FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
YW
X
Transfer
Compost
SLAS
COUNTY: Nash
MSWLF
PERMIT NO.: 6401-MSWLF-1983
Closed
X
HHW
white
X
Incin
T&P
FIRM
MSWLF
goods
6401-CDLF-1999
6403-CDLF-2000
FILE TYPE: COMPLIANCE
CDLF
X
Tire T&P/
X
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: January 10, 2022
FACILITY NAME AND ADDRESS:
Nash County C&D Landfill
SR 1425
3057 Duke Rd.
Nashville, NC 27856
GPS COORDINATES: N:36.05918 ° E:-78.00552 °
Date of Last Inspection: September 28, 2021
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Ben Barnes and Matthew Richardson
Telephone: 252-459-9823, 252-459-9899 (Barnes cell 252-904-3396)
Email address: solidwasteknashcountync.gov; Matthew.Richardsongnashcountync.gov
FACILITY CONTACT ADDRESS:
Nash County Solid Waste
P.O. Box 849
Nashville, NC 27856
PARTICIPANTS:
Amanda Thompson, NCDEQ Solid Waste
STATUS OF PERMIT:
640 1 -MSWLF- 1983 (Closed): The MSWLF ceased accepting waste during the summer of 1998, closure was documented
in a CQAR prepared by GEI Consultants and dated December 1998.
6401-CDLF-1999 (Closed): Locate on top of the closed MSWLF landfill (6401-MSWLF-1983), construction and
demolition waste was accepted until 2000, final closure was documented in a CQAR prepared by GEI Consultants and dated
March 2000.
6403-CDFL-2000: Permit to Construct Phases 6-9 and Permit to Operate Phases 1-5 was issued August 31, 2021
PURPOSE OF SITE VISIT:
Comprehensive Compliance Inspection
STATUS OF PAST NOTED AND OBSERVED VIOLATIONS
None.
OBSERVED VIOLATIONS
None.
Page 1 of 4
NORTH CAR()LINAD_E Q��
OepaNnent W Envimnmenbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS:
1. Edge of waste (EOW) markers were observed around 6401-MSWLF-1983, 6401-CDLF-1999, and 6403-CDLF-
2000. Continue to mow around the EOW markers so that they are visible from one to the next.
2. Portions of the grasses on 640 1 -MSWLF- 1983 and 640 1 -CDLF- 1999 were becoming overgrown. The overgrown
vegetation should be mown as needed to allow for proper inspection of the site.
3. Two areas of ATV tracks were observed up the side slopes and on top of 6401-MSWLF-1983. It appears that the
ATVs are using the powerline to access the property. No trespassing signs have been posted, however, are not
deterring the ATV riders. It is recommended that additional possible entrance points to the landfill be blocked or
see if a Sheriff Deputy may be able to patrol the area to help deter the ATVs.
4. 6403-CDLF-2000 Phase 4 had been covered and seeded. Some exposed waste was observed along the side slopes.
The waste can be picked up and taken to the working face in Phase 5 or covered with soil.
5. Several erosion rills were identified along the northern side slope of CDLF Phase 4. The rills should be repaired
and seeded. Additional seeding of the entirety of Phase 4 may be needed to prevent additional erosion.
6. During this inspection, the working face of Phase 5 was small and actively being compacted. Water from the recent
rains had pooled between the working face and the berm separating the waste from the remainder of Phase 5. Ms.
Thompson reminded Mr. Ben Barnes during a phone call after the inspection, that the water between the waste and
berm would need to be pumped and treated as leachate. Standing water was also observed at the eastern end of
Phase 5. As per previous discussions, as long as the water standing at the end of Phase 5 had not come into contact
with waste, the water could be pumped into the adjacent drainage ditch.
7. The metal recycling pile was small and of manageable size. White goods were stored upright and on the concrete
pad.
8. The sediment basin located to the north of the inactive CDLF had been mown and woody vegetation had been
removed. The sediment basin to the north of CDLF Phase 4 has been cleaned out and the side slopes mown.
Continue the maintenance of the sediment basins as needed to ensure that the basins function properly.
9. The tires have been laced within trailers for transport to Central Carolina Tire.
10. The permit, operations plan, and records were not reviewed during this inspection.
11. Digital photographs were taken during the inspection.
Please contact me if you have any questions or concerns regarding this inspection report.
Amanda Digitally signed by Amanda
Thompson
Thompson Date: 2022.01.1409:35:41
05'00' Phone: 910) 433-3353
Amanda Thompson
Environmental Senior Specialist
Regional Representative
Sent on: January 14, 2022 X Email Hand delivery US Mail Certified No.
Copies: Andrew Hammonds, Eastern District Supervisor — Solid Waste Section
Donna Wilson, Permitting Branch Engineer — Solid Waste Section
Page 2 of 4
NORTH CAR()LINAD_E Q��
OepaNnent of Envieonmenbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
View of the closed MSWLF.
View of erosion rills on the northern side slope of CDLF
Phase 4.
View of the sediment basin to the north of the inactive
CDLF.
View of the metal recycling and white goods storage.
View of the sediment basin to the north of CDLF Phase 4.
Page 3 of 4
NORTH CAR()LINAD_E Q��
OepaNnent of Envieonmenbl Wel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Standing water in CDLF Phase 5 between the waste and
berm.
Exposed waste on CDLF Phase 4.
View of the working face and standing water adjacent to
ATV tracks on the closed MSWLF.
Page 4 of 4