Loading...
HomeMy WebLinkAbout1812_DukeMarshall_RequestPh5 PiezAbandon_CLF24-504_FID2175488_20251231Moutos, Sarah From: Davin, Anne <Anne.Davin@duke-energy.com> Sent: Wednesday, December 31, 2025 5:36 PM To: Moutos, Sarah Cc: Yitbarek, Diana; Healy, Ashley Lisbeth; Hardin, Tyler; Werner, Elizabeth Subject: [External] Duke Energy - Marshall - Piezometer CLF24-504 Abandonment Request Attachments: 1812_Phase 5 Piezometer Abandonment Request CLF24-504 w cvr Itr.pdf Importance: High Follow Up Flag: Follow up Flag Status: Flagged CAUTION: External email. Do not click links or open attachments unless verified. Report suspicious emails with the Report Message button located on your Outlook menu bar on the Home tab. INTERNAL Hi Sarah, To progress site closure activities and future landfill construction, Duke Energy requests approval to abandon Industrial Landfill No.1 (1812-INDUS-2008; ILF) Phase 4 piezometers CLF24-504, located within the footprint of Phase 5. The attached Site Vicinity Plan (Figure 1) has the piezometers requested for abandonment circled. The piezometers were installed to support the Geotechnical Investigation for ILF Phase 5. It was installed in September 2024, and collectively 15 months of groundwater elevation data have been collected. The last water Level. measurements were collected on December 4, 2025, and currently shows a water level approximately 3.76 ft Lower than the initial reading. The remaining piezometer in the Phase 5 area (CLF24-505) will remain in place to continue to support the Geotechnical Investigation for ILF Phase 5. Abandonment of the piezometers will be supervised by qualified geotechnical field support that is under the direct supervision of and in contact with a Licensed Geologist. The piezometers will be abandoned by a North Carolina licensed well contractor in accordance with subchapter 02C of the North Carolina Administrative Code. Duke Energy will provide well abandonment logs to the Division upon completion of the field work. If you need additional information regarding this request do not hesitate to email or call me at Anne. Davin@Du ke- Energy.com or (919) 616-2333. To account for project schedules, Duke Energy would appreciate approval by Monday, January 5. Happy New Year! Anne Davin, E.I. Engineer I I Waste & Groundwater Programs 525 South Tryon Street I Charlotte, NC 28202 1 DEP-36A Cell: (919) 616 2333 Anne.Davin(@duke-eneray.com . DUKE ENERGY. INTERNAL (' DUKE ENERGY-. December 22, 2025 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 1646 Mail Service Center Raleigh, NC 27699-1646 Attn: Ms. Elizabeth Werner (submitted electronically) Re: Request for Approval to Abandon Piezometer CLF24-504 Industrial Landfill No.1 - Phase 5 Permit No.: 1812-INDUS-2008 Marshall Steam Station Terrell, North Carolina 28682 Dear Ms. Werner: 525 South Tryon St. Charlotte, NC 28202 Mail Code DEP-36A Charlotte, NC 28201-1006 To progress site closure activities and future landfill construction, Duke Energy requests approval to abandon Industrial Landfill No.1 (1812-INDUS-2008; ILF) Phase 4 piezometers CLF24-504, located within the footprint of Phase 5. The attached Site Vicinity Plan (Figure 1) has the piezometers requested for abandonment circled. The piezometers were installed to support the Geotechnical Investigation for ILF Phase 5. It was installed in September 2024, and collectively 15 months of groundwater elevation data have been collected. The last water level measurements were collected on December 4, 2025, and currently shows a water level approximately 3.76 ft lower than the initial reading. The remaining piezometer in the Phase 5 area (CLF24-505) will remain in place to continue to support the Geotechnical Investigation for ILF Phase 5. Abandonment of the piezometers will be supervised by qualified geotechnical field support that is under the direct supervision of and in contact with a Licensed Geologist. The piezometers will be abandoned by a North Carolina licensed well contractor in accordance with subchapter 02C of the North Carolina Administrative Code. Duke Energy will provide well abandonment logs to the Division upon completion of the field work. If you need additional information regarding this request do not hesitate to email or call me at Anne.Davin(cD_Duke-Energy.com or (919) 616-2333. Respectfully submitted, Anne Davin, E.I. Environmental Services Attachments: Figure 1 Monitoring Location Map (SynTerra, December 2024) cc (via e-mail): Deana Yitbarek, NCDEQ Sherri Stanley, NCDEQ Sarah Moutos, NCDEQ Dan Zakary, Duke Energy Jake Muessen, Duke Energy Scott La Sala, Duke Energy John Metcalf, Duke Energy www.duke-energy.com Page 1 of 2 INTERNAL Tyler Hardin, Duke Energy Ashley Healy, Duke Energy www.duke-energy.com Page 2 of 2 2 3 4 5 6 7 8 LEGEND s ' ; ASH BASIN WASTE BOUNDARY (APPROXIMATE) I .� � ,` . t , � ♦ ......... EXISTING SITE FEATURE (APPROXIMATE) /000 /1000, R' f I ♦ PROPERTY BOUNDARY - oat �. ` ` # / r ♦ PHASE BOUNDARY ♦ PROPOSED AECOM SOIL BORING AND PIEZOMETER LOCATION lole♦ 1 (PHASE 5) {~ r •. goal CLF 24-505 1 ' r 1 I s 1 4 1 I fw I Ajo _ 1 1 1 ,wR CLF 24-504 ; PH E 5 1 � ' . 1 • r " 1 l { ` 1 , r CLF 24-503_-0 1. ; f r f MALi- .— CLF 24-502 CLF 24-501 J /■F r 1 Jf. ' • f I . ►, . i r PHASE 4 I� �i .r r I II ► t C:\USERS\MEAGAN.SURANE\AECOM\DUKE ENERGY-MARSHALL - GENERAL (1)\ILF PHASE 5\900_CAD_GIS\910-CAD\25 -FIG URES\INSTRUM ENTATION PLAN-PH5.DWG 7/29/2024 2:15:17 P �I�NCHFS 1 2 3 TENTHS 10 230 410 5 1 I r 1 I r t•_ 11 4f dook ;l i / 3, 4f � 1 � 1 a 1'00, , r 1 / r PHASE 3 I r _ l I N REV. 0 PROPOSED INSTRUMENTATION PLAN MARSHALL STEAM STATION ♦� '�. INDUSTRIAL LANDFILL NO. 1 PHASE 5 EXPANSION ti CATAWBA COUNTY, NORTH CAROLINA ' FOR ISSUED FOR REVIEW SCALE: AS SHOWN DES: RLP DUKE1� DWG TYPE: .DWG DFTR: MCS - � DATE ENERGY NO: 60697246 ENKD. RPD 4v 1 07/20/2024 G RPD FILENAME: APPD: JAB DWG SIZE DRAWING NO. REVISION ANSI D FIGURE 2 0 22.0"x34.0" 4 .xt 6 7 8 9 10 I I I I I mr-C