HomeMy WebLinkAbout3620_DukeAllen_SSLF_RevisedDewateringSite Figure and Well Schematic_FID_20230605LINED RETENTION BASIN �.
DUKE ENERGY CAROLINAS GYPSUM PAD
PROPERTY LINEki STORAGE AREA
■
• • �� ■ ALLEN STEAM STATION
DISCHARGE
CANAL COAL PILE AREA
RETIRED ASH BASIN� RETIRED ASH BASIN
ASH LANDFILL
RETIRED ASH BASIN •� ° �' " ■ BOUNDARY
WASTE BOUNDARY ■ I
�: ACTIVE ASH BASIN
ACTIVE ASH BASIN � 8 Z�
WASTE BOUNDARY � _
■
AB-21 PWA/PWS/OWAU/OWAL
AB-21 S/SL/SS/D/BR/BRL - _-
------------
'_
-1 W Stowe / ED-1Lake p
?
ARAPHIC SCALE (IN FEET) •-
(WEST SYSTEM 17 WELLS)
2 V5,10A,
"�
LEGEND
Q� EDUCTOR WELL
C EDUCTOR PIEZOMETER
Q� PROPOSED EDUCTOR WELL
C PROPOSED EDUCTOR PIEZOMETER
C PIEZOMETER
ABANDONED MONITORING WELL
Q!I) MONITORING WELL
50OFT BUFFER FROM EDUCTOR WELLS
SOUTH STARTER LANDFILL BOUNDARY
ASH BASIN WASTE BOUNDARY
RETIRED ASH BASIN WASTE BOUNDARY
RETIRED ASH BASIN ASH LANDFILL WASTE BOUNDARY
_ DUKE ENERGY CAROLINAS ALLEN PLANT SITE
BOUNDARY
STREAM (AMEC NRTR 2015)
ZZZ WETLAND (AMEC NRTR 2015)
NOTES:
1. ALL BOUNDARIES ARE APPROXIMATE.
2. PROPERTY BOUNDARY PROVIDED BY DUKE ENERGY CAROLINAS.
3. THE WATERS OF THE US DELINEATION HAS NOT BEEN APPROVED BY THE
US ARMY CORPS OF ENGINEERS AT THE TIME OF THE MAP CREATION. THIS
MAP IS NOT TO BE USED FOR JURISDICTIONAL DETERMINATION PURPOSES.
THE WETLANDS AND STREAMS BOUNDARIES WERE OBTAINED FROM
STREAM AND WETLAND DELINEATION CONDUCTED BYAMEC FOSTER
WHEELER ENVIRONMENTAL & INFRASTRUCTURE, INC. NATURAL RESOURCE
TECHNICAL REPORT (NRTR) FOR ALLEN STEAM STATION DATED MAY 29, 2015
4. AERIAL PHOTOGRAPHY PROVIDED DUKE ENERGY, PROPELLER
COLLECTED MAY 9, 2023
5. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH CAROLINA STATE
PLANE COORDINATE SYSTEM FIPS 3200 (NAD83).
6. THE PROPOSED EDUCATOR WELL WEST SYSTEM IS COMPOSED OF 17
EDUCATOR WELLS, THE PROPOSED EDUCATOR WELL EAST SYSTEM IS
COMPOSED OF 24 WELLS.
CCR-23S/D
DUKE
ENERGY.
CAROLINAS
�11
Terra
AB-11 D
150 0
150 300
GRAPHIC SCALE IN FEET
DRAWN BY: C. HARRISON
DATE: 05/19/2023
REVISED BY: C. HARRISON
DATE: 05/24/2023
CHECKED BY: C. SUTTELL
DATE: 06/02/2023
APPROVED M'.C.SUTTELL
DATE: 06/02/2023
PROJECT MANAGER: C. SUTTELL
DATE: 06/02/2023
FIGURE 1
PROPOSED WELL AND PIEZOMETER MAP
ALLEN STEAM STATION
GASTON COUNTY, NORTH CAROLINA