HomeMy WebLinkAbout1119_DukeAsheville_APPROVAL_AbandonWellsRequest_FID1389898_20200214Werner, Elizabeth
From: Werner, Elizabeth
Sent: Friday, February 14, 2020 2:46 PM
To: Allison, Bryson
Cc: Frost, Larry; Campbell, Ted; Giachini, David; Hardin, Tyler; Toepfer, John R; Sullivan, Ed M; Duperier,
Henry A; Glass, Seth Gregory; Nordgren, Scott R.
Subject: RE: [External] Asheville Landfill - Well Abandonments
Hi Bryson,
The Solid Waste Section sees no issue with abandoning these wells (MW-25, MW-26, MW-17, LA-PZ-01R, and LA-PZ-02)
before the pre -construction meeting. The facility shall submit well abandonment records (Form GW-30) upon
completion of abandoning the wells. Please don't hesitate to contact me with any questions or concerns.
Sincerely,
Elizabeth
n�rMYr ae fr�w��� auN�h'
Ehmb _ Werner
Ilia,rogeologrst
Division of Waste Afanagement. Solid (rile Section
North Carolina Depar=ent ofEnvuonment Quality
919_707.3253
e izabath_ix-erner cdear_gov
Emod caTespcndence to and from this address is subject Ao the
No4h arz;dm Pbbkc Records Law and may be dwk�sed to third parties.
From: Allison, Bryson <Bryson.Allison@duke-energy.com>
Sent: Thursday, February 13, 2020 9:28 AM
To: Werner, Elizabeth <elizabeth.werner@ncdenr.gov>
Cc: Frost, Larry <larry.frost@ncdenr.gov>; Campbell, Ted <ted.campbell@ncdenr.gov>; Giachini, David
<david.giachini@ncdenr.gov>; Hardin, Tyler <Tyler.Hardin @duke-energy.com>; Toepfer, John R <John.Toepfer@duke-
energy.com>; Sullivan, Ed M <Ed.Sullivan@duke-energy.com>; Duperier, Henry A <Henry.Duperier@duke-energy.com>;
Glass, Seth Gregory <Seth.Glass@duke-energy.com>; Nordgren, Scott R. <Scott.Nordgren@duke-energy.com>
Subject: [External] Asheville Landfill - Well Abandonments
gmuterna I email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to
c. ov
Elizabeth,
With receipt of the Asheville CCR Landfill (1119-INDUS) Permit to Construct, we will be abandoning the wells and
piezometers listed below that are located within the construction activities footprint, in accordance with 15A NCAC 2C
.0113(b)(1). A figure is also attached circling the referenced wells.
• MW-25
• MW-26
• MW-27
• LA-PZ-01R
• LA-PZ-02
Is there any issue with abandoning these wells prior to the pre -construction meeting to be held with NCDEQ per permit
requirement Part 1-3 in Attachment 2?
I have also cc'ed Ted Campbell with the DWR — Asheville Regional Office as confirmation that no wells will be abandoned
that are included as part of the CAMA Interim Monitoring Program. Three of the wells/piezometers installed in the
landfill area have duplicate names to CAMA-IMP wells (MW-25, MW-26, and MW-27), but these are not the same wells
that are identified in the IMP.
Thanks, Bryson
L. 3 vyso-w Sheetk AU4&Yv
Engineer III - EHS CCP Waste & Groundwater Programs
0:980-373-6636 C: 706-910-9638
bryson.allison@duke-energy.com