Loading...
HomeMy WebLinkAbout4117_A1SandrockCDLF_ LeachateReleaseSamplePlan_FID1286112_20190307Response to Comments – March 7, 2019 Leachate Release Sample Plan A-1 Sandrock Construction & Demolition Debris (C&D) Landfill On March 4, 2019, the North Carolina Department of Environmental Quality provided comments to the A-1 Sandrock Leachate Release Sample Plan referenced above. The following paragraphs summarize the response prepared on behalf of A-1 Sandrock C&D Landfill and are incorporated by reference below into the sample plan. Comment #1: The soil sample SS-2 is located downstream of the CMP discharge point within SB1 (stormwater retention pond); therefore, it is the incorrect location for a background sample location. A soil sample should be collected in the upper slope area of SB1, by the haul road, where the earthen material is likely not impacted by the leachate seepage. I believe the soil used for the SB1 construction comes from the on-site borrow. Therefore, there is likely no issue for soil type variation. Response #1: Based on a telephone conversation with Ming Chao and Christine Ritter of NCDEQ on March 6, 2019, the background sample SS-2 will be collected in the upper slope of the dike and on the eastern side of SB1. The sample will be collected at an elevation greater than the elevation of the CMP discharge pipe so that the sample is representative of soil not impacted by leachate. Comment #2: The samples SS-3 through SS-7 should be collected in the ditch center and shall be collected from the down-stream toward upstream direction to avoid cross contamination. Response #2: Samples SS-3 through SS-7 will be collected within the center of the drainage ditch and will be collected in the manner from downstream to upstream (i.e., west to east) to prevent cross contamination. Comment #3: The samples SS-8 through SS-10 should be collected at the area with standing water or at the brim of SB1. Response #3: Samples SS-8 through SS-10 will be collected in areas with standing water or at the brim of SB1. Comment #4: The sampling tools must be the ones used for sediment sample collection, not hand trowels nor ordinary augers but tubing type augers that can be driven into the pond and retrieve sediment samples for testing, some has a liner/inner-tube (Teflon lined) inside the auger. If VOCs will be tested, the discrete sample from the grade to top 6-inch at each location can be cut out from the pipe/tube and capped from both ends. The proposed sample depth from 1 to 2 feet can be used for backup samples in case the soil remediation depth is required. Response #4: One sediment core will be collected at each proposed sediment sample location using a 2 foot long, 2 inch diameter Wildco® Hand Core Sediment Sampler with disposable core liners. The core liner will be replaced after each sample location to prevent cross contamination. After core collection, the core liner will be removed from the core apparatus and cut longitudinally to expose the sediment. Wood will collect the VOC samples within the core prior to cutting the core sleeve using a Terra Core ® sampler provided by the Laboratory and specifically used to collect VOC soil samples. Following the collection of VOC soil samples, the mini-core is transferred to sample bottles containing a preservative. Discrete sediment samples will be collected from within the top 0.5 feet of the core where impacts from leachate is most likely and will be submitted for laboratory analysis within sample containers provided by the laboratory. An additional, backup discrete sediment sample will be collected within the 1 to 2 feet portion of the core and will be placed on hold for laboratory analysis to prevent an additional mobilization in the case evaluation of the soil remediation depth is required for vertical delineation. Laboratory analysis of the backup samples (e.g., 1-2 foot sample depths) is dependent on the analytical results from the sample collected within the top 0.5 feet of the core. Comment #5: To avoid cross contamination, the surface water samples shall be collected first and then collect the sediment samples. Response #5: The surface water samples will be collected first and before any sediment samples to prevent cross contamination. Wood Environment & Infrastructure Solutions, Inc. 4021 Stirrup Creek Drive, Suite 100 Durham, NC 27703 Tel (919) 381-9900 www.woodplc.com February 28, 2019 Ms. Christine Ritter,Hydrogeologist North Carolina Department of Environmental Quality Division of Waste Management, Solid Waste Section 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Reference:LEACHATE RELEASE SAMPLE PLAN A-1 SANDROCK CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL 2091 BISHOP ROAD GREENSBORO, GUILFORD COUNTY, NORTH CAROLINA PERMIT NO.: 4117-CDLF-2008 FID: 1234647 Dear Ms.Ritter: On behalf of A-1 Sandrock, Inc., Wood Environment & Infrastructure Solutions, Inc. (Wood) has prepared this Leachate Release Sample Plan (Sample Plan) for the A-1 Sandrock Construction and Demolition Debris Landfill (the Site), Facility Permit Number 4117-CDLF-2008, located at 2091 Bishop Road, Greensboro, North Carolina. This Sample Plan was prepared in general accordance with 15A NCAC 13B .0542(l)(4) and the North Carolina Solid Waste Section Leachate Release Sampling and Analysis Guidelines. If you have any questions or need additional information, please contact Sheri Knox or Dave Garrett at (919)381-9913. Sincerely, Wood Environment & Infrastructure Solutions, Inc. David Garrett, PE, PG Sheri Knox, PE, PMP® Senior Engineer Associate Engineer cc:Mr.Ronnie Petty –A-1 Sandrock, Inc. Wood Environment & Infrastructure Solutions, Inc. 4021 Stirrup Creek Drive, Suite 100 Durham, NC 27703 Tel (919) 381-9900 www.woodplc.com LEACHATE RELEASE SAMPLE PLAN A-1 SANDROCK CONSTRUCTION AND DEMOLITION DEBRIS LANDFILL 2091 BISHOP ROAD GREENSBORO, GUILFORD COUNTY, NORTH CAROLINA PERMIT NO.: 4117-CDLF-2008 FID: 1234647 Latitude and Longitude:N 35.989408o, W 79.847044o Prepared for: A-1 Sandrock, Inc. 2091 Bishop Road Greensboro, North Carolina 27406 (336) 855-8195 Submitted to: North Carolina Department of Environmental Quality Division of Waste Management, Solid Waste Section 1646 Mail Service Center Raleigh, North Carolina, 27699-1646 Prepared by: Wood Environment & Infrastructure Solutions, Inc. 4021 Stirrup Creek Drive, Suite 100 Durham, North Carolina 27703 February 28,2019 David Garrett, PE, PG Sheri Knox, PE, PMP® Senior Engineer Associate Engineer Leachate Release Sample Plan A-1 Sandrock C&D Landfill Greensboro, North Carolina Wood Environment &Infrastructure Solutions, Inc. Project No.:6468188009 February 28, 2019 Page 1 1.0 BACKGROUND On February 5, 2019,the North Carolina Department of Environmental Quality (NCDEQ) Division of Waste Management (DWM) Solid Waste Section (SWS)performed a comprehensive inspection of the A-1 Sandrock Construction and Demolition Debris Landfill (Site) located at 2091 Bishop Road, Greensboro, Guilford County, North Carolina. Based on site observations, the Facility Compliance Inspection Report was submitted on February 20, 2019 which included the following violation: A-1 Sandrock, Inc. is in violation of 15A NCAC 13B .0542(l)(4) by failing to prevent leachate from leaving the edge of waste in the approximate location where Cell 2A and Cell 2B meet on the west side of the landfill.Stormwater was pumped from the new cell construction along the toe of the slope of Cell 2A, exposing waste. This activity exposed waste, and as pumping activities continued,the stormwater that came in contact with waste was discharged as leachate into the stormwater conveyance ditch. To achieve compliance with 15A NCAC 13B .0542(l)(4), A-1 Sandrock, Inc. must submit a soil sampling plan to NCDEQ. Additional measures may be required upon review of sampling analytical test results. It should be noted that the facility had received heavy rains immediately prior to the facility inspection, which had led to extraneous erosion of temporary soil cover at one observed location, thus uncovering waste at the toe of a slope and exposing runoff that had contacted the waste. At another location near the stormwater pond, severe erosion of a cut slope beneath a culvert exposed what appeared to be a groundwater seam that exhibited a dark color of unknown causes. The facility swiftly took steps to protect surface waters by draining and covering the affected areas with soil, per normal operating protocols. The intent of this sampling is to detect residual effects of leachate exposure within the near surface soils at the two described locations. This Leachate Release Sample Plan (Sample Plan) has been prepared by Wood Environment & Infrastructure Solutions, Inc. (Wood) on behalf of A-1 Sandrock, Inc. The Site is permitted by the NCDEQ DWM under Permit No. 4117-CDLF-2008. As defined by the NCDEQ DWM SWS, the Sample Plan has been prepared to meet the requirements of 15A NCAC 13B .0542(l)(4) and the North Carolina Solid Waste Section Leachate Release Sampling and Analysis Guidelines. Leachate Release Sample Plan A-1 Sandrock C&D Landfill Greensboro, North Carolina Wood Environment & Infrastructure Solutions, Inc. Project No.:6468188009 February 28, 2019 Page 2 2.0 SCOPE OF WORK The following scope of work has been developed in accordance with 15A NCAC 13B .0542(l)(4) and the North Carolina Solid Waste Section Leachate Release Sampling and Analysis Guidelines. Sample collection will include up to ten subsurface soil samples and two surface water samples. 2.1 Subsurface Soil and Surface Water Sampling At least 72 hours in advance of initiating subsurface investigation activities, Wood will contact the North Carolina One-Call System to locate utilities on the Site.Following utility clearance, Wood personnel will mobilize to the Site to perform subsurface soil and surface water sampling. The sampling will be completed at specific and discrete locations to evaluate the potential environmental impacts from the leachate.The proposed sample locations are displayed on Figure 1 and are described as follows: Soil Sample Locations SS-1 and SS-2 will represent background soil concentrations upgradient to the observed leachate discharge points. SS-1 will be located in the drainage ditch (e.g., toe of the slope) to the south/southwest of the phase 3 area and SS-2 will be collected in the stormwater retention pond located to the west of the landfill and approximately 150 to 200 feet north of the CMP pipe (i.e.,possible leachate discharge point)where impacts from the release are not expected to be encountered. Soil samples SS-3 through SS-7 will be collected along an area that extends approximately 200 feet within the drainage ditch at the toe of the slope located to the south of Cell 2B. Dependent on soil availability and gravel distribution, the soil samples SS-3 through SS-7 will be evenly distributed at approximately 40 to 50-foot intervals.However, if field observations suggest the presence of leachate, sample locations will be adjusted accordingly to include those locations. SS-8 will be collected at the location where possible leachate was observed below the CMP pipe during the Site inspection,which is located in the stormwater retention pond to the west of the landfill. Sample locations SS-9 and SS-10 will be collected at approximately 30-foot intervals to the south of the CMP pipe located in the stormwater retention pond. Surface Water Locations SW-1 will be collected within the drainage ditch at the toe of the slope located to the southeast of Cell 2B where surface drainage from within the landfill enters the drainage Leachate Release Sample Plan A-1 Sandrock C&D Landfill Greensboro, North Carolina Wood Environment & Infrastructure Solutions, Inc. Project No.:6468188009 February 28, 2019 Page 3 ditch if any water is encountered in the sampling locations SW-2 will be collected near the location where possible leachate was observed below the CMP pipe during the Site inspection, which is located in the stormwater retention pond to the west of the landfill. Surface water sampling will be conducted only if water is present during the time of sampling.Surface water samples will be collected into laboratory-provided containers via direct submersion by a technician wearing a new pair of nitrile gloves. Discrete subsurface soil samples will be collected at each sample location between one to two feet below ground surface using a hand auger or a digging bar if gravel is encountered. All soil samples will be placed into laboratory-provided containers by a technician wearing a new pair of nitrile gloves and all reusable sampling equipment will be properly decontaminated between sampling locations.Decontamination procedures for digging equipment include a water wash with Liquinox®soap and a triple deionized water rinse between each sampling location. Following soil and surface water sample collection, each sample will be immediately placed into a cooler packed with ice and will be shipped via courier under chain-of-custody protocols to Pace Analytical (Pace), a North Carolina certified laboratory located in Huntersville, North Carolina.Soil and surface water samples will be analyzed for the constituents and methods referred to in Appendix I including volatile organic compounds of the 40 Code of Federal Regulations (CFR) Part 258 along with total phosphorus, sulfate, nitrate, and pH as defined in the North Carolina Solid Waste Section Leachate Release Sampling and Analysis Guidelines. 2.2 Reporting Following sampling activities, Wood will prepare a report in compliance with the North Carolina Solid Waste Section Leachate Release Sampling and Analysis Guidelines to summarize the results and sampling methodology outlined above. Wood will provide the report to NCDEQ within 10 days after the analytical results are received from the laboratory and will include the following: A table of the surface water analytical results compared to the NC 2B Standards if applicable, A table of subsurface soil analytical results compared to the Preliminary Soil Remediation Goals (PSRGs). Both the Residential Health Based and the Protection of Groundwater PSRGs must be met, A map depicting each sample location, Leachate Release Sample Plan A-1 Sandrock C&D Landfill Greensboro, North Carolina Wood Environment & Infrastructure Solutions, Inc. Project No.:6468188009 February 28, 2019 Page 4 The associated laboratory reports from the NC certified laboratory including chain of custody and QA/QC results. A description of sampling methodology,and Conclusions and recommendations. FIGURE !B !B !B !B!B !B !B !B !B !B !(XW !(XW CMP Pipe StormwaterRetention Pond (SB1) CELL 2A CELL 2B PHASE 3 AREA SW-1 SW-2 SS-9 SS-8 SS-2 SS-7 SS-6 SS-5 SS-4 SS-3 SS-1 SS-10Hickory CreekNC Center for Geographic Information & Analysis 0 16080Feet Legend !B Proposed Soil Sample Location !(XW Proposed Surface Water Sample LocationStreets Stream Approximate Cell Boundary Approximate Site Boundary ³ DRAWN BY:CHECKED BY: DATE: PROPOSED SAMPLELOCATION MAP TITLE: PROJECT: CLIENT: SCALE: SITE: \\dhm-fs1\projects\Comm-Ind\Projects\Clients A to F\A-1 Sandrock\6480188087 - new groundwater reporting\GIS\Leachate Sampling A-1 SANDROCK C&D LANDFILL2091 Bishop RoadGreensboro, North Carolina 27406 03/06/2019 D. Young S. Knox 64801880871 " = 80 ' LOCATION: Figure: 1 Wood Environment & Infrastructure Solutions, Inc.4021 Stirrup Creek Drive, Suite 100Durham, NC 27703(919) 381-9900 A-1 SANDROCK, INC.Hickory CreekB IS H O P R D NC Center for Geographic Information &Analysis 1 Chao, Ming-tai From:Chao, Ming-tai Sent:Thursday, March 07, 2019 2:21 PM To:Knox, Sheri; Ritter, Christine Cc:Garrett, David Subject:Re: [External] I forgot to mention Dear Ms. Knox: Yes. You can proceed the sampling task according to the sampling plan. Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties unless the content is exempt by statute or other regulations. From: Knox, Sheri <sheri.knox@woodplc.com> Sent: Thursday, March 7, 2019 2:17 PM To: Chao, Ming-tai; Ritter, Christine Cc: Garrett, David Subject: [External] I forgot to mention CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov I wasn’t planning on revising, but have this email for reference. Can we proceed with work? From: Chao, Ming-tai <ming.chao@ncdenr.gov> Sent: Thursday, March 07, 2019 2:06 PM To: Knox, Sheri <sheri.knox@woodplc.com>; Ritter, Christine <christine.ritter@ncdenr.gov> Cc: Garrett, David <david.garrett2@woodplc.com> Subject: Re: [External] A-1 Sampling Plan Dear Ms. Knox: 2 After reviewing the responses to the 03/04/19 comments, I do not have any comments at this time except one which is about the survey of the sample locations. Should the lab results be negative, the sample location may not be a issue; but if it got a hit, then the sample location will become a reference point. At each sample location, I will suggest that A-1 sample crew drives a wood stake or metal pin tied with survey flag on which the sample ID can be written by a From: Knox, Sheri <sheri.knox@woodplc.com> Sent: Thursday, March 7, 2019 1:20 PM To: Ritter, Christine Cc: Garrett, David; Chao, Ming-tai Subject: RE: [External] A-1 Sampling Plan CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hello, Please see our revised sampling plan. Let us know if you have more comments, or if we can move forward with sample collection. Thanks a lot! Sheri Knox, P.E., PMP Associate Remediation Engineer Direct: 919.381.9913 Office: 919.381.9900 www.woodplc.com From: Ritter, Christine <christine.ritter@ncdenr.gov> Sent: Monday, March 04, 2019 1:19 PM To: Knox, Sheri <sheri.knox@woodplc.com>; ronniepetty@a1sandrockinc.com Cc: Garrett, David <david.garrett2@woodplc.com>; Chao, Ming-tai <ming.chao@ncdenr.gov>; Kirchner, Chuck <chuck.kirchner@ncdenr.gov>; Aja, Deborah <deborah.aja@ncdenr.gov>; Ulishney, Adam <adam.ulishney@ncdenr.gov> Subject: RE: [External] A-1 Sampling Plan In response to the Leachate Sampling Plan submitted by Wood Engineering, I am forwarding Ming Chao’s comments. 3 Please revise the sampling plan to incorporate the following revisions: The SS-2 is located the downstream of the CMP discharge point to the SB 1; therefore, it is the incorrect location for a background sample location. A soil sample should be collected in the upper slope area of SB1, by the haul road, where the earthen material is likely won’t be impacted by the leachate seepage. I believe the soil used for the SB1 construction comes from the on-site borrow. Therefore, there is likely no issue for soil type variation. The SS-3 through SS-7 should be sediment samples in the ditch center, and shall be collected from down- stream toward upstream direction to avoid cross contamination. The SS-8 through SS-10 should be sediment samples collected at the area with standing water or the brim of the SB 1. The sampling tools must be the ones used for sediment sample collection, not hand trowels nor ordinary augers but tubing type auger which can be driven into the pond and retrieve sediment samples for testing, some has a liner/inner-tube (Teflon lined) inside the auger. If VOCs will be tested, the discrete sample from the grade to top 6-inch at each location can be cut out from the pipe/tube and capped from both ends. The proposed sample depth from 1 to 2 feet can be used for backup samples in case the soil remediation depth is required. To avoid cross contamination, the SW samples shall be collected first then collect sediment samples. Please contact me with any questions. 4 From: Knox, Sheri <sheri.knox@woodplc.com> Sent: Thursday, February 28, 2019 4:27 PM To: Ritter, Christine <christine.ritter@ncdenr.gov> Cc: Garrett, David <david.garrett2@woodplc.com> Subject: [External] A-1 Sampling Plan CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Christine, Please see the attached sampling plan for A-1 Leachate Sampling. Please contact us if you have questions or comments. I also wanted to let you know that A-1 will be working with another consultant on implementation now the Assessment Monitoring Work Plan is complete. Thanks again! Sheri Knox, P.E., PMP Associate Remediation Engineer Direct: 919.381.9913 Office: 919.381.9900 www.woodplc.com 5 This message is the property of John Wood Group PLC and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorized use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system. If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@woodplc.com and include “Unsubscribe” in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications. Please click http://www.woodplc.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France. As a recipient of an email from a John Wood Group Plc company, your contact information will be on our systems and we may hold other personal data about you such as identification information, CVs, financial information and information contained in correspondence. For more information on our privacy practices and your data protection rights, please see our privacy notice at https://www.woodplc.com/policies/privacy-notice 1 Chao, Ming-tai From:Chao, Ming-tai Sent:Thursday, March 07, 2019 2:19 PM To:Knox, Sheri; Ritter, Christine Cc:Garrett, David Subject:Re: [External] A-1 Sampling Plan That is acceptable approach. From: Knox, Sheri <sheri.knox@woodplc.com> Sent: Thursday, March 7, 2019 2:15 PM To: Chao, Ming-tai; Ritter, Christine Cc: Garrett, David Subject: RE: [External] A-1 Sampling Plan CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov It is our routine approach to GPS sample locations and we will also flag it. From: Chao, Ming-tai <ming.chao@ncdenr.gov> Sent: Thursday, March 07, 2019 2:06 PM To: Knox, Sheri <sheri.knox@woodplc.com>; Ritter, Christine <christine.ritter@ncdenr.gov> Cc: Garrett, David <david.garrett2@woodplc.com> Subject: Re: [External] A-1 Sampling Plan Dear Ms. Knox: After reviewing the responses to the 03/04/19 comments, I do not have any comments at this time except one which is about the survey of the sample locations. Should the lab results be negative, the sample location may not be a issue; but if it got a hit, then the sample location will become a reference point. At each sample location, I will suggest that A-1 sample crew drives a wood stake or metal pin tied with survey flag on which the sample ID can be written by a From: Knox, Sheri <sheri.knox@woodplc.com> Sent: Thursday, March 7, 2019 1:20 PM To: Ritter, Christine Cc: Garrett, David; Chao, Ming-tai Subject: RE: [External] A-1 Sampling Plan CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov 2 Hello, Please see our revised sampling plan. Let us know if you have more comments, or if we can move forward with sample collection. Thanks a lot! Sheri Knox, P.E., PMP Associate Remediation Engineer Direct: 919.381.9913 Office: 919.381.9900 www.woodplc.com From: Ritter, Christine <christine.ritter@ncdenr.gov> Sent: Monday, March 04, 2019 1:19 PM To: Knox, Sheri <sheri.knox@woodplc.com>; ronniepetty@a1sandrockinc.com Cc: Garrett, David <david.garrett2@woodplc.com>; Chao, Ming-tai <ming.chao@ncdenr.gov>; Kirchner, Chuck <chuck.kirchner@ncdenr.gov>; Aja, Deborah <deborah.aja@ncdenr.gov>; Ulishney, Adam <adam.ulishney@ncdenr.gov> Subject: RE: [External] A-1 Sampling Plan In response to the Leachate Sampling Plan submitted by Wood Engineering, I am forwarding Ming Chao’s comments. Please revise the sampling plan to incorporate the following revisions: The SS-2 is located the downstream of the CMP discharge point to the SB 1; therefore, it is the incorrect location for a background sample location. A soil sample should be collected in the upper slope area of SB1, by the haul road, where the earthen material is likely won’t be impacted by the leachate seepage. I believe the soil used for the SB1 construction comes from the on-site borrow. Therefore, there is likely no issue for soil type variation. The SS-3 through SS-7 should be sediment samples in the ditch center, and shall be collected from down- stream toward upstream direction to avoid cross contamination. The SS-8 through SS-10 should be sediment samples collected at the area with standing water or the brim of the SB 1. The sampling tools must be the ones used for sediment sample collection, not hand trowels nor ordinary augers but tubing type auger which can be driven into the pond and retrieve sediment samples for testing, some has a liner/inner-tube (Teflon lined) inside the auger. If VOCs will be tested, the discrete sample from 3 the grade to top 6-inch at each location can be cut out from the pipe/tube and capped from both ends. The proposed sample depth from 1 to 2 feet can be used for backup samples in case the soil remediation depth is required. To avoid cross contamination, the SW samples shall be collected first then collect sediment samples. Please contact me with any questions. From: Knox, Sheri <sheri.knox@woodplc.com> Sent: Thursday, February 28, 2019 4:27 PM To: Ritter, Christine <christine.ritter@ncdenr.gov> 4 Cc: Garrett, David <david.garrett2@woodplc.com> Subject: [External] A-1 Sampling Plan CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Christine, Please see the attached sampling plan for A-1 Leachate Sampling. Please contact us if you have questions or comments. I also wanted to let you know that A-1 will be working with another consultant on implementation now the Assessment Monitoring Work Plan is complete. Thanks again! Sheri Knox, P.E., PMP Associate Remediation Engineer Direct: 919.381.9913 Office: 919.381.9900 www.woodplc.com This message is the property of John Wood Group PLC and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorized use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system. If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@woodplc.com and include “Unsubscribe” in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications. Please click http://www.woodplc.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France. 5 As a recipient of an email from a John Wood Group Plc company, your contact information will be on our systems and we may hold other personal data about you such as identification information, CVs, financial information and information contained in correspondence. For more information on our privacy practices and your data protection rights, please see our privacy notice at https://www.woodplc.com/policies/privacy-notice 1 Chao, Ming-tai From:Knox, Sheri <sheri.knox@woodplc.com> Sent:Thursday, March 07, 2019 1:20 PM To:Ritter, Christine Cc:Garrett, David; Chao, Ming-tai Subject:RE: [External] A-1 Sampling Plan Attachments:A-1 Leachate Release Sample Plan 03.07.2019.pdf CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hello, Please see our revised sampling plan. Let us know if you have more comments, or if we can move forward with sample collection. Thanks a lot! Sheri Knox, P.E., PMP Associate Remediation Engineer Direct: 919.381.9913 Office: 919.381.9900 www.woodplc.com From: Ritter, Christine <christine.ritter@ncdenr.gov> Sent: Monday, March 04, 2019 1:19 PM To: Knox, Sheri <sheri.knox@woodplc.com>; ronniepetty@a1sandrockinc.com Cc: Garrett, David <david.garrett2@woodplc.com>; Chao, Ming-tai <ming.chao@ncdenr.gov>; Kirchner, Chuck <chuck.kirchner@ncdenr.gov>; Aja, Deborah <deborah.aja@ncdenr.gov>; Ulishney, Adam <adam.ulishney@ncdenr.gov> Subject: RE: [External] A-1 Sampling Plan In response to the Leachate Sampling Plan submitted by Wood Engineering, I am forwarding Ming Chao’s comments. Please revise the sampling plan to incorporate the following revisions: The SS-2 is located the downstream of the CMP discharge point to the SB 1; therefore, it is the incorrect location for a background sample location. A soil sample should be collected in the upper slope area of SB1, by the haul road, where the earthen material is likely won’t be impacted by the leachate seepage. I believe the soil used for the SB1 construction comes from the on-site borrow. Therefore, there is likely no issue for soil type variation. 2 The SS-3 through SS-7 should be sediment samples in the ditch center, and shall be collected from down-stream toward upstream direction to avoid cross contamination. The SS-8 through SS-10 should be sediment samples collected at the area with standing water or the brim of the SB 1. The sampling tools must be the ones used for sediment sample collection, not hand trowels nor ordinary augers but tubing type auger which can be driven into the pond and retrieve sediment samples for testing, some has a liner/inner- tube (Teflon lined) inside the auger. If VOCs will be tested, the discrete sample from the grade to top 6-inch at each location can be cut out from the pipe/tube and capped from both ends. The proposed sample depth from 1 to 2 feet can be used for backup samples in case the soil remediation depth is required. To avoid cross contamination, the SW samples shall be collected first then collect sediment samples. Please contact me with any questions. From: Knox, Sheri <sheri.knox@woodplc.com> Sent: Thursday, February 28, 2019 4:27 PM To: Ritter, Christine <christine.ritter@ncdenr.gov> Cc: Garrett, David <david.garrett2@woodplc.com> Subject: [External] A-1 Sampling Plan CAUTION: External email. Do not click links or open attachments unless you verify. Send all suspicious email as an attachment to report.spam@nc.gov Hi Christine, Please see the attached sampling plan for A-1 Leachate Sampling. Please contact us if you have questions or comments. I also wanted to let you know that A-1 will be working with another consultant on implementation now the Assessment Monitoring Work Plan is complete. Thanks again! Sheri Knox, P.E., PMP Associate Remediation Engineer Direct: 919.381.9913 Office: 919.381.9900 www.woodplc.com Christine Ritter Hydrogeologist, Solid Waste Section Division of Waste Management North Carolina Department of Environmental Quality 919.707.8254 (Office) Christine.Ritter@ncdenr.gov 3 This message is the property of John Wood Group PLC and/or its subsidiaries and/or affiliates and is intended only for the named recipient(s). Its contents (including any attachments) may be confidential, legally privileged or otherwise protected from disclosure by law. Unauthorized use, copying, distribution or disclosure of any of it may be unlawful and is strictly prohibited. We assume no responsibility to persons other than the intended named recipient(s) and do not accept liability for any errors or omissions which are a result of email transmission. If you have received this message in error, please notify us immediately by reply email to the sender and confirm that the original message and any attachments and copies have been destroyed and deleted from your system. If you do not wish to receive future unsolicited commercial electronic messages from us, please forward this email to: unsubscribe@woodplc.com and include “Unsubscribe” in the subject line. If applicable, you will continue to receive invoices, project communications and similar factual, non-commercial electronic communications. Please click http://www.woodplc.com/email-disclaimer for notices and company information in relation to emails originating in the UK, Italy or France. As a recipient of an email from a John Wood Group Plc company, your contact information will be on our systems and we may hold other personal data about you such as identification information, CVs, financial information and information contained in correspondence. For more information on our privacy practices and your data protection rights, please see our privacy notice at https://www.woodplc.com/policies/privacy-notice