Loading...
HomeMy WebLinkAbout1812_DukeMarhall_2023Q4_GWCR_FID1827384_20240201(� DUKE ENERGY February 1, 2024 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 2090 U.S. Highway 70 Swannanoa, NC 28778 Attn: Ms. Sarah Moutos (submitted electronically) Re: Groundwater Condition Quarterly Report — October 2023 through December 2023 Industrial Landfill No.1 Permit No.: 1812-INDUS-2008 Marshall Steam Station Terrell, North Carolina 28682 Dear Ms. Moutos: 525 S. Tryon St. Charlotte NC, 28202 In accordance with the NCDEQ DWM September 17, 2021, Phase 2 Permit Modification Approval letter (FID 1609547), Duke Energy is providing the quarterly report describing groundwater conditions in the area of the Marshall Steam Station Industrial Landfill No.1 (ILF, 1812-INDUS-2008) Phases 2, 3, and 4. The report is for the quarterly period of October 2023 through December 2023 (Q4 2023). The quarterly report includes an analysis of groundwater levels and underdrain pump flowrates within Phases 2, 3 and 4, with an updated water level map, hydrographs, pump flowrate plot, and well construction and water level data tables. An evaluation of groundwater levels and pump flowrates compared to model predictions is included. Groundwater transducer data, groundwater model trend data, and underdrain pumping data are provided in an excel file format as the report Appendices. Groundwater conditions in the vicinity of Marshall Steam Station's Industrial Landfill No.1 continue to be monitored and evaluated. The next quarterly report (Q1 2024) will be submitted by May 1, 2024. If you need additional information regarding this submittal do not hesitate to email or call me at Ashley.Healy(@duke-energy.com or (717) 982-0986. Respectfully submitted, j4VAi Ashley Healy, P.G. Environmental Services Attachments: Industrial Landfill No.1 (1812-INDUS-2008) Groundwater Conditions Quarterly Report — October 2023 through December 2023 (SynTerra; February 2024) Appendices in excel format: 1) Appendix A Water Level Monitoring Data Files 2) Appendix B Groundwater Model Predicted Trend File 3) Appendix C Underdrain Pumping Data File 4) Appendix D Mann -Kendall Results www.duke-energy.com Page 1 of 2 cc (via e-mail): Claire Osborn, NCDEQ Elizabeth Werner, NCDEQ Sherri Stanley, NCDEQ Ed Mussler, NCDEQ Scott Saunders, Duke Energy Dan Zakary, Duke Energy Chris Varner, Duke Energy Tyler Hardin, Duke Energy Ed Sullivan, Duke Energy Thomas Colton, SynTerra Craig Eady, SynTerra www.duke-energy.com Page 2 of 2 L1 synTerra Science & Engineering Consultants synterracorp.com GROUNDWATER CONDITIONS QUARTERLY REPORT - OCTOBER 2023 TO DECEMBER 2023 INDUSTRIAL LANDFILL NO. 1 (1812-INDUS-2008) FOR MARSHALL STEAM STATION 8320 EAST CAROLINA HIGHWAY 150 TERRELL, NC 28682 JANUARY 31, 2024 PREPARED FOR L7 DUKE Z ENERGY DUKE ENERGY CAROLINAS, LLC LhL , �� `—% raig Eady, NC LG 1599 Senior Peer Reviewer \��gN�rAUuitprliry� Kevin O' Y �o N CAR Z�'�'��''� Projec cienti t SEAL 056667 �J "' G ��`tiordon Thomas Colton NC PE #056667 �i.""rhomA? %%.\\. 101f01111100Associate Engineer Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina If-ituxe1Alice] ZIll hLIII M 14U4111[91>•1 PAGE 1.0 INTRODUCTION........................................................................................................1-1 1.1 Objectives and Purpose...............................................................................................1-1 1.2 Key Findings.................................................................................................................1-1 2.0 QUARTERLY MONITORING RESULTS......................................................................... 2-1 2.1 Current Groundwater Conditions................................................................................2-1 2.2 Groundwater Trends.................................................................................................... 2-1 2.2.1 Water -Level Hydrographs and Model Trends ....................................................... 2-2 2.3 Underdrain Pump Performance...................................................................................2-3 3.0 QUARTERLY WATER -LEVEL REDUCTION ACTIVITIES ................................................... 3-1 4.0 REFERENCES.............................................................................................................4-1 January 2024 Page i Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina LIST OF FIGURES Figure 1 Monitoring Location Map Figure 2 Area of Focus Water -Level Map — Upper Flow Zone (January 2024) Figure 3A Upgradient of Phase 2 Expansion (MW-4/D and ILF-2S/D) Figure 313 Upgradient of Phase 2 Expansion (GWA-4S/D and CLF21-10) Figure 3C Within Phase 2 Expansion (CLF-UD and CLF21-11) Figure 3D Within Phase 2 Expansion (CLF21-12 and CLF21-13R) Figure 3E Within Phase 2 Expansion (CLF21-14R and CLF21-15) Figure 3F Within Future Phase 3 Expansion (CLF-301 and CLF22-305) Figure 3G Downgradient of the Phase 2 Expansion (CLF-401 and CLF-402) Figure 3H Downgradient of the Phase 2 Expansion (CLF22-306 and CLF22-307) Figure 31 Downgradient of the Phase 2 Expansion (CLF23-405 and CLF23-406) Figure 3.1 Downgradient of the Phase 2 Expansion (CLF23-407 and CLF23-408) Figure 4 Cell 5 (Underdrain) Pumping Flow Rate Vs. Simulated Flow Rate LIST OF TABLES Table 1 Groundwater Monitoring Network Well Information and Water Levels LIST OF APPENDICES Appendix A Water -Level Monitoring Data Files Appendix B Groundwater Model Predicted Trend File Appendix C Underdrain Pumping Data Files Appendix D Mann -Kendall Data January 2024 Page H Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina IIII &10]9_T411d01L1YJ►TA&I CCR coal combustion residuals Duke Energy Duke Energy Carolinas, LLC DWM Division of Waste Management Future Phases ILF Phases 3, 4, and 5 expansion gpm gallons per minute ILF Industrial Landfill 1812-INDUS-2008 NCDEQ North Carolina Department of Environmental Quality NPDES National Pollutant Discharge Elimination System reporting period fourth quarter 2023 (October 2023 to December 2023) Site Marshall Steam Station January 2024 Page Hi Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 1.0 INTRODUCTION 1.1 Objectives and Purpose SynTerra prepared this Groundwater Conditions Quarterly Report on behalf of Duke Energy Carolinas, LLC (Duke Energy) to document the water -level monitoring data and underdrain pumping records in the vicinity of the Industrial Landfill No.1 (ILF) (Permit No. 1812-INDUS- 2008) at the Marshall Steam Station (Site). This report is prepared in response to condition #3 in the North Carolina Department of Environmental Quality (NCDEQ) Division of Waste Management (DWM) September 17, 2021, Phase 2 Permit Modification Approval letter (FID 1609547). Data collected during the fourth quarter of 2023 (October 2023 to December 2023) reporting period were used to evaluate groundwater conditions for the ILF Phase 2 expansion (includes Cell 5 and Cell 6) and ILF Future Phases 3, 4, and 5 expansion (Future Phases). Specifically, this report evaluates the groundwater levels, underdrain pumping flow rates, and efforts to expedite reducing and maintaining groundwater levels near the ILF during the reporting period. 1.2 Key Findings Key findings of the evaluation conducted during this reporting period include: • Water levels are monitored in at 22 piezometers and monitoring wells and the ILF underdrain. During the reporting period, two piezometers (CLF-301 and CLF22-305) were abandoned; reducing the current number of monitoring locations from 22 to 20. Groundwater levels in the area are generally stable or decreasing. • During the reporting period, water levels continue to decrease at 18 out of 22 locations; other locations are generally stable, with the exception of GWA-4D which exhibits an increasing trend for the reporting period. Locations where water levels are greater than model predictions can be attributed to a slower basin excavation rate than assumed in the model. • The Cell 5 underdrain pump has been operational for 28 months with an average pumping rate of 8 gallons per minute (gpm). During the reporting period, the pumping rate continued to decrease, (10.4 gpm average in October through 6.9 gpm average in December). While the flow rates vary, the overall trends reasonably match the model predictions. The model predicted the underdrain to become dry after approximately 19 months of operation; however, the slower basin excavation rate has extended the period needed to operate the underdrain. January 2024 Page 1-1 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 2.0 QUARTERLY MONITORING RESULTS The established network of temporary and long-term piezometers and groundwater wells for monitoring groundwater conditions in the ILF Phase 2 expansion area is shown on Figure 1. Piezometer and groundwater well construction information (including water level and groundwater elevations) for the monitoring network is included in Table 1. 2.1 Current Groundwater Conditions Area of focus water levels were collected on January 5, 2024, for the upper (shallow) flow zone and were used to generate a groundwater level map (Figure 2). Site -wide water level sweeps occur semiannually during the second and fourth quarter. Observed groundwater levels during this reporting period indicate: • Groundwater is generally flowing north to south through the ILF area (Figure 2). • Groundwater levels in wells within and near the ILF have decreased, relative to groundwater levels from Quarter 3, 2023, except CLF21-13R. • Underdrain operations in Cell 5 have maintained a cone of groundwater depression around the Cell 5 blanket underdrain sump (CLF-UD, Figure 2). 2.2 Groundwater Trends A series of groundwater monitoring wells, piezometers, and the Cell 5 underdrain (CLF-UD) pump transducers are used to monitor water -level trends from as early as July 2021 through December 2023 (Figures 3A through 3J). The following are key observations of overall trend data: • CLF23-405, CLF22-307, and CLF22-306 were unable to be accessed for data collection due to wet conditions resulting from precipitation. Several download attempts were made to download the data in January 2024. Data for these locations are presented through the end of November 2023; remaining data are expected to be presented in the Q2 report. Groundwater level data collected from July 2021 (when close monitoring started) through December 2023 were evaluated using Mann -Kendall analysis to determine water -level trends (Appendix D). Statistically significant decreasing overall trends were observed in 20 of 22 locations. A overall stable trend was observed at CLF21-12 and CLF21-14/R, however both of these locations exhibited decreasing trends during the reporting period. • Generally, decreasing or stable trends were observed in locations downgradient of the Future Phases area during the reporting period (October 2023 through December 2023) and decreasing trends for the overall period (July 2021 through December 2023). January 2024 Page 2-1 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 2.2.1 Water -Level Hydrographs and Model Trends Pressure transducers are used to record high -resolution groundwater elevation data for evaluation of groundwater conditions resulting from dewatering and excavation. Transducer data in Excel spreadsheets are included in Appendix A. Manual water -level measurements and transducer records were used to generate hydrographs. Predicted groundwater level trends from the transient groundwater models are included in the hydrographs (Figures 3A through 3L). Appendix B contains Excel spreadsheets with the predicted transient groundwater level trends exported from the models. Upgradient of the Phase 2 Expansion: • MW-4/1) are located east of the ILF Phase 2 expansion (Figure 1). The shallow and deep flow zone water levels at those locations have overall decreasing trends. MW-4 and MW-41) show significantly decreasing trends over the reporting period (Figure 3A). ILF-2S/D are located north of the ILF (Figure 1). The shallow and deep flow zones water levels have overall decreasing trends and show decreasing (ILF-21)) and stable (ILF-2S) trends during the reporting period (Figure 3A). Monitoring locations GWA-4S/D and CLF21-10 are west of the ILF Phase 2 expansion (Figure 1). The shallow flow zone water levels at those locations have overall decreasing trends and showed decreasing trends during the reporting period. Deep flow zone water levels in GWA-4D have an overall decreasing trend and an increasing trend during the reporting period, despite being generally stable (Figure 313). Within the Phase 2 Expansion: • A transducer, identified as CLF-UD (Figure 1), was installed to monitor the Cell 5 underdrain sump water level with the temporary pump operations while the landfill cell was under construction. In October 2022, a permanent pump was installed; the water level in the permanent pump is recorded manually every week. The water levels within the sump demonstrate that the underdrain continues to operate as intended, maintaining a steady water level controlled by the pump settings (Figure 3C). Perimeter of the Phase 2 Expansion: • CLF21-11, CLF21-12, and CLF21-13R are located west and south of Cell 5. Shallow water levels at CLF21-11 show an decreasing trend since monitoring began as well as during the reporting period. Water levels in CLF21-12 show a stable trend overall since completion of the Cell 5 construction, however the water level showed a decrease during the reporting period. CLF21-13R water levels are overall decreasing but were stable during the reporting period (Figures 3C and 3D). January 2024 Page 2-2 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina • Monitoring locations CLF21-14R and CLF21-15 are west of Cell 6 (Figure 1). Water levels in CLF21-14R have an overall stable trend since ash excavation was completed for Cell 6, however the water levels are decreasing over the reporting period. CLF21-15 has an decreasing trend since monitoring began as well as during the reporting period(Figure 3E). Within the Future Phase 3 Expansion: Monitoring locations CLF-301 and CLF22-305 are within the Future Phase 3 expansion (Figure 1). Shallow water levels at CLF-301 and CLF22-305 have an decreasing trend since monitoring began as well as during the reporting period (Figure 3F). Water levels in CLF22-305 dropped below the transducer but manual measurements indicate that the water level decreased slightly during the reporting period. Downgradient of the Phase 2 Expansion (Future Phases Area): Monitoring locations CLF-401 and CLF-402 are within Future Phases 4 and 5 expansion (Figure 1). Shallow water levels at CLF-401 and CLF-402 have an overall decreasing trend and were decreasing during the reporting period (Figures 3G). CLF-402 decreased during the reporting period until the water level dropped below the transducer. • Monitoring locations CLF22-306 and CLF22-307 are downgradient of the Future Phase 3 expansion (Figure 1). Shallow water levels at CLF22-306 and CLF22-307 show decreasing water level trends overall and during the reporting period. (Figures 3H). The transducer record at CLF22-306 and CLF22-307 do not include most of December 2023 because they were inaccessible during January 2024 due to wet site conditions. • Monitoring locations CLF23-405, CLF23-406, CLF23-407, and CLF23-408 (Figure 31 and 3J) located in the Future Phases 3 and 4 have decreasing trends during the reporting period and overall, except CLF23-407 which was stable during the reporting period and shows an overall decreasing trend. The transducer record at CLF23-405 does not include most of December 2023 because it was inaccessible during January 2024 due to wet site conditions. 2.3 Underdrain Pump Performance An underdrain pump is installed within the Cell 5 underdrain (CLF-UD) (Figure 1). The underdrain pump removes groundwater from below the ILF Phase 2, Cell 5. The Cell 5 underdrain pump does not receive precipitation runoff; the underdrain is enclosed. Water removed by the pump is discharged to the lower portion of the ash basin where it is ultimately pumped through a water treatment system and discharged through an NPDES (National Pollutant Discharge Elimination System) outfall. The Cell 5 underdrain pumping and model - predicted dewatering rates are shown on Figure 4. January 2024 Page 2-3 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina The Cell 5 underdrain pump has been operational for 28 months, at an average pumping rate for the reporting period of 8 gpm. ILF Cell 5 pumping data, including the calculated monthly total volume pumped and monthly average flow rate are included in Appendix C. Pumping operations for the Cell 5 underdrain have removed approximately 1.1 million gallons of water during the reporting period. The Cell 5 underdrain average flow rates for the reporting period and each month are listed below. • The Cell 5 underdrain pump had an average flow rate of 8 gpm overall during the reporting period and monthly average flow rates of: o 10.4 gpm during October 2023 o 7.7 gpm during November 2023 o 6.9 gpm during December 2023 January 2024 Page 2-4 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 3.0 QUARTERLY WATER -LEVEL REDUCTION ACTIVITIES Efforts made during the reporting period by Duke Energy to safely expedite the reduction of groundwater levels within the ILF Phase 2 expansion and the Future Phases include: Phase 2, Cell 5 • Underdrain operations continued, with an average flow rate of approximately 8 gpm. • Cell 5 operations continue. Phase 2, Cell 6 • Cell 6 operations began on October 9, 2023. Phase 3, Cell 7 • The ILF Phase 3 Permit to Construct Application was approved by NCDEQ on December 29, 2023. Construction is anticipated to start by Summer 2024. Future Phases • Excavation of coal combustion residuals (CCR) in the Future Phases continued during the reporting period. The installation of approximately 136 dewatering wells was completed during the prior reporting period to support the construction of the Structural Fill (CC130031) northern stability feature. The dewatering wells began and continued intermittent operations in November 2023 through the remainder of 2023. The dewatering wells are phase 1 of a larger scale dewatering system that is expected to temporarily influence the groundwater elevations in the vicinity of ILF Future Phases nearest the stability feature dewatering system. Note the dewatering system to support construction of the stability feature was not included in the groundwater model simulations. January 2024 Page 3-1 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina 4.0 REFERENCES SynTerra (2021). Technical Memorandum: Modeling Support for the ILF Phase 2 Permit to Construct Modification, Marshall Steam Station. October 5, 2021. January 2024 Page 4-1 Project: 00.0083.46.09 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina FIGURES L7 synTerra Science & Engineering Consultants -�.--- - - - - -- ------ � a.. nr J �[ s COD ppw ? * 'CELL 5 CELL 6 4« ` PHASE 2 *_ R "! MAR-14 STORMWA C8D LANDFILL BASIN ,■® �� PERMIT NO. 1804 , • ,. 41 1 - ASBESTOS LANDFILL C7 �' FUT PERMIT NO. 1804 PHA DRYASI -, �' (PH 4v. PERMI' •'; n ; STRUCTURAL FILL CCB0031 • ;.', 'SAC;; _ "*'. I ' y t 9' w � +t � �, t+ t LEACHATE BASIN —. aazrn T`p.. i_ -- DUKE FIE- .: . CAROLINAS r :sir ASH BASIN ■ I I + ♦ I 1■ ■ 1 ■ •• ■ ■ !� �' , fix. :ti.. rs-. `�►•`t•.I S 1 .mil h��•� y ~ LEGEND LONG-TERM PIEZOMETERANDIOR GROUNDWATER MONITORING WELL TEMPORARY PIEZOMETER UNDERDRAIN PUMP 1. ABANDONED PIEZOMETER stir ASH BASIN WASTE BOUNDARY - GEOGRAPHIC LIMITATION ea° LANDFILL COMPLIANCE BOUNDARY g4° STRUCTURAL FILL BOUNDARY aao LANDFILL BOUNDARY 900 LEACHATE BASIN 1 — - - DUKE ENERGY CAROLINAS PROPERTY LINE y: — TOPOGRAPHIC CONTOUR (10' INTERVAL) > STREAM (MCKIM & CREED) WETLAND (MCKIM & CREED) + NOTES: �. o � 1. THE CLF-UD LOCATION WAS FORMERLY KNOWN AS CELL 5 PUMP. to 2.' -ABANDONED DURING THE REPORTING PERIOD. 3. ALL BOUNDARIES ARE APPROXIMATE. 1INj0 ■ _ - 4. THE STREAMS AND WETLANDS JURISDICTIONAL DETERMINATION WAS APPROVED - BY THE US ARMY CORPS OF ENGINEERS ON OCTOBER 25, 2017 (SAW-2015-01412). WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FRO MAMEC FOSTER 1.1804 ,• WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) DATED JUNE 2015. -PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. 6. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLYAND SHOULD NOT BEUSED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY PROVIDED BY TRANSASH. 7. AERIAL IMAGERY IS COMBINATION OF DUKE ENERGY PROPELLER AERIAL PHOTOGRAPHYCOLLECTED ONJANUARY4 2024, AND MAXAR SATELLITE IMAGERY AW OBTAINED FROM ESRI ONLINE COLLECTED ON AUGUST 23 2021. 8. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). RAPHICSC2 200 O00 400 FIGURE 1 NEE , MONITORING LOCATION MAP DRAWN BY T KING DATE 04/28/2022 GROUNDWATER CONDITIONS QUARTERLY REPORT REVISED BYT KING DATE_0TL/23/2024 OCTOBER 2023 THROUGH DECEMBER 2023 CHECKEDBY: T. COLTON DATE=01/23/2024 MARSHALL STEAM STATION APPROVED BY T. COLTON DATE_ 01/23/2024 PROJECT MANAGER: T COLTON TERRELL, NORTH CAROLINA r. ♦• �, Bap 6 � •/ +� CLF21 839.95 831 835 o 4 s . 94( • 8a15 �8ah: , • 920 `GWA-4S 846.79 � 870 ` 850 827,g CLF21-11 825.57 825 822.5 +• -` CLF UD y �• x', CLF21-12 � 5. 820.14 1 1 CLF21-13R r� 1 -A - lvt !, yx k l ip, 'fy F . +r 4' �'WATER • A i t �W __.:'tom LEGEND WELL ID 4 LEVEL (NAVD 88, FEET) BACKGROUND MONITORING WELL l` • MONITORING CLF21-14R '.17.5 .812.5 .+ sso'i+!s10 CLF-3011TI ." $5 CLF23-407 811.31 i . 8aq / . , �„ �R CLF-401 :..—�..� �:► 804.36 'Ile�( 805.40 805�e )� 1 .' - �.,, i � �aao� � •�� A! lQ�,��� '-�?4'` ����� " _.i ` ;� � _ sad � ��� ,�,F CLF23-406 ..;t`� �, - ;� �'66 a►,�,;1 �;..' 06 - ' 4 °' ^�: f CLF23 408 ' ti 795 20 t858 22-305 797 5,-'r` CLF22-306 • M,f z 1? - 795.14 ?s r .o4C`d k CLF23-405 3y t 795.53 vz A Yam" DUKE ENERGY CAROLINAS synTerra ie UNDERDRAIN PUMP INFERRED WATER LEVEL CONTOUR (2.5' INTERVAL) GROUNDWATER FLOW DIRECTION a FUTURE PHASES 1-15 ASH BASIN WASTE BOUNDARY — - — GEOGRAPHIC LIMITATION �►1 \ LANDFILL COMPLIANCE BOUNDARY J STRUCTURAL FILL BOUNDARY t LANDFILL BOUNDARY *' LANDFILL CELL 5 AND 6 BOUNDARY s10 LEACHATE BASIN DUKE ENERGY CAROLINAS PROPERTY LINE $ao TOPOGRAPHIC CONTOUR (10' INTERVAL) STREAM (MCKIM & CREED) 810 _ WETLAND (MCKIM & CREED) 8go � NOTES: 9p0 i 1. WATER LEVELS WERE COLLECTED ON 1/5/24, EXCEPTAT CLF22-305, CLF22-306, AND CLF23-405 WHICH WERE INACCESSIBLE IN 1/5/24; 12/6/23 WATER LEVELS WERE USED AT THESE LOCATIONS. 2. * -ABANDONED DURING THE REPORTING PERIOD. 3. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN VERTICAL DATUM OF 1988 (NAVD 88). 4. THE STREAMS AND WETLANDS JURISDICTIONAL DETERMINATION WAS APPROVED BY THE US ARMY CORPS OF ENGINEERS ON OCTOBER 25, 2017 wo (SAW-2015-01412). WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM o AMEC FOSTER WHEELER ENVIRONMENTAL AND INFRASTRUCTURE, INC. NATURAL RESOURCES TECHNICAL REPORT (NRTR) DATED JUNE 2015. 5. THE TOPOGRAPHY IS SHOWN FOR REFERENCE PURPOSES ONLY AND SHOULD NOT BE USED FOR DESIGN OR ENGINEERING PURPOSES. TOPOGRAPHY PROVIDED ' BY TRANSASH. 6. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS. •.;;t, 7. ALL BOUNDARIES ARE APPROXIMATE. 8. AERIAL IMAGERY IS A COMBINATION OF DUKE ENERGY PROPELLER AERIAL PHOTOGRAPHY COLLECTED ON JANUARY 4, 2024, AND MAXAR SATELLITE IMAGERY ' OBTAINED FROM ESRI ONLINE, COLLECTED ON AUGUST 23, 2021. 9. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE PLANE COORDINATE SYSTEM RIPS 3200 (NAD83). GRAPHIC SCALE 200 0 200 400 FIGURE 2 AREA OF FOCUS WATER -LEVEL MAP (IN FEET) UPPER FLOW ZONE DRAWNBY.T.KING DATE:05/12/2022 GROUNDWATER CONDITIONS QUARTERLY REPORT REVISED BY: T. KING DATE: 02/01/2024 CHECKED BY: T CGLTGN DATE: 02/01/2024 OCTOBER 2023 THROUGH DECEMBER 2023 APPROVED BY: T. COLTON DATE: 02/01/2024 MARSHALL STEAM STATION PROJECT MANAGER: T. CGLTGN TERRELL, NORTH CAROLINA www-s nterracor .com P:\O ARCGIS PRO PROJECTS\DUKE ENERGY\MARSHALL\2023\GW CONDITIONS OUARTERLY REPORT\GW CONDITIONS OUARTERLY REPORT 04 APRX ILF-02S/D MW-04/D 846 4 833 4 . �AmA.L DO �+ O 845 0 832 ♦ � O 0 ♦ 3 00 I 3 a 844 O, O z 831 z ♦ O O I c 843 c 830 ' O b o 2 2 _ o W to a I♦ M W 842 W 829 o, O I O OI O fY Gl ♦ G/ O• _.a.l_ 1 J O ��♦� 1 841 ♦O O I 828 III A AL5 1 11,111, 840 0 827 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date Date ILF-02S - Total water level change from transducer installation on 07/30/2021 to 12/31/2023 is -1.3 feet. MW-04 - Total water level change from transducer installation on 07/30/2021 to 12/31/2023 is -4.5 feet. ILF-02D - Total water level change from transducer installation on 07/30/2021 to 12/31/2023 is -1.1 feet. MW-04D - Total water level change from transducer installation on 07/30/2021 to 12/31/2023 is -4.5 feet. ILF-02S/D M W-04/D 837 849 00 0 p 846 a 834 z O o z -- o 0 0 ♦� I� ---------���� 2 843 4 M 831.' Op o � O O � W W > v L 0 0 O 00 840 --------------- +� 828 O O 00 M 825 837 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date Date LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 —North American Vertical DUKE r� DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 3A Future Phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 ENERGY.. REVISED BY: D.AVARD DATE:01/29/2024 UPGRADIENT OF PHASE 2 EXPANSION HYDROGRAPHS Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet ,N RpLIAS CHECKED BY: T. COLTON DATE: 01/12/2024 INDUSTRIAL LANDFILL NO 1.1812-INDUS � ) Cell 5 Blanket Underdrain construction completion (10/22/2021) GROUNDWATER CONDITIONS QUARTERLY REPORT Shallow Groundwater Flow Zone (Transducer Data) in - inches APPROVED BY:T. COLTON DATE:01/12/2024 OCTOBER 2023 THROUGH DECEMBER 2023 Deep Groundwater Flow Zone (Transducer Data) ♦ Manual Water Level Measurement PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION Bedrock Groundwater Flow Zone (Transducer Data) Daily Total Rainfall (inches) synTem TERRELL, NORTH CAROLINA — — - Transient Groundwater Model Water Level Predicted Trend www.synterracorp.com GWA-04S/D CLF21-10 852 4 843 4 851 842 00 •� O 3 00 3 > 850 o > 841 O z oo z c � c 849 2 " c 840 2 :.. 2 — o •M °C W 848 W 839 JKO ;&1;i '@ a> I 1 a>i 1 J J 847 I 838 I O 3 846 0 837 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date Date GWA-04S - Total water level change from transducer installation on 07/30/2021 to 12/31/2023 is -4.0 feet. CLF21-10 -Total water level change from transducer installation on 08/10/2021 to 12/31/2023 is -0.9 feet. GWA-04D - Total water level change from transducer installation on 07/30/2021 to 12/31/2023 is -4.5 feet. GWA-04S/D CLF21-10 855 844 00 0 852 — > 842 o a O� z i . U. ��� 000 p O Oppu._ � •O o O 000 O O 849 O O O > 840 O O O a) W G>J W O O 0 � O� 0 O OW O J L 846 838 v 843 836 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date Date LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 —North American Vertical DUKE r� DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 3B Future Phases 3 through 5 CCR excavation start (06/18/2021) ENERGY.. REVISED BY: D.AVARD DATE:01/29/2024 UPGRADIENT OF PHASE 2 EXPANSION HYDROGRAPHS Datum 1988 Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet ,N RpLIAS CHECKED BY: T. COLTON DATE: 01/12/2024 INDUSTRIAL LANDFILL NO 1.1812-INDUS � ) Cell 5 Blanket Underdrain construction completion (10/22/2021) GROUNDWATER CONDITIONS QUARTERLY REPORT Shallow Groundwater Flow Zone (Transducer Data) in - inches APPROVED BY:T. COLTON DATE:01/12/2024 OCTOBER 2023 THROUGH DECEMBER 2023 Deep Groundwater Flow Zone (Transducer Data) ♦ Manual Water Level Measurement1101 PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION Bedrock Groundwater Flow Zone (Transducer Data) Daily Total Rainfall (inches) S1T�a TERRELL, NORTH CAROLINA F — — - Transient Groundwater Model Water Level Predicted Trend www.synterracorp.com CLF-UD CLF21-11 818 [.,SET. 00 00 0 a z 814 +; v aj J L 810 M <o 00 0 00 0 0 0 4 3 KA 1 c 4- c 808 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date CLF-UD— Water level is stable during underdrain operations. Water levels spikes represent when pump was temporarily out of service. CLF-UD 819 p 816 a z U- a+ 813 M > N W GJ > 810 v r M s� 807 T TTTTTT 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date i 832 830 828 826 824 822 3 1 820 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date CLF21-11- Total water level change from transducer installation on 08/09/2021 to 12/31/2023 is -4.8 feet. CLF21-11 834 a 831 z U. o I OD I 828 d a� W N O N /< L C +� 825 ra sE 822 6/1 /2021 \ \ \ O � Op pip � O 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date LEGEND Cell 5 construction start (05/31/2021) Notes: NAVD 88 — North American Vertical DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3C WITHIN PHASE 2 EXPANSION HYDROGRAPHS ENERGY. REVISED BY: D. AVARD DATE: 01/29/2024 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE: 01/12/2024 GROUNDWATER CONDITIONS QUARTERLY REPORT `� Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE: 01/12/2024 OCTOBER 2023 THROUGH DECEMBER 2023 Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement PROJECT MANAGER:T.COLTON MARSHALL STEAM STATION - Transient Groundwater Model water level predicted trend p Daily Total Rainfall (inches) �1��..i ery � TERRELL ' NORTH CAROLINA www.synterracorp.com CLF21-12 CLF21-13/R 824 823 00 0 > 822 z Lj- c 821 0 41 M a� w 820 d v 819 - M 818 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date CLF21-12 - Total water level change from transducer installation on 08/09/2021 to 12/31/2023 is -3.0 feet. 1.3 1 00 0 8: a z c 0 8 -W M > GJ W GJ > GJ J 8 L V �1 i+ M i 805 —4— - ' . ' T T T 1 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 Date 4 3 2 1 0 4- M GC - 822 820 818 816 814 812 :r CLF21-13 was abandoned and replaced on November 4, 2021. .J 4 3 c 2 1 810 0 6/1 /2021 11 /1 /2021 4/1 /2022 9/1 /2022 2/1 /2023 7/1 /2023 12/1 /2023 Date CLF21-13R - Total water level change from transducer installation on 11/08/2021 to 12/31/2023 is -0.6 feet. CLF21-13 - Total water level change from transducer installation on 08/09/2021 to 10/01/2021 is -0.2 feet. CLF21-13/R 825 > 820 z o U. r- 0 815 a� W N > N J +� 810 Ij (6 sE 0 .o o`o 0 0 00 0 0 0 0 0 i 805 —4— '.' I 1 1 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 Date c oc LEGEND Cell 5 construction start (05/31/2021) Notes: NAVD 88 — North American Vertical DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 3D WITHIN PHASE 2 EXPANSION HYDROGRAPHS ENERGY. REVISED BY: D. AVARD DATE: 01/29/2024 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROLINAS INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE: 01/12/2024 GROUNDWATER CONDITIONS QUARTERLY REPORT `� Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE: 01/12/2024 OCTOBER 2023 THROUGH DECEMBER 2023 Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement PROJECT MANAGER:T.COLTON MARSHALL STEAM STATION - Transient Groundwater Model water level predicted trend p Daily Total Rainfall (inches) �1��..i ery � TERRELL ' NORTH CAROLINA www.synterracorp.com CLF21-14/R CLF21-15 823 4 827 4 822 826 O 00 Q 3 00 ZF 3 P�10� a 821 a 825 a z o z ♦ I .-. o ,-, c 820 2 c 824 ' O 2 o o O ♦ 4- o o p — `- > c > c u, 819 I I- O ♦ x uw 823 O I + � �. II ♦ O �. II � � � 818 .� ; 1 822 817 0 821 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date Date CLF21-14R - Total water level change from transducer installation on 04/08/2022 to 12/31/2023 is +0.9 feet. CLF21-15 - Total water level change from transducer installation on 08/13/2021 to 03/30/2023 is -3.5 feet. The CLF21-15 transducer was removed in April 2023. • • • • • CLF21-14 - Total water level change from transducer installation on 08/13/2021 to 03/22/2022 is -3.3 feet. The transducer was re -installed in July 2023. Total water level change from transducer installation on 07/31/2023 to 12/31/2023 is -0.9 feet. CLF21-14/R CLF21-15 830 828 0000 O c 825 a 825 z •• z LL o 0 0 00 0 o 0 0 0 o 0 820—♦� O O 822 0 � 0� O O O W GJ W O ; GJ > � J L 815 819 m 810 816 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date Date LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 - North American Vertical DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3E WITHIN PHASE 2 EXPANSION HYDROGRAPHS ENERGY. REVISED BY: D. AVARD DATE: 01/29/2024 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE: 01/12/2024 GROUNDWATER CONDITIONS QUARTERLY REPORT `� Cell 5 Blanket Underdrain construction completion (10/22/2021) Shallow Groundwater Flow Zone (Transducer Data) in -inches APPROVED BY: T. COLTON DATE: 01/12/2024 OCTOBER 2023 THROUGH DECEMBER 2023 - Transient Model level Manual Water Level Measurement PROJECT MANAGER:T.COLTON MARSHALL STEAM STATION Groundwater water predicted trend Daily Total Rainfall (inches) sy1Tem TERRELL NORTH CAROLINA www.synterracorp.com ' CLF-301 CLF-305 819 - 00 817 0 a z ++ LL c 815 0 41 M a� W N a>i 813 - J L r M i� 811 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date CLF-301- Total water level change from transducer installation on 07/27/2021 to 12/06/2023 is -6.0 feet. CLF-301—The transducer was removed 12/14/2023 and the well was abandoned in December 2023. CLF-301 1.15Le] 0 816 a z 41 41 813 M > GJ W W > GJ 810 v r M 807 -4- 6/1 /2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 Date LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 — North American Vertical Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 Cell 5 Blanket Underdrain construction start (9/20/2021) Ft - Feet Cell 5 Blanket Underdrain construction completion (10/22/2021) in - inches Shallow Groundwater Flow Zone (Transducer Data) Transient Groundwater Model water level predicted trend Manual Water Level Measurement Daily Total Rainfall (inches) 4 3 'r1 1 0 C 812 CLF22-305 water level dropped below the transducer as noted by manual water level recordings starting 8/8/2023. O O � O � � O ♦e s D 796 4 3 KA 1 0 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date CLF22-305 - Total water level change from transducer installation on 08/10/2021 to 12/06/2023 is -8.3 feet. The water level in CLF-305 dropped below the transducer elevation 08/01/2023. CLF-305 was abandoned in December 2023. CLF-305 C c M I-11CA a 806 z LL 0 799 a� W N > N J +� 792 m sE � a 785 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date CLF22-305 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of CLF22-305 (after Transient Groundwater Model calibration) DUKE DRAWN BY: D. AVARD DATE: 07/21/2021 FIGURE 3F ENERGY. REVISED BY: D.AVARD DATE:01/29/2024 WITHIN PHASE 3 EXPANSION HYDROGRAPHS CAROLINAS CHECKED BY: T. COLTON DATE:01/17/2024 INDUSTRIAL LANDFILL NO 1. (1812-INDUS) GROUNDWATER CONDITIONS QUARTERLY REPORT 1101 APPROVED BY: T. COLTON DATE:01/17/2024 OCTOBER 2023 THROUGH DECEMBER 2023 PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION synTem www.synterracorp.com TERRELL, NORTH CAROLINA CLF-401 CLF-402 814 4 818 4 815 3 811 3 o 00 z v 812 c z o I v 808 c � 2 =- c 2 0 — > M0 I u, 809 I —> W 805 co M OI +� M 806 L 41 m 802 3 0 0i . . . 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 Date Date CLF-402 - Total water level change from transducer installation on 07/27/2021 to 12/31/2023 is -9.9 feet. CLF 401-Total water level change from transducer installation on 07/27/2021 to 12/31/2023 is 9.7 feet. The water level dropped below the transducer elevation 11/05/2023. CLF-401 CLF-402 820 815 • O op O � 00 815 00 o O 00 'o o �o 0o z 810 •o o > z o0o O ° o00 U. 00 O LL 810 .. \ 0 0 a 805 M ai o 2 805 W ` N 0 > Qj \ J L i +�+ 800 r 800 f6 795 795 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date Date LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 — North American Vertical DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3G DOWNGRADIENT OF THE PHASE 2 EXPANSION ENERGY. REVISED BY: D. AVARD DATE: 01/29/2024 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE: 01/17/2024 GROUNDWATER CONDITIONS QUARTERLY REPORT Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE: 01/17/2024 OCTOBER 2023 THROUGH DECEMBER 2023 Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement PROJECT MANAGER: T. COLTON MARSHALL STEAM STATION - Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) WnTem TERRELL ' NORTH CAROLINA www.synterracorp.com CLF22-306 CLF22-307 807 807 4 4 804 804 ° 00 3 00 3 o � z z 801 +� 801 +; cILLc c 2 2= o ♦ — o — M > 4— M > 798 W 798 I W GJ a�i 1 G/ a�i 1 L L 795 a1 a1 4-1 0 795 m 792 0 0 6/1 /2021 10/1 /2021 2/1 /2022 6/1 /2022 10/1 /2022 2/1 /2023 6/1 /2023 10/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date Date CLF22-306 - Total water level change from transducer installation on 08/13/2021 to 12/06/2023 is -7.4 feet. CLF22-307 -Total water level change from transducer installation on 04/08/2022 to 12/06/2023 is -7.4 feet. CLF22-306 CLF22-307 808 810 e o ° ap `Q ° > CLF22 307 was not 800 ` Z 800 ` O O used in the ° Transient Z vGroundwater Model calibration, \ .0 water level c 792 \ 790 predictions were M T _ �/ prepared (Ij \ W following W v installation of > CLF22-307 (after J 784 ` +� 780 Transient m Groundwater Model calibration) 776 770 6/1 /2021 12/1 /2021 6/1 /2022 /1 /2022 6/1 1 /2023 12//2023 6/1 /2021 12/1 1 /2021 6//2022 12/1 /2022 6/1 1 /2023 12//2023 Date Date CLF22-306 was not used in the Transient Groundwater Model calibration, water level predictions were prepared following installation of The predicted increase of modeled water levels is based upon the expected shutdown of the Cell 5 underdrain pumping operation. The slower basin CLF22-306 (after Transient Groundwater Model calibration) excavation rate has extended the period needed to operate the underdrain and will delay the shutdown of the Cell 5 underdrain. LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 — North American Vertical I f DUKE DRAWN BY: D. AVARD DATE:07/21/2021 FIGURE 3H DOWNGRADIENT OF THE PHASE 2 EXPANSION ENERGY. REVISED BY: D. AVARD DATE: 01/29/2024 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROLINAS INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE: 01/17/2024 GROUNDWATER CONDITIONS QUARTERLY REPORT `� Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE: 01/17/2024 OCTOBER 2023 THROUGH DECEMBER 2023 Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement PROJECT MANAGER:T.COLTON MARSHALL STEAM STATION - Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) syriTeria TERRELL ' NORTH CAROLINA www.synterracorp.com CLF22-405 CLF23-406 807 4 810 4 807 00 804 3 0 3 o � a a z z +� +; 804 -71 c � c c 801 2 2= o — o — > c > p c W LJJ 801 0' Gl a>i 798Li 1 G/ a�i 1 J J L L 1 o m 798 795 Ou 0 0 6/1/2021 12/1/2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1/2023 6/1/2021 12/1/2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1/2023 Date Date CLF23-405 - Total water level change from transducer installation on 03/01/2023 to 12/06/2023 is -9.1 feet. CLF23-406 - Total water level change from transducer installation on 03/01/2023 to 12/31/2023 is -8.9 feet. CLF22-405 CLF23-406 812 818 Do p 804 p a 810 a z z o r O .... �O o 0 796 802 p a� O w \ 00 W ; O > J 788 L 794 M 780 786 6/1/2021 12/1/2021 6/1/2022 /1/2022 6/1/2023 12/1/2023 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 Date Date The predicted increase of modeled water levels is based upon the expected shutdown of the Cell 5 underdrain pumping operation. The slower The predicted increase of modeled water levels is based upon the expected shutdown of the Cell 5 underdrain pumping operation. The slower basin basin excavation rate has extended the period needed to operate the underdrain and will delay the shutdown of the Cell 5 underdrain. excavation rate has extended the period needed to operate the underdrain and will delay the shutdown of the Cell 5 underdrain. LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 - North American Vertical r� DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 31 DOWNGRADIENT OF THE PHASE 2 EXPANSION ENERGY. REVISED BY: D. AVARD DATE: 01/29/2024 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CARC]LINAS INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE: 01/12/2024 GROUNDWATER CONDITIONS QUARTERLY REPORT `� Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE: 01/12/2024 OCTOBER 2023 THROUGH DECEMBER 2023 Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement PROJECT MANAGER:T.COLTON MARSHALL STEAM STATION - Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) syriTeria TERRELL ' NORTH CAROLINA www.synterracorp.com CLF23-407 CLF23-408 812 4 807 4 00 810 3 00 804 3 0 o 0 oe a o a z z c � c c 808 2 801 2= o — o — M > 4— 'ca M > 'ca a� W a� W Gl a>, 806 1 G/ 798 1 a>, J J I L O L 241 ll"804 L 0 795 0 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 6/1 /2021 12/1 /2021 6/1 /2022 12/1 /2022 6/1 /2023 12/1 /2023 Date Date CLF23-407 - Total water level change from transducer installation on 03/01/2023 to 12/31/2023 is -4.7 feet. CLF23-408 - Total water level change from transducer installation on 03/21/2023 to 12/31/2023 is -8.2 feet. CLF23-407 CLF23-408 818 812 � 1 00 00 812 a 805 zz z o ° o 0 806 > 798 �p O � > � O W W > \ GJ � � 800 L 791 \ - v M 794 784 6/1/2021 12/1/2021 6/1/2022 /1/2022 6/1/2023 12/1/2023 6/1/2021 12/1/2021 6/1/2022 12/1/2022 6/1/2023 12/1/2023 Date Date The predicted increase of modeled water levels is based upon the expected shutdown of the Cell 5 underdrain pumping operation. The slower The predicted increase of modeled water levels is based upon the expected shutdown of the Cell 5 underdrain pumping operation. The slower basin basin excavation rate has extended the period needed to operate the underdrain and will delay the shutdown of the Cell 5 underdrain. excavation rate has extended the period needed to operate the underdrain and will delay the shutdown of the Cell 5 underdrain. LEGEND Notes: Cell 5 construction start (05/31/2021) NAVD 88 - North American Vertical r� DUKE DRAWN BY: D.AVARD DATE:07/21/2021 FIGURE 3J DOWNGRADIENT OF THE PHASE 2 EXPANSION ENERGY. REVISED BY: D. AVARD DATE: 01/29/2024 Future phases 3 through 5 CCR excavation start (06/18/2021) Datum 1988 CAROI INAS INDUSTRIAL LANDFILL NO 1. (1812-INDUS) Cell 5 Blanket Underdrain construction start (9/20/2021) Ft -Feet CHECKED BY: T. COLTON DATE: 01/12/2024 GROUNDWATER CONDITIONS QUARTERLY REPORT `� Cell 5 Blanket Underdrain construction completion (10/22/2021) in -inches APPROVED BY: T. COLTON DATE: 01/12/2024 OCTOBER 2023 THROUGH DECEMBER 2023 Shallow Groundwater Flow Zone (Transducer Data) Manual Water Level Measurement PROJECT MANAGER:T.COLTON MARSHALL STEAM STATION - Transient Groundwater Model water level predicted trend Daily Total Rainfall (inches) syriTeria TERRELL ' NORTH CAROLINA www.synterracorp.com 0- W a� co oc O U- c .ru N C= Ln N U 140 120 100 c ❑1 n 3 2 11 C 9/1/2021 3/1/2022 9/1/2022 3/1/2023 9/1/2023 Notes: Years of Operation 1. gpm = gallons per minute. 2. Flow data from the first day following a period of no flow were not plotted. 4 �' DUKE DRAWN BY: T. COLTON DATE: 10/13/2021 FIGURE 4 ENERGY REVISED BY: D. AVARD DATE: 01/10/2024 c CHECKED BY: T. COLTON DATE: 01/12/2024 CELL 5 (UNDERDRAIN) PUMPING FLOW RATE VS. SIMULATED FLOW RATE APPROVED BY: T. COLTON DATE: 01/12/2024 GROUNDWATER CONDITIONS QUARTERLY REPORT 46� PROJECT MANAGER: T. COLTON OCTOBER 2023 THROUGH DECEMBER 2023 MARSHALL STEAM STATION synTerra www.synterracorp.com TERRELL, NORTH CAROLINA Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina TABLE L7 synTerra Science & Engineering Consultants TABLE 1 GROUNDWATER MONITORING NETWORK WELL INFORMATION AND WATER LEVELS GROUNDWATER CONDITIONS QUARTERLY REPORT OCTOBER 2023 THROUGH DECEMBER 2023 MARSHALL STEAM STATION DUKE ENERGY CAROLINAS, LLC, TERRELL, NC Well ID Date Well/ Piezometer Installed Date Transducer Installed Monitoring Zone Northing (Ft-NAD 83) Easting (Ft-NAD 83) Measuring Point TOC Elevation (Ft-NAVD 88) Ground Surface Elevation (Ft-NAVD 88) Total Well Depth z' (Ft-BGS) Measured Well Depth' (Ft-TOC) Screened Interval 3 (Ft TOC) Top of Screen Elevation (Ft-NAVD 88) Bottom of Screen Elevation (Ft-NAVD 88) Water Level Measurement (Ft-TOC) 11/07/2023 Groundwater Elevation (Ft-NAVD 88) 11/07/2023 Water Level Measurement (Ft-TOC) 12/06/2023 Groundwater Elevation (Ft-NAVD 88) 12/06/2023 Water Level Measurement (Ft-TOC) 01/05/2024 Groundwater Elevation (Ft-NAVD 88) 01/05/2024 CLF-301 5/21/2021 7/27/2021 Shallow 685838.40 1413513.30 847.46 844.46 62.00 65.00 52.00 62.00 795.46 785.46 35.85 811.61 36.15 811.31 Abandoned CLF-401 5/17/2021 7/27/2021 Shallow 685783.50 1412779.50 832.44 830.44 39.00 41.00 29.00 39.00 803.44 793.44 26.47 805.97 27.03 805.41 27.04 805.40 CLF-402 5/21/2021 7/27/2021 Shallow 685598.80 1413217.80 818.41 816.41 50.00 52.00 40.00 50.00 778.41 768.41 16.32 802.09 16.93 801.48 17.24 801.17 CLF21-10 8/6/2021 8/6/2021 Shallow 687020.10 1412353.40 857.75 857.75 32.00 32.00 22.00 32.00 835.75 825.75 17.68 840.07 17.86 839.89 17.80 839.95 CLF21-11 8/5/2021 8/5/2021 Shallow 686572.30 1412572.20 850.17 850.08 40.00 41.64 31.64 41.64 818.53 808.53 24.11 826.06 24.64 825.53 24.60 825.57 CLF21-12 8/5/2021 8/5/2021 Shallow 686217.40 1412518.20 839.06 838.96 40.00 43.22 31.22 41.22 807.84 797.84 19.18 819.88 19.54 819.52 18.92 820.14 CLF21-13R 11/4/2021 11/8/2021 Shallow 686085.92 1412818.66 836.21 836.2 35.00 37.46 25.46 35.46 810.75 800.75 20.12 816.09 20.28 815.93 18.46 817.75 CLF21-14R 4/18/2022 4/18/2022 Shallow 686027.10 1414268.70 847.54 844.0 41.50 38.19 28.19 38.19 819.35 809.35 27.78 819.76 28.15 819.39 28.45 819.09 CLF21-15 8/10/2021 8/10/2021 Shallow 686307.70 1414410.00 864.37 864.37 55.00 55.00 45.00 55.00 819.37 809.37 40.75 823.62 40.91 823.46 41.10 823.27 CLF22-305 3/22/2022 4/8/2022 Shallow 685228.95 1413445.92 819.21 816.94 16.00 16.00 6.00 16.00 813.21 803.21 18.58 800.63 18.63 800.58 Abandoned CLF22-306 3/22/2022 4/8/2022 Shallow 685033.00 1413752.34 816.36 813.57 25.00 25.00 15.001 25.00 801.36 791.36 20.36 796.00 2122 795.14 Inaccessible CLF22-307 3/22/2022 4/8/2022 Shallow 684539.89 1413247.50 825.96 823.40 40.00 40.00 30.00 40.00 795.96 785.96 31.89 794.07 33.21 792.75 Inaccessible CLF23-405 2/14/2022 3/1/2022 Shallow 684920.61 1413022.90 810.29 807.29 42.00 42.00 32.00 42.00 778.29 768.29 13.75 796.54 14.76 795.53 Inaccessible CLF23-406 2/14/2022 3/1/2022 Shallow 685463.34 1412717.51 813.96 810.77 43.00 43.00 33.00 43.00 780.96 770.96 15.50 798.46 15.50 798.46 15.90 798.06 CLF23-407 2/15/2023 3/1/2022 Shallow 685796.44 1413229.69 828.87 826.33 43.00 43.00 33.00 43.00 795.87 785.87 23.53 805.34 24.05 804.82 24.51 804.36 CLF23-408 2/15/2023 3/1/2022 Shallow 685262.35 1413270.88 810.81 808.07 35.00 35.00 25.00 35.00 785.81 775.81 14.33 796.48 15.21 795.60 15.61 795.20 GWA-41) 6/12/2015 7/30/2021 Deep 686783.39 1411776.91 902.45 899.38 90.07 93.14 84.07 89.07 818.38 813.38 54.79 847.66 54.92 847.53 54.93 847.52 GWA-4S 5/19/2015 7/30/2021 Shallow 686776.57 1411777.34 901.97 898.98 67.99 70.98 52.19 67.19 849.78 834.78 54.89 847.08 55.11 846.86 55.18 846.79 MW-4 6/30/1989 7/30/2021 Shallow 686723.00 1414467.00 867.15 863.81 50.20 49.93 49.93 49.93 823.55 813.55 38.79 828.36 38.96 828.19 39.09 828.06 MW-4D 10/12/2006 7/30/2021 Bedrock 686715.00 1414462.00 866.74 863.42 64.18 67.55 56.65 61.65 807.87 802.87 39.10 1 827.64 39.30 827.44 39.35 827.39 ILF-21) 3/31/2019 7/30/2021 Deep 687699.24 1413205.78 885.14 885.57 107.00 106.57 91.57 101.57 793.57 783.57 41.42 843.72 4172 843.42 41.88 843.26 ILF-2S IL- 3/31/2019 7/30/2021 Shallow 687699.26 I 1413214.68 884.79 885.21 52.00 51.58 41.58 51.58 843.21 833.21 43.88 840.91 44.15 840.64 44.33 840.46 Notes: 1 Well depths initially measured during well installation and updated as new wells are installed. Z "Total Well Depth" is the depth to the bottom of the filter pack. 3 Values measured during well installation BGS - Below ground surface TOC - Top of casing Ft - Feet NAD 83 - North American Datum of 1983 NAVD 88 - North American Vertical Datum of 1988 NM - Not measured Prepared by: GTC Checked by: CSM Page 1 of 1 Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX A WATER -LEVEL MONITORING DATA FILES INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX B GROUNDWATER MODEL PREDICTED TREND FILES INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX C UNDERDRAIN PUMPING DATA FILES INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants Groundwater Conditions Quarterly Report — October 2023 to December 2023 Duke Energy Carolinas, LLC - Marshall Steam Station - Industrial Landfill No. 1 Terrell, North Carolina APPENDIX D MANN-KENDALL DATA INCLUDED AS EXCEL FILE) L7 synTerra Science & Engineering Consultants