HomeMy WebLinkAbout1119_DukeAsheville_INSP_FID_20240529FACILITY COMPLIANCE INSPECTION REPORT
0 Division of Waste Management
RTH CAROLINA Solid Waste Section
Environmental Quality
UNIT TYPE:
Lined
LCID
YW
Transfer
Compost
SLws
COUNTY: BUNCOMBE
MSWLF
PERMIT NO.: 1119-INDUS-2021
Closed
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&P/
Tire
Industrial
X
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: May 29, 2024
FACILITY NAME AND ADDRESS:
Duke Energy Progress — Asheville Steam Electric Plant
46 Duke Energy Lane
Arden, North Carolina 28704
GPS COORDINATES:
N: 35.470016 W:-82.547890
Date of Last Inspection: September 22, 2023
FACILITY CONTACT NAME AND PHONE NUMBER:
Ashley Healy, 717-982-0986, ashley.healy(aduke-energy.com
Joe Wilson, 334-787-0625, Joseph.wilson2(a,duke-energy.com
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Virtual Records Review (Mav 20. 2024)
Sarah Moutos— NCDEQ, Solid Waste Section
Diana Wilson — NCDEQ, Solid Waste Section
Ashley Healy — Duke Energy
Joe Wilson — Duke Energy
Michael Clough — Duke Energy
Site Inspection (May 29, 2024)
Sarah Moutos— NCDEQ, Solid Waste Section
Elizabeth Werner — NCDEQ, Solid Waste Section
Sherri Stanley — NCDEQ, Solid Waste Section
Connor McCloud — NCDEQ, Solid Waste Section
Eric Smith — NCDEQ, Division of Water Resources
Blake Butcher — NCDEQ, Division of Water Resources
Ashley Healy — Duke Energy
Kim Witt — Duke Energy
John Toepfer — Duke Energy
Joe Wilson — Duke Energy
Seth Glass — Duke Energy
Michael Clough — Duke Energy
Charles Hiner — Duke Energy
Page 1 of 14
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
STATUS OF PERMIT:
Initial Permit to Construct (PTC) issued February 7, 2020
Initial Permit to Operate (PTO) issued February 7, 2020
PTO expires on February 7, 2080. Closure CQA documentation received May 31, 2023.
Closure Permit (pending)
PURPOSE OF SITE VISIT:
Comprehensive and Closure Inspection
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
None.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
The facility is an industrial landfill permitted to receive solid waste generated by or at the Asheville Steam Electric Plant.
Waste types include but are not limited to: coal combustion residuals (CCR) which includes fly ash, bottom ash, and flue -
gas desulfurization (FGD) residue, waste stone, vegetation, and demolition waste from basin closure activities. The
landfill is primarily utilized for the disposal of ash previously generated by the Asheville Steam Station. Operations at the
facility began in April 2021. The landfill ceased accepting waste on August 18, 2022 and initiated closure activities on
September 16, 2022.
On June 27, 2024, the Section requested an options analysis for the Duke Energy North Carolina fleet landfills that use
closure turf. On receipt of Duke Energy's response to the option's analysis, the Section will issue the closure permit for
the Asheville Landfill.
1. All documents concerning this site may be found on the Solid Waste Section's database at:
httl)s:Hedocs.dea.nc. izov/WasteManaL-ementBrowse. asDx?id=732019&dbid=0&reao=WasteManaL,ement
2. The Comprehensive Site Inspection of this facility was performed in three (3) parts.
a. An Inspection Landfill Questionnaire was submitted on May 16, 2024.
b. A virtual landfill records review was conducted with Duke Energy staff on May 20, 2024.
c. The onsite inspection was conducted on May 29, 2024.
3. The Inspection Landfill Questionnaire was reviewed by Section staff. No issues were noted.
4. Virtual Records Review
a. Dust Control
i. Landfill — Dust control is monitored every day the landfill is operated. Dust control records
appear complete, no issues noted.
ii. Excavation — Dust control is monitored every day excavation is ongoing. Dust control records
appear complete, no issues noted.
b. Water Quality (groundwater and surface water) & Leachate Monitoring — The last two semi-annual
monitoring events occurred on September 25 - 26, 2023 and March 18-19, 2024.
c. Water Quality Monitoring Plan - The latest Plan is dated September 2023, Rev. 3.
Page 2 of 14
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
d. Leachate — double lined landfill
i. LCS — Consists of 1 pump station with 2 LCS pumps. Flow records appear complete, no issues
noted.
ii. LDS - Consists of 1 pump stations with 1 LDS pump. Flow records appear complete, no issues
noted.
e. Landfill — The landfill is inspected weekly. Inspection records generally complete, minor issues noted.
£ Closure Turf - Trampolining effect and wrinkles of closure turf.
g. Complaints — No complaints have been noted.
Onsite Inspection
h. Sign - The sign is posted, no issues.
i. Roads - All access roads are well maintained and appear to be all-weather.
j. Dust control — No dust was observed.
d. Closure Turf - Wrinkles visible along top deck, sideslopes and at toe of slopes.
e. MSE Berm — Vegetation was sparse. Basket geonet visible to photodegradation. Virginia Creeper was
planted along the berm to establish vegetation.
f. Edge of Waste Markers — in place, no issues.
Page 3 of 14
rR
z
K-t , z
. . . . . . . . . . . . . . .
N
4, R_ la
Ji
; Al
Ak
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
MSE Wall with Virginia Creeper marked, planted evenly to prevent erosion
Page 6 of 14
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Excavated 1964 Ash Basin
Page 7 of 14
JP,,.
OF,
A-MR-4
"A WE AREA A'
TWO
v vy
UTZ
dIft
EK
limp! I
* h ��
`'
i
:.+q��'*� � �• c -� ,�t ,a.' t
N
''3 ����� r.'• � P 4 ��a S ,��,5; '' �'^� r"� ti t ��� �� �k( v :^iiNy lµ +.? r ;r � oti ;.'+ @ir i iti: " y _ � r ,� �. i;.�
Ml`a^'�.:c [,� sir r `+'.;. K c 1 ''�'�Csa r'�'.v�'i 1���`h i� fqa� �r'�,G,�4�z.^� < � l'`..+i3� y41 4\"%Jfr N Ja,t�rf k.5�G 4"lr Yb �^� e�4��a�`.... 'I•�H" 4°?' _�.�
,dwi4`'�:YE ��. 54x ,rM ro>���.�,"K i���t��+3f�-i, ��+a,��%'�,�x��t���.�<� �� `� , t�� a �4,��a•:r��y� �:a � � �A"
,�?+Y,F'`^$s,S. �;.�� � "t..,t� .�• , lr::: , `;r,.. ,1�t :« a..9��r�� ° �d��,.�t � hr1, �`� s'#di 4 w� k ` .��'.t .\+fir ? "t���� j i=;Iy.. �} Y, k ��.�� �,�,. �' �rt.��f:, `� r... T. � � ... ., . e, a .,.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Synthetic turf on side slope, taken from the bottom
Page 11 of 14
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Synthetic turf along top deck
Page 12 of 14
a.
��
�. , _�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Former coal storage pile area
Please contact Sarah Moutos at 919.707.8287 Sarah.Moutos(c-r�,deq.nc.gov if you have any questions or concerns
regarding this inspection report.
Digitally signed by Sarah Moutos
DN: cn=Sarah Moutos, o=DWM - Solid Waste
Section, ou=NC Department of Environmental
Quality, email=Samh.Moutos@deq.nc.gov, c=US
Date: 2025.05.2914:51:13-04'00'
Sarah Moutos
Environmental Program Consultant
Solid Waste Section
Phone: 919-707-8287
Email: Sarah.MoutosSarah.Moutos ,dean
Sent on:
Email:
Hand
US
Certified No. fI
5/29/2025
X
delivery
Mail
Copies: Coal Ash Team — Solid Waste Section
Jason Watkins, Field Operations Branch Head
Page 14 of 14