Loading...
HomeMy WebLinkAbout3620-INDUS-2022_FAR-FY-2025-26STATE OF NORTH CAROLINA SOLID WASTE MANAGEMENT This form is for reporting the annual amounts of Production and Excavated Coal Combustion Residuals and Products managed during the period of July 1, 2025 - June 30, 2026. This report includes excavated CCR material included in the February 2020 Consent Order. 1) Facility Information Coal Combustion Residue Landfill Information Facility ID*3620-INDUS-2022 - Pull-Down List - Permit / Project Name South Starter Landfill - Allen Plant Contacts Facility Contact Please edit the information below as needed. Salutation*First Name*Last Name*Title*Telephone*Email* Ms.Courtney Murphy Lead Environmental Specialist (704) 382-7171 Courtney.Murphy@duke- energy.com Billing Contact Please edit the information below as needed. Salutation*First Name*Last Name*Title*Telephone*Email* Ms.Courtney Murphy Lead Environmental Specialist (704) 382-7171 Courtney.Murphy@duke- energy.com Address Mailing Address Please edit the information below as needed. Mail Address*City/Town*Zip Code*State* 525 S. Tryon Street; Mail Code: DEP-36A Charlotte 28202 NC Operations Disposal Operations*Did your facility accept and dispose of waste during the reporting period? Yes No Enter Yes or No, then please click the Next button on the lower right. Airspace / Capacity Data Questions in this section relate to all cells/units of the lined facility operated under the current 4-digit permit number regardless of whether the cells/units are closed or are not contiguous at the time of this report. Total Airspace Used is the cumaltive volume measured including daily, intermediate and final cover beginning at the opening date of the facility until the date of the last survey unless another period is approved. Total Tons Disposed is the cumulative total of tons disposed based on scale records beginning at the opening date of the facility until the end of this Reporting Period. Most Recent Survey Date*Total Airspace Used [cubic yards]*Total Tons Disposed In Used Airspace *(?)(?) 6/8/2026 1,282,873 1,534,294 Previously Reported Survey Date Previously Reported Used Space Previously Reported Total Tons Leachate Management*How is leachate transported to the waste water treatment facility? Sewer Connection Pump Truck Not Applicable Other [Describe] Leachate force main to leachate basin to onsite treatment system Alternative Cover Information Please describe the type[s] of alternative daily cover used at this facility? none 2) Production CCR / CCP Data Entry Waste Disposal Data Entry*Would you prefer to Manually Enter Data or Upload a Spreadsheet? Manually Enter Waste Disposal Data Upload Spreadsheet The following data should be entered as tons Enter the total amount of Production CCR landfilled at this facility during the reporting period. State County Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals(?) NC 0 0 0 0 0 0 0 0 0 0 0 0 0 Enter the total amount of Excavated CCR required by Consent Order landfilled at this facility during the reporting period. State County Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals(?) NC Gaston 12,636 121,773 202,610 183,694 176,524 129,860 111,007 96,173 102,490 167,368 107,577 122,563 1,534,2 75 Enter the total amount of Excavated CCR not required by Consent Order landfilled at this facility during the reporting period. State County Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals(?) NC 0 0 0 0 0 0 0 0 0 0 0 0 0 Enter the total amount of other permitted waste landfilled at this facility during the reporting period. State County Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals(?) NC Gaston 0 0 0 0 4 2 0 2 7 0 0 4 19 Enter the amount of CCR removed to CCP from the landfill at this facility during the reporting period. State County Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals(?) NC 0 0 0 0 0 0 0 0 0 0 0 0 0 3) CCR/CCP/Waste Disposal Summary The following summary is based on the data entered above. Total Production CCR Landfilled. Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals 0 0 0 0 0 0 0 0 0 0 0 0 0 Total Excavated CCR Landfilled required by Consent Order. Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals 12,636 121,773 202,610 183,694 176,524 129,860 111,007 96,173 102,490 167,368 107,577 122,563 1,534,275 Total Excavated CCR Landfilled not required by Consent Order. Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals 0 0 0 0 0 0 0 0 0 0 0 0 0 Total other permitted waste disposed. Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals 0 0 0 0 4 2 0 2 7 0 0 4 19 Summary Waste Landfilled Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May June Totals 12,636 121,773 202,610 183,694 176,528 129,862 111,007 96,175 102,497 167,368 107,577 122,567 1,534,294 CCR removed from landfill to CCP. Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals 0 0 0 0 0 0 0 0 0 0 0 0 0 Net Total Waste Disposed Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May Jun Totals 12,636 121,773 202,610 183,694 176,528 129,862 111,007 96,175 102,497 167,368 107,577 122,567 1,534,294 4) Certified Operators / Certification / Submittal Certified Operators*Are SWANA or other certified operator[s] employed at your facility? Yes No SWANA or Other Certified Operators Please enter the following information for all Certified Operators working at your facility. Name Certification Type Expiration Date(?) Michael Johnson Manager of LF Operations 7/17/2028 Steve Faussette Manager of LF Operations 8/28/2028 Stephen Harwood Manager of LF Operations 8/28/2028 Chase Peterson Manager of LF Operations 8/28/2028 Certification*CERTIFICATION: I certify that the information provided is an accurate representation of the activity at this facility. REMINDER: According to G.S. 130A-309.09D(b), this report must be sent to the County Manager of each county from which waste was received. A copy of this report will be automatically forwarded to the Regional Environmental Senior Specialist for your county. Name*Courtney Murphy Title*Lead Environmental Specialist Email*courtney.murphy@duke-energy.com Date*8/4/2026 Comments This is the first Solid Waste Annual Report for this facility since it just became operational and accepted waste near the end of July 2025. Therefore, the form fields on page 1 of this report for "previously reported" values are blank. This is a revised report from the submittal dated 8/1/2026 as the CCR landfill report form was not available for the SSLF 3620-INDUS until 8/3/2026. This report should supersede the 8/1/2026 submittal.