Loading...
HomeMy WebLinkAbout5405T_INSP_20230621FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 3 UNIT TYPE: Lined MSWLF LCID YW Transfer X Compost SLAS COUNTY: LENOIR Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 5405T-TRANSFER-1998 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: June 21, 2023 Date of Last Inspection: March 9, 2023 FACILITY NAME AND ADDRESS: Lenoir County Transfer Station 2949 Hodges Farm Rd. La Grange, NC 28551 GPS COORDINATES: N: 35.29453° W: -77.71301° FACILITY CONTACT NAME AND PHONE NUMBER: Landfill 252.566.4194 Kim Hill 252-566-4194 ext. 4177 Email: kimberly.l.hill@lenoircountync.gov FACILITY CONTACT ADDRESS: Same as above PARTICIPANTS: Liz Patterson, NCDEQ –Solid Waste Section Kim Hill – Lenoir County Solid Waste Director Johnnie Morries - Lenoir County STATUS OF PERMIT: The Life-of-Site Permit to Operate (PTO) was issued January 24, 2017 PURPOSE OF SITE VISIT: Comprehensive Inspection STATUS OF PAST NOTED VIOLATIONS: NONE OBSERVED VIOLATIONS: NONE The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 3 ADDITIONAL COMMENTS 1. The facility is fenced and is secured by a locking gate when it is not open for operation. 2. The correct signage is at the entrance of the facility listing the facility name, permit number and emergency contact information as well as materials accepted at the facility. 3. The facility is open to accept waste from 8:00 am until 4:00 pm Monday through Friday and 8:00 am until 12:00 pm on Saturday. The facility is normally closed on Sunday and select County holidays. Personnel are onsite during operating hours. 4. The approved Facility Permit, Operations Plan, and Contingency Plan were complete, in order, and reviewed during this Facility Compliance Inspection. 5. The waste type being accepted into the transfer facility was MSW. No unapproved waste was observed. 6. The access road is being maintained for all-weather use. 7. The tipping floor is cleaned daily and routinely sanitized. 8. The leachate collection system was reviewed and is operating properly at this time. Leachate is discharged to the City of Kinston sanitary sewer. 9. Fire extinguishers available for fire control. 10. The windblown waste is being managed well. Continue to ensure site staff conduct daily inspections for windblown waste on the site property. Windblown litter from site operations discovered during the daily inspections or observed on adjacent properties shall be picked up and containerized for disposal by the end of each operating day, unless the landowner of the adjacent property denies access to site staff. 11. Per 15A NCAC 13B .0405 (11) Site Cleaning and Maintenance: Unless otherwise stated in the site permit, all waste shall be removed from the tipping floor, the truck loading bays, and from behind push walls by the end of each day of operation and disposed of in accordance with this Subchapter. The tipping floor, push walls, and truck loading bays shall be cleaned with a pressure washer no less than once per month. The remaining areas of the site building including side walls and any material storage areas outside of the building shall be cleaned with a pressure washer no less than twice per year. Wash water generated from cleaning waste handling areas shall be contained and treated as leachate. Cleaning and maintenance records shall be maintained and made available to the Division upon written request. Scheduling of full facility pressure washing delayed due to budget and staffing issues. Staff are pressure washing the tipping floor, push walls, and truck loading bays no less than once a month. 12. Digital pictures of the transfer station taken during the inspection: FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 3 Transfer Station Transfer Trailer Staging Area Transfer trailer loading bay Please contact me if you have any questions or concerns regarding this inspection report. Phone: 910-796-7405(O) elizabeth.patterson@deq.nc.gov Liz Patterson Environmental Senior Specialist Regional Representative Sent on: 7/12/2023 + +- +-9 6+- X Email Hand delivery US Mail Certified No. [ _] Copies: Drew Hammonds, Eastern District Supervisor - Solid Waste Section