Loading...
HomeMy WebLinkAbout6301_MooreCo_Cell6_FactSheet_FID1405970_20200527 FACT SHEET SOLID WASTE PERMIT NUMBER 6301-CDLF-1992 FACILITY: Moore County Construction and Demolition Debris Landfill (CDLF) COUNTY: Moore CITY: Carthage, North Carolina OWNER & OPERATOR: Moore County P.O. Box 1927, Carthage N.C. 28357 FILE ID NO. (FID): XXX DESCRIPTION Moore County requested a permit to construct a new Cell 6 immediately adjacent to the existing Moore County CDLF. The existing CDLF consists of a five (5)-phase waste disposal area encompassing 21.7 acres with a gross capacity of 1,870,000 cubic yards. According to the permit application, the construction of the Cell 6 of the landfill will include: • A 5.6-acre lateral expansion (Phase 6) which is not included in the original landfill disposal boundary but is within the landfill property boundary. This expansion will increase the landfill waste boundary to 27.3 acres. • Vertical expansions (Phases 7 & 8) over Phases 5 and 6 of the landfill. The expansions will not increase the 27.3-acre waste boundary but will increase the approved landfill final grade to approximately 475 feet above mean sea level. • The combined lateral and vertical expansions will increase the landfill gross capacity to 2,500,000 cubic yards. Per North Carolina General Statute 130A-294(a3)(1)b(ii) and (1)(c), the proposed lateral expansion and increase of 10 percent or more in the quantity of solid waste to be disposed of in an existing sanitary landfill requires a new permit. This draft permit reflects the request made by Moore County. This draft permit doesn’t change the landfill service area and characteristics of the landfill’s acceptable waste stream that have been approved in the previous permit. Moore County owns and operates this CDLF which is located at 456 Turning Leaf Way in Aberdeen, North Carolina. The CDLF is within the 215-acre landfill property which is also occupied by a closed MSWLF unit, an active MSW transfer station, and other non-disposal waste management units. The landfill service area is Moore County including all municipalities within the county. Moore County CDLF Landfill 6301-CDLF-1992 ##, 2020 FID XXX Page 2 of 2 The Division of Waste Management has determined that the proposed facility plan, engineering plan, operations plan, construction quality assurance plan, closure and post- closure plan, water quality monitoring plan, and documentation of public meetings and local government approval satisfies the requirements of the Solid Waste Management Rules as codified in 15A NCAC 13B .0531 through .0547. The division has prepared Draft Solid Waste Permit 6301-CDLF-1992 to approve the request of new Cell 6 construction and new landfill gross capacity. This draft permit is now available for public review and comment. PERMIT STRUCTURE The permit is divided into two parts, the Permit Approval to Construct (PTC) and the Permit Approval to Operate (PTO). The PTC approves the construction of Cell 6 (including Phases 6, 7 and 8) of the Moore County CDLF. The PTO approves the waste disposal activities at existing Phases 1 through 5 (Cells 1 through 5) of the landfill. The permit consists of a list of approved documents and specific conditions for construction, operation and monitoring of the landfill unit. A copy of the draft permit is attached. PUBLIC COMMENT PERIOD North Carolina Solid Waste Management Rules require that the public be given an opportunity to comment on a draft permit for a municipal solid waste management facility. This 45-day comment period begins on ##, 2020 and ends on ##, 2020. The draft permit and related documents for issuance of this draft permit are available for review by appointment from 9 a.m. to 4 p.m., Monday-Friday, at the Division of Waste Management at the address provided below, and can also be viewed online at: http://portal.ncdenr.org/web/wm/sw. All data submitted by the applicant is available as part of the administrative record. Persons who wish to provide comments should submit comments in writing by 5 p.m., ##, 2020, to the address below. Please include the permit number. All comments received within the 45-day period will be considered in making the final determinations regarding the permit. A final permit decision and response to comments will be prepared after the conclusion of the comment period. PUBLIC HEARING A public hearings has been scheduled…. NOTIFICATION Persons interested in receiving notification of the final permit decision should make their request known in writing to the division contact listed below. DIVISION CONTACT North Carolina Division of Waste Management Solid Waste Section Attention: Ming-Tai Chao, P.E. Moore County CDLF Landfill 6301-CDLF-1992 ##, 2020 FID XXX Page 3 of 2 1646 Mail Service Center Raleigh, N.C. 27699-1646 Phone Number: (919) 707-8251 Email: ming.chao@ncdenr.org