HomeMy WebLinkAboutNew Firm Operator ProcessNew Firm Operator Process: Pumper
Pumper Vehicle(s)
Pumper Vehicle(s)
& SDTF
Pumper Vehicle(s)
& SLAS
Pumper Vehicle(s)
SDTF & SLAS
Portable Restroom Trailers) Only
Phase 1
Phase 1
1. Submit New Firm Application to the
Phase 1
1. Submit New Firm Application to
DWM
1. Submit New Firm Application to the
1. Submit New Firm Application to the DWM
the DWM
1. Submit New Firm Application to the
DWM
2. Pay Permit Fee to the DWM*
2. Pay Permit Fee to the DWM*
DWM
2. Pay Permit Fee to the DWM*
3. Obtain NCS Number from DWM
2. Pay Permit Fee of $845
2. Pay Permit Fee to the DWM*
3. Obtain NCS Number from DWM
4. Submit discharge / disposal authorization(s) to DWM
3. Obtain NCS Number from DWM
3. Obtain NCS Number from DWM
4. Submit discharge / disposal
5. Attend DWM New Operator Training Class
3. Obtain NCS Number from DWM
4. Submit discharge / disposal
authorization(s) to DWM
6. Get pumper vehicle(s) lettered
4. Submit discharge / disposal
authorization(s) to DWM
5. Attend DWM New Operator Training
7. Get pumper vehicle(s) inspected
4. Attend DWM New Operator
authorization(s) to DWM
5. Attend DWM New Operator Training
Class
8. Receive Signed Firm Permit
Training Class
Class
6. Get pumper vehicle(s) lettered
5. Attend DWM New Operator
6. Get pumper vehicle(s) lettered
7. Get pumper vehicle(s) inspected
Phase 2
5. Receive Signed Firm Permit
Training Class
7. Get pumper vehicle(s) inspected
8. Receive Signed Firm Permit
8. Receive Signed Firm Permit
9. Complete SDTF Application
6. Get pumper vehicle(s) lettered
Phase 2
a. Landowner Authorization
Phase 2
b. Letter from local govt stating location meets zoning requirements
7. Get pumper vehicle(s) inspected
9. Complete SLAS Application
c. Tanks or facility site location must meet horizontal and vertical
9. Complete SDTF Application
a. Landowner Authorization
setback requirements
8. Receive Signed Firm Permit
a. Landowner Authorization
b. Letter from local government
d. Pumper vehicles including trailers permitted as an SDTF that will
b. Letter from local govt stating
stating location meets zoning
be used to transport septage must meet all septage rule requirements
location meets zoning requirements
requirements
(such as lettering, metal tank etc.)
c. Tanks or facility site location must
c. Approved Nutrient Management
e. If Treatment Facility, need extra documentation
meet horizontal and vertical
Plan (NMP) and Erosion and
f. If Underground need engineer's certification
setback requirements
Runoff Management Plan
10. Receive Signed SDTF Permit
d. Pumper vehicles including trailers
d. Site soil evaluation, i.e. horizontal
permitted as an SDTF that will be
and vertical setbacks
Phase 3
used to transport septage must meet
e. Field inspection for crop coverage
all septage rule requirements (such
requirements and boundary markers
11. Complete SLAS Application
as lettering, metal tank etc.)
prior to use.
g. Landowner Authorization
e. If Treatment Facility, need extra
10. Receive Signed SLAS Permit
h. Letter from local government stating location meets zoning
documentation
requirements
f If Underground need engineer's
i. Approved Nutrient Management Plan (NMP) and Erosion and
certification
Runoff Management Plan
10. Receive Signed SDTF Permit
j. Site soil evaluation, i.e. horizontal and vertical setbacks
k. Field inspection for crop coverage requirements and boundary
markers prior to use.
12. Receive Signed SLAS Permit
New Firm Applications are available HERE.
New SDTF Applications are available HERE.
New SLAS Applications are available HERE.
*Permit Fees
a. $845 for one pumper vehicle
b. $1,003 for two pumper vehicles
c. $1,584 for three or more pumper vehicles
Checks - No additional fee
Debit Cards - $3.95 fee
Credit Card - 2.65% of invoice total fee
Blank Disposal Authorization Templates
are available for WWTPs, SDTFs, and SLASs.
Landowner Authorizations for SDTFs for Private,
Corporate, & LLC owned land are available.
Landowner Authorizations for SLASs for Private,
Corporate, & LLC owned land are available.
Registration for New Operator Training
provided by the DEQ is available HERE.
New Firm Operator Process: Non -Pumper
SDTF Only
SLAS Only
SDTF & SLAS
Restaurants
Phase 1
Phase 1
Phase 1
1. Submit New Firm Application to the DWM
1.
Submit New Firm Application to the DWM
1.
Submit New Firm Application to the DWM
1.
Submit New Firm Application to the DWM
2.
Pay Permit Fee of $500
2.
Pay Permit Fee of $500
2.
Pay Permit Fee of $500
2. Pay Permit Fee of $500
3.
Obtain NCS Number from DWM
3.
Obtain NCS Number from DWM
3.
Obtain NCS Number from DWM
4.
Attend DWM New Operator Training Class
4.
Attend DWM New Operator Training Class
4.
Attend DWM New Operator Training Class
3. Obtain NCS Number from DWM
5.
Receive Signed Firm Permit
5.
Receive Signed Firm Permit
5.
Receive Signed Firm Permit
4. Attend DWM New Operator Training Class
Phase 2
Phase 2
Phase 2a
6.
Complete SDTF Application
6.
Complete SLAS Application
6.
Complete SDTF Application
a. Landowner Authorization
a. Landowner Authorization
a. Landowner Authorization
b. Letter from local govt stating location meets
b. Letter from local government stating location
b. Letter from local govt stating location meets
zoning requirements
meets zoning requirements
zoning requirements
c. Tanks or facility site location must meet
c. Approved Nutrient Management Plan (NMP) and
c. Tanks or facility site location must meet
horizontal and vertical setback requirements
Erosion and Runoff Management Plan
horizontal and vertical setback requirements
d. Pumper vehicles including trailers permitted as
d. Site soil evaluation, i.e. horizontal and vertical
d. Pumper vehicles including trailers permitted as
an SDTF that will be used to transport septage
setbacks
an SDTF that will be used to transport septage
must meet all septage rule requirements (such as
e. Field inspection for crop coverage requirements
must meet all septage rule requirements (such as
lettering, metal tank etc.)
and boundary markers prior to use.
lettering, metal tank etc.)
e. If Treatment Facility, need extra documentation
e. If Treatment Facility, need extra documentation
f. If Underground need engineer's certification
f. If Underground need engineer's certification
Phase 2b
7.
Complete SLAS Application
a. Landowner Authorization
b. Letter from local government stating location
meets zoning requirements
c. Approved Nutrient Management Plan (NMP)
and Erosion and Runoff Management Plan
d. Site soil evaluation, i.e. horizontal and vertical
setbacks
e. Field inspection for crop coverage requirements
and boundary markers prior to use.
New Firm Applications are available HERE.
New SDTF Applications are available HERE
New SLAS Applications are available HERE
Permit Fee: $500
Checks — No additional fee
Debit Cards - $3.95 fee
Credit Card — 2.65% of invoice total fee
Blank Disposal Authorization Templates
are available for WWTPs, SDTFs, and SLASs.
Landowner Authorizations for SDTFs for Private,
Corporate, & LLC owned land are available.
Registration for New Operator Training
provided by the DEQ is available HERE.
Landowner Authorizations for SLASs for Private,
Corporate, & LLC owned land are available.