Loading...
HomeMy WebLinkAboutCCB0070_DukeBelewsCreek_APPROVAL_GWAssessmentWorkPlan_DIN27112_20161207 State of North Carolina | Environmental Quality | Waste Management 1646 Mail Service Center | 217 West Jones Street | Raleigh, 27699-1646 919 707 8200 PAT MCCRORY Governor DONALD R. VAN DER VAART Secretary MICHAEL SCOTT Director December 7, 2016 Sent via email to melonie.martin@duke-energy.com Melonie Martin Duke Energy Carolinas, LLC Environmental Services 3195 Pine Hall Road Belews Creek, North Carolina 27009 Re: Approval of Groundwater Assessment and Monitoring Plan Duke Energy Carolinas - Belews Creek Steam Station Structural Fill CCB0070 Stokes County DIN 27112 Dear Mrs. Martin: The Solid Waste Section (Section) has reviewed the Proposed Groundwater Assessment and Monitoring Plan (DIN 27003) for the structural fill at the Belews Creek Steam Station submitted on your behalf by HDR on November 7, 2016. The proposed plan is divided into two Phases. Phase 1 includes the installation of one shallow well and one deep well, SFMW-1S/1D. After installation, the wells will be sampled along with four surface water monitoring locations: SFSW-1, SFSW-2, SFSW-3 and SFSW-4. Phase 2 includes the installation of eight (8) wells combined into four (4) well clusters: SFMW-2S/2D, SFMW-3S/3D, SFMW-4S/4D and SFMW-5S/5D. The Section approves the Proposed Groundwater Assessment and Monitoring Plan. If you have any questions, please do not hesitate to contact me via email elizabeth.werner@ncdenr.gov or phone (919) 707-8253. Sincerely, Elizabeth S. Werner Permitting Hydrogeologist Solid Waste Section Cc: Ed Sullivan, P.E., Will Harrison and Evan Andrews – Duke Energy Progress Ellen Lorscheider – Section Chief, SWS Ed Mussler, P.E. – Permitting Branch Head, SWS Larry Frost – Permitting Engineer, SWS Shawn McKee – Environmental Senior Specialist, SWS Shannon Aufman – Permitting Engineer, SWS