Loading...
HomeMy WebLinkAbout1812_DukeMarshall_Phase 2_UnderdrainTemporaySampleLocation_1636956_20220107Industrial Landfill No. 1 Phase 2, Cell 5 Underdrain Temporary Underdrain Discharge Line Setup and Proposed Sample Location Temporary flex pipe for underdrain discharge Industrial Landfill No. 1 Phase 2, Cell 5 Underdrain Temporary Underdrain Discharge Line Setup and Proposed Sample Location Temporary flex pipe for underdrain discharge Industrial Landfill No. 1 Phase 2, Cell 5 Underdrain Temporary Underdrain Discharge Line Setup and Proposed Sample Location Discharge point within the ash basin, and within one of the rim ditches maintained as part of excavation in the future phases area Industrial Landfill No. 1 Phase 2, Cell 5 Underdrain Temporary Underdrain Discharge Line Setup and Proposed Sample Location • Follow-up email/letter to documenting the alternative sample location • Survey point and photos of alternative sample location for documentation in the February 2022 ECMP Report