Loading...
HomeMy WebLinkAbout9809_WilsonCDLF_CQA DRWG_20220916DocuSign Envelope ID: 341090CD-AC8D-4004-BCFC-OF26B9D22DF6 o_ v LO N N O N CO ''P WILSON COUNTY, NORTH CAROLINA WILSON COUNTY SOLID WASTE SERVICES L OF 1655 SEAL CARD '''•. O� 6 SS/0 Doctlig ned b�� 9<00 iGG A�EAL358C�1M007440 ,�'••.,� A EL 8�\�►1"1912022 SEAL • �',� �1J ��► VVESTSIDE E 0 LANDFILL AREA 2 PHASE I CONSTRUCTION REV. DATE DESCRIPTION 1 04/22 ADDENDUM NO.2 2 05/22 RESPONSE TO NCDEQ DEMLR COMMENTS DATED 05/10/22 3 06/22 RESPONSE TO NCDEQ DEMLR COMMENTS DATED 06/03/22 4 06/22 ISSUED FOR CONSTRUCTION 5 06/22 RESPONSE TO NCDEQ DWM COMMENTS DATED 06/23/22 b 09/22 RECORD ISSUE N W D2=E S 42 I _ 58 TOLSRJi _ - , O PRI TTE ST NE - I�p'' � - E C q pN50N ST GROVE ST NE- a\- �f R ! 1 Pii�! rG OCAND RD E I y LL BRD` - �0 - t C',' ,u ity— $ To`isnot CM J'E B m = ITE LO ATION 2 qY� G�SSS 9Zs RfpNJA4E¢TF O \ i g f00- - �- INE$STS-GVIEW R- "R Of•i' �- -�' • o f - _ Alt i li 41 /4R]'py L �V a ( LINCOLN SiS Ao ap 0\'Reat Haven \/Nr'✓qp - p O �� 0.EER DR se tP SSE. SSS OµOEN Alt A x Alt F 2 _• - CN IRLESTON ST SE J po `� B O -w- S o v. Pnnd W cwoou SITE LOCATION MAP NOT TO SCALE CONSTRUCTION DRAWINGS JUNE 2022 SHEET NO. DRAWING NO. DRAWING TITLE REVISION 1 - TITLE -COVER SHEET &&A3&A5A6 2 S1 EXISTING CONDITIONS Q2 04 06 3 S2 SUBGRADE GRADING PLAN AND DRAINAGE PLAN &&A3&A506 4 EC1 EROSION AND SEDIMENTATION DETAILS (SHEET 1 OF 4) Q2 04 06 5 EC2 EROSION AND SEDIMENTATION DETAILS (SHEET 2 OF 4) &A304 06 b EC3 EROSION AND SEDIMENTATION DETAILS (SHEET 3 OF 4) Q2 04 06 7 EC4 EROSION AND SEDIMENTATION DETAILS (SHEET 4 OF 4) 04 �6 I . . � — v . . � . . � � . .. I RECORD ISSUE NOT FOR CONSTRUCTION NC LIC. NO. F-1370 IENGINEERING) SC COA NO. C01488 14 N. Boylan Avenue, Raleigh NC 27603 1 919.828.0577 1526 Richland St., Columbia SC 29201 BARTLETT ENGINEERING a SUAYEYIN6 , PC Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. STANDARD SECTION LOCATION CALLOUT (SHEET AND DETAIL) SECTION REFERENCED SHEET WHERE SECTION IS PRESENTED STANDARD DETAIL CALLOUT DETAIL REFERENCED R SHEET WHERE DETAIL IS PRESENTED STANDARD DETAIL LABEL AND CALLOUT DETAIL TITLE DETAIL REFERENCED DETAIL 1 SCALE AS SHOWN S1 SHEET WHERE DETAIL IS PRESENTED STANDARD REVISION CALLOUT (SHEET AND DETAIL) A__'�_SHEET SET REVISION NUMBER © 2022 Smith Gardner, Inc. DocuSign Envelope ID: 341090CD-AC8D-4004-BCFC-OF26B9D22DF6 0) N 0 0 0 z O U) J CD t co co a 0 N O 0 0 U m m m m I -i - r-i r-i m PREPARED FOR: N IV CCA sl IN N cc N cc N3 CD IV Cj N3 CA IV CA CA O \ ` O O O O O O O r O �� Fe RECORD ISSUE \ LANDFILL ENTRANCE N N� �L °� I ` - •� - , W E NOT FOR ®CONSTRUCTION COMMINGLED/ l RECYCLE TRANSFER' \ / / \ ( HWY N 42 S �► �; 2300 FAC/LILY. o / /�' / C� / A� IC SCALE HOUSE\ / / / ~ PREPARED BY: NC LIC. NO. F-13701ENGINEERINGI �I�L ( SCCOANO. CO1488 �N TE r �\ s SMITH+ \\I /�— �l — / I MAINTENANCE \ \ I� I — \ \ 0\ // / / / SHOP / /�—Ij GARDNER III ( / / N 722000 I / ,. ENGINEERS 14 N. Boylan Avenue, Raleigh NC 27603 1919.828.0577 1526 Richland St., Columbia SC 29201 SEAL i9 // \ \� \ \\ \ ,,,R � I IDocuSi sm�J bT Q�L� ' ✓.9< �= i111 d�tg�,ac-� �- � / 1 / I / �� � � • 1�v�c-� N 21000 � /� I I I , 1 35sC21S4�440_ 028426 G/ / ` II \ /�� ^^1 I i FNGINEEF� G�.c ,,,,,,' ,n BR h2�12022 \ APPROXIMATE LIMITS SEAL MW-1 \� OF AREA 2 PHASE 1 (PROPOSED) m ��l r 7� 1 r \\\-1J�f0'� ^� �✓ — — �� l / (Q 1 C 6 ` 7�� 1 ` / ', J ( 1 1 r LEGEND REV. DATE DESCRIPTION \ \ \ \ —� — — ./�i ° rl-r`obi o ? ll o 1 (ry� a��czl�ry7�p `� p/ D EX/STING 10' CONTOUR 2 05/22 RESPONSE TO NCDEQ DEMLR 950 TSB-4 I I Iq � S �^`� < OF ARCHAEOLOGICAL (SEE REFERENCE 2) COMMENTS DATED 05/10/22 IIr� l �Il < / GNIFICANCE (TO BE PRESERVED) EXISTING 2' CONTOUR 4 06/22 ISSUED FOR CONSTRUCTION B-13 IIII ��\\ / LN �\ \ \ \ / (SEE REFERENCE 2) b 09/22 RECORD ISSUE l \ // RO\WR�A 1 B-14 \\ 1 / — —APPROXIMATE PROPERTY LINE \\ - (SEE REFERENCES 1) APPROX/MA TE STREAM CENTER LINE 112— IN. 13-15 REFERENCE 2) I %y / MW-5 0 1 (/pp MW� I 1 tl (SEE / / Y�� � � �� 11ti / APPROXIMATE LIMITS OF SOLID WASTE 7 9 ll� = �B . I B-1OkSB-1 r � LANDFILL UNIT SEE REFERENCE 6 ( ) EXIS71 / / /MW-4 1 (/ 1 \\\ GP-2 �' �� =-- o — — �mN o —�) v 1� `�B o 2�� I�ol �) p/ K. — — — — — — — — — — AREA 2 -PROPOSED WASTE LIMITS SB-2 x \ _ roc roc PROPOSED LIMITS OF CONSTRUCTION \ /� " )\� \ _ see o fa ' \\v 1 \ GP-1 ( \ \GMW-1 I \�� \ \ • \�� /� ; _ // // /%� \ \ FLOOD HAZARD ZONE (0.2 PCT ANNUAL CHANCE) (SEE REFERENCE 3) \ \iio II I / EMERGENCY FLOOD HAZARD ZONE AE PCT ANNUAL MW-6D MW-1 / l /_ 4 ° ` �� J///„�\�,1 �_ f /G/��/�i/j �� N' I - - - P-108 ,/i��\� /// IIII I I �r YARD WASTE STAGING (1 CHANCE) (SEE REFERENCE 3) FLOOD WAY � o ,� AREA OF POTENTIAL ` PZ-4 _ /� �� J /�� %�/ /% 1�% /� / �\ IIII - /15, /� III I� I I II.... lggl I / / ///// //� III /�/ // /�/ III / r / / /� / I 1 II I I - � (SEE REFERENCE 3) Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and WE7LANDs no warranty is either expressed or implied. Any reuse or N 718 L S/GNI /CANCE I IIII /�— \ � redistribution of this document in whale or part without the (SEE REFERENCE 4) /// I �I II I II S o 01,/P � // III III � ( / / / \ \\ \ / '/ > � \ written authorization of Smith Gardner, Inc., will be at the sole risk of the reci lent. If there is a discre ancy between the AREA OF POTENTIAL ARCHAEOLOG/CAL SIGNIFICANCE lectronic filespand the si ned and sealed hard co ies,the hard \\���\�\\-�\(TO BE RESERVED) (SEE REFERENCE 7) copies shall govern. Use of any electronic files generated or /%� 7 �/ � // ~ \ \ / provided by Smith Gardner, Inc., constitutes an acceptance of •� { /' these terms and conditions. / i GMW-3iii//�i \ I //%l ///�/ /�//ice//���//, /� CONVENIENCE CENTER GP-1 EX/STING LANDFILL GAS MONITORING PROBE B-18 Q GMW-2 / I � I \ / \ / % / P-102 /,,/ �✓ / / / ' // / /j�% / - , i/i��/�i r/ / /! / // � /� \ \\ / /)) ///� �' A // / ,�, \\\ \� • I Off\ 1 \ PROJECT TITLE: EX/STING C&D LANDFILL AREA 1 GROUNDWA TER GMW-1 CO%ENIENCE CENTER MONITORING WELL , � J I � II \ \ ( \ 1 ENTRANCE � P-108 EX/STING P/EZOMETER �-�, �I� \\ � ��/ WI LSO N CO U NTY SO LI 0 WASTE ® A� ///, `\ �; �� — �� �/ �i i� 1 \\ t/ / M W-1 A EX/STING MONITORING WELL W E S T S I D E C R D LANDFILL N 717000 AREA 2- PHASE I P-110 A /// CONSTRUCTION ASB DISPOSAL STOS TRENCH AREA REFERENCES 1. PARCEL BOUNDARIES WETLAND AND STREAM LOCATIONS PROVIDED BY BARTLETT DRAWING TITLE: ENGINEERING & SURVEYING, PC. BASED ON FIELD SURVEY DATED AUGUST 5, 2020. 2. EXISTING TOPOGRAPHY IN ACTIVE AREAS PROVIDED BY BARTLETT ENGINEERING & /// \ \\� j SURVEYING, PC. BASED ON FIELD SURVEY DATED AUGUST 5, 2020. SUPPLEMENTAL \ �J% �J ~ \�� \�� � \�� " — ��/ i � = i �%/i / I IIII Oj /' / �' —' / J TOPOGRAPHY FOR AREAS OUTSIDE OF ACTIVE AREAS PROVIDED BY FLOOD RISK �/i /ice Iy INFORMATION SYSTEM (FRIS) LiDAR. FEMA MAP NUMBERS 3720373100J AND EXISTING CONDITIONS \ �� 3720373200J, DATED 04/16/13. TOPOGRAPHY IN PHASE 1 FROM ENGINEERING SURVEY PROVIDED BY SMITH GARDNER, INC. N 716000 / /�//� \\\ �, / � 3. FLOOD HAZARD INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM FEMA FIRM MAP NO. 3720373100J, 3772037200J, AND 3720374100J. m `\\���\ �� \l /j//% — �' —• \� / z 4. WETLAND SURVEY AND STREAM DELINEATION DATED MARCH 2O20 FROM SOIL & `�� ✓' C[OS — � • / c� / _ I I ENVIRONMENTAL CONSULTANTS, PA. 5. WASTE LIMIT BOUNDARIES, INCLUDING CAP LIMITS FROM MAP TITLED "LANDFILL SITE — MON LQ �YR�A/ = l,� PLAN", DRAWING NO. 1, DATED 8/1/00, PREPARED BY GARY W. AHLBERG, P.E. _ IIm 6. LCID AND C&D LANDFILL AREA DATED OCT. 2015 MAP TITLED "WILSON COUNTY LANDFILL OVERALL SITE (11X17)" PREPARED BY BARTLET ENGINEERING & SURVEYING, PC. DESIGNED: PROJECT NO: W.M.B. WILSON 20-1 7. ARCHAEOLOGICAL STUDY DATED OCTOBER 2017, AUGUST 2020, AND JUNE 2021. FROM DRAWN: SCALE: C 0 ED ARCHAEOLOGICAL CONSULTANTS OF THE CAROLINAS, INC. AS SHOWN I I 8. WELL AND BORING LOCATION PROVIDED BY BARTLETT ENGINEERING & SURVEYING, PC."1. APPROVED R% DATE: D 0L/T/ON BASED ON FIELD SURVEY DATED MAY 27, 2020. JULY 2020 OFILL AREA ' ' 0 400' 800' 1200' FILENAME: WILSON-D0042 SHEET NUMBER: DRAWING NUMBER: 2 S1 © 2022 Smith Gardner, Inc. DocuSign Envelope ID: 341090CD-AC8D-4004-BCFC-OF26B9D22DF6 a LO N Lo N N 0 N m PREPARED FOR ND LEGEND \ CA / \ \ l - - - - \ o CONCRETE WASHOUT 7= - - - x o EXIS77NG 10' CONTOUR \ o - - ' / l (� �� - - X o i o (SEE REFERENCE I)- ______ EXIS77NG 2' CONTOUR I ,/ (/ I I II I \ O O Jul L/ x \ (SEE REFERENCE 1) �\ PERMIT BOX - - - x N __ _ _ 110 PROPOSED 10' CONTOUR ` EXISTING I ��0 RAINGAUGEi \ I �� \ I I ���\ E PROPOSED 2' CONTOUR \ BORROW I I roc AREA I I / \ o LIMITS OF DISTURBANCE APPROX/MA TE PROPERTY LINE (SEE REFERENCES 1) 3 (AREA = 7.37 AC.), I APPROXIMATE STREAM CENTER LINE CONSTRUCTION \ roc (SEE REFERENCE 2) ENTRANCE/ EXIT EC o / / / I ) ` `\\ ` / \ �\ \ Imo' � - � - \ \ F\ / � I PREPARED BY: - - - - - - 5OFT WETLAND AND STREAM BUFFER BASE BID AGGREGATE SURFACING C1 I NC LIC. NO. F-1370 IENGINEERING) SC COA NO. CO1488 20OFT WETLAND AND STREAM BUFFER (� 0000 S M ITH+ - - - - - - - - - - AREA 2 LIMITS OF WASTE I \ / /i / I CONTRACTOR LAY \ \ \ \ I \ \ / \ ( I I / I� / I \ \ \ \\ CELL ACCESS RAMP 5 DOWN AREA - PHASE LIMITS i / / �// j J - / EC LOC LOC PROPOSED LIMITS OF CONSTRUCTION I / j / �'7 �, 3 1 v \ \ �\ I / / l \ / ( I -/ I I GARDNER (SEE NOTE 3) I / / RIP RAP OUTLET I / ' \ \ l r- \ - Ii�i / /I I ENGINEERS PROPOSED SILT FENCE/LIMITS OF CONSTRUCTION L / / J PROTECTION I \ \ \ 2 INLET PROTECTION \ \\ / (SEE NOTE 3) I\ / 1 .I / ) 1 >>z � EC1 ��oc 14 N. Boylan Avenue, Raleigh NC 27603 1919.828.0577 \ / \ / / / ''• �' \ T '� \ I v / 1526 Richland St., Columbia SC 29201 PROPOSED DRAINAGE CHANNEL c/ L I I I I I / �,� ,,4 r 4 •1. t'.• ;i.Z., \ \ \ \ \� RIP RAP OUTLET FLOOD HAZARD ZONE (0.2PCT ANNUAL \ /o6/ ) /, J / I / / I / `; s ,ti ; s' <pc �\ \ \ \ \ \ 2 II / / / _ I/ / - / - �\ / / / \ � , \ I ( \ , \ \ \ PROTECTION G / _ , / CHANCE) (SEE REFERENCE 3) /1 / : \- / I I SEALLIMITS OF DISTURBANCE e\ �!,],o,1..1111.,,�"� CARFLOOD HAZARD ZONE AE p (SEE REFERENCE 3) (AREA 12.6 AC.) EsoZ/° •., •,; \ I / / 'f• .5 \\ \ \ 7 .__. DocuSign by: `C 7 • AREA OF POTENTIAL ARCHAEOLOGICAL SIGNIFICANCE ) (/ (� / / (I > i ( I I \ \ \ \ / ,,/ > > \ / / \ \ �� ALTERNATE BID AGGREGATE�5� - TO BE RESERVED) (SEE REFERENCE 6) (SEE NOTE 2) / � � / ` I , - / I 1 / 1 '•: <. - \ / s s9 ? � -/ (/ / 1 I I / / \ \ \ :,ti:. 1pc \ \ \ \� \ / ��` ��O> - / l �358C21E040_ 02 4 WETLANDSIr / �� l \ \ 1 � \ \ \ '\ \ < � - � FN � ,Z. •' (SEE REFERENCE 4) l \ ( Jl I I / I I I I� \ o - �� \ `� ��\ - \ \ \ \ �` \ 9 �O> / •.% icy ciNEE \��.• V` s / i '�i, 'q EL BR %09/19/2022 BORROW AREA - - - \ \ - / / ( / / I ;, •. \ \ �' / I I \ / \ _ / v / - -- - �/ \\ \=L J __7 NA / / SEAL NA GREEN CURTEX I OR EQUAL (RECP) - _ r - - _ - - - \ '1 I /j/ I �� S13-4 GP-1 EX/STING LANDFILL GAS MONITORING PROBE - - - - - - _ _ _ _ /••.i (SEE REFERENCE 5) _ _ _ - _� l �� _ - - - - - - - / J / / I �/ I i EC1 PERIMETER BERM (TYP.) \�\ SKIMMER BASIN EC2 G M W-1 EXIS77NG C&D LANDFILL AREA 1 GROUNDWA TERISOJ / / MONITORING WELL (SEE REFERENCE 5)- EX/STING P/EZOMETER � � � � �y ` � � l ^ N I \ I •' Y•,` ` ` \ \ \ � // � / / o � - - - (SEE REFERENCE 5) EXISTING MONITORING WELL / 1 \ \� \ 11 ( \ 1 1 \ `\ 51 • 5 S / \ \ \ \ \ \ \ I / / (SEE REFERENCE 5) \ / I/ \\ \\ \\� J / \\ \\ \ \ �\ v \\ �\ \ \ \ I SILT BAG / REV. DAT \ / / 1 04/2 SB-1 PROPOSED SEDIMENT BASIN 2 05/2 PROPOSED STONE FILTER OUTLET J/( STONE FILTER FENCE 4 \ - _ 1 I {.''. 1 J \ \ \ � \ < ^' \ _ - \ \ \ \ 3 06/2 (TYP.) EC3 I I\ \ - - _ - 1., \ \ \ \\\ \ \ _ \ o -� / 5 06/2 NOTES \ I I a - - 1 // l \ 1. CONTRACTOR TO INSTALL SILT FENCE AROUND SOIL STOCKPILE 6 09/2 ,,� 7 � 2 � � \ . P Z -1 it •. �!. C � l / I 6 I 2. CONTRACTOR TO PROTECT AREAS OF ARCHAEOLOGICAL SIGNIFICANCE. - / \ (TYP.) INTERIOR BERM EC1 /_ DC-,3 - - _ , - ` I I ,til / / / / 3. PZ-1 ABANDONED BY GEOLOGIC EXPLORATIONS ON 9/7/22. I to Ioe"REFERENCES -) � 4 I / / 1. PARCEL BOUNDARIES WETLAND AND STREAM LOCATIONS PROVIDED BY BARTLETT ENGINEERING & EXISTING BORROW AREA \ l / \ \ \ I I I ^ ��'`� /b /� - �I �Z�oc -yy�„ (`' % I / / / SURVEYING, PC. BASED ON FIELD SURVEY DATED AUGUST 5, 2020. ��� c /� B-15 ( / I // // 2. EXISTING TOPOGRAPHY IN ACTIVE AREAS PROVIDED BY BARTLETT ENGINEERING & SURVEYING, PC. BASED ON FIELD SURVEY DATED AUGUST 5, 2020. SUPPLEMENTAL TOPOGRAPHY FOR AREAS OUTSIDE OF ACTIVE AREAS PROVIDED BY FLOOD RISK INFORMATION SYSTEM (FRIS) LiDAR. FEMA MAP MW-5 /) I I I -� / NUMBERS 3720373100J AND 3720373200J, DATED 04/16/13. TOPOGRAPHY IN PHASE 1 FROM } I \ \ , - -� ( I / / I ENGINEERING SURVEY PROVIDED BY SMITH GARDNER INC E DESCRIPTION 2 ADDENDUM NO.2 2 RESPONSE TO NCDEQ DEMLR COMMENTS DATED 05/10/22 2 RESPONSE TO NCDEQ DEMLR COMMENTS DATED 06/03/22 2 ISSUED FOR CONSTRUCTION 2 RESPONSE TO NCDEQ DWM COMMENTS DATED 06/21/22 2 RECORDISSUE I Electronic files are instruments of service provided by Smith 3. FLOOD HAZARD INFORMATION FROM NORTH CAROLINA FLOODPLAIN MAPPING PROGRAM, FEMA FIRM no Gardner, d e , Inc. for the convenience is either expressed or implied. the i dtennded ruse recipient(s), and _ / I I 1 MAP NO. 3720373100J 3772037200J AND 3720374100J. / 1 L I ' ' redistribution of this document in whole or part without the ` / ( / / // I / f0 �E A@ANDONEO I I I / 4. WETLAND SURVEY AND STREAM DELINEATION DATED MARCH 2O20 FROM SOIL & ENVIRONMENTAL written authorization of Smith Gardner, Inc., will be at the sole 3 / ( MW-2 % - / I / I I / / CONSULTANTS PA. risk of the recipient. If there is a discrepancy between the SILT BAG \ / / o / / ,` ✓ / �� -- - I / BY OTHER' I�E N0 3) / / / ' electronic files and the signed and sealed hard copies, the hard EC2LOC / o / ) ( / / \ ) I ) / 5. WELL AND BORING LOCATION PROVIDED BY BARTLETT ENGINEERING & SURVEYING, PC. BASED ON copies shall govern. Use of any electronic files generated or coy / / ` ? I ( \ / / \ - - - _ I / / / FIELD SURVEY DATED MAY 27, 2020. provided by Smith Gardner, Inc., constitutes an acceptance of �� / `' l / \ I \ \ - / �- ) i 6. ARCHAEOLOGICAL STUDY DATED OCTOBER 2017 AUGUST 2020 AND JUNE 2021. FROM these terms and conditions. / \ t RIP RAP LINED q / ��o / \ �) ( / / ARCHAEOLOGICAL CONSULTANTS OF THE CAROLINAS, INC. STONE FILTER OUTLET TO o�/ �'-� �o� _ ► � ► �� � l � ,t / _ - .r _ CHANNEL (TV.) 1_ �� / �� / 1 I ( / I J ^� \ � /_ // ( / / / 7. SEASONAL HIGH POTENTIOMETRIC GROUNDWATER ELEVATIONS COLLECTED FROM SEMI-ANNUAL PROJECT TITLE: BE -REMOVED ONCE BASIN t - - - _ � ( ) / b B-11 r- _\ ( / ` I / / � / / / / // - / ��� 1' 1 I �` f ') ) \ '1 / \_ - / / / 1 - / - / / / / � GROUNDWATER MONITORING AND HYDROGEOLOGIC INVESTIGATIONS PERFORMED FROM 2016 TO 2021. N 719000 IS OPERATIONAL =•,,�, \ I \ -- B-10 ' / �`., ) SB-1 I _ - - / / I � � GENERAL EROSION AND SEDIMENTATION CONTROL NOTES �� ( - _ ( \� \� \ / I ( �� I I I f / ) - \ / - / I / 1 1. ALL EROSION AND SEDIMENTATION CONTROL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN WI LSO N CO U NTY SO LI D WASTE �1\� (/ I�/1J/�� l ` `1(JI �i \ 1 I 13-12� I \ MANUAL AS WELL AS APPLICABLE REGULATIONS. - 92 - / \ I 1 I \ 2. AN EROSION AND SEDIMENTATION CONTROL PERMIT AND A CERTIFICATE (COC) MUST BE OBTAINED PRIOR TO ANY LAND DISTURBING ACTIVITIES. WESTS I D E CRD LANDFILL / 3 _ - - SB-1 - \ 1 / 1 / / \ / I I j \ / \111 / I ) \ 3. EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE ESTABLISHED PRIOR TO, OR AS SOON AS PRACTICAL THEREAFTER, ANY LAND CLEARING OR CONSTRUCTION ACTIVITIES MAY BEGIN. THE RIP RAP OUTLET O I� 1 \ �/ CONTRACTOR SHALL FOLLOW THE FOLLOWING SCHEDULE: I ( I ( l l / _ I l� II I I A. CONTACT NCDEQ DIVISION OF ENERGY, MINERAL, AND LAND RESOURCES, LAND QUALITY SECTION, (RALEIGH REGIONAL OFFICE: (919) 791-4200), AT LEAST 48 HOURS PRIOR TO COMMENCING LAND AREA 2 PHASE 1 I / PROTECTION/ \ ` - I / I' \ \ _ / f \ ` �_ �� S� (\ / 111 / / / \ DISTURBING ACTIVITIES. \ / / / ) I I I B FLAG THE CLEARING LIMITS AND IDENTIFY ANY TREE PROTECTION AREAS WITH THE OWNER CONSTRUCTION C. INSTALL TEMPORARY GRAVEL CONSTRUCTION ENTRANCE/EXIT. D. CLEAR ONLY AS NECESSARY TO INSTALL EROSION AND SEDIMENTATION CONTROL MEASURES. J L) 1 I ) I / / E. ONLY STRIP/GRUB AREAS REQUIRED FOR INSTALLATION OF STRUCTURES, BERMS AND DRAINAGE CHANNELS. F. PERFORM EARTHWORK AS REQUIRED FOR CONSTRUCTION. INSTALL DRAINAGE AND EROSION AND SEDIMENTATION CONTROL MEASURES AS AREAS ARE BROUGHT TO GRADE. 5 1 // / G. PERFORM FINE GRADING AND ESTABLISH PERMANENT VEGETATION ON COMPLETED AREAS. DRAWING TITLE: �6�� ` a EC2 BAFFLES (TV.)_ -/- _ - (/ 1 - \ `� 1 / 4. SITE DEWATERINGH. AFTER BIS TO BE DONE THROUGH ILIZATION, REMOVE SILT CA SILT BAG WITH AING AND OTHER PFLOATING INTAKEMEASURES ATHAT IS CONSTANTLY MONITOREDS DIRECTED BY THE OWNER AND SWHILE NMUSENT VEGETATION ON THE DISTURBED AREAS. 2 < - C� _�'��.,��d�l/ \ \ \ ( 5. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE CONSTRUCTED ACCORDING TO THE CONTRACT DRAWINGS AND SPECIFICATIONS. PROPOSED SIL - T FENCE 7 #. l ECG 1 ) \ / \ �( \ - \ ` ^� 6. ALL EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE INSPECTED AT LEAST ONCE EVERY SEVEN CALENDAR DAYS AND WITHIN 24 HOURS AFTER ANY STORM EVENT OF GREATER THAN 1 S U B G RAD E GRADING DRY DETENTION BASIN C2 / \ SB 2\ J ( C - INCH OF RAIN PER 24 HOUR PERIOD AND APPROPRIATE MAINTENANCE CONDUCTED. A RAIN GAGE SHALL BE INTALLED AT THE PROJECT SITE FOR MONITORING. MAINTENANCE SHALL INCLUDE, BUT AND DRAINAGE PLAN O ) �� / NOT BE LIMITED TO: A. THE REMOVAL AND SATISFACTORY DISPOSAL OF TRAPPED OR DEPOSITED SEDIMENTS FROM BASINS, TRAPS, BARRIERS, FILTERS, AND/OR DRAINAGE FEATURES/DEVICES; B. REPLACEMENT OF FILTER FABRICS USED FOR SILT FENCES UPON LOSS OF EFFICIENCY; AND C. REPLACEMENT OF ANY OTHER COMPONENTS WHICH ARE DAMAGED OR CANNOT SERVE THE INTENDED USE. 7. SOIL STABILIZATION SHALL BE ACHIEVED ON ANY AREA OF THE SITE WHERE LAND -DISTURBING ACTIVITIES HAVE TEMPORARILY OR PERMANENTLY CEASED ACCORDING TO THE FOLLOWING SCHEDULE: ✓7 A. ALL BASIN AND DIVISION SLOPES ARE TO BE COVERED WITH A SUITABLE RECP AFTER SEEDING AND ALL SWALES AND DITCHES ARE TO BE LINED TO THE LINED TO THE TOP OF THE BANK. \`/ ,r l B 6 I o �\ -) I B. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3H:lV) SHALL BE PROVIDED TEMPORARY OR PERMANENT PZ-3 STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. C. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DESIGNED: DAYS FROM THE LAST LAND -DISTURBING ACTIVITY. W. M. B. D. BASINS, TRAPS, CHANNELS, AND DIVERSIONS SHALL BE LINED WITH ANCHORED ROLLED EROSION PRODUCTS OR RIP RAP AND/OR VEGETATED UPON CONSTRUCTION. DRAWN: s E. PERMANENT GROUND COVER FOR ALL DISTURBED AREAS SHALL BE ESTABLISHED WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF J / / / \ \ \ �� ✓ 1 J I \ , \ \ \ / \ CONSTRUCTION OR DEVELOPMENT. APPROVED: 8. A COPY OF THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN, THE CERTIFICATE OF APPROVAL, AND LETTER OF APPROVAL ARE TO BE KEPT ON SITE (BY OWNER). 9. THE NPDES PERMIT (WITH A MINIMUM OF 30 DAYS OF SELF -INSPECTION REPORTS) ARE TO BE KEPT ON SITE AND A RAIN GAUGE IS TO BE INSTALLED AND MAINTAINED FOR RECORD KEEPING FILENAME: UNTIL THE PROJECT IS CLOSED OUT BY THE LAND QUALITY SECTION REGIONAL OFFICE. SHEET NUMBER: // / \\ i `\ ✓ / \ \ \ / �, n = �� v 0 0 / 10. UPON PROJECT COMPLETION, THE PERMITTEE SHALL CONTACT DEMLR TO CLOSE OUT THE EROSION AND SEDIMENTATION CONTROL PLAN. AFTER DEMLR INFORMS THE PERMITTEE OF THE PROJECT / \ J \ // CLOSEOUT, VIA INSPECTION REPORT, THE PERMITTEE SHALL VISIT DEQ.NC.GOV/NCGO1 TO SUBMIT AN ELECTRONIC NOTICE OF TERMINATION (e-NOT). A $100 ANNUAL GENERAL PERMIT FEE WILL BE 3 h22 Smith Gardner, Inc. / \ \ 1\� / ? // CHARGED UNTIL THE e-NOT HAS BEEN FILLED OUT. PROJECT NO: WILSON 20-1 SCALE: AS SHOWN DATE: JULY 2020 WILSON-DO043 DRAWING NUMBER: S2 DocuSign Envelope ID: 341090CD-AC8D-4004-BCFC-OF26B9D22DF6 PREPARED FOR: SEEDING SCHEDULE MATERIAL SEED TYPE APPLICATION RATE 4,000 LBS/ACRE (SANDY SOIL) LIME - 6,000 LBS/ACRE (CLAY SOIL) FERTILIZER (10-10-10) _ 1,000 LBS/ACRE SEED KENTUCKY 31 TALL FESCUE 250 LBS/ACRE SERICEA LESPEDEZA 30 LBS/ACRE PERMANENT KOBE LESPEDEZA 10 LBS/ACRE (SEE NOTE 4) SEASONAL NURSE CROP SEE NOTE 2 TEMPORARY SEASONAL NURSE CROP SEE NOTE 2 MULCH - 4,000-5,000 LBS/ACRE BINDER - 400 GALLONS/ACRE NOTES: 1. APPLICATION RATES AND/OR CHEMICAL ANALYSIS SHALL BE CONFIRMED OR ESTABLISHED BY A SOIL TEST. 2. USE SEASONAL NURSE CROP IN ACCORDANCE WITH SEEDING DATES AS STATED BELOW: APRIL 15 - AUGUST 15 10 LBS/ACRE GERMAN MILLET OR 15 LBS/ACRE SUDANGRASS AUGUST 16 - APRIL 14 25 LBS/ACRE RYE (GRAIN) 3. FROM SEPTEMBER 1 - MARCH 1, USE UNSCARIFIED SERICEA SEED. SPECIFICATIONS: 1. GENERAL: THE CONTRACTOR SHALL ESTABLISH A SMOOTH, HEALTHY, UNIFORM, CLOSE STAND OF GRASS FROM THE SPECIFIED SEED. PRIOR TO REVEGETATION, THE CONTRACTOR SHALL ADEQUATELY TEST THE SOILS TO BE REVEGETATED TO ENSURE THE ADEQUACY OF THE SPECIFIED REQUIREMENTS. ANY MODIFICATIONS TO THESE REQUIREMENTS DEEMED NECESSARY AFTER THE REVIEW OF SOIL TEST RESULTS, SHALL BE AT THE CONTRACTOR'S SOLE EXPENSE. THE ENGINEER WILL PERFORM THE OBSERVATIONS TO DETERMINE WHEN SUCCESSFUL REVEGETATION IS ACHIEVED. 2. SOIL PREPARATION: A. LIMIT PREPARATION TO AREAS WHICH WILL BE PLANTED SOON AFTER PREPARATION. B. LOOSEN SURFACE TO MINIMUM DEPTH OF FOUR (4) INCHES. C. REMOVE STONES, STICKS, ROOTS, RUBBISH AND OTHER EXTRANEOUS MATTER OVER THREE (3) INCHES IN ANY DIMENSION. D. SPREAD LIME UNIFORMLY OVER DESIGNATED AREAS AT THE RATE SPECIFIED IN THE SEEDING SCHEDULE. E. AFTER APPLICATION OF LIME, PRIOR TO APPLYING FERTILIZER, LOOSEN AREAS TO BE SEEDED WITH DOUBLE DISC OR OTHER SUITABLE DEVICE IF SOIL HAS BECOME HARD OR COMPACTED. CORRECT ANY SURFACE IRREGULARITIES IN ORDER TO PREVENT POCKET OR LOW AREAS WHICH WILL ALLOW WATER TO STAND. F. DISTRIBUTE FERTILIZER UNIFORMLY OVER AREAS TO BE SEEDED AT THE RATE SPECIFIED IN THE SEEDING SCHEDULE. (1) USE SUITABLE DISTRIBUTOR. (2) INCORPORATE FERTILIZER INTO SOIL TO DEPTH OF A LEAST TWO (2) INCHES. (3) REMOVE STONES OR OTHER SUBSTANCES WHICH WILL INTERFERE WITH TURF DEVELOPMENT OR SUBSEQUENT MOWING. G. GRADE SEEDED AREAS TO SMOOTH, EVEN SURFACE WITH LOOSE, UNIFORMLY FINE TEXTURE. (1) ROLL AND RAKE, REMOVE RIDGES AND FILL DEPRESSIONS, AS REQUIRED TO MEET FINISH GRADES. (2) FINE GRADE JUST PRIOR TO PLANTING. 3. SEEDING: A. USE APPROVED MECHANICAL POWER DRIVEN DRILLS OR SEEDERS, MECHANICAL HAND SEEDERS, OR OTHER APPROVED EQUIPMENT. B. DISTRIBUTE SEED EVENLY OVER ENTIRE AREA AT THE RATE SPECIFIED IN THE SEEDING SCHEDULE. C. STOP WORK WHEN WORK EXTENDS BEYOND MOST FAVORABLE PLANTING SEASON FOR SPECIES DESIGNATED, OR WHEN SATISFACTORY RESULTS CANNOT BE OBTAINED BECAUSE OF DROUGHT, HIGH WINDS, EXCESSIVE MOISTURE, OR OTHER FACTORS. D. RESUME WORK ONLY WHEN FAVORABLE CONDITION DEVELOPS, OR AS DIRECTED BY THE ENGINEER. E. LIGHTLY RAKE SEED INTO SOIL FOLLOWED BY LIGHT ROLLING OR CULTIPACKING. F. IMMEDIATELY PROTECT SEEDED AREAS AGAINST EROSION BY MULCHING OR PLACING ROLLED EROSION CONTROL PRODUCTS, WHERE APPLICABLE. (1) SPREAD MULCH IN A CONTINUOUS BLANKET AT THE RATE SPECIFIED IN THE SEEDING SCHEDULE. (2) IMMEDIATELY FOLLOWING SPREADING MULCH, SECURE WITH EVENLY DISTRIBUTED BINDER AT THE RATE SPECIFIED IN THE SEEDING SCHEDULE. (3) FOR SLOPES NOT STEEPER THAN 3H:1V AND AS AN OPTION TO USING BINDER TO SECURE MULCH, USE A MULCH ANCHORING TOOL OPERATED ALONG THE CONTOUR OF THE SLOPE. 4. MAINTENANCE: THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING ALL SEEDED AREAS THROUGH THE END OF HIS WARRANTY PERIOD. THE CONTRACTOR SHALL PROVIDE, AT HIS EXPENSE, PROTECTION OF ALL SEEDED AREAS AGAINST DAMAGE AT ALL TIMES UNTIL ACCEPTANCE OF THE WORK. MAINTENANCE SHALL INCLUDE, BUT NOT BE LIMITED TO, THE FOLLOWING ITEMS: A. REGRADE AND REVEGETATE ALL ERODED AREAS UNTIL ADEQUATELY STABILIZED BY GRASS. B. REMULCH WITH NEW MULCH IN AREAS WHERE MULCH HAS BEEN DISTURBED BY WIND OR MAINTENANCE OPERATIONS SUFFICIENTLY TO NULLIFY ITS PURPOSE. ANCHOR AS REQUIRED TO PREVENT DISPLACEMENT. C. REPLANT BARE AREAS USING SAME MATERIALS SPECIFIED. VEGATIVE STABILIZATION DETAIL 1 NOT TO SCALE EC1 20' NCDOT AGGREGATE BASE COURSE 2% 3-��Z 1 8' 1' a NONWOVEN GEOTEXTILE 8 OZ./SY OR ENGINEER Lo NOTES: APPROVED EQUIVALENT CN 1. AGGREGATE BASE COURSE SHALL MEET THE GRADING REQUIREMENTS IN NCDOT (SEE NOTE 3) SECTION 520 AND BE OBTAINED FROM AN APPROVED NCDOT SOURCE. 2. AGGREGATE SHALL BE PLACED AND COMPACTED IN 8-INCH THICK (IN -PLACE) LIFTS TO 100 PERCENT ITS STANDARD PROCTOR MAXIMUM DRY DENSITY. 3. GEOTEXTILE SHALL HAVE A MINIMUM GRAB TENSILE STRENGTH OF 180 LBS, MINIMUM PUNCTURE RESISTANCE OF 75 LBS, TRAPEZOIDAL TEAR OF 75 LBS, CD o AND AOS OF LESS THAN 0.6 MM. z 0 ACCESS ROAD AGGREGATE SURFACING L DETAIL 4 NOT TO SCALE N EC1U)i _01 RECORD ISSUE NOT FOR CONSTRUCTION I © 2022 Smith Gardner, Inc. A FLOW _ (TYP.) MAINTENANCE OF EROSION AND SEDIMENTATION FEATURES INLET PROTECTION MAINTENANCE 1. INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE DESIGN DEPTH OF THE TRAP. PLACE THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. 2. CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM THE STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. 3. AFTER ALL THE SEDIMENT -PRODUCING AREAS HAVE BEEN PERMANENTLY STABILIZED, REMOVE THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO BLEND WITH THE ADJOINING AREAS AND PROVIDE PERMANENT GROUND COVER (SURFACE STABILIZATION). WASHED NO. 57 STONE N1' 2' MAINTENANCE OF EROSION AND SEDIMENTATION FEATURES CHANNELS. DIVERSION BERMS. SWALES. ETC. PLAN TYPE GT-S GEOTEXTILE SECTION A -A INLET PROTECTION DETAIL r2� NOT TO SCALE EC1 r PIPE INVERT 1. INSPECT CHANNELS, DIVERSION BERMS, SWALES, ETC. AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS, AND MAKE REPAIRS PROMPTLY. CHECK GRASS AND RECP LINED CHANNELS AFTER EVERY RAINFALL UNTIL THE ESTABLISHMENT OF A GOOD STAND OF VEGETATION. 2. GIVE SPECIAL ATTENTION TO THE OUTLET AND INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR HOLES, OR BANK FAILURES. 3. MAKE REPAIRS IMMEDIATELY AND REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. 4. MAINTAIN ALL VEGETATION IN (AS APPLICABLE) AND ADJACENT TO THE CHANNEL IN A HEALTHY, VIGOROUS CONDITION. RECP 3 1 ACCESS ROAD AGGREGATE SURFACING nrowrTrD nnnrcc Dnnn 24 (;FL (;ULVLK I ( I YF'.) PERIMETER DRAINAGE EC13CHANNEL EXISTING GRADE (VARIES) i uuTtI nr HIACITr COMPACTED EMBANKMENT OR CUT INTO NATIVE SOILS CELL ACCESS RAMP DETAIL r5 NOT TO SCALE EC1 RECP RECP 3 CLASS I RIP -RAP WASHED N0. 57 STONE A RIP RAP OUTLET PROTECTION SCHEDULE PIPE L (FT) W (FT) D50 (IN) X (FT) SB-1 OUTLET 15.0 16.5 9 1.5 SB-1 INLET 28.0 24.0 6 1.0 C-1 OUT 22.0 10.0 6 1.0 SECTION A -A PLAN MAINTENANCE OF EROSION AND SEDIMENTATION FEATURES RIP RAP OUTLET PROTECTION 1. IN GENERAL, ONCE A RIPRAP INSTALLATION HAS BEEN PROPERLY DESIGNED AND INSTALLED IT REQUIRES VERY LITTLE MAINTENANCE. RIPRAP SHOULD BE INSPECTED PERIODICALLY FOR SCOUR OR DISLODGED STONES. CONTROL OF WEED AND BRUSH GROWTH MAY BE NEEDED IN SOME LOCATIONS. 2' (MIN.), DRAINAGE CHANNEL CORRIDOR RIP RAP OUTLET PROTECTION DETAIL r3 NOT TO SCALE EC1 VARIES �.O' MIN. VARIES VARIES VARIES / / 3 / 1 / COMPACTED / -- EMBANKMENT OR CUT INTO NATIVE PERIMETER DRAINAGE C3 SOILS CHANNEL TYPICAL INTERIOR BERM DETAIL s NOT TO SCALE EC1 PERIMETER ACCESS ROAD ACCESS ROAD 4 AGGREGATE SURFACING EC1 PERIMETER DRAINAGE CHANNEL NOTE: 1. COMPACTED EMBANKMENT FILL SOILS TO 95 PERCENT STANDARD PROCTOR MAXIMUM DRY DENSITY AT f3% ITS OPTIMUM MOISTURE CONTENT. 2. COMPACT UPPER 1 FOOT OF PERIMETER ACCESS ROAD SUBGRADE TO 100% OF ITS STANDARD PROCTOR MAXIMUM DRY DENSITY. DRAINAGE CHANNEL CORRIDOR VARIES 8.0' MIN. VARIES VARIES VARIES COMPACTED EMBANKMENT OR 1 CUT INTO NATIVE 1 SOILS EXISTING GRADE (VARIES) TYPICAL PERIMTER BERM CROSS SECTION DETAIL 7 NOT TO SCALE EC1 LIMITS OF WASTE EXISTING GRADE (VARIES) LIMITS OF WASTE DRIP RAP (D5o) TYPE GT-S GEOTEXTILE nn nni �J50) NOTES: 1. D5o REFERS TO THE MINIMUM REQUIRED AVERAGE STONE SIZE. 2. FOR MORE THAN ONE PIPE, EXTEND RIP RAP 1.0' MIN. BEYOND OUTSIDE EDGES OF PIPES. 3. FOR APRONS IN CHANNELS, EXTEND RIP RAP TO TOP OF CHANNEL. 4. RIP RAP PROTECTION FOR SB-1 INLET SHALL BE PLACED IN THE DRAINAGE CHANNEL BEGINNING AT THE OUTSIDE EDGE OF THE SB-1 BERM AND EXTEND 8' (MIN.) INTO THE FLOOR OF SB-1. PREPARED BY: NC LIC. NO. F-1370 IENGINEERINGI SC COA NO. CO1488 MIM SMITH GARDNER ENGINEERS 14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 1526 Richland St., Columbia SC 29201 SEAL A CARO �0 pFESSiO�'I'--- M � �, Docugned by:Q�- ySEA o - Z (�, - r (W 358C2V64007440. Z -z FNG WN G,2� EL 6R�•�/19/2022 SEAL 3 �1 REV. DATE DESCRIPTION 2 05/22 RESPONSE TO NCDEQ DEMLR COMMENTS DATED 05/10/22 4 06/22 ISSUED FOR CONSTRUCTION 6 09/22 RECORD ISSUE Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. PROJECT TITLE WILSO N COUNTY SOLID WASTE WESTSIDE CRD LANDFILL AREA 2- PHASE I CONSTRUCTION DRAWING TITLE: EROSION AND SEDIMENTATION DETAILS (SHEET 1 OF 4) DESIGNED: PROJECT NO: W.M.B. WILSON 20-1 DRAWN: p SCALE: C.t.J. AS SHOWN APPROVE DATE: JULY 2020 FILENAME: WILSON-DO044 SHEET NUMBER: DRAWING NUMBER: 4 ECI DocuSign Envelope ID: 341090CD-AC8D-4004-BCFC-OF26B9D22DF6 (F) TOP OF BERM EL = (E) i EMERGENCY SPILLWAY EL = (D) 3 3 1 5 BAFFLES 1 C PRINCIPAL SPILLWAY EL = (C) REINFORCED CONCRETE RISER 39 STRUCTURE AND OUTLETS HEIGHT - (G ) CLEANOUT EL = (B) BASE EL = A PAD FOR SKIMMER (SEE NOTE 2) 1 3' (MIN) 1 1 1 DRAIN ±6 CMP (ALUMINIZED STEEL TYPE 2) (SEE NOTE 2) SCH 80 PVC BARREL 0 = (H); SLOPE = (1); CUT-OFF TRENCH INV. IN = (J) (COMPACTED CLAY) INV. OUT = (K) 4' (MIN.) LENGTH = (L) NOTES: 1. CONSTRUCT FILTER DIAPHRAGM OF ASTM C-33 FINE AGGREGATE. THE ENGINEER SHALL VERIFY COMPATIBILITY OF FINE AGGREGATE AND MATERIAL TO BE USED AS ADJACENT STRUCTURAL FILL PRIOR TO CONSTRUCTION. ALTERNATIVELY, USE TWO (2) (M) CMP (OR EQUAL) ANTI SEEPAGE COLLARS SPACED AT 8 FEET AND 32 FEET, RESPECTIVELY, FROM THE DOWNSTREAM SIDE OF THE REINFORCED CONCRETE RISER. 2. DRAIN TO CONSIST OF FAIRCLOTH SKIMMER ((N)SIZE AND (0) 0 ORFICE) AND ADEQUATELY SIZED OUTLET PIPE. PROVIDE ROPE ATTACHMENT FOR MAINTENANCE AND A 6'x6'xl' THICK RIP RAP PAD AT BOTTOM OF BASIN FOR SKIMMER TO REST ON WHEN BASIN IS DRY. SELECTED SKIMMER SHALL PROVIDE A 3 DAY DRAWDOWN BASED ON THE APPROXIMATE STORAGE VOLUME OF BASIN (P). 3. IF NECESSARY, CONTRACTOR SHALL SUBMIT A PLAN FOR TEMPORARY DEWATERING OF BASIN TO INSTALL RISER, BARREL, AND SKIMMER. 4. FOLLOWING THE MANUFACTURER'S DIRECTIONS, ATTACH A ROPE TO THE SKIMMER AND STAKE TO THE SIDE OF THE BASIN. 5. STABILIZE ALL BASIN SIDE SLOPES DISTURBED BY CONSTRUCTION BY SUITABLE MEANS IMMEDIATELY AFTER COMPLETING EACH BASIN. EXISTING TERRAIN FLOW STRUCTURAL FILL (CONSTRUCT WITH COHESIVE SOILS) FILTER DIAPHRAGM (WIDTH = 11') (SEE NOTE 1) DRAIN SAND INTO \� RIP -RAP 18" 24" RIP RAP OUTLET 3 PROTECTION EXTENDED DRY DETENTION BASIN SCHEDULE BASIN A (FEET) B (FEET) C (FEET) D (FEET) E (FEET) F (FEET) G (FEET) H (INCHES) I (%) J (FEET) K (FEET) L (FEET) M N (INCHES) 0 (INCHES) P (CF) SB-1 92.0 94.2 96.0 97.0 98.0 10.0 5.0 18 3.3 92.0 90.0 60 4' X 4' 8 6.0 171,000 SILT BAG STREAM BANK FLOW DISCHARGE HOSE FROM PUMP (UTILIZE A FLOATING INTAKE) 15'-20' FILTER GEOTEXTILE�_8" OF NO. 5 OR NO. 57 STONE NOTES: 1. SILT BAGS MUST BE LOCATED GREATER THAN 50 FEET FROM THE TOP OF A STREAM BANK AND WATER MUST BE DISCHARGED IN A DIFFUSE MANNER. PROVIDE STABILIZED OUTLET TO STREAM BANK. 2. THE SIZE AND NUMBER OF BAGS SHALL BE BASED ON THE DEWATERING PUMP MANUFACTURERS RECOMMENDATIONS. EACH BAG SHALL BE AT LEAST 10' X 15" SHALL BE MADE FROM A FILTER FABRIC MEETING NCDOT REQUIREMENTS, AND HAVE A SEWN -IN SLEEVE FOR RECEIVING PUMP DISCHARGE. 3. TIGHTLY SECURE THE PUMP DISCHARGE TO THE SILT BAG SLEEVE WITH A STRAP OR SIMILAR DEVICE TO PREVENT WATER/SEDIMENT FROM LEAKING WITHOUT TREATMENT. 4. CONTROL PUMP RATE TO PREVENT EXCESS PRESSURE WITHIN THE SILT BAG IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS. AS THE BAG FILLS WITH SEDIMENT, REDUCE THE PUMP RATE. 5. REPLACE THE SILT BAG WHEN 3/4 FULL OF SEDIMENT. 6. INSPECT BAG AND PIPING FOR DAMAGE AND BLOCKAGE PRIOR TO AND DURING USE. MONITOR CONTINUOUSLY DURING USE. SILT BAG FOR DEWATERING ACTIVITIES DETAIL 3 NOT TO SCALE EC2 NOTES: 1. THE TARP USED TO PROTECT THE WEIR SHALL BE THE WIDTH SPECIFIED. THE LENGTH OF THE TARP SHALL BE ACCORDING TO AVAILABLE SUPPLY. IF MULTIPLE TARPS ARE TO BE USED, THEN TARPS SHALL BE OVERLAPPED AT LEAST 12". THE UPSTREAM 12" TARP SHALL OVERLAP THE DOWNSTREAM TARP. THE TARP SHALL BE 50 MIL. HEAVY DUTY SILVER TARPAULINS OR EQUIVALENT FOR U.V. RESISTANCE. 2. PROVIDE A MINIMUM OF THREE POROUS BAFFLES TO EVENLY DISTRIBUTE FLOW ACROSS THE BASIN, REDUCING TURBULENCE. 3. BAFFLE MATERIAL MUST BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR A SILT FENCE. 4. SKIMMER TO CONSIST OF FAIRCLOTH SKIMMER (2.7"0 ORIFICE) AND ADEQUATELY SIZED OUTLET PIPE (BASIN VOLUME = 24,030 CF AT SPILLWAY). PROVIDE 6'x6'xl' THICK RIP RAP PAD AT BOTTOM OF BASIN FOR SKIMMER TO REST ON WHEN BASIN IS DRY. INFLOW STRI OR Cl MAINTENANCE OF EROSION AND SEDIMENTATION FEATURES SEDIMENT BASIN 1. INSPECT SEDIMENT BASINS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT 2 D- (ONE-HALF INCH OR GREATER) RAINFALL EVENT AND REPAIR IMMEDIATELY. CD REMOVE SEDIMENT AND RESTORE THE BASIN TO ITS ORIGINAL DIMENSIONS WHEN N SEDIMENT ACCUMULATES TO ONE-HALF THE HEIGHT OF THE FIRST BAFFLE. CD PULL THE SKIMMER TO ONE SIDE SO THAT THE SEDIMENT UNDERNEATH IT CAN BE EXCAVATED. EXCAVATE THE SEDIMENT FROM THE ENTIRE BASIN, NOT JUST AROUND THE SKIMMER OR FIRST CELL. MAKE SURE VEGETATION GROWING IN 3 THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE SKIMMER. 2. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF o WATER IS FLOWING UNDERNEATH OR AROUND THEM. 3. IF THE SKIMMER IS CLOGGED WITH TRASH AND THERE IS WATER IN THE BASIN, ° USUALLY PULLING ON THE ROPE WILL MAKE THE SKIMMER BOB UP AND DOWN AND DISLODGE THE DEBRIS AND RESTORE FLOW. IF THIS DOES NOT WORK, a) PULL THE SKIMMER TO THE SIDE OF THE BASIN AND REMOVE THE DEBRIS. ALSO CHECK THE ORIFICE INSIDE THE SKIMMER TO SEE IF IT IS CLOGGED; IF SO a) REMOVE DEBRIS. N 4. IF THE SKIMMER ARM OR BARREL PIPE IS CLOGGED, THE ORIFICE CAN BE o REMOVED AND THE OBSTRUCTION CLEARED WITH A PLUMBER'S SNAKE OR BY FLUSHING WITH WATER. BE SURE TO REPLACE THE ORIFICE BEFORE o REPOSITIONING THE SKIMMER. N 0 5. CHECK THE EMBANKMENT, SPILLWAYS, AND OUTLET FOR EROSION DAMAGE, AND INSPECT THE EMBANKMENT FOR PIPING AND SETTLEMENT. MAKE ALL w NECESSARY REPAIRS IMMEDIATELY. REMOVE ALL TRASH AND OTHER DEBRIS FROM THE SKIMMER AND POOL AREAS. 6. FREEZING WEATHER CAN RESULT IN ICE FORMING IN THE BASIN. SOME SPECIAL co PRECAUTIONS SHOULD BE TAKEN IN THE WINTER TO PREVENT THE SKIMMER FROM PLUGGING WITH ICE. 0 2022 Smith Gardner, Inc. DRY DETENTION BASIN DETAIL NOT TO SCALE EC2 20" MIN. TARP PROTECTION 1 1 2 2 (SEE NOTE 1) 1 2 '_ EMERGENCY DITCH AND BURY SPILLWAY TARP EDGE (MIN. 12") SECTION THRU WEIR UrIl I LLJ rLhiv VILVV 8' 1' MIN FREEBOARD INFLOW STRUCTURE BAFFLES SKIMMER OR CHANNEL (SEE NOTE 2) ELEV. 103.0' DEWATERING ZONE __] 1 2.5 ELEV. 98.0' 1 i INLET SHALL BE PROTECTED (AS NEEDED) FROM EROSION WITH RIPRAP, TARP, MATTING OR EQUIVALENT. SKIMMER BASIN DETAIL r4 NOT TO SCALE EC2 PAD FOR SKIMMER (SEE NOTE 4) CROSS SECTION TOP OF BERM (EL. 105.0) EMERGENCY SPILLWAY ELEVATION 8"0 CMP (ALUMINIZED STEEL TYPE 2) OUTLET PIPE 3 RIP RAP OUTLET ,EC1 PROTECTION SKIMMER BASIN SCHEDULE SKIMMER SIZE 3" ORIFICE SIZE 2.7" DEWATERING RATE 3 DAYS RISER SCHEDULE BASIN C (FEET) H (INCHES) J (FEET) P (FEET) Q (FEET) R (FEET) SB-1 95.0 18 92.0 91.7 92.1 96.5 NOTES: 1. PROVIDE WATERTIGHT JOINTS ON ALL PIPING. 2. PRECAST CONCRETE BOXES SHALL CONFORM TO THE FOLLOWING SEE NOTE 1 REQUIREMENTS: A. CONCRETE: COMPRESSIVE STRENGTH 4000 PSI B. REINFORCING: ASTM A-615, GRADE 60 C. MEETS H-20 LOADING. 3. PROVIDE STEPS FOR DROP INLETS WITH H>4.5'. STEPS SHALL HAVE A 16" SPACING THE FULL HEIGHT OF THE DROP INLET. START FIRST STEP 6" BELOW TOP. 4. BASE MUST BE PHYSICALLY ATTACHED OR INTEGRATED INTO THE DESIGN OF THE RISER STRUCTURE. (SEE NOTE STEPS 5. CONTRACTOR SHALL VERIFY LOCATION AND INVERT ELEVATION OF EXISTING OUTLET PIPE. RECORD ISSUE NOT FOR CONSTRUCTION 24"0 CAST FRAME & C 4'w X 1.0'H ORIFICE (4 ORIFICE FOR SKIMb (SIZE AS REQUIRED FOR SKIMMI CON 7'x7' R A� PLAN A� VVIVII r%VIL"/ VI\VJIIL"/ JIVI\L ULUUII\V SECTION A -A EXTENDED DRY BASIN RISER DETAIL 2 NOT TO SCALE EC2 ' ZONE 35% OF BASIN SURFACE AREA 1ST CELL 25% OF BASIN SURFACE AREA 2ND CELL 25% OF BASIN SURFACE AREA I OUTLE T 2 15% OF BASIN SURFACE AREA STAKE TO SUPPORT WIRE PLAN VIEW SUPPORT ROPE TO WIRE TO PREVENT SAGGING COIR MESH OR SIMILAR, STAPLED OR TRENCHED INTO BOTTOM OR SIDE ELEVATION BAFFLES DETAIL r5 NOT TO SCALE EC2 I� 0 0 I I 0.9 PREPARED FOR: PREPARED BY: NC LIC. NO, F-1370 (ENGINEERING) SC COA NO. CO1488 SMITH GARDNER ENGINEERS PRECAST CONCRETE TOP 14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 1526 Richland St., Columbia SC 29201 SEAL .�` CAR '''•. DocuSignby: 00 Q ^ PRECAST CONCRETE BOX (� � S G �'�><� . (SEE NOTE 2) 358C21 E64a0744 '•. �i FNGINEE��G'� �.�: ti 1881111111 SEAL (H) 0 CMP (ALUMINIZED STEEL TYPE 2) (SEE NOTE 1) REV. DATE DESCRIPTION 2 05/22 RESPONSE TO NCDEQ DEMLR COMMENTS DATED 05/10/22 3 06/22 RESPONSE TO NCDEQ DEMLR COMMENTS DATED 06/03/22 4 06/22 ISSUED FOR CONSTRUCTION 6 09/22 RECORD ISSUE POST FENCE AND FABRIC BURIED IN TRENCH FLOW 6"x 6" TRENCH, BACKFILLED AND COMPACTED CV SECTION A -A SUPPORT POST 24" INTO BASIN SUBGRADE AND SLOPES -Imw-A ' - A NOTES: 1. BAFFLE MATERIAL SHOULD BE SECURED AT THE BOTTOM AND SIDES USING STAPLES OR BY TRENCHING AS FOR SILT FENCE. 2. MOST OF THE SEDIMENT WILL ACCUMULATE IN THE FIRST BAY, WHICH SHOULD BE READILY ACCESSIBLE FOR MAINTENANCE. 3. PROVIDE 3 BAFFLES (USE TWO IF LESS THAN 20 FEET IN LENGTH). 4. BAFFLE SHALL BE 700 g/mz COIR EROSION BLANKET. 5. TOPS OF BAFFLES SHOULD BE 2 INCHES LOWER THAN THE TOP OF THE BERMS. 6. INSPECT BAFFLES FOR REPAIR ONCE A WEEK AND AFTER EACH RAINFALL. Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. PROJECT TITLE WILSO N COUNTY SOLID WASTE WESTSIDE CRD LANDFILL AREA 2- PHASE CONSTRUCTION DRAWING TITLE: EROSION AND SEDIMENTATION DETAILS (SHEET 2OF4) DESIGNED: PROJECT NO: W.M.B. WILSON 20-1 DRAWN: SCALE: TsJ. AS SHOWN APPROVED DATE: JULY 2020 FILENAME: WILSON-DO044 SHEET NUMBER: DRAWING NUMBER: 5 ECI DocuSign Envelope ID: 341090CD-AC8D-4004-BCFC-OF26B9D22DF6 PREPARED FOR: d O v N N O N C�8 MAINTENANCE OF EROSION AND SEDIMENTATION FEATURES CHANNELS, DIVERSION BERMS, SWALES, ETC. 1. INSPECT CHANNELS, DIVERSION BERMS, SWALES, ETC. AT REGULAR INTERVALS AS WELL AS AFTER MAJOR RAINS, AND MAKE REPAIRS PROMPTLY. CHECK GRASS AND RECP LINED CHANNELS AFTER EVERY RAINFALL UNTIL THE ESTABLISHMENT OF A GOOD STAND OF VEGETATION. 2. GIVE SPECIAL ATTENTION TO THE OUTLET AND INLET SECTIONS AND OTHER POINTS WHERE CONCENTRATED FLOW ENTERS. CAREFULLY CHECK STABILITY AT ROAD CROSSINGS AND LOOK FOR INDICATIONS OF PIPING, SCOUR HOLES, OR BANK FAILURES. 3. MAKE REPAIRS IMMEDIATELY AND REMOVE ALL SIGNIFICANT SEDIMENT ACCUMULATIONS TO MAINTAIN THE DESIGNED CARRYING CAPACITY. 4. MAINTAIN ALL VEGETATION IN (AS APPLICABLE) AND ADJACENT TO THE CHANNEL IN A HEALTHY, VIGOROUS CONDITION. 6" MIN. LAYER OF 2-3" WASHED STONE CONSTRUCTION ENTRANCE/EXIT DETAIL 3 NOT TO SCALE EC3 1/2" MESH HARDWARE CLOTH rillh r` - dill �II� IIII IIII IIII 3' MAX. ELEVATION GRADE l WASHED STONE FILTER FENCE DETAIL r4 NOT TO SCALE EC3 RIP RAP LINED CHANNELS A LI\VJIVI\ VVI\II\VL ULI1I\f\LI 1LVU) (SEE NOTE 1) GRASS LINED CHANNELS DRAINAGE CHANNEL DETAIL rl NOT TO SCALE EC3 MAINTENANCE OF EROSION AND SEDIMENTATION FEATURES CONSTRUCTION ENTRANCE MAINTENANCE 1. MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2—INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. OST -IED STONE V MAINTENANCE OF EROSION AND SEDIMENTATION FEATURES STONE FILTER FENCE SECTION A -A 1. INSPECT STONE FILTER FENCE AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE MESH HARDWARE CLOTH, POST, OR STONE OF A STONE FILTER FENCE COLLAPSE, TEAR, MOVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS WHEN HALF OF THE STONE OUTLET IS COVERED TO ENSURE DEWATERING DURING THE NEXT RAIN EVENT. TAKE CARE TO AVOID UNDERMINING THE STONE FILTER FENCE DURING CLEANOUT. 4. REPLACE STONE AS NEEDED TO ENSURE DEWATERING. THE STONE HEIGHT MUST BE AT LEAST 12 INCHES HIGH AND THERE MUST BE AT LEAST 12 INCHES OF SEPARATION BETWEEN THE TOP OF THE MESH HARDWARE CLOTH AND THE TOP OF THE STONE. 5. REMOVE ALL STONE FILTER FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. WOVEN WIRE FENCE (MIN. 14 GAGE WITH 6» MAX MESH SPACING) TO SUPPORT FILTER FABRIC r A 8' MAX. GRADE LINE FLOW 5' (MIN.) STEEL FENCE POST ("T" OR "U" TYPE) FILTER FABRIC ATTACHED TO WIRE FENCE WITH PLASTIC OR WIRE TIES MAINTENANCE OF EROSION AND SEDIMENTATION FEATURES SILT FENCE I I 4" MIN. N 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. Z MAKE ANY REQUIRED REPAIRS IMMEDIATELY. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE, OR 00 BECOME INEFFECTIVE, REPLACE IT PROMPTLY. COMPACTED SOIL 8" (MIN.) 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE EMBEDMENT OF FILTER FABRIC VOLUME FOR THE NEXT RAIN AND TO REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. ELEVATION SECTION A -A 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED. NOTE: 1. PLACE 10' MIN. LENGTH OF STONE FILTER FENCE AT LOW POINTS ALONG SILT FENCE AND WHERE DIRECTED BY THE ENGINEER TO RELEASE WATER. SEE DETAILe4 C3 SILT FENCE DETAIL 2 NOT TO SCALE EC3 RECORD ISSUE NOT FOR CONSTRUCTION C1 PREPARED BY: NC LIC. N0. F-1370 (ENGINEERING) SC COA NO. CO1488 SM ITH GARDNER ENGINEERS 14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 1526 Richland St., Columbia SC 29201 SEAL Docaignedb 'O Ny< 0 SEAL c R N4A 358CS1 F-64007440 �'•. �i FNGINEE��G'� �.�. ti 18un1WR���9/19/2022 SEAL REV. DATE DESCRIPTION 2 05/22 RESPONSE TO NCDEQ DEMLR COMMENTS DATED 05/10/22 4 06/22 ISSUED FOR CONSTRUCTION 6 09/22 RECORD ISSUE Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. PROJECT TITLE: WILSO N COUNTY SOLID WASTE WESTSIDE CRD LANDFILL AREA 2- PHASE CONSTRUCTION DRAWING TITLE: EROSION AND SEDIMENTATION DETAILS (SHEET 3OF4) DESIGNED: PROJECT NO: W.M.B. WILSON 20-1 DRAWN: SCALE: IFSJ. AS SHOWN APPROVED 1Q., DATE: �/ JULY 2020 FILENAME: WILSON-DO044 SHEET NUMBER: DRAWING NUMBER: 6 EC3 © 2022 Smith Gardner, Inc. DocuSign Envelope ID: 341090CD-AC8D-4004-BCFC-OF26B9D22DF6 D_ 0 Lo N N O N C�8 COMPACTED BACk A / \ ROLLED EROSION CONTROL PRODUCT (RECP) \ C4 FOR ANCHOR LAYOUT C / RECP A» A. LONGITUDINAL ANCHOR TRENCH U D. INTERMITTENT CHECK SLOT TYPICAL CHANNEL CROSS SECTION 30' MAX — �o TYPICAL CHANNEL PROFILE 3" RECP B. OVERLAP AT ADJACENT EDGES 12" ri AIM E. OVERLAP AT ROLL ENDS (TYP.) RECP \NCHOR (TYP.) NOTES: 1. PLACE ANCHORS AT ANCHOR TRENCHES, OVERLAPS, AND CHECK SLOTS ON 1 FOOT CENTERS. IF APPLICABLE, STAGGER ANCHOR SPACING BETWEEN MULTIPLE ROWS OF ANCHORS. INSTALLATION OF ROLLED EROSION CONTROL PRODUCTS (CHANNELS) DETAIL rl NOT TO SCALE EC4 12 nn1 In 1 ^T n n 1 nVrn 1 C. UPSTREAM TERMINAL ANCHOR TRENCH inn F. DOWNSTREAM TERMINAL ANCHOR TRENCH 6' 1 ANCHOR YD2 A / � B 1_ I 1 TYPICAL SLOPE PROFILE \ RECP eWIun❑ TYP.) L 1.5 ANCHORS 2 ANCHORS/YD2 ANCHOR LAYOUT DETAIL 3 NOT TO SCALE EC4 1� TYPICAL SLOPE PLAN VIEW RECP --,Flow / 12" FOR ANCHOR LAYOUT RECP PREPARED FOR: PREPARED BY: NC LIC. NO, F-1370 (ENGINEERING) SC COA NO. CO1488 SMITH MIM GARDNER ENGINEERS 14 N. Boylan Avenue, Raleigh NC 27603 919.828.0577 1526 Richland St., Columbia SC 29201 SEAL ,,,�����unui���� .�` CAR '''•. A. DocuSigneczy: SEAL w, l�lI' j°jVtl 6 358C21 E6400%40 •. �i NGIW G ,•'•*.,110 yA EL 3 `j1912022 18811111191 SEAL REV. DATE DESCRIPTION 4 06/22 ISSUED FOR CONSTRUCTION HOR (TYP.) 6 09/22 RECORD ISSUE A. UPSLOPE TERMINAL ANCHOR TRENCH RECP Flow B. OVERLAP AT ROLL ENDS C. OVERLAP AT ADJACENT EDGES D. DOWNSLOPE TERMINAL ANCHOR TRENCH NOTE: 1. PLACE ANCHORS AT ANCHOR TRENCHES, OVERLAPS, AND CHECK SLOTS ON 1 FOOT CENTERS. IF APPLICABLE, STAGGER ANCHOR SPACING BETWEEN MULTIPLE ROWS OF ANCHORS. 2.5 ANCHORS/YD 2 INSTALLATION OF ROLLED EROSION CONTROL PRODUCTS (SLOPES) DETAIL 2 NOT TO SCALE EC4 RECORD ISSUE NOT FOR CONSTRUCTION Electronic files are instruments of service provided by Smith Gardner, Inc. for the convenience of the intended recipient(s), and no warranty is either expressed or implied. Any reuse or redistribution of this document in whole or part without the written authorization of Smith Gardner, Inc., will be at the sole risk of the recipient. If there is a discrepancy between the electronic files and the signed and sealed hard copies, the hard copies shall govern. Use of any electronic files generated or provided by Smith Gardner, Inc., constitutes an acceptance of these terms and conditions. PROJECT TITLE: WILSO N COUNTY SOLID WASTE WESTSIDE CRD LANDFILL AREA 2- PHASE CONSTRUCTION DRAWING TITLE: EROSION AND SEDIMENTATION DETAILS (SHEET4 ON I DESIGNED: N ur? DRAWN: . T T. AM APPROVED: FILENAME: SHEET NUMBER: PROJECT NO: WILSON 20-1 SCALE: AS SHOWN DATE: JULY 2020 WILSON-D0044 DRAWING NUMBER: E C 4 © 2022 Smith Gardner, Inc.