Loading...
HomeMy WebLinkAbout1804_DukeMarshall_DALF_RequestforWellAbandonment_FID1767404_20230106(' DUKE ENERGY-. January 6, 2023 North Carolina Department of Environmental Quality Division of Waste Management Solid Waste Section 2090 U.S. Highway 70 Swannanoa, NC 28778 Attn: Ms. Sarah Moutos (submitted electronically) Re: Request for Approval to Abandon Observation and Monitoring Wells Dry Ash Landfill Phase 11 Permit No.: 1804-INDUS-1983 Marshall Steam Station Terrell, North Carolina 28682 Dear Ms. Moutos: 526 South Church St. Charlotte, NC 28202 Mailing Address P.O. Box 1006 Mail Code EC 13K. Charlotte, NC 28201-1006 To support the installation of an amended final cover system for the Marshall Steam Station Dry Ash Landfill Phase II (1804-INDUS), Duke Energy requests approval to abandon 14 observation and groundwater monitoring wells located within the limit of waste of the landfill. Two of the wells requested for abandonment include landfill compliance observation wells OB-2 and OB-3. The attached Figure (Figure 2 Sample Locations) has the observations wells requested for abandonment circled. The 12 groundwater monitoring wells, AL-2S/D/BR/BRL/BRLL/BRLLL, AL-3S/D/BR, AL-4D/BR/BRL, are associated with the Coal Ash Management Act (CAMA) Interim Monitoring Program (IMP). The attached Figure (Figure 1 Sample Location Map) has the monitoring wells requested for abandonment circled. A separate request has also been submitted to the Division of Water Resource Regional Office for approval to abandon these monitoring wells. Abandonment of the observation wells will be supervised by qualified geotechnical field support that is under the direct supervision of and in contact with a Licensed Geologist. The piezometer will be abandoned by a North Carolina licensed well contractor in accordance with subchapter 02C of the North Carolina Administrative Code. Duke Energy will provide well abandonment records to the Division upon completion of the field work. If you need additional information regarding this request do not hesitate to email or call me at Ashley.Healy(cD-duke-energy.com or (717) 982-0986. Respectfully submitted, j4l_�Ai Ashley Healy, P.G. Environmental Services Attachments: Figure 2 Sample Locations (SynTerra, December 2022) Figure 1 Sample Location Map (SynTerra, 2021) cc (via e-mail): Claire Osborn, NCDEQ Sherri Stanley, NCDEQ www.duke-energy.com Page 1 of 2 Ed Mussler, NCDEQ Brandy Costner, NCDEQ Scott Saunders, Duke Energy Dan Zakary, Duke Energy Chris Varner, Duke Energy Tyler Hardin, Duke Energy Kim Witt, Duke Energy www.duke-energy.com Page 2 of 2 NOTES: 1. STREAM AND WETLAND DELINEATION CONDUCTED BY MCKIM & CREED MARCH 2O16) ' GWA-8S 2. SAMPLE LOCATIONS WERE DERIVED FROM VARIOUS SOURCES AND ARE A MIX OF SURVEYED AND APPROXIMATE LOCATIONS. r� '� THEREFORE, SAMPLE LOCATIONS ARE TO BE DEEMED APPROXIMATE.CTURAL 3. AERIAL PHOTOGRAPHY OBTAINED FROM GOOGLE EARTH PRO FILL BG-3S/BF ON JANUARY 22, 2021. IMAGE COLLECTED ON JUNE 16, 2021. GWA-43GWA-5S 4. DRAWING HAS BEEN SET WITH A PROJECTION OF NORTH - + ?' ` �: MW-4D • a°p0 , CAROLINA STATE PLANE COORDINATE SYSTEM FIPS 3200 (NAD83). ILF-1 S/D/BR ±� ".' M-6 AB-17S/D �.` GWA-6S GWA-14S/D GWA-3. ,� • v MW-3 PVSF-3S/D/BR - M-16 AL-3S/BR ') O OB 3 (MW-7) ■ -' �• AB-16S/DU L , AL-4BR/BR, �i AB-16D • � AB-11S � PVSF-2S/D/BR/BRL,; AB-15S/SL fir. �4�it AB 11D �.,�. • ' AL,2S/D/BRL/BRLL/BRLLL O MW-5' � I CCR-15S/D �7r• MW 2 D �• !* ; '�♦ ; • AB-14S/DU MW-14S/D/BRL I GWA-10S/D AB-10S/SL/BR/BRL , 1� �. MW-12S/D , t ACd_9 oc/nicer . a OUTFALL 101 / S-1 1BRA t�py.. w: 1BR r� it gig 9-M1 k memo 1000, 1, Terrell Lake Norman of Catawba 40 . kyi Y q OB 1 O "f .+ w, ®•(Dry Ash Landfill) O=ACCES ROAD j AB-6S/BRA/BRL , '7 CCR-12S/D d STRUCTURAL FILL�A"MERV • )' t CCR-10S/D O �� ' - ' CCR-11S/D CCR-9D MW-6S/D GWA-12S/D/BR MW-11S/D AB-66R-, AB-21S �• LEGEND ` r�i� ,®• © # CCR-9S/DA � 1 •= 0` AB-1S/D/BR/BRLL/BRLLL �' O GROUNDWATER SAMPLING LOCATION r •♦ "� Q'� ' S-2 .-: 7 t� • SOIL SAMPLING LOCATION � �_. _ MS-8 ., � \ MSSW001 - % OUTFALL 102 / 104 SOIL AND GROUNDWATER SAMPLING LOCATION l� MW-10S/D O MS-9� 'r ����I' w;�" �• '' " r0 O AREA OF WETNESS (AOW) SAMPLING LOCATION a 04 +'� MSWW002 O. MW-7S/D'> AOW AND SEDIMENT SAMPLING LOCATION a MS-100 0117) • SURFACE WATER SAMPLING LOCATION ° O 1 SURFACE WATER AND SEDIMENT SAMPLING LOCATION AB-5S/DU ° • EFFLUENT WATER SAMPLING LOCATION • • � - �r . � AB-3S r '0 MW-9S/D O ABANDONED MONITORING WELLAND PIEZOMETER 0 AB-2D/BR r� •a•�.� MS-15e- r., • ASH BASIN WASTE BOUNDARY MS-11 4 =. . ( O I �• !h �r : �► A ^ . _ . _ - GEOGRAPHIC LIMITATION -+ MS-7 O 1 MS-2 ;�^ CCR-2S/D t.� ' `!.�~. ! LANDFILL BOUNDARY HOLDING A ! �` CCR-1S/D �,,� �� �� �' i• STRUCTURAL FILL BOUNDARY MS-6 O MS-13 O ,co ♦ �/ LANDFILL COMPLIANCE BOUNDARY MS-3 - • O CCR 4S/D ' F t - , •.� s3w"y' '�¢---DUKEENERGYCAROLINASPROPERTYLINE . R,w C• � MS-12 s GWA � � • � ;. � _ 1 RB-1S 2S/DA r • �� .Y` STREAM MCKIM &CREED 2016 - t CCR 3S/D •;*, d+ ( ) ♦ GWA-1D/BR O WETLAND MCKIM &CREED 2016 _ ♦ mot,. r. , r �`t 'y�►��• 2� Ins MS-4lamp LRB-20S ` Ir -• ` '4, ``�" ( DUKE 500 GRAPH IC SCALE 1,000 FIGURE 1 -;, - . , �� ENERGY® IN FEET a` . •14 =Z !CAROLINAS SAMPLE LOCATION MAP • ��., , _r DRAWN BY: C DATE:07/27/2019 21 MARSHALL STEAM STATION y . WFW�- � REVISED BY: B. MCGANN DATE: 07/27/2021 ■1c { �- �[ APPROCHECKVED TB.WILKN DATE:07/27/2021 TERRELL, NORTH CAROLINA APPROVED BY: B. WICKER DATE: 07/27/2021 Y_<-• 1 1 �.2 '� �Ter� www.SVn PROJECT MA lterracorD.COM