Loading...
HomeMy WebLinkAbout5001_ROSCANS_1985(� op P- Weather Conditions N.C. DEPARTMENT OF HUMAN RES ®URCES DIVISION OF HEALTH SERVI_4C: ES INSPECTION FORM FOR SANITARY L^NDFILLS Name of Sir, Location Signa SIR: An in Permit Number County ? e of Person (s) Receiving R spectivn or your land disposal notified of the violations if site has been __� sport made this date an y, e---L marked below with and yQu are 1. PLAN REQUIREMENTS _a cross (X)• 6. ACCESS Site plan approved Attendant Construction plans approved on duty � Plans being followed Access controls A11 weather road 2• SPREADING & COMPACTING Dust - controlled Waste restricted to the BURNING smallest area practicable Waste properly compacted Evidence of burning 3. COVER REQUIREMENTS control equipment Six inches daily cover available 8• SPECIAL WASTES Two foot final cover Spoiled f°od, animal One foot intermediate cover abattoir carcasses, e bat toir waste , hatchery covered waste, immediately 4. DRAINAGE CONTROLLED 9• UNAUTHORIZED WASTES On --site erosion ACCEPTED WRITTEN PERMISSION WITHOUT Off -site siltation Type Erosion control devices Seeding of completed areas Temporary seeding 10. VECTOR CONTROL S• WATER PROTECTION Effective control measures Off -site leaching 11. MISCELLANEOUS Waste placed in water Blowing material Surface water impounded Proper controlled signs posted Monitoring wells installed REMARKS: / /'I AL •fir DATE NAME c I'd & Hazardous Waste Management Branch Solid & Hazardous Waste Management Branch N. C. DEPARTMENT OF HUMAN RESOURCES DIVISION OF HEALTH SERVICES STATE LABORATORY OF PUBLIC HEALTH P. 0. BOX 28047 - 306 N. WILMINGTON ST., RALEIGH 27611 Site Number �b t?0,000DQDQl Field Sample Number C J wc�sSite cwl GoL) - - - Name of Site &r—,V �1�ta/ Nl� %�cll�tr51f1 Cif eaAIdlw/ocation S R 1336 � Ctu�IOUJ�ey, �/C Collected By n,e$ �F-• ph#CtSID# )� Date Collected 3/27f /3.5 Time 30,P✓/ Type of Sample: Environmental Concentrate Comments G oundwater Solid /�,UNUf1L L»1N,1/ 101?-nQ1r1yr Srhf&}/ :519mPGF rface Water L Liquid _Soil Sludge %/1� Sft//IrIE 1�� �E�yfP-- is ' Pi>' 7. SO,• _Other Other (_U/�f D= 3 J TNnRr_Anrrr PT PMTCTDV Extractables Total Parameter Results mg/1 Parameter Results mg/l Parameter Results mg/1 Arsenic __I%Arsenic <r< D l eiChloride S' _ Barium _LBarium o (.-,Conductivity — Cadmium Cadmium < d', - (/Copper �;_ < ;, C' Chromium/Chromium Fluoride — Lead r/Lead 'ron — Mercury Mercury <o .00cj�-\ ✓Manganese 3 Selenium�lenium < p, Jp Nitrate — Silver _Silver -�c�, o i H -� _ _ � /Sulfates i/ TD S_ — _ :ZTOC ORGANIC CHEMISTRY Parameter. Results mg/1 Parameter ResultsParameter Results mg/1 _ Endrin Toxaphene PCB's _ Lindane _ 2,4-D _ Petroleum _ Methoxychlor _ _ 2,4,5-TP(Silvex) _ EDB _ TOX MICROBIOLOGY RADIOCHEMISTRY Parameter Parameter Results PCi 1 _ (MF) (MPN) Coliform Colonies/100mis Coliform Colonies/100mis _Gross Alpha Gross Beta Date Received Date Extracted Reported By DHS 3191 (Revised 2/84) Solid and Hazardous Waste APR 10 RM- 2a _BASTE I Date Reported Date Analyzed Lab Number Weather Conditions N.C. DEPARTMENT OF HUMAN RESOURCES Permit Number DIVISION OF HEALTH SERVICES n / INSPECTION FORM FOR SANITARY LANDFILLS Name of Site _-_- County a Location Signature of Person(s) Receiving Report SIR: An inspection of your land disposal site has been made this date and you are notified of the violations, if any, marked below with a cross (X). 1. PLAN REQUIREMENTS 6. ACCESS Site plan approved Attendant on duty Construction plans approved Access controls Plans being followed All weather road 2. SPREADING & COMPACTING Dust controlled Waste restricted to the smallest area practicable Waste properly compacted 3. COVER REQUIREMENTS Six inches daily cover Two foot final cover One foot intermediate cover 4. DRAINAGE CONTROLLED On -site erosion Off -site siltation Erosion control devices Seeding of completed areas Temporary seeding BURNING Evidence of burning Fire control equipment available 8. SPECIAL WASTES Spoiled food, animal carcasses, abattoir waste, hatchery waste, etc., covered immediately 9. UNAUTHORIZED WASTES ACCEPTED WITHOUT WRITTEN PERMISSION Type 10. VECTOR CONTROL Effective control measures 5. WATER PROTECTION Off -site leaching 11. Waste placed in water Surface water impounded Fi-if 5tOPC Monitoring wells installedl"OLA) �nR� REMARKS: MISCELLANEOUS Blowing material controlled Proper signs posted DATE ,.L(�X5 NAME Solid & Hazardous Waste Management Branch DHS FORM 1709 (7/82) Solid & Hazardous Waste Management Branch Ronald H. Levine, M.D., M.P.H. STATE HEALTH DIRECTOR DIVISION OF HEALTH SERVICES WESTERN REGIONAL OFFICE Building 3 Black Mountain, N.C. 28711 (704) 669-3349 TO: Julian Foscue Area Supervisor FROLI: James Patterson Waste Management Specialist January 17, 1985 PE: 1. Closeout of Jackson County Landfill at Cullowhee 2. Approval of Newly Developed Landfill Area to be Used by Western Carolina University 1. On Thursday, January 1, 1985, I met with Albert Foster (WCU), Herb Vogel (WCU), and Mike Borrkshire (Butler Associates) concerning the closure of the Old Cullowhee Landfill and the approval of a newly developed landfill area to be used solely by Western Carolina University. Concerning the closure of the old landfill area, my findings were that the greater portion of the landfill area did not have adequate cover. The soil depths over the landfill rnaged from 6" to 24". I recommended more extensive borings by the county and ultimately at least 2' soil cover over the entire landfill area. The edge of the dike (photo enclosed) revealed a large amount of exposed brush. Since the face of the dike is almost '-vertical in nature, cover would be impractical. Sediment basins have been installed on both sides of the old landfill area (see photo). The basin areas and slopes have been seeded and now have a good stand of grass. 2. A dike has been constructed around a portion of the new landfill area (photo enclosed). There is a spring on the back side of the dike. I reccomended some additional trenches of the area below the spring after discussing the presence of the spring with Gordon Layton. A large sediment basin has been constructed on the new area and the area around this basin has been seeded and grass is in place. The University's plan was to start placing garbage in the landfill on January 10, 1985. If further information is needed, please advise. JEP/dgh Enclosures James. G. Hart' Phillip J. Kirk, Jr. STATE Or NORTH CAROLINA /DEPAR10-ErJT Oc , UU --Atr RESOURCES GOVERNOR SECRETARY G � oar �,�►-C� — C.�.?� a�,�a� <., �xp.�tme.,�,-1 bF�Sin %opJ (veu) �ju�rid'P.ov+'i' �+l1e nl N iilrP')wcef) —Cizl�(��1 w I Uw%Le / �/o � Fy