HomeMy WebLinkAboutNew Firm Operator ProcessNew Firm Operator Process: Pumper
New Firm Applications are available HERE. *Permit Fees Blank Disposal Authorization Templates Registration for New Operator Training a. $845 for one pumper vehicle are available for WWTPs, SDTFs, and SLASs. provided by the DEQ is available HERE. New SDTF Applications are available HERE. b. $1,003 for two pumper vehicles
c. $1,584 for three or more pumper vehicles Landowner Authorizations for SDTFs for Private, Corporate,
New SLAS Applications are available HERE. & LLC owned land are available. Checks – No additional fee Debit Cards - $3.95 fee Landowner Authorizations for SLASs for Private, Corporate,
Credit Card – 2.65% of invoice total fee & LLC owned land are available.
Pumper Vehicle(s) Pumper Vehicle(s) & SDTF Pumper Vehicle(s) & SLAS Pumper Vehicle(s) SDTF & SLAS Portable Restroom Trailer(s) Only
1. Submit New Firm Application to the DWM
2. Pay Permit Fee to the DWM* 3. Obtain NCS Number from DWM
4. Submit discharge / disposal authorization(s) to DWM 5. Attend DWM New Operator Training Class 6. Get pumper vehicle(s) lettered 7. Get pumper vehicle(s) inspected
8. Receive Signed Firm Permit
Phase 1 1. Submit New Firm Application to the
DWM 2. Pay Permit Fee to the DWM* 3. Obtain NCS Number from DWM
4. Submit discharge / disposal authorization(s) to DWM 5. Attend DWM New Operator Training Class 6. Get pumper vehicle(s) lettered 7. Get pumper vehicle(s) inspected 8. Receive Signed Firm Permit Phase 2 9. Complete SDTF Application
a. Landowner Authorization b. Letter from local govt stating location meets zoning requirements
c. Tanks or facility site location must meet horizontal and vertical setback requirements
d. Pumper vehicles including trailers permitted as an SDTF that will be used to transport septage must meet all septage rule requirements (such as lettering, metal tank etc.) e. If Treatment Facility, need extra
documentation f. If Underground need engineer’s certification 10. Receive Signed SDTF Permit
1. Submit New Firm Application to the DWM
2. Pay Permit Fee to the DWM* 3. Obtain NCS Number from DWM 4. Submit discharge / disposal
authorization(s) to DWM 5. Attend DWM New Operator Training Class 6. Get pumper vehicle(s) lettered 7. Get pumper vehicle(s) inspected 8. Receive Signed Firm Permit Phase 2 9. Complete SLAS Application a. Landowner Authorization
b. Letter from local government stating location meets zoning requirements
c. Approved Nutrient Management Plan (NMP) and Erosion and Runoff Management Plan
d. Site soil evaluation, i.e. horizontal and vertical setbacks e. Field inspection for crop coverage requirements and boundary markers prior to use. 10. Receive Signed SLAS Permit
1. Submit New Firm Application to the DWM 2. Pay Permit Fee to the DWM*
3. Obtain NCS Number from DWM 4. Submit discharge / disposal authorization(s) to DWM 5. Attend DWM New Operator Training Class
6. Get pumper vehicle(s) lettered 7. Get pumper vehicle(s) inspected 8. Receive Signed Firm Permit Phase 2 9. Complete SDTF Application a. Landowner Authorization b. Letter from local govt stating location meets zoning requirements c. Tanks or facility site location must meet horizontal and vertical setback requirements
d. Pumper vehicles including trailers permitted as an SDTF that will be used to transport septage must meet all septage rule requirements (such as lettering, metal tank etc.)
e. If Treatment Facility, need extra documentation f. If Underground need engineer’s certification 10. Receive Signed SDTF Permit
Phase 3 11. Complete SLAS Application g. Landowner Authorization h. Letter from local government stating location meets zoning
requirements i. Approved Nutrient Management Plan (NMP) and Erosion and Runoff Management Plan j. Site soil evaluation, i.e. horizontal and vertical setbacks k. Field inspection for crop coverage requirements and boundary markers prior to use. 12. Receive Signed SLAS Permit
1. Submit New Firm Application to the DWM
2. Pay Permit Fee of $845 3. Obtain NCS Number from DWM
4. Attend DWM New Operator Training Class 5. Receive Signed Firm Permit
New Firm Operator Process: Non-Pumper
New Firm Applications are available HERE. Permit Fee: $500 Blank Disposal Authorization Templates Registration for New Operator Training are available for WWTPs, SDTFs, and SLASs. provided by the DEQ is available HERE.
New SDTF Applications are available HERE. Checks – No additional fee
Debit Cards - $3.95 fee Landowner Authorizations for SDTFs for Private, Corporate, New SLAS Applications are available HERE. Credit Card – 2.65% of invoice total fee & LLC owned land are available. Landowner Authorizations for SLASs for Private, Corporate,
& LLC owned land are available.
SDTF Only SLAS Only SDTF & SLAS Restaurants
Phase 1
1. Submit New Firm Application to the DWM 2. Pay Permit Fee of $500 3. Obtain NCS Number from DWM 4. Attend DWM New Operator Training Class
5. Receive Signed Firm Permit
Phase 2 6. Complete SDTF Application
a. Landowner Authorization b. Letter from local govt stating location meets zoning requirements c. Tanks or facility site location must meet
horizontal and vertical setback requirements
d. Pumper vehicles including trailers permitted as an SDTF that will be used to transport septage must meet all septage rule requirements (such as lettering, metal tank etc.)
e. If Treatment Facility, need extra documentation
f. If Underground need engineer’s certification
Phase 1
1. Submit New Firm Application to the DWM 2. Pay Permit Fee of $500 3. Obtain NCS Number from DWM 4. Attend DWM New Operator Training Class
5. Receive Signed Firm Permit Phase 2 6. Complete SLAS Application
a. Landowner Authorization b. Letter from local government stating location meets zoning requirements c. Approved Nutrient Management Plan (NMP) and
Erosion and Runoff Management Plan
d. Site soil evaluation, i.e. horizontal and vertical setbacks e. Field inspection for crop coverage requirements and boundary markers prior to use.
Phase 1
1. Submit New Firm Application to the DWM 2. Pay Permit Fee of $500 3. Obtain NCS Number from DWM 4. Attend DWM New Operator Training Class
5. Receive Signed Firm Permit
Phase 2a 6. Complete SDTF Application
a. Landowner Authorization b. Letter from local govt stating location meets zoning requirements c. Tanks or facility site location must meet
horizontal and vertical setback requirements
d. Pumper vehicles including trailers permitted as an SDTF that will be used to transport septage must meet all septage rule requirements (such as lettering, metal tank etc.)
e. If Treatment Facility, need extra documentation
f. If Underground need engineer’s certification Phase 2b
7. Complete SLAS Application
a. Landowner Authorization b. Letter from local government stating location meets zoning requirements
c. Approved Nutrient Management Plan (NMP) and Erosion and Runoff Management Plan d. Site soil evaluation, i.e. horizontal and vertical setbacks
e. Field inspection for crop coverage requirements
and boundary markers prior to use.
1. Submit New Firm Application to the DWM 2. Pay Permit Fee of $500 3. Obtain NCS Number from DWM
4. Attend DWM New Operator Training Class 5. Receive Signed Firm Permit