Loading...
HomeMy WebLinkAbout1812_DukeMarshall_Phase 4 Piezometer Abandonment Request_FID1926180_20250212(' DUKE ENERGY-. February 12, 2025 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 2090 U.S. Highway 70 Swannanoa, NC 28778 Attn: Ms. Sarah Moutos (submitted electronically) Re: Request for Approval to Abandon Piezometers Industrial Landfill No.1 - Phase 4 Permit No.: 1812-INDUS-2008 Marshall Steam Station Terrell, North Carolina 28682 Dear Ms. Moutos: 525 South Tryon St. Charlotte, NC 28202 Mail Code DEP-36A Charlotte, NC 28201-1006 To progress site closure activities and future landfill construction, Duke Energy requests approval to abandon Industrial Landfill No.1 (1812-INDUS-2008; ILF) Phase 4 piezometers CLF-401, CLF23-406, and CLF23-407, located within the footprint of Phase 4 and Phase 5 (CLF-401). The attached Site Vicinity Plan (Figure 1) has the piezometers requested for abandonment circled. The piezometers were installed to support the Geotechnical Investigation for ILF Phase 4 and Phase 5 (CLF- 401). Piezometer CLF-401 was installed in May 2021, CLF23-406 was installed in February 2022, and CLF23- 407 was installed in February 2023, and collectively 44 months of groundwater elevation data have been collected from CLF-401, 36 months for CLF23-406, and 24 months for CLF23-407. The last water level measurements were collected on January 3, 2025, and demonstrated substantial separation between groundwater and compacted soil liner base grade (see Figure 2 attached). Abandonment of the piezometers will be supervised by qualified geotechnical field support that is under the direct supervision of and in contact with a Licensed Geologist. The piezometers will be abandoned by a North Carolina licensed well contractor in accordance with subchapter 02C of the North Carolina Administrative Code. Duke Energy will provide well abandonment logs to the Division upon completion of the field work. If you need additional information regarding this request do not hesitate to email or call me at Anne.Davin(a-)Duke-Energy.com or (919) 616-2333. Respectfully submitted, 0'1v� kc>'�� Anne Davin, E.I. Environmental Services Attachments: Figure 1 Monitoring Location Map (SynTerra, December 2024) Figure 2 Hydrographs (SynTerra, 2025) cc (via e-mail): Deana Yitbarek, NCDEQ Sherri Stanley, NCDEQ Eliabeth Werner, NCDEQ Dan Zakary, Duke Energy www.duke-energy.com Page 1 of 2 Jake Muessen, Duke Energy Scott La Sala, Duke Energy John Metcalf, Duke Energy Tyler Hardin, Duke Energy Ashley Healy, Duke Energy www.duke-energy.com Page 2 of 2 CLF-401 CLF-402 6 814 6 819 815 O�p�000 0 O O �p 0p 0 808 0 p > 4 Q � 4 Z 811 0 O Z O O� c c 802 �- — o — p +� v 807 'p is c +�o a p ,F W O 2 tY W I 2 OC • aW>i aW>i 796 803 i O�I II 3 3did,799LtLj11A 0 790 tL�l0 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 Date Date CLF-401- Total water level change from transducer installation on 07/27/2021 to 12/31/2024 is -14.5 feet. CLF-402 - Total water level change from transducer installation on 07/27/2021 to 12/31/2024 is -20.3 feet. CLF-401 CLF-402 819 815 814 OO`pOp p 809 �4�0�000 O Q O O O > Z O p O Z 809 \ O v 803 p �p OHO �o c \ o OD �000 a) 804 ` 797 w DO ; O O J a) 799 — 3 791 794 785 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 6/1 /2024 12/1 /2024 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 6/1 /2024 12/1 /2024 Date Date LEGEND Notes: DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE3F Cell 5 construction start (05/31/2021) NAVD 88 — North American Vertical 'DUKE .� ENERGY. REVISED BY: D. AVARD DATE:01/10/2025 DOWNGRADIENT OF THE PHASE 2 EXPANSION (CLF-401 AND CLF-402) Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAR�LINAS INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE:01/14/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT `� Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE:01/14/2025 SEPTEMBER 2024 THROUGH DECEMBER 2024 Shallow Groundwater Flow Zone ( Transducer Data) ♦ Manual Water Level Measurement PROJECT MANAGER:T.COLTON MARSHALL STEAM STATION — — -Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) synTerra TERRELL, NORTH CAROLINA www.synterracorp.com CLF22-405 CLF23-406 808 6 808 6 802 00 00 804 0 0 Q 4 Q 4 z 796 VP z 4.; c � c 800 —_ o — o — M 790 'm 2 M > a w ra 2 > a) w O Gl J N J 796 O O 784 L- I �. 4 778 0 792 U �u 0 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 Date Date CLF23-405 - Total water level change from transducer installation on 03/01/2023 to 12/31/2024 is -23.5 feet. CLF23-406 - Total water level change from transducer installation on 03/01/2023 to 12/31/2024 is -13.6 feet. CLF22-405 CLF23-406 815 818 00 co 807 o 00 p Q 810 a ° z z V 799 o Op LL o c O pJ > 802 — o Op 791 W W 0 � > > O1 0 O L 794 783 3 3 ° � 775 786 6/1 /2021 1 1 1 12/1 /2021 6/1 /2022 12/1 /2022 12//2023 6//2024 12//2024 1 6//2021 1 1 1/2023 12//2021 6//2022 12//20 1 1 /2023 12//2023 6//2024 112//2024 Date Date/1 LEGEND Notes: The modeled water levels are truncated �� DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3H Cell 5 construction start 05/31/2021 ( ) NAVD 88 — North American Vertical based upon the expected shutdown of p p <. r ENERGY:: REVISED BY: D. AVARD DATE: Ol/10/2025 DOWNGRADIENT OF THE PHASE 2 EXPANSION Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 the Cell 5 underdrain pumping CAROLINAS (CLF23-405 AND CLF23-406) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - Feet operation. The slower basin excavation CHECKED BY: T. COLTON DATE:01/14/2025 INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches rate has extended the period needed to APPROVED BY: T. COLTON DATE: 01/14/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT — — - Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement operate the underdrain and will delay 10 PROJECT MANAGER:T. COLTON SEPTEMBER 2024 THROUGH DECEMBER 2024 Transient Groundwater Model water level predicted trend the shutdown of the Cell 5 underdrain MARSHALL STEAM STATION Daily Total Rainfall (inches) synTerld TERRELL NORTH CAROLINA www.s nterracor com y p. CLF23-407 CLF23-408 6 806 6 812 O 8 O 00 808 00 800 O � � O Q 4 a Op 4 z z p +s Y p c 804 -- c 794 -- o — o — m > 4— r- M > u, 2 LU 0. 2 a1 � aJ ar 800 O a, 788 Gl � GJ M M 796 0 782 L 0 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 6/1/2024 12/1/2024 Date Date CLF23-407 - Total water level change from transducer installation on 03/01/2023 to 12/31/2024 is -10.4 feet. CLF23-408 - Total water level change from transducer installation on 03/21/2023 to 12/31/2024 is -22.1 feet. CLF23-407 CLF23-408 818 810 0 0 812 Q 803 a z z Bo v o 0 c �o 0 .2 806 > 796 — > ` O LU O OQ W O > ` a>i L 800 — �� O 789 O M 3 3 7944 782 6/1/2021 12/1 /2021 6/1 /2022 12/1/2022 12/1/2023 6/1 /2024 12/1/2024 6/1/2021 12/1 1 /2021 6//2022 12/1 /20 /2023 12/1/2023 6/1 /2024 12/1/2024 Date/2023 Date/1 LEGEND Notes: The modeled water levels are truncated �� DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 31 Cell 5 construction start 05/31/2021 ( ) NAVD 88 — North American Vertical based upon the expected shutdown of p p <. r ENERGY:: REVISED BY: D. AVARD DATE: Ol/10/2025 DOWNGRADIENT OF THE PHASE 2 EXPANSION Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 the Cell 5 underdrain pumping CAROLINAS (CLF23-407 AND CLF23-408) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - Feet operation. The slower basin excavation CHECKED BY: T. COLTON DATE:01/14/2025 INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches rate has extended the period needed to APPROVED BY: T. COLTON DATE: 01/14/2025 GROUNDWATER CONDITIONS QUARTERLY REPORT — — - Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement operate the underdrain and will delay 10 PROJECT MANAGER:T. COLTON SEPTEMBER 2024 THROUGH DECEMBER 2024 Transient Groundwater Model water level predicted trend the shutdown of the Cell 5 underdrain MARSHALL STEAM STATION Daily Total Rainfall (inches) synTerld TERRELL NORTH CAROLINA www.s nterracor com y p.