HomeMy WebLinkAbout1812_2025 Q2 ILF Groundwater Conditions Report_w cvr ltr_8-1-2025(� DUKE ENERGY August 1, 2025 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 2090 U.S. Highway 70 Swannanoa, NC 28778 Attn: Ms. Sarah Moutos (submitted electronically) Re: Groundwater Condition Quarterly Report — April 2025 through June 2025 Industrial Landfill No.1 Permit No.: 1812-INDUS-2008 Marshall Steam Station Terrell, North Carolina 28682 Dear Ms. Moutos: 525 S. Tryon St. Charlotte NC, 28202 In accordance with the NCDEQ DWM September 17, 2021, Phase 2 Permit Modification Approval letter (FID 1609547), Duke Energy is providing the quarterly report describing groundwater conditions in the area of the Marshall Steam Station Industrial Landfill No.1 (ILF, 1812-INDUS-2008) Phases 2, 3, 4, and 5 Expansion (Future Phases). The report is for the quarterly period of January 2025 through March 2025 (Q1 2025). The quarterly report includes an analysis of groundwater levels and underdrain pump flowrates within Phases 2, 3, 4 and 5 Expansion, with an updated water level map, hydrographs, pump flowrate plot, and well construction and water level data tables. An evaluation of groundwater levels and pump flowrates compared to model predictions is included. Groundwater transducer data, groundwater model trend data, and underdrain pumping data are provided in an excel file format as the report Appendices. Groundwater conditions in the vicinity of Marshall Steam Station's Industrial Landfill No.1 continue to be monitored and evaluated. The next quarterly report (Q2 2025) will be submitted by November 1, 2025. If you need additional information regarding this submittal do not hesitate to email or call me at Anne.Davin(cDduke-energy.com or (919) 616-2333. Respectfully submitted, 9�v� A>,�� Anne Davin, E.I. Environmental Services Attachments: Industrial Landfill No.1 (1812-INDUS-2008) Groundwater Conditions Quarterly Report — April 2025 through June 2025 (SynTerra; July 2025) Appendices in excel format: 1) Appendix A Water Level Monitoring Data Files 2) Appendix B Groundwater Model Predicted Trend File 3) Appendix C Underdrain Pumping Data File 4) Appendix D Mann -Kendall Results cc (via e-mail): Deana Yitbarek, NCDEQ www.duke-energy.com Page 1 of 2 Elizabeth Werner, NCDEQ Sherri Stanley, NCDEQ Scott Saunders, Duke Energy Dan Zakary, Duke Energy Jake Muessen, Duke Energy Ashley Healy, Duke Energy Tyler Hardin, Duke Energy Ed Sullivan, Duke Energy Thomas Colton, SynTerra www.duke-energy.com Page 2 of 2 41P synTerra Science & Engineering Consultants synterracorp.com GROUNDWATER CONDITIONS QUARTERLY REPORT — APRIL 2025 TO JUNE 2025 INDUSTRIAL LANDFILL NO. 1 PERMIT NO. 1812-INDUS-2008) FOR MARSHALL STEAM STATION 8320 EAST CAROLINA HIGHWAY 150 TERRELL, NC 28682 JULY 31, 2025 PREPARED FOR *r7 DUKE N`ca'RD,,,,, `� ENERGY.: 'EESSJp Z/'j'�'�,��� CAROLINAS H �•'9 ' SEAL q, ' = DUKE ENERGY CAROLINAS, LLC 056667 0 MAS G \`\. — ti G. Thomas Colton, NC P.E. No. 056667 Trevor Ludwick Associate Engineer/Project Manager Project Scientist Scott A. Spinner, NC L.G. Senior Peer Reviewer Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina ILl 1RX919141910Ill I I►kM PAGE 1.0 INTRODUCTION........................................................................................................ 1-1 1.1 Objectives and Purpose...............................................................................................1-1 1.2 Key Findings.................................................................................................................1-1 2.0 QUARTERLY MONITORING RESULTS......................................................................... 2-1 2.1 Current Groundwater Conditions................................................................................ 2-1 2.2 Groundwater Trends.................................................................................................... 2-1 2.2.1 Groundwater Level Hydrographs and Model Trends ............................................ 2-1 2.3 Underdrain Pump Performance...................................................................................2-3 3.0 QUARTERLY WATER -LEVEL REDUCTION ACTIVITIES ................................................... 3-1 4.0 REFERENCES.............................................................................................................4-1 July 2025 Page i Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina LIST OF FIGURES Figure 1 Site Location Map Figure 2 Monitoring Locations Figure 3 Groundwater Elevations — Upper Flow Zone (July 2025) Figure 4A Upgradient of Phase 2 Expansion (ILF-2S/D and MW-4/D) Figure 413 Upgradient of Phase 2 Expansion (GWA-4S/D and CLF21-10) Figure 4C Within Phase 2 Expansion (CLF-UD and CLF21-11) Figure 4D Within Phase 2 Expansion (CLF21-12 and CLF21-13/13R) Figure 4E Within Phase 2 Expansion (CLF21-14/14R and CLF21-15) Figure 4F Downgradient of the Phase 2 Expansion (CLF-402 and CLF-408) Figure 4G Downgradient of the Phase 2 Expansion (CLF22-306/306R and CLF22-307/307R) Figure 4H Southwest of the Future Phase 5 Expansion (CLF24-501 and CLF24-502) Figure 41 West of the Future Phase 5 Expansion (CLF24-503 and CLF24-504) Figure 4J West of the Phase 2 Expansion (CLF24-505) Figure 5 Cell 5 (Underdrain) Pumping Flow Rate vs. Simulated Flow Rate LIST OF TABLES Table 1 Groundwater Monitoring Network Well Information and Water Levels LIST OF APPENDICES Appendix A Water -Level Monitoring Data Files Appendix B Groundwater Model Predicted Trend File Appendix C Underdrain Pumping Data Files Appendix D Mann -Kendall Data July 2025 Page H Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina II&10]y_[4l:%]►1iLTI1.7_1►U7_13 3:1VAF-A00 L11.1 Duke Energy Duke Energy Carolinas, LLC DWM Division of Waste Management Future Phases ILF Phases 3, 4, and 5 expansion gpm gallons per minute ILF Industrial Landfill (Permit No. 1812-INDUS-2008) NCDEQ North Carolina Department of Environmental Quality reporting period second quarter 2025 (April 2025 to June 2025) Site Marshall Steam Station July 2025 Page Hi Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 1.0 INTRODUCTION 1.1 Objectives and Purpose SynTerra prepared this Groundwater Conditions Quarterly Report (report) on behalf of Duke Energy Carolinas, LLC (Duke Energy) to document the groundwater -level monitoring data and underdrain pumping records in the vicinity of the Industrial Landfill No.1 (ILF) (Permit No. 1812- INDUS-2008) at the Marshall Steam Station (Site; Figure 1). This report is prepared in response to condition #3 in the North Carolina Department of Environmental Quality (NCDEQ) Division of Waste Management (DWM) September 17, 2021, Phase 2 Permit Modification Approval letter (FID 1609547). Data collected during the second quarter of 2025 [April 2025 to June 2025 (reporting period)] were used to evaluate groundwater conditions for the ILF Phase 2 expansion (includes Cell 5 and Cell 6) and ILF Future Phases 3, 4, and 5 expansion (Future Phases). Groundwater levels are monitored at 21 piezometers and monitoring wells and the ILF underdrain. Specifically, this report evaluates the groundwater levels, underdrain pumping flow rates, and efforts to expedite reducing and maintaining groundwater levels near the ILF during the reporting period. 1.2 Key Findings Key findings of the evaluation conducted during this reporting period include: • Groundwater levels in the vicinity of the ILF are stable or have decreased since monitoring began in July 2021. • During the reporting period, groundwater levels were stable or decreased at 19 of the 21 monitoring locations. Groundwater levels increased at CLF23-408 and CLF24-501; those locations are in the southern extent of ILF Future Phases 4 and 5. • Monitoring locations where groundwater levels are greater than model predictions may be attributed to increased precipitation in the area or to a slower basin excavation rate than assumed in the model. Additionally, neither the original model calibration nor the 2024 update include the new ILF Phase 5 piezometers. • The Cell 5 underdrain pump has been operational for 46 months. During the reporting period, the average pumping rate was approximately 7.8 gallons per minute (gpm), an increase compared to that of the previous reporting period (7.1 gpm). While the flow rates vary, the overall trends generally match the model predictions. The model predicted the underdrain to become dry after approximately 19 months of operation; however, the slower basin excavation rate has extended the period needed to operate the underdrain. July 2025 Page 1-1 Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 2.0 QUARTERLY MONITORING RESULTS 2.1 Current Groundwater Conditions The established network of temporary and long-term piezometers and groundwater wells for monitoring groundwater elevations in the ILF Phase 2 expansion area is shown on Figure 2. Piezometer and groundwater well construction information pertaining to the monitoring network (including water levels and groundwater elevations) is provided in Table 1. Depth to groundwater measurements were collected on July 1, 2025, for the upper (shallow) flow zone and were used to generate a groundwater elevation map (Figure 3). Groundwater elevations indicate: 0 Groundwater at the ILF area has an overall flow direction from north to south (Figure 3). Groundwater levels in wells and piezometers at the ILF are similar or have decreased compared to groundwater levels during the first quarter of 2025. • Underdrain operations in Cell 5 have maintained a cone of groundwater depression around the Cell 5 blanket underdrain sump (CLF-UD; Figure 3). 2.2 Groundwater Trends Transducers installed in groundwater monitoring wells, piezometers, and the Cell 5 underdrain (CLF- UD) pump have been used to monitor water -level trends from as early as July 2021 through June 2025 (Figure 4A through Figure 4J). Key observations of those data include: Groundwater level data collected from July 2021 (when monitoring started) through June 2025 were evaluated using Mann -Kendall analysis to determine water -level trends (Appendix D). Statistically significant decreasing groundwater elevation trends were observed in 16 of 21 monitored locations. Stable groundwater levels were observed at five of 21 locations (CLF21-12, CLF24-502, CLF24-503, CLF24-504, and CLF24-505). Decreasing or stable water level trends were observed in locations downgradient of the Future Phases area during the reporting period, except for CLF23-408 and CLF24-501, which are located in the southern extent of ILF Future Phases 4 and 5. 2.2.1 Groundwater Level Hydrographs and Model Trends Pressure transducers are used to record high -resolution groundwater elevation data for evaluation of groundwater conditions resulting from dewatering and excavation. Transducer data are included in Appendix A. Manual water -level measurements and transducer records were used to generate groundwater level hydrographs. Predicted groundwater level trends from the transient groundwater models are included in those hydrographs (Figure 4A through Figure 4J). The predicted transient groundwater level trends exported from the models are provided in Appendix B. July 2025 Page 2-1 Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina Upgradient of the Phase 2 Expansion Water levels upgradient of the Phase 2 expansion are generally stable. Water -level trends at upgradient locations show overall decreasing trends from the start of monitoring (July 2021) through this reporting period. Information regarding the water -level trends during the reporting period and overall monitoring period is provided below. Location ID Flow Zone Reporting Period Trend Overall Trend Location Plot MW-4 Shallow Stable Decreasing East of the ILF Phase 2 expansion Figure 4A MW-4D Deep Stable Decreasing East of the ILF Phase 2 expansion Figure 4A ILF-2S Shallow Stable Decreasing North of the ILF Figure 4A ILF-21) Deep Stable Decreasing North of the ILF Figure 4A GWA-4S Shallow Stable Decreasing West of the ILF Phase 2 expansion Figure 4B GWA-41) Deep Decreasing Decreasing West of the ILF Phase 2 expansion Figure 4B CLF21-10 Shallow Stable Decreasing West of the ILF Phase 2 expansion Figure 4B Within the Phase 2 Expansion A transducer, identified as CLF-UD (Figure 2), was installed to monitor the Cell 5 underdrain sump water level with the temporary pump operations while the landfill cell was under construction. In October 2022, a permanent pump was installed; since then, the water level has been recorded manually every week. The water levels within the sump demonstrate that the underdrain continues to operate as intended, maintaining a steady water level controlled by the pump settings (Figure 4C). Perimeter of the Phase 2 Expansion, Outside of Cell 5 and Cell 6 Water levels at the perimeter of the Phase 2 expansion are decreasing or stable. Information regarding the water -level trends during the reporting period and overall monitoring period is provided below. Location ID Flow Zone Reporting Period Trend Overall Trend Location Plot CLF21-11 Shallow Stable Decreasing West of Cell 5 Figure 4C CLF21-12 Shallow Stable Stable Southwest of Cell 5 Figure 4D CLF21-13R Shallow Stable Decreasing South of Cell 5 Figure 4D CLF21-14R Shallow Decreasing Decreasing East of Cell 6 Figure 4E CLF21-15 Shallow Decreasing Decreasing East of Cell 6 Figure 4E CLF24-505 Shallow Stable Stable West of Cell 5 Figure 4.1 Downgradient of the Phase 2 Expansion (Future Phases Area) Water levels downgradient of the Phase 2 expansion are decreasing or stable, except for CLF24-501 and CLF23-408. Water levels in three other locations also temporarily July 2025 Page 2-2 Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina increased during the reporting period (CLF24-502, CLF24-503, and CLF24-504). Those locations are proximate to the dewatering rim ditch/sump in the Future Phases area. It is possible that precipitation and water management in the dewatering ditches have contributed to these increases. Information regarding the water -level trends for the reporting period and the overall monitoring period is provided below. Flow Reporting Overall Location ID Location Plot Zone Period Trend Trend Within Future Phases 4 & 5 CLF-402 Shallow Decreasing Decreasing Figure 4F Expansion Downgradient of the Future CLF22-306 Shallow Stable Decreasing Figure 4G Phase 3 Expansion Downgradient of the Future CLF22-307 Shallow Stable Decreasing Figure 4G Phase 3 Expansion CLF23-408 Shallow Increasing Decreasing In the Future Phase 3 and 4 Figure 4F CLF24-501 Shallow Increasing Decreasing Southwest of Future Phase 5 Figure 4H CLF24-502 Shallow Stable Stable Southwest of Future Phase 5 Figure 4H CLF24-503 Shallow Stable Stable West of Future Phase 5 Figure 41 CLF24-504 Shallow Stable Stable West of Future Phase 5 Figure 41 2.3 Underdrain Pump Performance An underdrain pump is installed within the Phase 2 Cell 5 underdrain (CLF-UD) (Figure 2). The underdrain pump removes groundwater from below the ILF Phase 2, Cell 5. The Phase 2 Cell 5 underdrain pump does not receive precipitation runoff; the underdrain is enclosed. Water removed by the pump is discharged to the lower portion of the ash basin where it is ultimately pumped through a water treatment system and discharged through a National Pollutant Discharge Elimination System outfall. The Phase 2 Cell 5 underdrain pumping and model - predicted pumping rates are shown on Figure 5. The Phase 2 Cell 5 underdrain pump has been operational for 46 months. The average pumping rate during the reporting period was 7.8 gpm. ILF Cell 5 pumping data, including the calculated monthly total volume pumped and monthly average flow rate, are included in Appendix C. Pumping operations for the Phase 2 Cell 5 underdrain have removed approximately 1 million gallons of water during the reporting period. The Phase 2 Cell 5 underdrain pump had an average flow rate of 7.8 gpm overall during the reporting period. Monthly average flow rates during the reporting period were as follows: • April 2025 — 7.2 gpm • May 2025 — 7.3 gpm • June 2025 — 8.9 gpm July 2025 Page 2-3 Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 3.0 QUARTERLY WATER -LEVEL REDUCTION ACTIVITIES During the reporting period, Duke Energy conducted the following activities to expedite the reduction of groundwater levels within the ILF Phase 2 expansion and the Future Phases: • Phase 2, Cell 5: o Continued underdrain operations, with an average flow rate of approximately 7.8 gpm. o Continued Phase 2 Cell 5 operations. • Phase 2, Cell 6: o Continued Phase 2 Cell 6 operations, which began on October 9, 2023. • Phase 3, Cell 7: o Received the ILF Phase 3 Permit to Construct on December 29, 2023. The ILF Phase 3 construction is anticipated to start by summer 2025 with preparation of the landfill footprint with excavation and removal of ash underway. o Submitted a permit modification to lower the base grades of ILF Phase 3 on July 3, 2024, that was approved by the NCDEQ DWM on July 12, 2024. Lowering the base grades was made possible because of the decreasing water levels from closure of the ash basin. • Phase 4, Cell 8: o Received a Permit to Construct on November 12, 2024. Construction of Phase 4 is expected to start in late 2025. o Submitted a permit modification to lower base grades, increase the size of the access road culvert, and revise the leachate force main alignment of the ILF Phase 4 on January 28, 2025; NCDEQ DWM approved that modification on March 4, 2025. Lowering the base grades was made possible because of the decreasing water levels from closure of the ash basin. • Future Phases: o Continued passive dewatering and excavation of coal combustion residuals. July 2025 Page 3-1 Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 4.0 REFERENCES SynTerra. (2021). Technical Memorandum: Modeling Support for the ILF Phase 2 Permit to Construct Modification, Marshall Steam Station. October 5, 2021. July 2025 Page 4-1 Project: 00.0083.46.11 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina FIGURES 1610 synTerra Science & Engineering Consultants TRIV"` OAKWOOD C" - N v x QQ �c 2 �. F,41 P OP INDUSTRIAL LANDFILL #1 STRUCTURAL FILL �(• 'WASTE BOUNDARY WASTE BOUNDARY I •I �• IPERMIT NO. 1812-INDUS CCB0072 ' • p J �. • • ASBESTOS LANDFILL ..000-'. .0 `V WASTE BOUNDARY s Ford ♦ PERMIT NO. 1804-INDUS-1983 ' signaled DUKE ENERGY CAROLINAS • ' .e PROPERTY BOUNDARY rora Ij. — + C&D LANDFILL WASTE BOUNDARY PERMIT NO. 1804-INDUS-1983 N'1 • DRY ASH LANDFILL WASTE BOUNDARY PERMIT NO. 1804-INDUS-1983 l ASH BASIN STRUCTURAL FILL — WASTE BOUNDARY WASTE BOUNDARY Mo - —GEOGRAPHIC LIMITATION e � ♦ "claw C<e ti FGD RESIDUE LANDFILL ♦ 4 / WASTE BOUNDARY • �+� •� WrNALDA AVE �. ♦'�... •,.� ♦• .� • /j♦ S 1 � ti V�tA MARSHALL C McoONA(o : ` STEAM STATION POWERBLOCK C GREENWOOD RE _ STgJ f R, Ig6j�� DR PO Q J� NOTES: 4/y R` RHO 1. FGD - FLUE GAS DESULFURIZATION e'�a irl Cr 2. BOUNDARIES ARE APPROXIMATE. ePF. 3.2019 USGS TOPOGRAPHIC MAP, TROUTMAN AND LAKE NORMAN NORTH QUADRANGLE, OBTAINED FROM THE USGS NATIONAL MAP AT https://www.usgs.gov. FIGURE I DUKE SITE LOCATION MAP CATAWBA t'® ENERGY COUNTY GROUNDWATER CONDITIONS QUARTERLY REPORT wwsroH-sALEM APRIL 2025 THROUGH JUNE 2025 INAS INDUSTRIAL LANDFILL NO. 1 (PERMIT NO. 1812-INDUS-2008) ASHEVILLEMARSHALL STEAM STATION le CHARLOTTE TERRELL, NORTH CAROLINA DRAWN BY. T KING DATE: 05/15/2019 REVISED BY L FOREMAN DATE 07/18/2025 1,000 0 1.000 2,000 CHECKED BY: T. COLTON DATE 07/18/2025 synTerra APPROVED BY T. COLTON DATE 07/18/2025 GRAPHIC SCALE (IN FEET) Www-svriterracom-com PROJECT MANAGER_ T COLTON � eb Af` ' GWA-4S - �" �+ a. ,� 'A ,� - . .28 �71 CLF21-10 840.35 �eo• 81 - 850 CLF21-11 825.81 sa 821. CLF-UD 1 C LF21-12 2819.66 )5 1-13R �i�♦���i,��w�� 811.CLF236 %iE,�.��. 81( �iS���� 8 LF24 504 +�" p •• \ ' .CLF24-503 i 4t, 04,4 796.75 r, ILF-2S 840.12 's-1 os •-aoo.ft 7s5 CLF-40, 787.56 S 1� rj, I r .. . i�'b�0� �s�� 1�;•S�L 3 . w�� 782.90 1, n - CLF24-502': ►CLF24-50lW4f4 ♦�y?yf _r� :J ✓ (?p�y7 G fj 794.45 785.10 ♦, O A♦ IK , Er L �e•�e�♦5,�� d \ f CLF22-306RR t �♦ J_ ►♦�� x t i 1 _. 786.08 ?,�m�FIRM �4♦� CLF22-307R r 1777.00 1 f $x% J 1f. j v� w' N f M 4` ylk F OL i f M W-4 828.15 \ L; �i CLF21-14R y _ t �815.47 - 810 otio 88p J 8' y� GRAPHIC SCALE DUKE 200 0 200 400 ENERGY® FEET) CAROLINAS (IN DRAWN BY T KING DATE: 05/12/2022 REVISED BY L. FOREMAN DATE: 0/18/2025 CHECKED BY. T. COLTON DATE: 01/18/2025 APPROVED BY: T. COLTON DATE: 07/18/2025 synTerra PROJECT MANAGER: T. COLTON www-s nterracor .com LEGEND MW-6S WELL ID 765.80 GROUNDWATER ELEVATION (FEET, NAVD 88) LONG-TERM PIEZOMETERAND/OR GROUNDWATER MONITORING WELL �e TEMPORARY PIEZOMETER ie UNDERDRAIN PUMP INFERRED GROUNDWATER ELEVATION CONTOUR (5' INTERVAL) GROUNDWATER FLOW DIRECTION ASH BASIN WASTE BOUNDARY - - - GEOGRAPHIC LIMITATION STRUCTURAL FILL BOUNDARY LANDFILL BOUNDARY INDUSTRIAL LANDFILL #1 WASTE BOUNDARY BOUNDARY BETWEEN LANDFILL PHASE 2, CELLS 5 AND 6 FUTURE LANDFILL PHASES - - LANDFILL COMPLIANCE BOUNDARY LEACHATE BASIN DUKE ENERGY CAROLINAS PROPERTY LINE TOPOGRAPHIC CONTOUR (10' INTERVAL) NQi -�: STREAM (AMEC NRTR) 1. WATER LEVELS WERE COLLECTED ON 7/1/25. 2. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88). 3. THE STREAMS AND WETLANDS JURISDICTIONAL DETERMINATION WAS APPROVED BY THE U.S. ARMY CORPS OF ENGINEERS ON OCTOBER 25, 2017 (SAW-2015-01412). WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) DATED JUNE 2015. 4. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLYAND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY PROVIDED BY TRANSASH. 5. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. 6. BOUNDARIES ARE APPROXIMATE. 7. AERIAL IMAGERY IS A COMBINATION OF DUKE ENERGY PROPELLER AERIAL PHOTOGRAPHY COLLECTED ON MARCH 26, 2025, AND MAXAR SATELLITE IMAGERY OBTAINED FROM ESRI ONLINE, COLLECTED ON AUGUST 23, 2021. 8. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD 83). 9. NA- NOT AVAILABLE FIGURE 3 GROUNDWATER ELEVATIONS - UPPER FLOW ZONE (JULY 2025) GROUNDWATER CONDITIONS QUARTERLY REPORT APRIL 2025 THROUGH JUNE 2025 INDUSTRIAL LANDFILL NO. 1 (PERMIT NO. 1812-INDUS-2008) MARSHALL STEAM STATION TERRELL, NORTH CAROLINA ILF-2S/D M W-4/D 834 846 6 6 O ♦ O 00 844 0 ♦ ♦ p0 00 832 � O O Q • ' O pJ �� ♦ 4 Q ` 4 ♦ ° Z �� Z O _ �' _ ^ c 842 ° O♦ O� ° 830 ° 0 00 041 - > �� > O p O c Uj ♦ 1 I J I ♦ °� ♦O O r 2 W � O p O I 4 Og°I ♦O° ° Off° OD ca 2 oC a0+ 3 840 Cp• �o 0 000 3 828 I I. 0 0 c7 C7 826 838 0 0 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date ILF-2S - Total water level change from transducer installation on 07/30/2021 to 07/01/2025 is -1.2 feet. MW-4 - Total water level change from transducer installation on 07/30/2021 to 07/01/2025 is -3.9 feet. ILF-21) - Total water level change from transducer installation on 07/30/2021 to 07/01/2025 is -2.0 feet. MW-4D - Total water level change from transducer installation on 07/30/2021 to 07/01/2025 is -4.4 feet. ILF-2S/D MW-4/D 837 848 � 00 I 00 845 O 834 ' a lrftb J Z 0 O 0 M 0 I '•. 842 <0> °� 1 > 831 •° O-! a _ s e.ti._ _. LY °. may, °o* <%> ° °°p° °° °O 3 � aoo oe ° �o °��•° o 839 3 c 828 O Op0 ��• O. 0 L I cD 836 825 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date LEGEND Notes: Cell 5 construction start (5/31/2021) NAVD 88—North American Vertical Datum 1988 DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 4A of Future Phases 3 through 5 CCR excavation start (6/18/2021) Ft - feet ENERGY- REVISED BY: D. AVARD DATE:07/18/2025 GROUNDWATER ELEVATION HYDROGRAPHS Cell 5 Blanket Underdrain construction start (9/20/2021) in - inches GARCILINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 UPGRADIENT OF PHASE 2 EXPANSION (ILF-2S/D AND MW-4/D) Cell 5 Blanket Underdrain construction completion (10/22/2021) Shallow Groundwater Flow Zone Data) Manual Water Level Measurement APPROVED BY: T. COLTON DATE:07/21/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT (Transducer APRIL 2025 THROUGH DUNE 2025 Deep Groundwater Flow Zone (Transducer Data) Daily Total Rainfall (inches) �� PROJECT MANAGER: T. COLTON Bedrock Groundwater Flow Zone (Transducer Data) — — - Transient Groundwater Model Water Level Predicted Trend (Shallow) INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) — — - Transient Groundwater Model Water Level Predicted Trend (Deep) synTerra MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA www.synterracorp.com GWA-4S/D CLF21-10 842 6 852 6 O 00 O� �O 850 00 841 p O O p 'v0 O Z O O 4 Z O O_ O I p .�.LJr 4 O p0 O 4 O 4 p O O 00 Op c 848 O O �• O Op00 DOOb m 840 • - O O D*p 011-> p LU O •O<0OHO 2 U 2 fY O ate+ 3 846 3 839 c c 0 0 c7 ahilC7 838 0 844Llii0 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date GWA-4S - Total water level change from transducer installation on 07/30/2021 to 07/01/2025 is -4.0 feet. CLF21-10 -Total water level change from transducer installation on 08/10/2021 to 07/01/2025 is -0.7 feet. GWA-41D - Total water level change from transducer installation on 07/30/2021 to 07/01/2025 is -4.3 feet. GWA-4S/D CLF21-10 844 855 00 00 ao p a 852 p Z 842 a z---- v '• c c 849 O OD > 840 O p m W L OO O' OOQO4�>os� <9 OO O 846 838 0 , 3 o 0 836 843 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date LEGEND Notes: Cell 5 construction start (5/31/2021) NAVD 88— North American Vertical Datum 1988 DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE46 of Future Phases 3 through 5 CCR excavation start (6/18/2021) Ft - feet ENERGY- REVISED BY: D. AVARD DATE:07/18/2025 GROUNDWATER ELEVATION HYDROGRAPHS UPGRADIENT OF PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) In - Inches CAROLINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 (GWA-4S�D AND CLF21-10) Cell 5 Blanket Underdrain construction completion (10/22/2021) APPROVED BY: T. COLTON DATE: 07/21/2025 Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement GROUNDWATER CONDITIONS QUARTERLY REPORT Deep Groundwater Flow Zone (Transducer Data) Daily Total Rainfall (inches) �� PROJECT MANAGER: T. COLTON APRIL 2025 THROUGH JUNE 2025 Transient Groundwater Model Water Level Predicted Trend (Shallow) INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) Transient Groundwater Model Water Level Predicted Trend (Deep) synTerra www.synterracorp.com MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA CLF-UD CLF21-11 817 6 830 6 O O 00 815 00 828 — Q 4 Q 4 Z Z LL ^ +; LL c 813 �— c 826 —_ 41 m 2 = W O OOP 2 oc a, 811 6JOp 00 O O aJ f6 824 O O 00 3 3 c c 0 0 C9 Q 11 0 822 809 0 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date CLF-UD — Water level is stable during underdrain operations. Water levels spikes represent when pump was temporarily out of service. CLF21-11- Total water level change from transducer installation on 08/09/2021 to 07/01/2025 is -4.9 feet. CLF-UD CLF21-11 830 817 �O _ 00 00 0 828 815 > Q z _ Z *' \ v c 826 0 �OOOOOO�.O 813 m > v O O� O > W O O Q� uU y` 824 O p40 000 O O. 00 , NAAjAi M 811 3 822 0 c� 809 820 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date LEGEND Cell 5 construction start (5/31/2021) Notes: NAVD 88—North American Vertical Datum 1988 DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 4C Future phases 3 through 5 CCR excavation start (6/18/2021) of Ft - feet ENERGY-. REVISED BY: D. AVARD DATE:07/18/2025 GROUNDWATER ELEVATION HYDROGRAPHS Cell 5 Blanket Underdrain construction start (9/20/2021) in - inches GARQLINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 WITHIN PHASE 2 EXPANSION (CLF-UD AND CLF21-11) Cell 5 Blanket Underdrain construction completion (10/22/2021) Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement APPROVED BY: T. COLTON DATE:07/21/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT APRIL 2025 THROUGH DUNE 2025 Transient Groundwater Model water level predicted trend (Shallow) Daily Total Rainfall (inches) �� PROJECT MANAGER: T. COLTON INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) synTema MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA I www.synterracorp.com CLF21-12 CLF21-13/13R 821 6 824 6 00 b I I O O O O 00 822 00 818 <8>O O Q 4 Q O� 4 Z Z lie o Q o 820 p O Op O O O O'0 ' O O 0c 815 CLF21-13 was abandoned and replaced with O O ODO Op M O > CLF21-13R on November 4, 2021. _ a� v 2 Opp 2 CC M818 I I I M 812 0 0 0 0 do 0 809 816 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date CLF21-13R - Total water level change from transducer installation on 11/08/2021 to 07/01/2025 is -8.8 feet. CLF21 12 Total water level change from transducer installation on 08/09/2021 to 07/01/2025 is 3.6 feet. CLF21-13 - Total water level change from transducer installation on 08/09/2021 to 10/01/2021 is -0.2 feet. CLF21-12 CLF21-13/13R 827 823 00 822 4� �6' 00 0 818 O. 0L! O O O D O 00 �O O a I o 0 0 a' Q Op O O a . o o° o0 00 0 0 0 ° 00o �o o coon oo • z °O °o z V poo v 817 c 813 0 o > m a) - ` W L- W 812 � 808 L 41 ` M 3 M 3 � c 807 0803 o L (D 802 798 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 Date Date LEGEND Notes: Cell 5 construction start (5/31/2021) NAVD 88—North American Vertical Datum 1988 DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 4D of Future phases 3 through 5 CCR excavation start (6/18/2021) Ft - feet ENERGY-. REVISED BY: D. AVARD DATE:07/18/2025 GROUNDWATER ELEVATION HYDROGRAPHS Cell 5 Blanket Underdrain construction start (9/20/2021) in - inches GARQLINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 WITHIN PHASE 2 EXPANSION (CLF21-12 AND CLF21-13/13R) Cell 5 Blanket Underdrain construction completion (10/22/2021) Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement APPROVED BY: T. COLTON DATE:07/21/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT APRIL 2025 THROUGH DUNE 2025 Transient Groundwater Model water level predicted trend (Shallow) Daily Total Rainfall (inches) �� PROJECT MANAGER: T. COLTON INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) synTema MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA I www.synterracorp.com CLF21-14/14R CLF21-15 6 827 6 822 In April of the Q2 2022 reporting period, Q piezometer CLF21-14 was extended and re -named CLF21-14R. 821 00 00 825 Q4 Q The CLF21-15transducer 4 Z Z was removed in April 2023 LL 820 LL and replaced in July 2023 0�00 C � ODO�jJ� C c - 2 823 �Op0O > 819 ♦ ♦ p p c OO c W 0' O 0' 2 ♦Y W 2 *T 3 j j 1 i 3 821 818 • O o o c7 C7 0 819 0 817 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date CLF21-14R - Total water level change from transducer installation on 04/08/2022 to 07/01/2025 is +0.2 feet. CLF21-15 - Total water level change from transducer installation on 08/13/2021 to 07/01/2025 is -3.6 feet. • • • • • • • CLF21-14 - Total water level change from transducer installation on 08/13/2021 to 03/22/2022 is -3.3 feet. Total water level change from transducer installation on 07/31/2023 to 12/31/2023 is -0.9 feet. CLF21-14/14R CLF21-15 828 828 00 00 > O� > 824 825 a z 'o z v o �' o o 4. C 820 O O 822 LL �O O .0 O�0 0� O 0 �� �O�'� �OO. d \ O O M ate+ 1° 3 816 819 c o o (D 816 812 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date LEGEND Notes: Cell 5 construction start (5/31/2021) NAVD 88—North American Vertical Datum 1988 DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 4E of Future phases 3 through 5 CCR excavation start (6/18/2021) Ft - feet ENERGY-. REVISED BY: D. AVARD DATE:07/18/2025 GROUNDWATER ELEVATION HYDROGRAPHS Cell 5 Blanket Underdrain construction start (9/20/2021) in - inches cAaoLlnl,as REVIEWED BY: S. SPINNER DATE:07/18/2025 WITHIN PHASE 2 EXPANSION (CLF21-14/14R AND CLF21-15) Cell 5 Blanket Underdrain construction completion (10/22/2021) Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement APPROVED BY: T. COLTON DATE:07/21/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT Transient Groundwater Model water level predicted trend (Shallow) Daily Total Rainfall (inches) �� PROJECT MANAGER: T. COLTON APRIL 2025 THROUGH DUNE 2025 INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) synTerra I MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA www.synterracorp.com CLF-402 CLF23-408 6 806 6 815 O � • O �� 800 O 0 808 000 p� O 00 Q O 4 QO , 4 z O z 794 16 c 801 -- 241 788 W i OIO 2 i ' 2 .0 Gl 3 794 3 782 I a 787 0 776 0 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date CLF-402 - Total water level change from transducer installation on 07/27/2021 to 07/01/2025 is -24.1 feet. CLF23-408 - Total water level change from transducer installation on 03/21/2023 to 07/01/2025 is -20.27 feet. CLF-402 CLF23-408 815 810 0 809 o� �o 00 � 803 Op o \ Q z \ z �O Opp v 803 c 796 �p�O o O p ` ft > (' p W \ O 797 W� 0 L � 789 N O1 +• � 3 3 c 3 791 782 Cog OD O Op, O 785 775 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 Date Date LEGEND Cell 5 construction start (5/31/2021) Notes: NAVD 88— North American Vertical Datum The modeled water levels are DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 4F GROUNDWATER ELEVATION HYDROGRAPHS Future 3 through 5 CCR excavation start (6/18/2021) 1988 truncated based upon the pp ENEI.GY=, REVISED BY: D. AVARD DATE:07/18/2025 phases of expected shutdown of the Cell 5 DOWNGRADIENT OF THE PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - feet underdrain pumping operation. CAROLINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 (CLF-402 AND 408) Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches The slower basin excavation rate APPROVED BY: T. COLTON DATE:07/21/2025 Shallow Groundwater Flow Zone (Transducer Data) ♦ has extended the period needed to Manual Water Level Measurement p GROUNDWATER CONDITIONS QUARTERLY REPORT Transient Groundwater Model water level predicted trend (Shallow) Daily Total Rainfall (inches) operate the underdrain and will PROJECT MANAGER: T. COLTON APRIL 2025 THROUGH DUNE 2025 delay the shutdown of the Cell 5 INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) underdrain. WnTerra www.synterracorp.com MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA CLF22-306/306R CLF22-307/307R 6 806 6 804 00 - -� �► oa 0 800 0 00 00 797 �p Q 4 Q I 0 4 Z 796 Z aJ ♦ � 0 c � 0 788 c �= > 792 > W 2 i 2 f6 M +M+ � 779 I �I ..I . 3 I o III 00 3 � 788 � • o.' � � �� 0 0 I ,� c7 C7 0 770 0 784 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1/2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date CLF22-306 - Total water level change from transducer installation on 08/13/2021 to 06/26/2024 is -12.2 feet. CLF22-307 - Total water level change from transducer installation on 04/08/2022 to 06/26/2024 is -14.9 feet. CLF22-306R - Total water level change from transducer installation on 07/11/2024 to 07/01/2025 is +0.2 feet. CLF22-307R - Total water level change from transducer installation on 07/11/2024 to 07/01/2025 is -4.5 feet. CLF22-306/306R CLF22-307/307R 810 815 CLF22-306 became dry prior to abandonment. - The piezometer 00 00 804 O and transducer j 806 CLF22-307 became j�p O O were reinstalled in Q Z dry prior to Z �O� O July 2024. abandonment. I O The piezometer 798 c 797 and transducer c 0 I CLF22 306 was not were reinstalled in M used in the M > cu ` July 2024. > p Transient LU \ ♦ 1 W 792 \ Groundwater ai 788 ( U O Model calibration, M M ♦ ♦ , water level <%> predictions were 786 �. prepared following t P 779 OHO O installation of Op�� C7 CLF22-306 (after . Op OO . Transient 780 Groundwater 770 Model calibration) 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 Date Date LEGEND Notes: Cell 5 construction start (5/31/2021) NAVD 88— North American Vertical Datum The modeled water levels are DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 4G GROUNDWATER ELEVATION HYDROGRAPHS Future 3 through 5 CCR excavation start (6/18/2021) 1988 truncated based upon the pp ENEI.GY=. REVISED BY: D. AVARD DATE:07/18/2025 phases of expected shutdown of the Cell 5 DOWNGRADIENT OF THE PHASE 2 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - feet underdrain pumping operation. CAROLINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 (CLF22-306/306R and CLF22-307/307R) Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches The slower basin excavation rate APPROVED BY: T. COLTON DATE:07/21/2025 Shallow Groundwater Flow Zone (Transducer Data) ♦ has extended the period needed to Manual Water Level Measurement p GROUNDWATER CONDITIONS QUARTERLY REPORT Transient Groundwater Model water level predicted trend (Shallow) Daily Total Rainfall (inches) operate the underdrain and will PROTECT MANAGER: T. COLTON APRIL 2025 THROUGH JUNE 2025 delay the shutdown of the Cell 5 INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) underdrain. synTerra www.synterracorp.com MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA CLF24-501 CLF24-502 6 794 798 6 O ti• I 00 791 � 00 796 0 � Q I 4 Z I 4 z v o,-71 c 788 �— c 794 —_ 41 I O > IJJ I c 2 ♦Y > i� c 2 GJ W M 785 M 792 � O o C9 C7 782 0 790tLoV 0 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date CLF24-501- Total water level change from transducer installation on 09/03/2023 to 07/01/2025 is -7.3 feet. CLF24-502 - Total water level change from transducer installation on 09/03/2023 to 07/01/2025 is +1.3 feet. CLF24-501 CLF24-502 794 798 O 00 0 O > 791 > < 796 — a �o z C 788 v 794 N W L W ai -W L 0 M 3 785 3 792 3p Q 782 790 4 - 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 Date Date LEGEND Notes: The modeled water levels are Cell 5 construction start (5/31/2021) NAVD 88— North American Vertical Datum DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 4H GROUNDWATER ELEVATION HYDROGRAPHS truncated based upon the Future 3 through 5 CCR excavation start (6/18/2021) 1988 pp ENERGY=, REVISED BY: D. AVARD DATE:07/18/2025 phases of expected shutdown of the Cell 5 SOUTHWEST OF THE FUTURE PHASE 5 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - feet underdrain pumping operation. CAROLINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 (CLF24-501 AND CLF24-502) Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches p The slower basin excavation rate APPROVED BY: T. COLTON DATE: 07/21/2025 Shallow Groundwater Flow Zone (Transducer Data) ♦ has extended the period needed to Manual Water Level Measurement p GROUNDWATER CONDITIONS QUARTERLY REPORT Transient Groundwater Model water level predicted trend (Shallow) Daily Total Rainfall (inches) operate the underdrain and will PROJECT MANAGER: T. COLTON APRIL 2025 THROUGH DUNE 2025 delay the shutdown of the Cell 5 INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) underdrain. WnTerra www.synterracorp.com MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA CLF24-503 CLF24-504 799 6 814 6 00 798 I 00 812 0 0 Q I 4 Z I 4 z 4 o . v 0 c 797 c 810 —_ +� 41 W I O ai Uj 2 ♦Y U 2 GJ Gl 3 796 3 808 c c 0 0 c7 C7 795 0 41 0 806 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date Date CLF24-503 - Total water level change from transducer installation on 09/03/2023 to 07/01/2025 is -0.5 feet. CLF24-504 - Total water level change from transducer installation on 09/03/2023 to 07/01/2025 is -1.6 feet. CLF24-503 CLF24-504 799 81300 - 00 > 798 z 812 a z 4-; 0 j 0 I 797 v 811 N W L W ai 4+ L M 3 M 796 810 c 0 0 /L^ V 795 809 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 Date Date LEGEND Cell 5 construction start (5/31/2021) Notes: NAVD 88— North American Vertical Datum The modeled water levels are DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 41 GROUNDWATER ELEVATION HYDROGRAPHS Future 3 through 5 CCR excavation start (6/18/2021) 1988 truncated based upon the pp ENERGY=, REVISED BY: D. AVARD DATE:07/18/2025 phases of expected shutdown of the Cell 5 WEST OF THE FUTURE PHASE 5 EXPANSION Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - feet underdrain pumping operation. CAROLINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 (CLF24-503 AND CLF24-504) Cell 5 Blanket Underdrain construction completion (10/22/2021) p in - inches The slower basin excavation rate APPROVED BY: T. COLTON DATE: 07/21/2025 Shallow Groundwater Flow Zone (Transducer Data) ♦ has extended the period needed to Manual Water Level Measurement p GROUNDWATER CONDITIONS QUARTERLY REPORT Transient Groundwater Model water level predicted trend (Shallow) Daily Total Rainfall (inches) operate the underdrain and will PROTECT MANAGER: T. COLTON APRIL 2025 THROUGH JUNE 2025 delay the shutdown of the Cell 5 INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) underdrain. synTerra www.synterracorp.com MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA CLF24-505 830 6 00 829 0 Q 4 z I O }' O c 828 I o = Space Not Used hill r W 2 N M 827 c 0 c� 0 826 6/1 /2021 2/1 /2022 10/1 /2022 6/1 /2023 2/1 /2024 10/1 /2024 6/1 /2025 Date CLF24-505 - Total water level change from transducer installation on 09/03/2023 to 07/01/2025 is -1.3 feet. CLF24-505 830 00 0 829 — a z o 0 lit0 c 828 Loo' y Space Not Used W G! 827 C 3 O Q 826 6/1/2021 2/1/2022 10/1/2022 6/1/2023 2/1/2024 10/1/2024 6/1/2025 Date LEGEND Cell 5 construction start (5/31/2021) Notes: The modeled water levels are NAVD 88— North American Vertical Datum DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 4J Future phases 3 through 5 CCR excavation start (6/18/2021) of 1988 truncated based upon the the Cell 5 ENERGY-. REVISED BY: D. AVARD DATE:07/18/2025 GROUNDWATER ELEVATION HYDROGRAPHS Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - feet expected shutdown of underdrain pumping operation. CAROLINAS REVIEWED BY: S. SPINNER DATE:07/18/2025 WEST OF THE PHASE 2 EXPANSION (CLF24-505) Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches The slower basin excavation rate APPROVED BY: T. COLTON DATE:07/21/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement has extended the period needed to♦ APRIL 2025 THROUGH JUNE 2025 Transient Groundwater Model water level predicted trend (Shallow) operate the underdrain and will Daily Total Rainfall (inches) p PROJECT MANAGER: T. COLTON INDUSTRIAL LANDFILL NO 1. (PERMIT NO. 1812-INDUS-2008) delay the shutdown of the Cell 5 underdrain. synTerra MARSHALL STEAM STATION, TERRELL, NORTH CAROLINA www.synterracorp.com E Q C1A N O LL 140 120 FOR F."M 10-K 0 9/1/2021 6/1/2022 3/1/2023 12/1/2023 9/1/2024 Notes: Date gpm - gallons per minute In. - inches Flow data from the first day following a period of no flow were not plotted. n i❑ 2 0 6/1/2025 f DUKE DRAWN BY: T. COLTON DATE: 10/13/2021 FIGURE 5 US ENERGY REVISED BY: D. AVARD DATE:07/18/2025 CELL 5 (UNDERDRAIN) ACTUAL PUMPING FLOW RATE VS. SIMULATED FLOW RATE CAROLINA$ CHECKED BY: S. SPINNER DATE:07/18/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT APPROVED BY: T. COLTON DATE:07/21/2025 APRIL 2025 THROUGH JUNE 2025 �a 7 PROJECT MANAGER: T. COLTON INDUSTRIAL LANDFILL NO. 1 (PERMIT NO. 1812-INDUS-2008) smTerra www.synterracorp.com MARSHALL STEAM STATION 7' TERRELL, NORTH CAROLINA Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina TABLE 1610 synTerra Science & Engineering Consultants TABLE 1 GROUNDWATER MONITORING NETWORK WELL INFORMATION AND WATER LEVELS GROUNDWATER CONDITIONS QUARTERLY REPORT APRIL 2025 THROUGH JUNE 2025 INDUSTRIAL LANDFILL NO. 1 (PERMIT NO. 1812-INDUS-2008) MARSHALL STEAM STATION DUKE ENERGY CAROLINAS, LLC, TERRELL, NC Well/ Piezometer ID Date Well/ Piezometer Installed Date Transducer Installed Measuring Point TOC Elevation (Ft-NAVD 88) Ground Surface Elevation (Ft-NAVD 88) Measured Well Depth (Ft-TOC) Screened Interval (Ft-TOC) Top of Screen Elevation (Ft-NAVD 88) Bottom of Screen Elevation (Ft-NAVD 88) Water Level Measurement (Ft-TOC) 03/28/2025 Groundwater Elevation (Ft-NAVD 88) 03/28/2025 Water Level Measurement (Ft-TOC) 05/06/2025 Groundwater Elevation (Ft-NAVD 88) 05/06/2025 Water Level Measurement (Ft-TOC) 06/03/2025 Groundwater Elevation (Ft-NAVD 88) 06/03/2025 Water Level Measurement (Ft-TOC) 07/01/2025 Groundwater Elevation (Ft-NAVD 88) 07/01/2025 CLF-402R4 5/21/2021 1/3/2025 826.31 823.45 57.9 47.9 57.9 778.41 768.41 37.71 788.60 38.31 788.00 38.60 787.71 38.75 787.56 CLF21-10 8/6/2021 8/6/2021 857.75 857.75 32.0 22.0 32.0 835.75 825.75 17.45 840.30 17.50 840.25 17.52 840.23 17.40 840.35 CLF21-11 8/5/2021 8/5/2021 850.17 850.08 41.6 31.6 41.6 818.53 808.53 24.58 825.59 24.48 825.69 24.50 825.67 24.36 825.81 CLF21-12 8/5/2021 8/5/2021 839.06 838.96 41.2 31.2 41.2 807.84 797.84 19.50 819.56 19.57 819.49 19.60 819.46 19.40 819.66 CLF21-13R 11/4/2021 11/8/2021 836.21 836.18 35.5 25.5 35.5 810.75 800.75 24.49 811.72 24.76 811.45 24.95 811.26 24.85 811.36 CLF21-14R 4/18/2022 4/18/2022 847.54 843.97 38.2 28.2 38.2 816.04 806.04 28.84 818.70 28.90 818.64 29.00 818.54 29.07 818.47 CLF21-15 8/10/2021 8/10/2021 864.37 864.37 55.0 45.0 55.0 819.37 809.37 41.61 822.76 41.68 822.69 41.76 822.61 41.83 822.54 CLF22-306# 10/31/2024 12/5/2024 823.40 820.40 43.0 33.0 43.0 790.40 780.40 36.60 786.80 37.25 786.15 37.55 785.85 37.32 786.08 CLF22-307# 6/25/2024 7/11/2024 807.50 804.30 32.1 22.1 32.1 785.40 775.40 29.24 778.26 30.30 777.20 30.09 777.41 30.50 777.00 CLF23-408R# 2/15/2023 1/3/2025 813.13 810.05 37.2 27.2 37.2 785.98 775.98 34.74 778.39 31.63 781.50 30.98 782.15 30.23 782.90 CLF24-501 8/16/2024 9/3/2024 807.30 804.10 30.0 20.0 30.0 787.30 777.30 23.42 783.88 23.26 784.04 22.94 784.36 22.20 785.10 CLF24-502 8/16/2024 9/3/2024 806.50 803.10 25.0 15.0 25.0 791.50 781.50 13.34 793.16 12.80 793.70 12.03 794.47 12.05 794.45 CLF24-503 8/15/2024 9/3/2024 815.00 812.30 55.0 45.0 55.0 770.00 760.00 18.61 796.39 18.63 796.37 18.22 796.78 18.25 796.75 CLF24-504 8/13/2024 9/3/2024 834.40 831.40 54.0 44.0 54.0 790.40 780.40 23.40 811.00 24.00 810.40 23.68 810.72 23.73 810.67 CLF24-505 8/14/2024 9/3/2024 856.20 853.60 55.0 45.0 55.0 811.20 801.20 27.90 828.30 28.05 828.15 28.00 828.20 27.92 828.28 GWA-4D 6/12/2015 7/30/2021 902.45 899.38 89.1 84.1 89.1 818.38 813.38 54.19 848.26 54.38 848.07 54.48 847.97 54.60 847.85 GWA-4S 5/19/2015 7/30/2021 901.97 898.98 67.2 52.2 67.2 849.78 834.78 54.48 847.49 54.60 847.37 54.22 847.75 54.95 847.02 ILF-2D 3/31/2019 7/30/2021 885.14 885.57 101.6 91.6 101.6 793.57 783.57 41.77 843.37 41.72 843.42 42.15 842.99 42.10 843.04 ILF-2S 3/31/2019 7/30/2021 884.79 885.21 51.6 41.6 51.6 843.21 833.21 44.57 840.22 44.60 840.19 44.69 840.10 44.67 840.12 MW-4 6/30/1989 7/30/2021 867.15 863.81 53.6 43.6 53.6 823.55 813.55 38.66 828.49 38.85 828.30 39.05 828.10 39.00 828.15 MW-4D 10/12/2006 7/30/2021 866.74 863.42 63.9 58.9 63.9 807.87 802.87 39.05 827.69 39.40 827.34 39.50 827.24 39.38 827.36 Notes: # - Piezometer replaced to facilitate excavation. Replacement piezometers are located near original piezometers. BGS - below ground surface Ft - feet NAVD 88 - North American Vertical Datum of 1988 TOC - top of casing Prepared by: TWL Checked by: PBT Page 1 of 1 Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX A WATER -LEVEL MONITORING DATA FILES INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX B GROUNDWATER MODEL PREDICTED TREND FILES INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX C UNDERDRAIN PUMPING DATA FILES INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — April 2025 to June 2025 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX D MANN-KENDALL DATA INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants