Loading...
HomeMy WebLinkAbout1302_CabarrusCo_CDLF_PH3PTCAppReview_DIN27206_20170104    ROY COOPER Governor State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, NC 27699-1646 919 707 8200 T January 4, 2017 Sent Via Email – KPGrant@cabarruscounty.us Mr. Kevin Grant Sustainability Manager 242 General Services Drive Concord, North Carolina 28025 Subject: Engineering Technical Review Cabarrus County C&D Landfill Cabarrus County, Permit # 1302-CDLF-2006, Document ID 27206 Mr. Grant, The Division of Waste Management, Solid Waste Section (Section) has completed the technical review of your application submittal titled Substantial Amendment and Phase 3 Permit to Construct (DIN 26872). The application was submitted on your behalf by CDM-Smith and was received in the Asheville Regional Office on October 18, 2016. Based on this review, the Section requires clarification or additional information in order to complete the permitting activity. Please provide a response to each of the items listed below: Engineering Plan 1. Rule .0539(e)(4) requires engineering drawings to illustrate the cap system including base and top elevations, landfill gas devices, infiltration barrier, surface water removal, protective and vegetative cover, and details. Base elevations and landfill gas devices were not apparent in the engineering drawings provided. 2. Rule .0539(e)(6)(A) requires engineering drawings to illustrate cross-sections, showing borings, which indicate existing ground surface elevations, base grades, seasonal high ground-water level and estimated long-term seasonal high ground-water level. Boring locations and estimated long-term seasonal high ground-water levels were not apparent in the engineering drawings provided. 3. Rule .0539(e)(6)(B) requires engineering drawings to include a map showing the existing ground surface elevation and base grades and must include labeled boring locations which indicate seasonal high ground-water level and estimated long-term seasonal high ground- water level. No ground-water contour map was included in the engineering drawings provided. Construction Quality Assurance Plan 4. Rule .0541(b)(5) requires a plan for holding daily and monthly troubleshooting meetings. Section 3.3, Progress Meetings, states progress meetings will be held at a frequency specific to the needs of the project, typically on a biweekly basis. Mr. Kevin Grant  Engineering Technical Review  January 4, 2017  Page 2 of 2    Operations Plan 5. Rule .0542(b)(D) requires operation drawings to illustrate special waste handling areas, such as asbestos disposal area, within the C&DLF unit. No special waste handling areas were noted on the operation drawings. Please verify there are no special waste handling areas planned for CDLF Phase 3. 6. Rule .0542(c)(2) requires asbestos waste to be managed in accordance with 40 CFR 61. Asbestos waste is defined in Section 2.1, Waste Definitions, however, there is no mention of asbestos waste management in Section 2.2, Acceptable Waste, Section 2.3, Acceptable Waste Requiring Special Handling, or Section 2.4, Prohibited Wastes. Closure and Post-closure Plan 7. General Statute 130A-295.2(h1) requires the owner or operator of a sanitary landfill for the disposal of construction and demolition debris waste to establish financial assurance sufficient to cover a minimum of one million dollars ($1,000,000) in costs for potential assessment and corrective action (PACA) at the facility. There was no mention of the PACA costs in the financial assurance cost estimates If you should have any questions regarding this matter please contact me at (828) 296-4703, or by email at allen.gaither@ncdenr.gov . Sincerely, Allen Gaither Environmental Engineer CC: Mr. Martin Sanford – CDM-Smith Mr. Perry Sugg – SWS/RCO