Loading...
HomeMy WebLinkAbout5001_ROSCANS_1988WEATHER CONDITIONS NAME OF SITE LOCATION ;C. DEPARTMENT OF HUMAN RESOURCEb DIVISION OF HEALTH SERVICES INSPECTION FOR SANITARY LANDFILLS COUNTY SIGNATURE OF PERSON(S) RECEIVING REPORT PERMIT NUMBER SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS — (a) Construction plans shall be approved and followed. (b) Specified monitoring and reporting requirements shall be met. SPREADING AND COMPACTING REQUIREMENTS (a) Solid waste shall be restricted into the smallest area feasible. (b) Solid waste shall be compacted as densely as practical into cells (3) COVER REQUIREMENTS (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. (b) Areas which will not have additional wastes placed on them for 12 months or more shall be covered with a minimum of one foot of intermediate cover. (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. — (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS (a) Surface water shall be diverted from the operational area. (b) Surface water shall not be impounded over or in waste. (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS — (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. (b) Solid waste shall not be disposed of in water. (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS (a) The site shall be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. — (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. (c) The access road to the site shall be of all-weather construction and maintained in good condition. (d) Dust control measures shall be implemented where necessary. REMARKS DATE: ►CIM (9) SIGN REQUIREMENTS — (a) Signs providing information on dumping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS (a) Open burning of solid waste is prohibited. (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. —(c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. (e) Barrels and drums shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS — (a) A site shall only accept those solid wastes which it is permitted to receive. (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1,1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, P. O. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS — (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. (b) Appropriate methods such as fencing and diking shall be pro- vided within the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. Solid and Hazardous Waste Management Branch DHS 1709 (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer) vd , STATE a North Carolina Department of Human Resources Western Regional Office • Black Mountain 28711 James G. Martin, Governor October 27, 1988 Mr. Andrew B. Comrie Assistant Director, Physical Plant Office of the Physical Plant Western Carolina University Cullowhee, NC 28723 Dear Mr. Comrie: David T. Flaherty, Secretary In response to your letter dated October 3, 1988 requesting authorization to dispose of alum sludge in the Western Carolina University Landfill, the N. C. Solid Waste Branch has no objection to the alum disposal provided the sludge is non -liquid in nature. If you have further questions, please let me know. Sincerely, .ZC��4 James E. Patterson Waste Management Specialist JEP/dgm cc: Mr. Julian Foscue .-Carolina Department of Human Resources Western Regional Office • Black Mountain 28711 James G. Martin, Governor David T. Flaherty, Secretary October 6, 1988 Mr. Andrew B. Comrie Assistant Director of Physical Plant The Physical Plant Western Carolina University Cullowhee, North Carolina 28723 Dear Mr. Comrie: Thank you for your response to my recent correspondence concerning the Western Carolina University landfill. We also appreciate your efforts in eliminating the problem areas addressed in this letter. It is my understanding that at this time you have discontinued removing cover material from the area at the base of the old Jackson County landfill and that you have placed two feet of final cover over the old landfill site except for an access road. You further stated that some power poles were stored on the old landfill site and that you wished to forego placing two feet of dirt over the road until the poles are removed. Based on the circumstances, your request for an extension until April 15, 1989 for placing two feet of cover over the road is granted. Sincerely, James E. Patterson Waste Management Specialist JEP/dgm cc: Julian Foscue iWART�OLINA OFFICE OF THE PHYSICAL PLANT (704) 227-7442 October 3, 1988 Mr. James E. Patterson Waste Management Specialist North Carolina Department of Human Resources Western Regional Office Black Mountain, North Carolina 28711 SUBJECT: Alum Sludge Disposal Wastewater Treatment Facility Western Carolina University Dear Mr. Patterson: This is a follow-up to our conversation of September 29, 1988 regarding disposal of the alum sludge generated by our Water Treatment Plant and collected in the proposed Wastewater Treatment Facility. The Wastewater Treatment Facility will consist of a two -cell sand filter lagoon system to store and dewater the alum sludge. When it becomes necessary to remove the sludge from a cell, the sludge will be allowed to dry through draining and evaporation. When one cell is being dried, all the wastewater being generated will be collected in the second cell. At the current water production rate, only one cell will have to be cleaned each year. The estimated annual sludge production at current treatment rate is eight tons. We have received Authorization to Construct and a NPDES Permit (No. NC0074624) to discharge the supernatant into the Tuckasegee River. What we need from you is written authorization for disposal of the alum sludge in the University's landfill to complete our record file. Sincerely, ,mow An rew B. Comrie Assistant Director, Physical Plant cp CULLOWHEE, NORTH CAROLINA 28723 Western Carolina University is one of the sixteen senior institutions of The University of North Carolina and an affirmative action/equal opportunity employer. OLINA OFFICE OF THE PHYSICAL PLANT (704) 227-7442 September 14, 1988 Mr. James E. Patterson Waste Management Specalist North Carolina Department of Human Resources Western Regional Office Black Mountain, North Carolina 28711 Dear Mr. Patterson: Reference your letter of September 7, 1988 to Mr. Culp concerning operation of the Western Carolina University Landfill and closure of the old Jackson County Landfill. We have discontinued taking cover material from the base of the old Jackson County Landfill area. The entire area of the old Jackson County Landfill has been covered with two feet of soil and seeded with grass except for the access road. We are currently using this area as temporary storage for Electric Resale power poles pending completion of a new Warehouse and Storage Facility in late December, 1988. The power poles will then be removed the landfill, the access road covered with two feet of soil and seeded. Request you extend the close out compliance date of the old Jackson County Landfill to mid -April, 1989. Sincerely, Andrew B. Comrie Assistant Director of Physical Plant cp CULLOWHEE, NORTH CAROLINA 28723 Western Carolina University is one of the sixteen senior institutions of The University of North Carolina and an affirmative action/equal opportunity employer. rth Carolina Department of Human Resources - Western Regional Office • Black Mountain 28711 James G. Martin, Governor September 7, 1988 Mr. James Culp, Director The Physical Plant Western Carolina University Cullowhee, NC 28723 Dear Mr. Culp: David T. Flaherty, Secretary I visited Western Carolina University on August 30, 1988 and observed two areas of concern which need to be addressed by your staff. First of all, immediately discontinue removing soil from the borrow area at the base of the old Jackson County Landfill. Any further excavation in this area would weaken the dike or cause leachate problems. Secondly, the old Jackson County Landfill area needs to be totally closed out. This can be accomplished by placing two feet of suitable compacted soil over the entire area, grading this area, then seeding with grass to stabilize. A compliance date of October 1, 1988 has been established for completion of this closure. Thank you for your cooperation and if you have questions, please contact me. Sincerely, 6�t rim' ' , A, 6 �R James E. Patterson Waste Management Specialist JEP/dgm cc: Julian Foscue Herb Vogel DEPARTMENT OF HUMAN RESOURCE EAIHER CUNDIIIONS DIVISION OF HEALTH SERVICES PERMIT NUMB R INSPECTION FOR SANITARY LANDFILLS NAME OF SITE COUNTY LOCATION i SIGNATURE OF PERSON(S) RECEIVING REPORT SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS (a) Construction plans shall be approved and followed. (b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS (a) Solid waste shall be restricted into the smallest area feasible. _(b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. (b) Areas which will not have additional wastes placed on them for 12 months or more shall be covered with a minimum of one foot of intermediate cover. (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. — (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS (a) Surface water shall be diverted from the operational area. — (b) Surface water shall not be impounded over or in waste. (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS — (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. — (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS — (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. — (b) Solid waste shall not be disposed of in water. (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS (a) The site shall be adequately secured by means of gates chains (9) SIGN REQUIREMENTS (a) Signs providing information on dumping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS (a) Open burning of solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. — (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. —(e) Barrels and d ru ms shal I not be disposed of u n less they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS (a) A site shall only accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. — (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. — (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1,1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, _ P. O. Box 2091, Raleigh, NC, 27602. berms, fences, and other security measures approved by the (12) MISCELLANEOUS REQUIREMENTS division, to prevent unauthorized entry. (a) Effective vector control measures shall be applied to control (b) An attendant shall be on duty at the site at all times while it is flies, rodents, and other insects or vermin when necessary. open for public use to ensure compliance with operational (b) Appropriate methods such as fencing and diking shall be pro - requirements. vided within the area to confine solid waste subject to be blown — (c) The access road to the site shall be of all-weather construction by the wind. At the conclusion of each day of operation, all and maintained in good condition. windblown material resulting from the operation shall be col- - (d) Dust control measures shall be implemented where necessary. lected and returned to the area by the owner or operator. REMARKS:P�'f�� DATE: £l r NAME Solid and Hazardous Waste Management Branch DHS 1709 (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer) N. )EPARTMENT OF HUMAN RESOURCES WEATHER CONDITIONS DIVISION OF HEALTH SERVICES PERMIT NUMBER INSPECTION FOR SANITARY LANDFILLS NAME OF SITE COUNTY LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS (a) Construction plans shall be approved and followed. (b) Specified monitoring and reporting requirements shall be met (2) SPREADING AND COMPACTING REQUIREMENTS (a) Solid waste shall be restricted into the smallest area feasible. (b) Solid waste shall be compacted as densely as practical into cells (3) COVER REQUIREMENTS — (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. (b) Areas which will not have additional wastes placed on them for 12 monthsor more shall be covered with a minimum of one foot of intermediate cover. (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. — (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS (a) Surface water shall be diverted from the operational area. — (b) Surface water shall not be impounded over or in waste. (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. — (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS — (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. (b) Solid waste shall not be disposed of in water. (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS (a) The site shall be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. — (c) The access road to the site shall be of all-weather construction and maintained in good condition. (d) Dust control measures shall be implemented where necessary. REMARKS: DATE (9) SIGN REQUIREMENTS — (a) Signs providing information on dumping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS (a) Open burning of solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. — (e) Barrels and drums shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS (a) A site shall only accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. — (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. — (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1,1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, P. O. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS —(a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. — (b) Appropriate methods such as fencing and diking shall be pro- vided within the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. NAME: Solid and Hazardous Waste Management Branch DHS 1709 (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer) I DEPARTMENT OF HUMAN RESOURCE; WEATHER CONDITIONS DIVISION OF HEALTH SERVICES PERMIT NUMBER INSPECTION FOR SANITARY LANDFILLS NAME OF SITE COUNTY LOCATION _-' SIGNATURE OF PERSON(S) RECEIVING REPORT SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS (a) Construction plans shall be approved and followed. — (b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS (a) Solid waste shall be restricted into the smallest area feasible. (b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. (b) Areas which will not have additional wastes placed on them for 12 monthsor more shall be covered with a minimum of one foot of intermediate cover. — (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS (a) Surface water shall be diverted from the operational area. (b) Surface water shall not be impounded over or in waste. (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. (b) Solid waste shall not be disposed of in water. (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS (a) The site shall be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. — (c) The access road to the site shall be of all-weather construction and maintained in good condition. — (d) Dust control measures shall be implemented where necessary. REMARKS: (9) SIGN REQUIREMENTS — (a) Signs providing information on dumping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS — (a) Open burning of solid waste is prohibited. (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. —(c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. — (e) Barrels and drums shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS (a) A site shall only accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. — (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. — (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1,1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, P. O. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS —(a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. — (b) Appropriate methods such as fencing and diking shall be pro- vided within the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. DATE: NAME: Solid and Hazardous Waste Management Branch DHS 1709 (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)