Loading...
HomeMy WebLinkAboutNew Firm Operator ProcessNew Firm Operator Process: Pumper Pumper Vehicle(s) Pumper Vehicle(s) & SDTF Pumper Vehicle(s) & SLAS Pumper Vehicle(s) SDTF & SLAS Portable Restroom Trailers) Only Phase 1 Phase 1 1. Submit New Firm Application to the Phase 1 1. Submit New Firm Application to DWM 1. Submit New Firm Application to the 1. Submit New Firm Application to the DWM the DWM 1. Submit New Firm Application to the DWM 2. Pay Permit Fee to the DWM* 2. Pay Permit Fee to the DWM* DWM 2. Pay Permit Fee to the DWM* 3. Obtain NCS Number from DWM 2. Pay Permit Fee of $845 2. Pay Permit Fee to the DWM* 3. Obtain NCS Number from DWM 4. Submit discharge / disposal authorization(s) to DWM 3. Obtain NCS Number from DWM 3. Obtain NCS Number from DWM 4. Submit discharge / disposal 5. Attend DWM New Operator Training Class 3. Obtain NCS Number from DWM 4. Submit discharge / disposal authorization(s) to DWM 6. Get pumper vehicle(s) lettered 4. Submit discharge / disposal authorization(s) to DWM 5. Attend DWM New Operator Training 7. Get pumper vehicle(s) inspected 4. Attend DWM New Operator authorization(s) to DWM 5. Attend DWM New Operator Training Class 8. Receive Signed Firm Permit Training Class Class 6. Get pumper vehicle(s) lettered 5. Attend DWM New Operator 6. Get pumper vehicle(s) lettered 7. Get pumper vehicle(s) inspected Phase 2 5. Receive Signed Firm Permit Training Class 7. Get pumper vehicle(s) inspected 8. Receive Signed Firm Permit 8. Receive Signed Firm Permit 9. Complete SDTF Application 6. Get pumper vehicle(s) lettered Phase 2 a. Landowner Authorization Phase 2 b. Letter from local govt stating location meets zoning requirements 7. Get pumper vehicle(s) inspected 9. Complete SLAS Application c. Tanks or facility site location must meet horizontal and vertical 9. Complete SDTF Application a. Landowner Authorization setback requirements 8. Receive Signed Firm Permit a. Landowner Authorization b. Letter from local government d. Pumper vehicles including trailers permitted as an SDTF that will b. Letter from local govt stating stating location meets zoning be used to transport septage must meet all septage rule requirements location meets zoning requirements requirements (such as lettering, metal tank etc.) c. Tanks or facility site location must c. Approved Nutrient Management e. If Treatment Facility, need extra documentation meet horizontal and vertical Plan (NMP) and Erosion and f. If Underground need engineer's certification setback requirements Runoff Management Plan 10. Receive Signed SDTF Permit d. Pumper vehicles including trailers d. Site soil evaluation, i.e. horizontal permitted as an SDTF that will be and vertical setbacks Phase 3 used to transport septage must meet e. Field inspection for crop coverage all septage rule requirements (such requirements and boundary markers 11. Complete SLAS Application as lettering, metal tank etc.) prior to use. g. Landowner Authorization e. If Treatment Facility, need extra 10. Receive Signed SLAS Permit h. Letter from local government stating location meets zoning documentation requirements f If Underground need engineer's i. Approved Nutrient Management Plan (NMP) and Erosion and certification Runoff Management Plan 10. Receive Signed SDTF Permit j. Site soil evaluation, i.e. horizontal and vertical setbacks k. Field inspection for crop coverage requirements and boundary markers prior to use. 12. Receive Signed SLAS Permit New Firm Applications are available HERE. New SDTF Applications are available HERE. New SLAS Applications are available HERE. *Permit Fees a. $845 for one pumper vehicle b. $1,003 for two pumper vehicles c. $1,584 for three or more pumper vehicles Checks - No additional fee Debit Cards - $3.95 fee Credit Card - 2.65% of invoice total fee Blank Disposal Authorization Templates are available for WWTPs, SDTFs, and SLASs. Landowner Authorizations for SDTFs for Private, Corporate, & LLC owned land are available. Landowner Authorizations for SLASs for Private, Corporate, & LLC owned land are available. Registration for New Operator Training provided by the DEQ is available HERE. New Firm Operator Process: Non -Pumper SDTF Only SLAS Only SDTF & SLAS Restaurants Phase 1 Phase 1 Phase 1 1. Submit New Firm Application to the DWM 1. Submit New Firm Application to the DWM 1. Submit New Firm Application to the DWM 1. Submit New Firm Application to the DWM 2. Pay Permit Fee of $500 2. Pay Permit Fee of $500 2. Pay Permit Fee of $500 2. Pay Permit Fee of $500 3. Obtain NCS Number from DWM 3. Obtain NCS Number from DWM 3. Obtain NCS Number from DWM 4. Attend DWM New Operator Training Class 4. Attend DWM New Operator Training Class 4. Attend DWM New Operator Training Class 3. Obtain NCS Number from DWM 5. Receive Signed Firm Permit 5. Receive Signed Firm Permit 5. Receive Signed Firm Permit 4. Attend DWM New Operator Training Class Phase 2 Phase 2 Phase 2a 6. Complete SDTF Application 6. Complete SLAS Application 6. Complete SDTF Application a. Landowner Authorization a. Landowner Authorization a. Landowner Authorization b. Letter from local govt stating location meets b. Letter from local government stating location b. Letter from local govt stating location meets zoning requirements meets zoning requirements zoning requirements c. Tanks or facility site location must meet c. Approved Nutrient Management Plan (NMP) and c. Tanks or facility site location must meet horizontal and vertical setback requirements Erosion and Runoff Management Plan horizontal and vertical setback requirements d. Pumper vehicles including trailers permitted as d. Site soil evaluation, i.e. horizontal and vertical d. Pumper vehicles including trailers permitted as an SDTF that will be used to transport septage setbacks an SDTF that will be used to transport septage must meet all septage rule requirements (such as e. Field inspection for crop coverage requirements must meet all septage rule requirements (such as lettering, metal tank etc.) and boundary markers prior to use. lettering, metal tank etc.) e. If Treatment Facility, need extra documentation e. If Treatment Facility, need extra documentation f. If Underground need engineer's certification f. If Underground need engineer's certification Phase 2b 7. Complete SLAS Application a. Landowner Authorization b. Letter from local government stating location meets zoning requirements c. Approved Nutrient Management Plan (NMP) and Erosion and Runoff Management Plan d. Site soil evaluation, i.e. horizontal and vertical setbacks e. Field inspection for crop coverage requirements and boundary markers prior to use. New Firm Applications are available HERE. New SDTF Applications are available HERE New SLAS Applications are available HERE Permit Fee: $500 Checks — No additional fee Debit Cards - $3.95 fee Credit Card — 2.65% of invoice total fee Blank Disposal Authorization Templates are available for WWTPs, SDTFs, and SLASs. Landowner Authorizations for SDTFs for Private, Corporate, & LLC owned land are available. Registration for New Operator Training provided by the DEQ is available HERE. Landowner Authorizations for SLASs for Private, Corporate, & LLC owned land are available.