HomeMy WebLinkAbout3426_INSP_20210312NORTH CAROLINAD_E Q��
OepeNnenf of Envlronmmbl 0uel�
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
UNIT TYPE:
Lined
LCID
X
YW
Transfer
Compost
SLAS
COUNTY: Forsyth
MSWLF
PERMIT NO.: 3426-LCID-2020
Closed
HHW
White
Incin
T&P
FIRM
MSWLF
goods
FILE TYPE: COMPLIANCE
CDLF
Tire T&P/
Tire
Industrial
DEMO
SDTF
Collection
Monofill
Landfill
Date of Site Inspection: March 12, 2021 Date of Last Inspection: February 3, 2021
FACILITY NAME AND ADDRESS:
Union Cross Land Development LCID Landfill
7301 Watkins Ford Road
Kernersville, NC 27284
GPS COORDINATES (decimal degrees): Lat.: 36.043868'
FACILITY CONTACT NAME AND PHONE NUMBER:
Name: Tanner Boyles, Operator
Telephone: 336-669-7808 (mobile)
Email address: tannerboyles l (a)yahoo.com
FACILITY CONTACT ADDRESS:
Union Cross Land Development LCID Landfill
Tanner Boyles, Operator
7301 Watkins Ford Road
Kernersville, NC 27284
PARTICIPANTS:
Tanner Boyles, Operator — Union Cross Land Development LCID
Susan Heim, Environmental Senior Specialist — Solid Waste Section
STATUS OF PERMIT:
Approval of Notified LCID Landfill (NI 110) issued: 6/11/2019.
Permit to Operate LCID Landfill issued: December 21, 2020.
Permit to Operate expires: December 21, 2025.
PURPOSE OF SITE VISIT:
Partial Inspection
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
None
Long.:-80.099191 °
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
Page 1 of 2
NORTH CAROLINAD_E Q��
OepeNnenf of Envlronmmbl 0w1�
ADDITIONAL COMMENTS:
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
1. The facility is permitted as an LCID landfill, a small Type 1 compost facility, and a treatment and processing
unit for wood waste and used concrete. The newly permitted Phase 2 of the LCID landfill began accepting
waste on January 13, 2021. This inspection was conducted to inspect the compost facility and wood waste
treatment and processing unit prior to the start of operations.
2. The Wood Recycling/Processing Area is approximately 30' wide and 420' long, and is located directly south of
the LCID landfill unit. The area had been prepared with crushed stone and concrete that was compacted into a
stable base, then covered with a layer of mulch to ensure separation between the blades of the grinder and the
compacted stone base. This treatment and processing area was inspected during the January 13, 2021 inspection
and found to be ready to begin operations at that time.
3. The 100' x 200' areas to be used for mulch storage and compost operations are located south of the berm
designed to separate them from the wood waste treatment and processing area. The mulch storage area is
situated in the .5-acre space closest to the entry roadway, and the compost area is adjacent to it, to the west.
Both the mulch storage and compost areas had been surveyed and staked out in the approved location. Survey
stakes were present at the time of the inspection. Mr. Boyles stated that he had scraped off the vegetative cover,
then spread layers of clay that he compacted into a solid, stable pad suitable for conducting these wood waste
operations.
4. The mulch storage pad was inspected and found to be ready to accept material. Mr. Boyles was given verbal
permission to begin using the Mulch Storage Area.
5. The operations pad for the compost area was also inspected. However, a drainage pipe designed to direct
surface water north along the west side of the facility to the sediment basin was to be located at the western end
of the pad and had not yet been installed. Mr. Boyles stated that he hoped to have the pipe installation
completed and the end of the pad repaired, compacted and ready for inspection within the next week. Please
contact Susan Heim at 336-776-9672 to schedule a pre -operations inspection prior to beginning compost
operations.
Please contact me if you have any questions or concerns regarding this inspection report.
Digitally signed by Susan Heim
DN: cn=Susan Heim, o=Solid
Waste Section,h,Field
Operations Branch,
email=susan.heim@ncdenr.go
v, c=US
Date: 2021.03.17 14:37:39
-04'00'
Phone: 336-776-9672
Susan Heim
Environmental Senior Specialist
Regional Representative
Sent on: March 17, 2021 to
X
Email
Hand delivery
US Mail
Certified No. [ ]
Tanner Boyles.
Copies: Deb Aja, Western District Supervisor — Solid Waste Section
Ming-Tai Chao, Permitting Engineer — Solid Waste Section
Scotty Woods, Environmental Specialist — Forsyth County
Page 2 of 2