Loading...
HomeMy WebLinkAbout6204_RepuiblicServices_UwharrieMSWLF_2022Cost Est._20220715HODGES, HARBIN, NEWBERRY & TRIBBLE, INC. Consulting Engineers June 15, 2022 Ms. Sarah M. Moutos Environmental Program Consultant Division of Waste Mgmt - Solid Waste Section North Carolina Dept of Environmental Quality 217 W. Jones Street Raleigh, NC 27603 Re: Uwharrie Regional MSW Landfill Montgomery County, North Carolina Facility Permit No. 62-04 Closure / Post -Closure Cost - REVISED HHNT Project No. 6703-291-05 Dear Ms. Moutos: We have enclosed the updated Closure/Post-Closure Cost Estimate for Financial Assurance on the subject project. Please note, these costs have been updated to 2022 dollars and to address comments provided by Mr. Ming Chao, P.E. during his review of the Phases 5 & 6 Permit to Construct application. The costs are summarized below: Closure Costs............................................................................................... $16,432,010.08 Post -Closure Costs....................................................................................... $115150,100.00 Potential Assessment and Corrective Action ................................................. $2,440,001.18 Total Financial Assurance............................................................................ $30,022,111.26 The annual financial assurance mechanism will be submitted under separate cover after these costs have been approved. Should you have any questions, please call. Sincerely, HODGES, HARBIN, NEWBERRY & TRIBBLE, INC. K Matthew Cheek, P.E Professional Engineer KMC/sc Enclosure Q 'g_SSIpN• *6 v G-r�(I '`•: ` 01 NEE•: cc: Sherri Stanley (w/ enclosure) Ming Chao, P.E. (w/ enclosure) Mike Gurley (w/ enclosure) Joe Reynolds (w/ enclosure) 3920 Arkwright Road, Suite 101 • Macon, Georgia 31210 (478) 743-7175 • Fax (478) 743-1703 • www.hhnt.com SAVANNAH • ATLANTA • Macon • STATESBORO • GREENVILLE, SC UHWARRIE REGIONAL LANDFILL FACILITY PERMIT NO.62-04 MONTGOMERY COUNTY, NC CLOSURE COST ESTIMATE 2022 UPDATE GENERAL Largest Area: Cells No. 1 - 14B = 6,355,404 s.f. = 145.9 acres Subtract Acreage Previously Closed = 39.1 Acres = 106.8 acres = 4,652,208 s.f. CLOSURE CARE COST ESTIMATE 1 Contractor Mobilization 2 Subgrade Preparation 3 6" Topsoil 4,652,208 s.f. x 0.5 ft. — 27 4 18" Cover Soil 4,652,208 s.f. x 1.5 ft. — 27 5 18" Infiltration Layer (1 x 10-5 cm/sec) 484,262 s.f. x 1.5 ft. — 6 Drainage Layer (Geocomposite) Material Labor 7 FML Material & Installation 8 Permanent Vegetation 9 Silt Fence 10 Excelsior Matting 11 Final Disposal of Waste & Cleanup 12 Downdrain Construction 13 Stormwater Diversion Berms 14 Stormwater Channels & Lining 15 Sediment Basin Cleanout 16 Landfill Gas Extraction System Expansion 17 Yard Waste Collection Unit Decomissioning 18 Scrap Tire Collection Unit Decomissioning 19 Waste Limit Survey for Deed Recordation 20 Engineering and Closure Certification 21 CQA Monitoring & Reporting (including Field & Lab testing) 22 Certification Surveying 1 L.S. @ $50,000.00 = $50,000.00 4,652,208 s.f. @ $0.22 = $1,023,485.76 ft3/cy = 86,152 c.y. @ ft3/cy = 258,456 c.y. @ $6.00 = $516,912.00 $6.85 = $1,770,423.60 27 ft3/cy = 26,903 c.y. @ $12.00 = $322,841.33 4,652,208 s.f. @ $0.49 = $2,279,581.92 4,652,208 s.f. @ $0.15 = $697,831.20 4,652,208 s.f. @ $0.59 = $2,744,802.72 106.8 ac @ $2,950.00 = $315,060.00 3,250 l.f. @ $4.00 = $13,000.00 516,912 s.y. @ $2.00 = $1,033,824.00 1,250 tons @ $50.00 = $62,500.00 11,386 l.f. @ $78.00 = $888,108.00 84,643 l.f. @ $22.25 = $1,883,306.75 16,000 s.y. @ $89.85 = $1,437,600.00 12,000 c.y. @ $7.00 = $84,000.00 1 L.S. @ $200,000.00 = $200,000.00 1 L.S. @ $20,000.00 = $20,000.00 1 L.S. @ $20,000.00 = $20,000.00 1 L.S. @ $6,500.00 = $6,500.00 106.8 ac @ $2,650.00 = $283,020.00 106.8 ac @ $6,461.00 = $690,034.80 106.8 ac @ $835.00 = $89,178.00 TOTAL CLOSURE COST (2022) $16,432,010.08 UWHARRIE REGIONAL LANDFILL FACILITY PERMIT NO. 62-04 MONTGOMERY COUNTY, NC POST CLOSURE CARE COST ESTIMATE 2022 UPDATE Constructed Area Covered by this Est. = 145.9 ac 1 Water Monitoring & Statistics (Includes Appendix I sampling, analysis & reporting for 2 events per year.) Groundwater 21 wells @ 2 event/yr @ $1,450.00 = $60,900.00 Underdrain 1 location @ 2 event/yr @ $1,450.00 = $2,900.00 Surface Water 3 locations @ 2 event/yr @ $205.00 = $1,230.00 Leachate 1 sample @ 2 event/yr @ $960.00 $1,920.00 2 Methane Gas Monitoring 17 wells @ 4 events/yr @ $25.00 = $1,700.00 3 Sediment & Erosion Control, (including Inspections, Repairs to Cap, Slope & Vegetation) 1 L.S. @ $31,000.00 = $31,000.00 4 Sediment Basin Cleanout 1,200 C.Y. @ $7.40 = $8,880.00 5 Leachate Collection Treatment & Analysis (Average over 30 years) 1 L.S. @ $70,000.00 = $70,000.00 6 Leachate System Maintenance (including camera & jetting every 5 yrs) 1 L.S. @ $22,000.00 = $22,000.00 7 Alarm System Monitoring 1 L.S. @ $1,440.00 = $1,440.00 8 Engineering Inspections & Reporting 4 yr @ $1,500.00 = $6,000.00 9 Air Emissions Testing & Reporting 1 yr @ $5,700.00 = $5,700.00 10 Operation & Maintenance of the Methane Gas Collection System 1 yr @ $110,000.00 = $110,000.00 11 Mowing 2 yr @ $9,750.00 = $19,500.00 12 Site Maintenance & Repair (including fencing, gates, security, paths to final cover system & 1 L.S. @ $2,500.00 = $2,500.00 monitoring network) ANNUAL POST CLOSURE CARE COST (2022) $345,670.00 X 30 YEARS $10,370,100.00 13 Leachate System Decommissioning (one-time cost) 2 Ea. @ $75,000.00 = $150,000.00 14 LFG System Decommissioning (one-time cost) (including conversion to passive vents) 1 L.S. @ $630,000.00 = $630,000.00 ANNUAL POST CLOSURE CARE COST (2022) $780,000.00 TOTAL 30 YEAR COST (2022) $11,150,100.00