Loading...
HomeMy WebLinkAboutCOMPOST9505_INSP_20180829FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 2 UNIT TYPE: Lined MSWLF LCID YW Transfer Compost X SLAS COUNTY: Watauga Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 9505-COMPOST CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: 8/29/2018 Date of Last Inspection: 11/2/2017 FACILITY NAME AND ADDRESS: Triple T Pumping 795 Troy Norris Road Boone, NC 28607 GPS COORDINATES: N: 36.28566° W: 81.64509° FACILITY CONTACT NAME AND PHONE NUMBER: Name: Mike Garlock and Kim Pierson Telephone: (828) 262-5745 Email address: tripletpumping@bellsouth.net FACILITY CONTACT ADDRESS: 1372 N.C. Highway 194 North Boone, NC 28607 PARTICIPANTS: Troy Harrison, Compost & Land Application Branch Eddie Jones, Triple T Pumping STATUS OF PERMIT: Active Issued: July 30, 2012 Expires: July 30, 2017* *Renewal request submitted to Tony Gallagher via e-mail on 4/19/2017 PURPOSE OF SITE VISIT: Routine Inspection STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: N/A The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 2 ADDITIONAL COMMENTS 1. The facility is a Small Type III Solid Waste Compost Facility, which was operated as Composting Pilot Project (SWCD-95-01) prior to the issuance of the permit. The compost facility is operated to compost dewatered septage, including and grease septage. 2. The facility is at the same location as a permitted Septage Detention and Treatment Facility (Permit SDTF-95-01). The two facilities share the same entrance/gate and access roads. 3. Active composting is not being done at this time and there was no compost in the curing bays. According to the company, no composting is currently being done at this time. De-watered septage (including grease septage) is mixed with wood chips and temporarily stored on a pile before final disposal at the Foothills Landfill (NC Solid Waste Permit No. 14-03). 4. Leachate is still being generated from the storage pile even though composting is not being done. No leachate was observed leaving the area. The leachate collection and pumping system must be kept in good working order even if no compost is being produced. 5. The access road was well maintained with a locked gate. A “NO TRESPASSING” sign was posted at the site entrance. 6. Facility setbacks were maintained from exterior property lines. No changes were observed compared to the previous inspection regarding setbacks. The Septage Detention and Treatment Facility and the compost facility operate on two adjoining properties owned by the each of the permit holders. The property line was addressed in the original permitting action. 7. The 2017-2018 facility annual report was received by the Division on August 3, 2018. Please contact me if you have any questions or concerns regarding this inspection report. _______________________________________ Phone: 828-296-4701 Troy Harrison Environmental Senior Specialist Regional Representative Sent on: 9/7/2018 X Email Hand delivery US Mail Certified No. Copies: Donna Wilson, NC Solid Waste Section Solid Waste Files