Loading...
HomeMy WebLinkAbout5001_ROSCANS_1986„r ."'I ”' North Carolina Department of Human Resources Division of Health Services P.-O. Box 209 ® Raleigh -North Carolina 276113 - 1 James G. Martin, Governor Phillip J. Kirk, Jr., Secretary December 15, 1986 Jensen Engineering 12 Broad Street P.O. Box 18149 Asheville, North Carolina 28814 Attention: William D. Conner RE: WCU Sanitary Landfill_, clean up measures Dear Mr. Conner: Ronald H. Levine, M.D., M.P.H. State Health Director The recommended clean up measures for the WCU Sanitary Landfill are approved. All additional cover material must be stabilized with suitable vegetation as soon as possible. In addition, the appropriate agency should be contacted prior to any burning activities. If there are any questions or comments, please call me at (919) 733-2178. Si cerely, c C, amen C. Coffey, Environmental Engineer Solid & Hazardous Waste Management Branch Environmental Health Section JCC/mj cc : 7ulian Foscue -,Tim Peterson ...C. DEPARTMENT OF HUMAN RESOURCES WEATHER CONDITIONS DIVISION OF HEALTH SERVICES INSPECTION FOR SANITARY LANDFILLS �r PERMIT NUMBfrR NAME OF SITE COUNTY LOCATION SIGNATUJZE OF PERSON(S) RECEIVING -RE ORT SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS (a) Construction plans shall be approved and followed. (b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS (a) Solid waste shall be restricted into the smallest area feasible. _(b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. — (b) Areas which will not have additional wastes placed on them for 12 months or more shall be covered with a minimum of one foot of intermediate cover. -- (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS — (a) Surface water shall be diverted from the operational area. (b) Surface water shall not be impounded over or in waste. (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS — (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. (b) Solid waste shall not be disposed of in water. (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS — (a) The site shall be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. (c) The access road to the site shall be of all-weather construction and maintained in good condition. (d) Dust control measures shall be implemented where necessary. REMARKS DATE NAME: (9) SIGN REQUIREMENTS — (a) Signs providing information on dumping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS — (a) Open burning of solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. — (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal h not performed on the working face. — (e) Barrels and drums shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS (a) A site shall on ly accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1,1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, P. O. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. — (b) Appropriate methods such as fencing and diking shall be pro- vided within the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. Solid and Hazardous Waste Management Branch DHS 1709 (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer) _.C. DEPARTMENT OF HUMAN RESOURCE' WEATHER CONDITIONS DIVISION OF HEALTH SERVICES PERMIT NUMBf t INSPECTION FOR SANITARY LANDFILLS NAME OF SITE COUNTY LOCATION SIGNATURE OF PERSON(S) RECEIVING REPORT SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS (a) Construction plans shall be approved and followed. (b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS (a) Solid waste shall be restricted into the smallest area feasible. (b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS — (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. (b) Areas which will not have additional wastes placed on them for 12 months or more shall be covered with a minimum of one foot of intermediate cover. — (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS — (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS (a) Surface water shall be diverted from the operational area. —_ (b) Surface water shall not be impounded over or in waste. (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. (b) Solid waste shall not be disposed of in water. (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS (a) The site shall be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. — (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. (c) The access road to the site shall be of all-weather construction and maintained in good condition. (d) Dust control measures shall be implemented where necessary. REMARKS: DATE: f Off 14,22 4 NAME: (9) SIGN REQUIREMENTS — (a) Signs providing information on dumping procedures, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS — (a) Open burning of solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. — (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. -- (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. (e) Barrels and drums shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS (a) A site shall only accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1,1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, P. O. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS — (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. — (b) Appropriate methods such as fencing and diking shall be pro- vided within the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. Solid and Hazardous Waste Management Branch DHS 1709 (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/66) (white — Raleigh Office yellow — Facility green — Preparer) A.C. DEPARTMENT OF HUMAN RESOURCtS WEATHER CONDITIONS DIVISION OF HEALTH SERVICES PERMIT NUMBER INSPECTION FOR SANITARY LANDFILLS NAME OF SITE COUNTY )-J)c_ 't,/\/ (�)//11A I ,wind lll �► � Di/A &-6 _Sr,(i�so/ LOCATION -- SIGNATURE OF PERSON(S) RECEIVING REPORT SIR (1) AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). PLAN AND PERMIT REQUIREMENTS (9) SIGN REQUIREMENTS — (a) (:onstruction plans shall be approved and followed. (a) Signs providing information on dumping procedures, the hours — (b) Specified monitoring and reporting requirements shall be met. during which the site is open for public use, the permit number (2) SPREADING AND COMPACTING REQUIREMENTS — (a) S',olid waste shall be restricted into the smallest area feasible. (b) Solid waste shall be compacted as densely as practical into cells (3) COVER REQUIREMENTS — (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. — (b) Areas which will not have additional wastes placed on them for 12,months or more shall be covered with a minimum of one foot of intermediate cover. (c) Aftor final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS — (a) Adegfate erosion control measures shall be practiced to pre- vent silt from leaving the site. — (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS — (a) Surface water shall be diverted from the operational area. (b) Surface water shall not be impounded over or in waste. —(c) Compleited areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. —_ (b) Solid waste shall not be disposed of in water. —_ (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8), ACCESS AND SECURITY REQUIREMENTS (a) The site shall be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. (c) The access road to the site shall be of all-weather construction and maintained in good condition. (d) Dust control measures shall be implemented where necessary. REMARKS DATE: NAME: and other pertinent information shall be posted at the site entrance. (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS — (a) Open burning of solid waste is prohibited. (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to' immediately provide fire -fighting services when needed. (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves, apd the, removal is not performed on the working fact. (e) Barrels and dru ms shal I not be disposed of u n less they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS — (a) A site shall only accept those solid wastes which it is permitted to receive. — (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. — (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. — (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1,1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, P. O. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS — (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. (b) Appropriate methods such as fencing and diking shall be pro- vided within the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. Solid and Hazardous Waste Management Branch DHS 1709 (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer) WEATHER CONDITIONS NAME OF SITE LOCATION iv.C. DEPARTMENT OF HUMAN RESOURCES DIVISION OF HEALTH SERVICES PERMIT NUMNR INSPECTION FOR SANITARY LANDFILLS COUNTY On SIGNATURE OF PERSON(S) RECEIVING REPORT jj/� g / g a• SIR: AN INSPECTION OF YOUR LAND DISPOSAL SITE HAS BEEN MADE THIS DATE AND YOU ARE NOTIFIED OF THE VIOLATIONS, IF ANY, MARKED BELOW WITH A CROSS (X). (1) PLAN AND PERMIT REQUIREMENTS (a) Construction plans shall be approved and followed. (b) Specified monitoring and reporting requirements shall be met. (2) SPREADING AND COMPACTING REQUIREMENTS — (a) Solid waste shall be restricted into the smallest area feasible. (b) Solid waste shall be compacted as densely as practical into cells. (3) COVER REQUIREMENTS — (a) Solid waste shall be covered after each day of operation, with a compacted layer of at least six inches of suitable cover or as specified by the division. (b) Areas which will not have additional wastes placed on them for 12 months or more shall be covered with a minimum of one foot of intermediate cover. (c) After final termination of disposal operations at the site or a major part thereof or upon revocation of a permit, the area shall be covered with at least two feet of suitable compacted earth. (4) EROSION CONTROL REQUIREMENTS — (a) Adequate erosion control measures shall be practiced to pre- vent silt from leaving the site. _ (b) Adequate erosion control measures shall be practiced to pre- vent excessive on -site erosion. (5) DRAINAGE CONTROL REQUIREMENTS (a) Surface water shall be diverted from the operational area. (b) Surface water shall not be impounded over or in waste. — (c) Completed areas shall be adequately sloped to allow surface water runoff in a controlled manner. (6) VEGETATION REQUIREMENTS (a) Within six months after final termination of disposal operations at the site on a major part thereof or upon revocation of a permit, the area shall be stabilized with native grasses. (b) Temporary seeding will be utilized as necessary to stabilize the site. (7) WATER PROTECTION REQUIREMENTS (a) The separation distance of four (4) feet between waste and water table shall be maintained unless otherwise specified by the division in the permit. (b) Solid waste shall not be disposed of in water. (c) Leachate shall be contained on site or properly treated prior to discharge. An NPDES permit may be required prior to the dis- charge of leachate to surface waters. (8) ACCESS AND SECURITY REQUIREMENTS — (a) The site shall be adequately secured by means of gates, chains, berms, fences, and other security measures approved by the division, to prevent unauthorized entry. (b) An attendant shall be on duty at the site at all times while it is open for public use to ensure compliance with operational requirements. (c) The access road to the site shall be of all-weather construction and maintained in good condition. (d) Dust control measures shall be implemented where necessary. REMARKS: (9) SIGN REQUIREMENTS (a) Signs providing information on dumping procedu res, the hours during which the site is open for public use, the permit number and other pertinent information shall be posted at the site entrance. — (b) Signs shall be posted stating that no hazardous or liquid waste can be received without written permission from the division. — (c) Traffic signs or markers shall be provided as necessary to pro- mote an orderly traffic pattern to and from the discharge area and to maintain efficient operating conditions. (10) SAFETY REQUIREMENTS (a) Open burning of solid waste is prohibited. — (b) Equipment shall be provided to control accidental fires or arrangements shall be made with the local fire protection agency to immediately provide fire -fighting services when needed. (c) Fires that occur at a sanitary landfill shall be reported to the division within 24 hours and a written notification shall be submitted within 15 days. — (d) The removal of solid waste from a sanitary landfill is prohibited unless the owner/operator approves and the removal is not performed on the working face. — (e) Barrels and drums shall not be disposed of unless they are empty and perforated sufficiently to ensure that no liquid or hazard- ous waste is contained therein. (11) WASTE ACCEPTANCE AND DISPOSAL REQUIREMENTS — (a) A site shall only accept those solid wastes which it is permitted to receive. (b) No hazardous, liquid, or infectious waste shall be accepted or disposed of in a sanitary landfill except as may be approved by the division. (c) Spoiled foods, animal carcasses, abattoir waste, hatchery waste, and other animal waste delivered to the disposal site shall be covered immediately. (d) Asbestos waste that is packaged in accordance with 40 CFR 61, as amended through January 1,1985, may be disposed of separate and apart from other solid wastes at the bottom of the working face or in an area not contiguous with other disposal areas, in either case, in virgin soil. Separate areas shall be clearly marked so that asbestos is not exposed by future land -disturbing activi- ties. The waste shall be covered immediately with soil in a manner that will not cause airborne conditions. Copies of 40 CFR 61 may be obtained and inspected at the Solid and Hazard- ous Waste Management Branch, Division of Health Services, P. O. Box 2091, Raleigh, NC, 27602. (12) MISCELLANEOUS REQUIREMENTS (a) Effective vector control measures shall be applied to control flies, rodents, and other insects or vermin when necessary. (b) Appropriate methods such as fencing and diking shall be pro- vided within the area to confine solid waste subject to be blown by the wind. At the conclusion of each day of operation, all windblown material resulting from the operation shall be col- lected and returned to the area by the owner or operator. DATE: NAME: - -- --- Solid and Hazardous Waste Management Branch DHS 1709 (Revised 4/85) Solid & Hazardous Waste Management Branch (Review 4/86) (white — Raleigh Office yellow — Facility green — Preparer)