HomeMy WebLinkAbout7607_GreatOakMSWLF_PreConMeetingMinutes_Phases1_DIN26159_20160527 SCS Engineers, PC Environmental Consultants 2520 Whitehall Park Drive 704 504-3107 and Contractors Suite 450 FAX 704 504-3174 Charlotte, NC 28273-3557 www.scsengineers.com Offices Nationwide May 27, 2016 File No. 02215305.02 MEETING MINUTES TO: John Workman, WM Jason Workman, Preston Contractors Dakota Hinterer, Preston Contractors SUBJECT: Pre-Construction Meeting Great Oak Landfill Cells 1A & 1B 2016 Tuesday, May 24, 2016 FROM: Steve Lamb, SCS Engineers Orion Holtey, SCS Engineers This memorandum summarizes the topics discussed during the pre-construction meeting for the construction of Cells 1A and 1B at the Great Oak Landfill (Landfill). The meeting was conducted May 24th at 11:00 a.m. at the Randolph County Office Building, 725 McDowell Road, Asheboro, NC 27205. These minute are posted on-line The following attended the meeting: John Workman, WM Dan Moore, WM Steve Lamb, SCS Orion Holtey, SCS Jason Workman, Preston Contractors Dakota Hinterer, Preston Contractors John Patrone, DEQ-WM-SWS Ming-Tai Chao, DEQ-WM-SWS Christine Ritter, DEQ-WM-SWS John Murray, DEQ-WM-SWS (by phone) Steve Laskota, S&ME Neil Hulland, S&ME Paxton Arthurs, Randolph County Charlie Morgan, Charlie Morgan Surveying John Workman began the meeting with some opening remarks pertaining to the overall project, which will involve several contractors working on site simultaneously. Introductions were made by all present and a Sign In Sheet was circulated. A copy of the Sign In Sheet is provided in Pre-Construction Meeting May 27, 2016 Page 2 Attachment A. Mr. Workman stated that Preston Contractors will serve as overall Construction Manager on behalf of WM, in addition to their role as contractor for Cells 1A and 1B. The additional contractors working on the site include a paving contractor, leachate tank contractor, utility contractor, and building contractors. Following Mr. Workman’s opening comments, Steve Lamb chaired the meeting. Steve stated that the purpose of this meeting was to discuss the construction and testing of Cells 1A and 1B. A Meeting Agenda prepared by SCS Engineers was provided to all. A copy of the Meeting Agenda is provided in Attachment B. Steve indicated Meeting Minutes would be provided to all attendees and that anytime during the meeting questions could be asked. The following items were discussed: 1. Personal protective equipment (e.g., hard hat, steel-toed boots, safety vest) should be worn at all times. Any visitor to the site must also wear hard hat, safety vest, and steel-toed boots. 2. Contractor is solely responsible for the health and safety of their employees and subcontractors. 3. Preston Contractors stated that all people who enter the site must sign in daily to confirm they have reviewed the Job Safety Analysis (JSA). 4. Preston Contractors stated that a daily JSA meeting will be held at the start of each day. The CQA Monitor will attend the daily JSA when present at the site. 5. The Owner of the project is Waste Management of Carolinas, Inc. The Owner is responsible for the overall contract management. 6. The Engineer and Designer for the project is S&ME. S&ME is responsible for site engineering services related to the design and should be contacted for proposed changes or clarifications. 7. S&ME is also responsible to provide final drawings stamped “Issued For Construction” to all interested partied. Ming-Tao requested an electronic copy and John Murray requested ½ size hard copy. S&ME stated a “file share” link will be emailed to all parties. 8. SCS Engineers will be providing construction quality assurance (CQA) services during the construction of Cell 1A and 1B. CQA services will include the preparation of the Construction Certification Report to be submitted to DEQ. Atlantic Coast Consulting (ACC) will be a sub- consultant to SCS and will primarily provide the on-site CQA monitors. a. CQA Manager – Orion Holtey b. CQA Monitors – Taylor Herbertson and Paul Vaillancourt c. CQA Officer/Certifying Engineer – Steve Lamb 9. The Surveyor of Record will be Charlie Morgan Surveying, PLLC. The Surveyor of Record will be responsible to provide as-built documentation of the cell components, such as the top of subgrade, top of structural fill, and top of protective cover layer. Pre-Construction Meeting May 27, 2016 Page 3 10. The General Contractor will be Preston Contractors. The Project Manager for Preston Contractors will be Dakota Hinterer. The Site superintendent will be Chad Howdershelt. 11. The installer of the geosynthetics for the project will be Environmental Services Inc. (ESI). 12. Ming-Tai Chao, DEQ, stated the following: a. DEQ will review of site design hydrogeology report and environmental permitting. b. DEQ will confirm all monitoring wells are maintained and/or replaced and correct documentation is prepared. c. DEQ will review all CQA document submittals. d. DEQ and Local Fire Department will need to be notified prior to blasting, and a Blasting Plan should be prepared by the Contractor. e. A pre operations (pre-op) meeting should be scheduled with John Paxton prior to beginning operation. f. Per DEQ rule, the liner must be evaluated for leaks – Electric testing. 13. John Patrone, DEQ will be the on-site inspector. 14. John Murray stated he is the DEQ Project Manager and will be responsible for approving the Construction Certification Report and issued the Permit to Operate. He stated Ming will assist by reviewing CQA documentation and testing results. 15. Christine Ritter is the DEQ hydrogeologist for the site. 16. Review lines of communication and authority a. If the Contractor has questions or requires clarification of the Construction Drawings, either Design engineer or CQA Manager should be contacted to address questions. b. CQA Manager should be included on all project communications to assist in providing direction in the field. 17. Preston stated they have reviewed the Drawings, CQA Plan, and Specifications and did not have any questions at this time. It should be noted that a meeting was held prior to the pre-con meeting to discuss the erosion and sediment controls. 18. Jason Workman of Preston Contractors provided an overall discussion of the project schedule. Key items included: a. A preliminary project schedule will be submitted to all parties in the next few days. b. Mass Excavation of cells will begin June 24th. Pre-Construction Meeting May 27, 2016 Page 4 c. Certified base grade inspection is required prior to liner installation. d. Tentative date for beginning of liner installation is August 26th. e. Goal is to finish construction of Cell 1A by December 1st. f. Today clearing, haul road preparation, and temporary stream crossing work will be conducted. 19. SCS stated the project schedule must be updated by Preston on a monthly basis. 20. SCS stated that two separate Construction Certification Reports will be prepared for this project. A report will be prepared for Cell 1A and a separate report for Cell 1B. 21. The subgrade must be inspected by SCS Engineer’s Professional Geologist (PG) pursuant to the permit conditions and NC regulations. SCS will notify Christine Ritter (DEQ) prior to this site inspection. 22. Daily Field Reports will prepared by the CQA Monitor. These will be reviewed by the CQA Manager. 23. A Weekly Summary Report will be prepared by the CQA Manager 24. Copies of the Daily and Weekly Reports will be submitted to John Murray, DEQ. 25. Submittals and Shop Drawings shall go to Steve Laskota, S&ME and copied to Owner and CQA Manager. Responses will be provided from S&ME 26. Geosynthetic manufacturer’s testing data (MQC) should go to CQA Manager. 27. Pay Applications should go to Owner. These should be submitted the 1st of the month. 28. Submit Pay Applications monthly to the Owner with adequate documentation and/or surveys to verify quantities requested for payment. CQA Manager will assist Owner as needed. 29. Progress meetings will be conducted bi-weekly initially as erosion and sediment controls are established. 30. Meetings will be conducted weekly as cell construction begins. Locations of future meeting TBD. 31. A liner pre-construction meeting will be held prior to the geosynthetics installation. 32. Permanent benchmarks needs to be established in the field by Charlie Morgan surveying. Pre-Construction Meeting May 27, 2016 Page 5 CONTACTS Owner Primary Contact John Workman 1850 Parkway Place, Suite 600 Marietta, GA 30067 Phone: (704) 400-6557 Email: jworkman@wm.com Secondary Contact Environmental Manager Terry Darragh Daniel Moore, P.G. Work: (803) 744-3349 Cell: (336) 253-0091 Cell: (803) 201-8376 Email: dmoore36@wm.com Email: tdarragh@wm.com General Contractor Primary Contact Superintendent Dakota Hinterer Chad Howdershelt Project Engineer Mountaineer/Preston Contractors, Inc. 15237 S Preston Highway Cell: (304) 698-1448 Kingwood, WV 26537 Email: chad.howdershelt@mciwv.com Phone: (304) 329-2129 Cell: (443) 789-0987 Email: dakota.hinterer@mciwv.com CQA Consultant CQA Officer/Certifying Engineer CQA Manager Steve Lamb, P.E. Orion Holtey, P.E. SCS Engineers SCS Engineers 2520 Whitehall Park Drive, Suite 450 Cell: (941) 527-7480 Charlotte, NC 28273 Email: oholtey@scsengineers.com Phone: (704) 504-3107 Cell: (704) 576-4731 Email: slamb@scsengineers.com CQA Geosynthetic Monitor ACC, Inc. Taylor Herbertson Cell: (770) 713-0465 Email: THerbertson@atlcc.net Pre-Construction Meeting May 27, 2016 Page 6 Design Engineering Firm Design Manager Steve Loskota, P.E. S&ME, Inc. Phone: (704) 523-4726 Email: sloskota@smeinc.com Design Engineer Project Coordinator Sharon Korleski, P.E. Neil Hulland S&ME, Inc. S&ME, Inc. Phone: (864) 208-9371 Phone: (704) 443-1892 Email: skorleski@smeinc.com Email: nhulland@smeinc.com Survey Firm Charlie Morgan Charlie Morgan Surveying, PLLC Phone: (336) 629-5015 Email: cmorganpls@gmail.com Randolph County Design Manager Paxton Arthurs Randolph County Phone: (336) 318-6605 Email: paxton.arthurs@randolphcountync.gov NCDEQ John Murray Ming-Tai Chao DEQ-WM-SWS DEQ-WM-SWS Phone: (252) 808-2808 Phone: (919) 707-8251 Email: john.murray@ncdenr.gov Email: Ming.Chao@ncdenr.gov Christine Ritter John Patrone DEQ-NC-SWS DEQ-WM-SWS Phone: (919) 707-8254 Phone: (336) 776-9673 Email: christine.ritter@ncdenr.gov Email: john.patrone@ncdenr.gov M:\PROJECT FILES\02215305.02\Newforma\Meetings\Precon - 2016.05.24\Pre-Con Meeting Minutes 5.27.16.docx Offices Nationwide ATTACHMENT A SIGN IN SHEET ATTACHMENT B MEETING AGENDA SCS Engineers, PC Environmental Consultants 2520 Whitehall Park Drive 704 504-3107 and Contractors Suite 450 FAX 704 504-3174 Charlotte, NC 28273-3557 www.scsengineers.com Offices Nationwide May 24, 2016 File No. 02215305.02 MEETING AGENDA SUBJECT: Pre-Construction Meeting Great Oak Landfill Cells 1A & 1B 2016 Tuesday, May 24, 2016 This agenda outlines topics to be discussed during the pre-construction meeting for the construction of Cells 1A and 1B at the Great Oak Landfill (Landfill). The meeting is scheduled for May 24th at 11:00 a.m. The meeting will take place at the Randolph County Office Building, 725 McDowell Road, Asheboro, NC 27205. TOPICS FOR DISCUSSION Health & Safety 1. Personal protective equipment (e.g., hard hat, steel-toed boots, safety vest) should be worn at all times. 2. Contractor is solely responsible for the health and safety of their employees and subcontractors. Responsibilities of Each Party 1. Owner – Waste Management of Carolinas, Inc. 2. Designer – S&ME 3. CQA Firm – SCS Engineers with sub-consultant ACC a. CQA Manager b. CQA Monitors c. CQA Officer/Certifying Engineer 4. General Contractor – Preston Contractors 5. Geosynthetics Installer - ESI 6. NCDEQ Pre-Construction Meeting May 24, 2016 Page 2 7. Review lines of communication and authority Review Contractor’s Work Plan, Construction Drawings, Specifications, and CQA Plan 1. Contractor’s Work Plan 2. Construction Drawings a. Site Preparation Plans and Laydown Areas b. Grading Plans c. Geosynthetic Liner Plans d. Leachate Collection Plans e. Details and Sections 3. Specifications 4. CQA Plan 5. All parties have current documents? Project Schedule and Critical Path Items 1. Review Contractors Construction Schedule a. Refer to Section 01 0000, Part 3.02 for schedule requirements. 2. Critical Path Items 3. Work Hours, Weekends and Holidays 4. Contractor shall update schedule on a monthly basis. Establish Reporting and Documenting Procedures 1. As-built Documents 2. Daily Field Reports by CQA Monitors 3. Weekly Summary Reports by CQA Manager 4. Soil Testing Reports 5. Geosynthetic Materials Testing Reports 6. Protocol for correcting construction or non-conformance Pre-Construction Meeting May 24, 2016 Page 3 Submittal Procedures 1. Submittals related to design changes (e.g., diameter of pond riser) must go to the Designer and copied to Owner and CQA Manager. 2. All shop drawing must go to the Designer and copied to Owner and CQA Manager. 3. Geosynthetic manufacturer’s testing data (MQC) should go to CQA Manager. 4. Pay Applications should go to Owner. 5. Submit Pay Applications monthly to the Owner with adequate documentation and/or surveys to verify quantities requested for payment. CQA Manager will verify quantities requested for payment. 6. Change Orders Construction Progress Meetings 1. Weekly 2. Pre-con meeting for Geosynthetics Site Inspection 1. Work areas 2. Stockpile locations 3. Laydown areas, 4. Access Roads 5. Haul Roads Surveying (Provide Record Drawings Showing) 1. Existing surface prior to subgrade preparation. 2. Surface of Excavation/structural fill. 3. Surface of the sub-base (including edges, bottom, and limits of pipe trenches and sump) 4. Surface of the leachate collection/operations of protective cover layer (including edges, bottom, and limits of pipe trenches and sump) 5. Surface of the intermediate soil cover and bench locations following placement of final cover soil layer. Pre-Construction Meeting May 24, 2016 Page 4 6. Surface and limits of geosynthetics 7. Anchor trench 8. Alignment and inverts of piping 9. Document deviations from the Construction Drawings. Pre-Construction Meeting May 24, 2016 Page 5 CONTACTS Owner Primary Contact John Workman 1850 Parkway Place, Suite 600 Marietta, GA 30067 Phone: (704) 400-6557 Email: jworkman@wm.com Secondary Contact Terry Darragh Work: (803) 744-3349 Cell: (803) 201-8376 Email: tdarragh@wm.com General Contractor Primary Contact Superintendent Dakota Hinterer Chad Howdershelt Project Engineer Work: (304) 692-1448 Mountaineer/Preston Contractors, Inc. Cell: 15237 S Preston Highway Email: Kingwood, WV 26537 Phone: (304) 329-2129 Cell: (443) 789-0987 Email: dakota.hinterer@mciwv.com CQA Consultant CQA Officer/Certifying Engineer Steve Lamb, P.E. SCS Engineers 2520 Whitehall Park Drive, Suite 450 Charlotte, NC 28273 Phone: (704) 504-3107 Cell: (704) 576-4731 Email: slamb@scsengineers.com CQA Manager Orion Holtey P.E SCS Engineers Cell: (941) 527-7480 Email: oholtey@scsengineers.com Pre-Construction Meeting May 24, 2016 Page 6 CQA Geosynthetic Monitor ACC Taylor Herbertson Cell: (770) 713-0465 Email: THerbertson@atlcc.net CQA Soils Monitor ACC Paul Vaillancourt Cell: Design Engineering Firm Design Manager Steve Loskota, P.E. S&ME, Inc. Phone: (704) 523-4726 Email: sloskota@smeinc.com Design Engineer Sharon Korleski, P.E. S&ME, Inc. Phone: (864) 208-9371 Email: skorleski@smeinc.com M:\PROJECT FILES\02215305.02\Newforma\Meetings\Pre-Con Meeting Agenda 5.24.16.docx 1 Chao, Ming-tai From:Holtey, Orion <OHoltey@scsengineers.com> Sent:Tuesday, May 31, 2016 4:27 PM To:tdarragh@wm.com; dakota.hinterer@mciwv.com; chad.howdershelt@mciwv.com; THerbertson@atlcc.net; sloskota@smeinc.com; nhulland@smeinc.com; cmorganpls@gmail.com; paxton.arthurs@randolphcountync.gov; Murray, John E; Chao, Ming-tai; Ritter, Christine; Patrone, John; jworkman@mciwv.com Cc:jworkman@wm.com; dmoore36@wm.com; Lamb, Steve Subject:Great Oaks Landfill Cells 1A & 1B - Pre-Con Meeting Minutes Attachments:Pre-Con Meeting Minutes 5.27.pdf Follow Up Flag:Flag for follow up Flag Status:Flagged Good Afternoon,                 Please find the May 24th Pre‐Con Meeting minutes for the Great Oaks Landfill Cells 1A and 1B construction  attached.  The minutes include the agenda and the sign in sheet.      Note:  All parties identified in the Contacts section of the minutes have been included on this email and will be invited to  the next progress meeting.        Please feel free to contact our office with any questions or comments.  If any revisions are made, updated minutes will  be provided.    Regards,    Orion J. Holtey, P.E. Senior Project Engineer SCS ENGINEERS, PC 2520 Whitehall Park Drive, Suite 450 Charlotte, NC 28273 Phone (704) 504-3107 ext. 2143 Fax (704) 504-3174 oholtey@scsengineers.com Ownership Makes a Difference!