, Operations Manager – Waste Management (c. 336-494-8207, bowens4@wm.com) Paxton Arthurs, Director - Randolph County Public Works (c. 336-736-7927, pgarthurs@co.randolph.nc.us) Digital pictures taken March 24, 2017 by John Patrone, DWM – SWS Windblown material removed from stormwater basin FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 4 Phase 1, Cell 1A working face Landfill gas monitoring well – representative