HomeMy WebLinkAbout3606_INSP_20210909FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
X
LCID
YW
Transfer
Compost
SLAS
COUNTY: Gaston
MSWLF
PERMIT NO.: 36-06
Closed
xxw
white
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
TireT&P
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: 9/9/2021
FACILITY NAME AND ADDRESS:
Gaston County Landfill
3155 Philadelphia Church Road
Dallas, NC 28034
Date of Last Inspection: 8/16/2021
GPS COORDINATES (decimal degrees): Lat.: 35.3887
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Ray Maxwell, Gaston Co. Public Works Director
Telephone: (704) 922-0267
Email address: rmaxwellggastongov.com
Name: Barry Cloninger, Landfill Administrator
Telephone: (704) 922-0267
Email address: barry.cloningerggastongov.com
Name: Marcie Smith, Solid Waste & Recycling Administrator
Telephone: (704) 922-0267
Email address: Marcie. smithAag stongov.com
FACILITY CONTACT ADDRESS:
Same as above
Long.:-81.17237
PARTICIPANTS:
Barry Cloninger, Landfill Administrator
Kim Sue, NCDEQ — Environmental Senior Specialist — Solid Waste Section
STATUS OF PERMIT:
Current — Approved May 3, 2017 (DIN 27480) Life of Site
Operations Plan — Approved November 1, 2016 (DIN 26770)
PURPOSE OF SITE VISIT:
Operational/Partial Inspection
STATUS OF PAST NOTED VIOLATIONS:
1. RESOLVED: 15A NCAC 13B .1626(2)(c): cited for failure to ensure a minimum of one foot of intermediate cover
is maintained on areas which will not have additional waste placed on them for 12 months or more, but where final
termination of disposal operations has not occurred. Ms. Smith stated that Mr. Cloninger applied 4,000 lbs. of
fertilizer and 1,200 lbs. of seed mixture (fescue, millet and rye) on the entire slope. She provided photographs of
the area on September 6, 2021. During the inspection of the western side slope of Unit II, Phase 2 adequate
intermediate cover was observed. Therefore, this violation is considered resolved.
Page 1 of 4
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
BEFORE: Rills and exposed waste observed on the western side slope of Unit II, Phase 2. Photos taken by Kim
Sue 8/16/2021.
AFTER: View of the western side slope of Unit II, Phase 2 with intermediate cover after fertilizer and seed mixture
had been applied. Photos taken by Barry Cloninger 9/6/2021.
Page 2 of 4
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
AFTER: View of the western side slope of Unit II,
Phase 2 with intermediate cover after fertilizer and seed
mixture had been applied. Photos taken by Kim Sue
9/9/2021.
OBSERVED VIOLATIONS:
None
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
ADDITIONAL COMMENTS
1. Facility staff began staging dirt on Unit II, Phase 2 on August 18, 2021 in preparation for applying intermediate
cover. On August 26, 2021 Ms. Smith provided photos showing the intermediate cover was being applied, repairing
all the erosion rills and covering the exposed waste.
2. The slopes appeared to be stable. Mr. Cloninger explained after cover soil had been tracked in well, he had applied
fertilizer and seed with equipment that raked it in to assist in germination.
Page 3 of 4
FACILITY COMPLIANCE INSPECTION REPORT
20 Division of Waste Management
P-W Solid Waste Section
Please contact me if you have any questions or concerns regarding this inspection report.
DN: cn=Kim ee, Kim Sue
DN: cn=Kim Sue, —Division of Waste
Management, ou=Solid Waste Section,
` ...�..�,� email=kimsue@ncdenr.gov, c=US
Date: 2021.09.1014:30:06 -04'00'
Kim Sue
Environmental Senior Specialist
Regional Representative
Phone: (704) 235-2163
Emailed to: Ray Maxwell
X
Email
Hand delivery
US Mail
Certified No. 1J
9/10/2021
Copies: Deb Aja, Western District Supervisor - Solid Waste Section
Jordan Russ, E.I., Engineering Project Manager — Solid Waste Section
Barry Cloninger, Gaston County Landfill Administrator
Marcie Smith, Gaston County Solid Waste & Recycling Administrator
Page 4 of 4