Loading...
HomeMy WebLinkAbout33F_BarnhillLCID_PTO_26579_20160809 Facility Permit No: 33-F Barnhill Contracting Company LCID Landfill Permit to Construct and Operate August 9, 2016 Doc ID No. 26579 Page 1 of 9 North Carolina Department of Environmental Quality Division of Waste Management Pat McCrory Donald R. van der Vaart Governor Secretary State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, NC 27699-1646 919 707 8200 T STATE OF NORTH CAROLINA DEPARTMENT OF ENVIRONMENTAL QUALITY DIVISION OF WASTE MANAGEMENT SOLID WASTE SECTION LAND CLEARING AND INERT DEBRIS (LCID) LANDFILL PERMIT NO. 33-F BARNHILL CONTRACTING COMPANY is hereby issued a PERMIT TO OPERATE BARNHILL CONTRACTING COMPANY LCID LANDFILL PHASES 1 THROUGH 6 Located at 10826 NC Highway 97 West, northeast of Rocky Mount, Edgecombe County, North Carolina in accordance with Article 9, Chapter 130A of the General Statutes of North Carolina and all rules promulgated thereunder and subject to the conditions set forth in this permit. The legal description of the site is identified on the deed recorded for this property listed in Attachment No. 1 of this permit. ________ Edward F. Mussler, III, P.E., Supervisor Permitting Branch, Solid Waste Section Division of Waste Management, NCDEQ Facility Permit No: 33-F Barnhill Contracting Company LCID Landfill Permit to Construct and Operate August 9, 2016 Doc ID No. 26579 Page 2 of 8 Form LCID2009 ATTACHMENT 1 PART I: PERMITTING HISTORY Permit Date Permit to Construct and Operate, Phase 1 October 29, 1998 Permit to Operate, Phases 1-3 July 27, 2010 Permit to Operate, Phases 1-6 April 19, 2016 PART II: LIST OF DOCUMENTS FOR THE APPROVED PLAN 1. LCID Permit Application, Barnhill Contracting Company. August 1998, revised through October 1998. 2. LCID Permit Renewal Application, Barnhill Contracting Company. Prepared by Appian Consulting Engineers, PA, Rocky Mount. September 2009, revised through June 2010. Doc ID 11231. 3. LCID Permit Renewal Application, Barnhill Contracting Company. Prepared by Appian Consulting Engineers, PA, Rocky Mount. July 2015. Doc ID 26582. PART III: PROPERTIES APPROVED FOR THE SOLID WASTE FACILITY Property Book Page Acreage Grantor Grantee Original Permit 889 272-275 111.54 Hugh H. Battle et al Barnhill Contracting Company Total Site Acreage: 111.54 Note: The actual disposal area is approximately 10.66 acres. The Parcel number for the property is 386194509600. Facility Permit No: 33-F Barnhill Contracting Company LCID Landfill Permit to Construct and Operate August 9, 2016 Doc ID No. 26579 Page 3 of 8 Form LCID2009 PART IV: GENERAL PERMIT CONDITIONS 1. This permit is issued by the North Carolina Department of Environment and Natural Resources, Division of Waste Management, Solid Waste Section (Section). In accordance with North Carolina Solid Waste Management Rule 15A NCAC 13B .0201(e), a land clearing and inert debris solid waste management facility permit may be combined in two parts: a Permit to Construct and a Permit to Operate. The Permit to Construct are contained in Attachment 2 of this permit. The Permit to Operate conditions are contained in Attachment 3 of this permit. 2. The persons to whom this permit is issued ("permittee") are the owners and operators of the solid waste management facility. 3. The Solid Waste Permit 33-F was recorded on page 430 in Book 1230 at the Edgecombe County Register of Deeds office. 4. When this property is sold, leased, conveyed, or transferred in any manner, the deed or other instrument of transfer must contain in the deed description section, in no smaller type than that used in the body of the deed or instrument, a statement that the property has been used as a land clearing and inert debris landfill and a reference by book and page to the recordation of the permit. 5. By beginning construction or receiving waste at this facility the permittee shall be considered to have accepted the terms and conditions of this permit. 6. Construction and operation of this solid waste management facility must be in accordance with the Solid Waste Management Rules, 15A NCAC 13B, Article 9 of Chapter 130A of the North Carolina General Statutes (NCGS 130A-290, et seq.), the conditions contained in this permit; and the approved plan. Should the approved plan and the rules conflict, the Solid Waste Management Rules shall take precedence unless specifically addressed by permit condition. 7. The permit is issued based on the documents submitted in support of the application for permitting the facility including those identified in Attachment 1, "List of Documents for Approved Plan," and which constitute the approved plan for the facility. Where discrepancies exist, the most recent submittals and the Conditions of Permit shall govern. 8. This permit may be transferred only with the approval of the Section, through the issuance of a new or substantially amended permit in accordance with applicable statutes and rules. In accordance with NCGS 130A-295.2(g), the permittee must notify the Section thirty (30) days prior to any significant change in the identity or business structure of either the owner or the operator, including but not limited to, a proposed Facility Permit No: 33-F Barnhill Contracting Company LCID Landfill Permit to Construct and Operate August 9, 2016 Doc ID No. 26579 Page 4 of 8 Form LCID2009 transfer of ownership of the facility or a change in the parent company of the owner or operator of the facility. 9. The permittee is responsible for obtaining all permits and approvals necessary for the development of this project including approval from appropriate agencies for sedimentation and erosion control, and a General or Individual National Pollutant Discharge Elimination System (NPDES) Stormwater Discharge Permit, if applicable. Issuance of this permit does not remove the permittee's responsibilities for compliance with any other local, state or federal rule, regulation or statute. - End of Section - Facility Permit No: 33-F Barnhill Contracting Company LCID Landfill Permit to Construct and Operate August 9, 2016 Doc ID No. 26579 Page 5 of 8 Form LCID2009 ATTACHMENT 2 CONDITIONS OF PERMIT TO CONSTRUCT Not Applicable ATTACHMENT 3 CONDITIONS OF PERMIT TO OPERATE PART I: FACILITY SPECIFIC CONDITIONS 1. This Permit to Operate expires August 9, 2021. Pursuant to 15A NCAC 13B .0201(g), no later than April 27, 2021, the owner or operator must submit a request to the Section for permit review and must submit updated facility plans meeting the requirements of Rule 0.565 and .0566. 2. This facility must conform to the operational requirements of the NC Solid Waste Management Rules, 15A NCAC 13B .0566, and to the operational plan required by 15A NCAC 13B .0565(4). 3. Pursuant to 15A NCAC 13B .0201(c) and (e), this permit approves continued operation of Phases 1 through 6 of the Barnhill Contracting Company LCID Landfill. 4. The landfill is permitted for a total gross capacity of 551,785 cubic yards. Gross capacity is the measured volume between the bottom of waste and the top of final cover. Development of the landfill is approved as summarized below: Acreage Capacity (Cubic Yards) Phase 1 10.66 Currently Filled: 183,911 Remaining Permitted Capacity: 173,739 Phase 2 * Phase 3 * Phase 4 * 88,671 Phase 5 * 62,170 Phase 6 * 41,690 Total (Gross) 10.66 551,785 Facility Permit No: 33-F Barnhill Contracting Company LCID Landfill Permit to Construct and Operate August 9, 2016 Doc ID No. 26579 Page 6 of 8 Form LCID2009 5. This facility is permitted to receive land clearing waste; yard trash; untreated and unpainted wood; uncontaminated soil; inert debris such as unpainted rock, brick, concrete, and concrete block; and asphalt in accordance with NCGS 130-294(m). 6. This facility is permitted to receive waste generated within Nash, Edgecombe, and Halifax Counties. Proposed changes to the service area must be submitted to the Section for review prior to any changes in accordance with Condition No. 10 of this Attachment 7. The permanent markers that accurately delineate the waste disposal boundary must be maintained. 8. Excavation, grading and fill material side slopes must not exceed a ratio of three horizontal feet to one vertical feet (3:1). 9. Open burning of land clearing waste is prohibited. If a fire occurs, the permittee must provide oral notification to the Section within 24 hours of the occurrence followed by a written report of the details of the fire within 10 working days of the occurrence. The report must include the cause, the location(s) on the premises, the dimensions and volume of material involved, a description of emergency response activities with results, and a description of mitigation measures implemented to reduce or eliminate conditions leading to the fire. Other conditions may be required based on the severity or nature of the fire. 10. Revisions to the design or operation of the facility or changes to the facility service area must be submitted to the Section for review and approval prior to the implementation of any changes. Revisions or changes that require modification to the permit will be subject to the appropriate permitting fee. 11. Amendments or revisions to the NC General Statutes or to the NC Solid Waste Management Rules or any violation of ground water standards may necessitate modification of the approved design or operation plans, waste acceptance requirements or may require closure of the facility. 12. Copies of this permit, the approved plans and all records required to be maintained by the permittee must be maintained at the facility, unless otherwise approved by the Section, and made available to the Section upon request during normal business hours. Cover Material Requirements 13. Solid waste must be covered with 1 foot of suitable soil cover at least once per month or when the active area reaches 1 acre in size, whichever occurs first, or more often when Facility Permit No: 33-F Barnhill Contracting Company LCID Landfill Permit to Construct and Operate August 9, 2016 Doc ID No. 26579 Page 7 of 8 Form LCID2009 necessary to prevent the site from becoming a nuisance or to mitigate conditions associated with fire, windblown materials, vectors or excessive water infiltration. 14. The facility must maintain a supply of cover material adequate to cover the working face in case of an emergency or fire, at all times. 15. Vegetative ground cover sufficient to control erosion must be established within 30 (thirty) working days upon completion of any phase of LCID landfill development or as addressed in the approved Sedimentation and Erosion Control permit. 16. Within 120 calendar days after completion of the final disposal operations, the disposal area must be closed and covered with a minimum of 1 foot of suitable soil cover sloped to allow surface water runoff in a controlled manner. However, for ditches with depths greater than 6 inches and widths less than 3 feet located on the landfill, at least 2 feet of soil is required between the bottom elevation of the ditches and the waste mass. Erosion and Sedimentation Control Requirements 18. The permittee is solely responsible for maintaining an approved sedimentation and erosion control plan. All earth-disturbing activities must be conducted in accordance with the Sedimentation Control Act N.C.G.S. 113A-50, et seq., and rules promulgated under 15A NCAC 4. 19. Facility construction, operations or practices must not cause or result in a discharge of pollution, dredged material, and/or fill material into waters of the state in violation of the requirements under Sections 401 and 404 of the Clean Water Act, as amended. 20. Modifications to the approved sedimentation and erosion control activities require approval by the North Carolina Land Quality Section. The permittee must notify the Section of any sedimentation and erosion control plan modifications. Drainage Control and Water Protection Requirements 21. All required sedimentation and erosion control measures must be installed and maintained to mitigate excessive on-site erosion and to prevent silt from leaving the site of the landfill unit during the service life of the facility. 22. Ground water quality at this facility is subject to the classification and remedial action provisions of 15 NCAC 2L. 23. Solid waste must be placed a minimum of four feet above the seasonal high water table. Facility Permit No: 33-F Barnhill Contracting Company LCID Landfill Permit to Construct and Operate August 9, 2016 Doc ID No. 26579 Page 8 of 8 Form LCID2009 24. Solid waste must not be disposed in standing water. Surface water must be diverted away from the operational area and must not be impounded over or in waste. 25. Leachate must be properly managed on site using best management practices. - End of Permit Conditions- Form LCID2009