Loading...
HomeMy WebLinkAbout4703-LCID-2020_INSP_20210413FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 1 of 4 UNIT TYPE: Lined MSWLF LCID X YW Transfer Compost SLAS COUNTY: Hoke Closed MSWLF HHW White goods Incin T&P FIRM PERMIT NO.: 4703-LCID-2020 CDLF Tire T&P / Collection Tire Monofill Industrial Landfill DEMO SDTF FILE TYPE: COMPLIANCE Date of Site Inspection: April 13, 2021 Date of Last Inspection: January 13, 2021 FACILITY NAME AND ADDRESS: 401 Sand LCID Landfill Doc Brown Rd, Raeford, NC 28376 GPS COORDINATES: Lat: 35.034910 Long: -79.173166 FACILITY CONTACT NAME AND PHONE NUMBER: Elliot Lindsay, 910-366-0261 Duncan Parker email – duncanparkersgg@yahoo.com FACILITY CONTACT ADDRESS: Mr. Elliot Lindsay 3029 Fayetteville Rd, Raeford, NC 28376 PARTICIPANTS: David Powell, NC DEQ, Solid Waste Section Melissa Joyner, NC DEQ, DEMLR Elliot Lindsay, L&D Landfill - 401 Sand Co. Duncan Parker, L&D Landfill - 401 Sand Co. Josh Byrd, L&D Landfill - 401 Sand Co STATUS OF PERMIT: Permit issued September 3, 2020; Expires September 3, 2025. PURPOSE OF SITE VISIT: Pre Operation Inspection Follow Up STATUS OF PAST NOTED VIOLATIONS: N/A OBSERVED VIOLATIONS: NA The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit, or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 2 of 4 ADDITIONAL COMMENTS 1. DEMLR’s Melissa Joyner and David Powell, with the Section, inspected the new LCID for Pre Operating conditions. Currently site has 4 Edge of Waste (EOW) markers, and erosion fence installed. Only 2 acres are prepared for operation out of the 5 acres. If this facility wishes to operate in phases or cells, it should be in the approved plans/application. Otherwise facility should be operated as designed. This should be done before Pre Operational Inspection. 2. Facility is in two parts. Refer to picture above in #1. On left is the approximately 3 acres of higher elevation and the right area, lower elevation, is surrounded by erosion control fence and is the 2-acre area that the owners have prepared for disposal. An all-weather road goes through center of this site and is to the left of this view in the picture, running away from camera. Owners indicate the idea is to allow trucks to back up to the edge of this road, along the lower elevation 2-acre area, and dump over side, then compact and cover then slope. Waste should be compacted as densely as possible and covered with soil. Building the waste and cover correctly should reduce the potential for fires and sinkholes in future. Dumping off the “Cliff” of the high elevation soil into the lower, may not be the best procedure for dumpers. 3. Updated AS BUILT Map/Drawing were provided to the Section, and now shows the road for this facility. Good job. 4. Section staff didn’t notice if sign was updated yet but if not should be compliant with permit, which refers to the rule. Signage requirements are 15A NCAC 13B .0566. (14) - A sign shall be posted at the site entrance showing the site contact's name and phone number, the permit number, emergency contact information, and the waste types accepted for disposal at the site. This should be done before final Pre Operational Inspection. FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 3 of 4 5. Operator has received DEMLR bond, so permit should be close to follow once 401 Sand follows Ms. Joyner instructions and fill out request for Certificate of Coverage she sent via email after inspection. 6. Ms. Joyner discussed unused areas needed vegetative cover along with silt fence. Lower elevation 2-acre area has silt fence but it was recommended that a second silt fence be installed in low areas. They should also be installed according to approved SECP/rules. If adjustments need to be made, then update the plan/documentation. This should be done before Pre Operational Inspection. 7. Outfalls were having some issues and eroding on inside of silt fence. Erosion control measures, structures or devices shall be utilized to prevent silt from leaving the site and prevent on-site erosion, and shall comply with 15A NCAC 04 (15A NCAC 13B .0566 (5)). Discussions with Mr. Parker and Ms. Joyner, determined the northern outfalls needed repair. Also, an outlet should be added to the silt fence around the center on the east fence. This should be done before Pre Operational Inspection. Northern outfall needing repair FACILITY COMPLIANCE INSPECTION REPORT Division of Waste Management Solid Waste Section Page 4 of 4 Northern silt fence eroding on inside. 8. Ensure that during all development, operation and closure activities, side slopes do not exceed 3:1 NCAC 13B .0566. (2) Solid waste in the landfill shall be compacted. Slopes shall not exceed a ratio of three horizontal to one vertical at any time. 9. The lower elevation area of 2 acres has been graded and sloped well to shed storm water to the erosion control structures. Be sure to maintain this once facility is in operation. 10. Operator should repair and develop all aspects of the facility according to approved plans, have approved mining permit in hand, and made any adjustments to these documents that are needed before requesting a Pre Operation Inspection from the Section. Facility cannot accept waste until these steps have been completed and a Pre Operation Inspection is completed by Section staff confirming. Communicate with Section staff, when ready, for a final check or Pre Operational Inspection. Please contact me if you have any questions or concerns regarding this inspection report. ________________________________________ Phone: 910-433-3350 _ David Powell Environmental Senior Specialist Regional Representative Sent on: 4/23/2021 X Email Hand delivery US Mail Certified No. [ _] Copies: Drew Hammonds, Eastern District Supervisor - Solid Waste Section Ming Chao, Permitting Engineer – Solid Waste Section Melissa Joyner, Environmental Specialist - DEMLR