Loading...
HomeMy WebLinkAbout3901_GranvilleCo_CDLF_permitApp_solr farm_DIN25316_20151120 9731-F Southern Pine Blvd. Charlotte, NC 28273 tel: 704/837-2002 fax: 704/837-2010 www.JoyceEngineering.com November 5, 2015 Mr. Ming-Tai Chao NC DEQ Division of Waste Management 1646 Mail Service Center Raleigh, North Carolina 27699 RE: Proposed Solar Project, Oxford Landfill Facility Granville County, North Carolina Permit No. 39-01, Document ID No. (DIN) 24775 Dear Mr. Chao: In response to your letter dated July 23, 2015, and on behalf of Granville County (the County), Joyce Engineering (JOYCE), is pleased to submit this Permit Modification Application for the Oxford C&D landfill (Permit No. 3901-CDLF-1997), along with all the other requested permits and documents. In accordance with your request, please find enclosed revisions made to the approved Facility Plan and Drawings. The location for the proposed solar project is shown on the revised Facility Plan Drawings (FP-01 to FP-05). Moreover, Section 4.0 – “Solar Project” has been added to the Facility Plan. A copy of the new page is included. Section 4.0 serves as a narrative description for the new locations of some municipal solid waste management units (MSWMUs) relocated as a result of the proposed solar project. The new locations for displaced MSWMUs are within the landfill property (please refer to the attached Facility Plan Drawings). The approved Facility Plan, Operations Plan, Financial Assurance cost estimates, Landfill Gas Monitoring Plan (LFGMP), Water Quality Monitoring Plan (WQMP), Engineering Plan, Closure and Post-Closure Plan, CQA Plan and Technical Specifications were not included in this submittal due to the fact that no revisions have been made to the landfill design since they were last permitted, and no expansions are proposed with this submittal. A waste disposal plan was prepared and certified by a professional engineer. The plan states that no on-site burial for debris will take place during construction. Oxford Landfill facility will accommodate C&D waste and any other recyclables generated during construction, except damaged solar panels. Damaged solar panels contain hazardous materials, therefore they will be returned to the manufacturer for recycling. Waste hauling will be routed without interrupting the Landfill’s normal operations. During construction, trees, brush and vegetation will be burned on- site. The Green Earth Developers, LLC (the Developer) has obtained a burning permit for trees, brush and vegetation to clear the land for the solar farm. The Burning Permit No. 588055 has been issued to Mr. David Banfield, who intends to burn land clearing debris on-site approximately 0.5 miles from landfill entrance, between the dates of 10/19/2015 and 11/12/2015. A permit extension will be acquired, if needed. The Developer will be burning leaves, small branches, ground clearing vegetative debris, and other permitted vegetative matter and the fire shall encompass an area not to exceed 0.5 acres. Prior to the scheduled open burning, the County will notify the NC DEQ Solid Waste Section in writing of the activities according to Rule 15A Mr. Ming-Tai Chao November 5, 2015 Page 2 of 2 NCAC 13B .0542(i) or 1626(5). A copy of the Burning Permit and the Waste Disposal Plan are attached for your reference. The County and the Developer obtained a special use and building permit in accordance with the local zoning requirements. A copy of the approved construction drawings is attached to this letter. Moreover, the Developer obtained an NPDES Construction Stormwater General Permit (NCG010000) for the subject solar project. A copy of the permit document and approval letter are attached for your reference. Finally, with regard to the financial assurance, the lease agreement between the County and the Cornwall Solar Center, LLC (the Owner) states that the Owner will be responsible for the solar panel system shut down and final decommission plan. Moreover, the County obtained a financial assurance letter from the Owner. The lease agreement and the financial assurance letter hold the Owner responsible for the costs of removal, cleanup, and disposal the non-recyclable component associated with the solar project and costs for site restoration after the solar panel system is shut down and decommissioned. A copy of the lease agreement between the County and the Owner and the financial assurance letter are attached for your reference. Please do not hesitate to contact us with any questions or comments you may have. We look forward to working with you to get the County’s permit modified to include the solar project. Sincerely, JOYCE ENGINEERING, INC. Amy Davis, P.E. Technical Consultant Attachments Attachment to Facility Plan (Section 4.0) Revised Facility Plan Drawings – Facility Plan Drawings (FP-1 to FP-05) Waste Disposal Plan Burning Permit No. 588055 Letter of Approval with Modifications for NPDES General Storwwater Permit Certificate of Plan Approval for Erosion and Sedimentation Control Plan Construction Drawings Lease Agreement Financial Assurance Letter C: Ms. Amanda Freeman, Landfill Manager Section III- Facility Plan 8 Joyce Engineering, Inc. Oxford MSW Landfill Expansion Rev. October 2015 Granville County, North Carolina 4.0 SOLAR PROJECT 4.1. Solar Project Development The proposed solar project is shown on Drawings No. FP-01 through FP-05. Drawing No. FP-01 shows the property boundaries, limits of the existing waste disposal areas, limits of the proposed waste disposal areas, the existing environmental monitoring system, the landfill entrance road, landfill access and perimeter roads, scalehouse and office, convenience center, and the proposed solar project. Current topography for the property is shown, as well as the 300-foot buffer from the property line and other site features. The solar project is located at the southwest end of the property as shown on Drawing No. FP-01. The solar project is surrounded by a fence to prevent illegal trespassing. The white goods containers are placed northeast of the proposed solar project, outside the fenced solar farm parameters. White goods are removed by a metal recycling contractor, which is handled through a bid process. Tires are disposed of by customers onto the ground in the designated tire disposal area as shown on Drawing No. FP-01. Prior to the proposed solar project, the County used the solar farm area to receive, process, and temporarily stockpile yard waste and land clearing debris, and to conduct active composting activities. Additionally, the solar farm area was used as a soil-borrow area to meet the facility soil needs. Due to the solar project, the County had to relocate the composting area and yard waste and land clearing debris area to Unit 2, south of Phase 1. Moreover, Unit 2 is now being used to serve as a soil-borrow area to sustain the site soil needs instead of the solar farm area. The new locations for displaced municipal solid waste management units are within the landfill property (Drawings No. FP-01 through FP-05). Finally, the County discontinued the disposal of animal carcass in the solar farm area in 2013. SCALE: DATE: FILE: LOT # WASTE DISPOSAL PLAN 10-14-2015 N/A' WASTE DISPOSAL PLAN: WASTE GENERATED BY CONSTRUCTION ACTIVITIES: 1.NO ON-SITE BURIAL FOR DEBRIS. 2.WASTE GENERATED FROM GENERAL CONSTRUCTION ACTIVITY INCLUDE: 2.1.CARDBOARD AND PLASTIC BANDING, PALETTES 2.2. VEGETATION FROM CLEARING OPERATION. 2.3.COPPER AND ALUMINUM CABLE 2.4.CONCRETE WASH CONTAINED WITHIN NCDENR APPROVED WASHOUT. 2.5.LANDSCAPE PACKING MATERIALS 2.6.MATERIALS INTERNAL TO SKIMMER SEDIMENT BASINS: SCHEDULE 40 PLASTIC, POROUS BAFFLES, METALAND WOODEN STAKES, SILT FENCE FILTER FABRIC. 3.GRANVILLE COUNTY LANDFILL CAN ACCOMMODATE CONSTRUCTION WASTE. WASTE HAULING WILL HAVE TO BE ROUTED THROUGH THE PROPER CHANNELS WITHIN THE LANDFILL OPERATION. 4.BURNING PERMIT OBTAINED FOR VEGETATION THAT WAS REMOVED. 5.GRANVILLE COUNTY LANDFILL ACCEPTS RECYCLABLE MATERIAL. 6.SOLAR PANELS CONTAIN HAZARDOUS MATERIALS. IN THE EVENT A PANEL IS DAMAGED BEYOND USEDEVELOPER RETURNS PANEL TO MANUFACTURER FOR RECYCLING. WASTE GENERATED BY OPERATIONAL ACTIVITIES: 1. NO WASTE IS GENERATED BY THE OPERATION OF THE SOLAR FACILITY. CORNWALL SOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NC 1 Mousa A. Maimoun From:Amy Davis Sent:Wednesday, October 14, 2015 3:51 PM To:Mousa A. Maimoun Subject:FW: Online Burning Permit Application     Amy R. Davis, PE │Senior Project Consultant │ JOYCE ENGINEERING  Richmond, VA - Greensboro, NC - Charlotte, NC - Charleston, SC│9731-F Southern Pine Blvd., Charlotte, NC 28273 │ tel: (704) 817-2037 │direct: (704) 837-2004 │fax: (704) 837-2010 │ JoyceEngineering.com    From: David Banfield [mailto:david.banfield@ged.bluenrgy.com]   Sent: Wednesday, October 14, 2015 3:35 PM  To: Amanda Freeman <amanda.freeman@granvillecounty.org>  Cc: Amy Davis <adavis@joyceengineering.com>; Mike Patterson <michael.patterson@us.panasonic.com>  Subject: Fwd: Online Burning Permit Application  Amanda, Here’s our Burn Permit. See email below. It’s good through 11/12, but an be extended if necessary. David Banfield Green Earth Developers – Project Manager  NABCEP Certified PV Installer        ________________________________________________________________________________________________________   O: 704-849-0054  M: 336-429-6529  E: David.Banfield@GED.BlueNRGY.com    Green Earth Developers   547 W. Charles St., Suite 100   Matthews, NC 28105  Geneva • Fort Lauderdale • Melbourne • Paris • Seattle • Sydney  http://bluenrgy.com  Begin forwarded message: From: <burn.permits@ncagr.gov> Subject: Online Burning Permit Application Date: October 14, 2015 at 3:13:56 PM EDT To: <David.Banfield@GED.BlueNRGY.com> 2 Date: 10/14/2015 Subject: Online Burning Permit Application Name: David Banfield Burning Permit number 588055 has been issued to David Banfield who intends to start a fire in or near Oxford NC, 0.5 miles from Landfill Entrance, between the dates of 10/19/2015 and 11/12/2015. The fuel type shall be Leaves, Small branches, Ground clearing vegetative debris, Other permitted vegetative matter and the fire shall encompass an area of 0.5 acres CONTACT INFORMATION: Street address: 547 West Charles Street, Suite 100 City: Matthews, NC, NC Zipcode: 28105 Phone: 336-429-6529 Email address: David.Banfield@GED.BlueNRGY.com Additional comments: Clearing Trees, Brush and Vegetative Debris for Solar Farm Please save or print this email for your records. You may be required to produce your permit for North Carolina Forest Service or law enforcement personnel. E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. This email address is not monitored. Please direct any questions regarding laws and regulation to your county forest ranger. Technical questions regarding the online system may be directed to amanda.hubbard@ncagr.gov North Carolina Department of Environmental Quality Pat McCrory Donald R. van der Vaart Governor Secretary Division of Energy, Mineral, and Land Resources Energy Section • Geological Survey Section • Land Quality Section 1628 Mail Service Center Raleigh, NC 27699• Phone: 919-791-4200 • FAX: 919-571-4718 Internet: http://portal.ncdenr.org/web/lr/ An Equal Opportunity \ Affirmative Action Employer – 50% Recycled \ 10% Post Consumer Paper October 8, 2015 LETTER OF APPROVAL WITH MODIFICATIONS AND PERFORMANCE RESERVATIONS Green Earth Developers, LLC Mandy Lantham 547 West Charles St Suite 100 Matthews, NC 28105 RE: Project Name: CORNWALL SOLAR CENTER Acres Approved: 24.5 Project ID: GRANV-2016-008 County: Granville, City: Oxford Address: 6595 Landfill Rd. River Basin: Neuse & Roanoke Stream Classification: Other Submitted By: Mr. Jonathan Rett, PE Date Received by LQS: September 23, 2015 Plan Type: Utilities Dear Sir or Madam: This office has reviewed the subject erosion and sedimentation control plan. We find the plan to be acceptable and hereby issue this Letter of Approval. The enclosed Certificate of Approval must be posted at the job site. This plan approval shall expire three (3) years following the date of approval, if no land-disturbing activity has been undertaken, as is required by Title 15A NCAC 4B .0129. Please be aware that your project will be covered by the enclosed NPDES Construction Stormwater General Permit NCG010000. Please become familiar with all the requirements and conditions of this permit in order to achieve compliance. Title 15A NCAC 4B .0118(a) requires that a copy of the approved erosion control plan be on file at the job site. Also, this letter gives the notice required by G.S. 113A-61.1(a) of our right of periodic inspection to insure compliance with the approved plan. Letter of Approval Mandy Lantham October 8, 2015 Page 2 of 3 Revised 08172012 North Carolina's Sedimentation Pollution Control Act is performance-oriented, requiring protection of existing natural resources and adjoining properties. If, following the commencement of this project, the erosion and sedimentation control plan is inadequate to meet the requirements of the Sedimentation Pollution Control Act of 1973 (North Carolina General Statute 113A-51 through 66), this office may require revisions to the plan and implementation of the revisions to insure compliance with the Act. Acceptance and approval of this plan is conditioned upon your compliance with Federal and State water quality laws, regulations, and rules. In addition, local city or county ordinances or rules may also apply to this land-disturbing activity. This approval does not supersede any other permit or approval. Please note that this approval is based in part on the accuracy of the information provided in the Financial Responsibility Form, which you provided. You are requested to file an amended form if there is any change in the information included on the form. In addition, it would be helpful if you notify this office of the proposed starting date for this project. Please notify us if you plan to have a preconstruction conference. Your cooperation is appreciated. Sincerely, Tessa R Monday Environmental Engineer Land Quality Section Enclosures: Certificate of Approval NPDES Permit cc: Mr. Jonathan M Rett, PE HensonFoley Design 8712 Lindholm Dr Suite 202A, Huntersville NC 28078 NPDES File Letter of Approval Mandy Lantham October 8, 2015 Page 3 of 3 Revised 08172012 MODIFICATIONS AND PERFORMANCE RESERVATIONS Project Name: CORNWALL SOLAR CENTER Project ID: GRANV-2016-008 County: Granville Submit 2 copies of modifications - Provide two copies (one full size and one 11x17") of revised plans showing all the Modifications or Performance Reservations required for approval prior to beginning any land-disturbing activity. – 48 hour notification - Land Quality shall be formally notified a minimum of 48 hours prior to construction beginning. - Riparian Buffers - Approval of this erosion and sedimentation control plan does not authorize land- disturbing activity in a riparian buffer zone that would violate 15A NCAC 02B, which regulates the Randleman Lake watershed, Catawba, Neuse and Tar-Pamilico River Basins. – Provide a letter from the Granville Landfill agreeing to allow Cornwall Solar to inspect, maintain or other for the existing access road culvert and any affected areas downstream of the culvert. Additional measures may be required - The developer is responsible for the control of sediment on-site. If the approved erosion and sedimentation control measures prove insufficient, the developer must take those additional steps necessary to stop sediment from leaving this site. Each sediment storage device must be inspected after each storm event. Maintenance and/or clean out, is necessary anytime the device is at 50% capacity. During panel construction within the basin footprint, inspect the skimmer/outlet at the end of each work day to ensure functionality. Any loss of sediment from the Cornwall Solar Center must be reported to Land Quality. – CIVIL SITE PLAN PACKAGE PROPOSED CORNWALL SOLAR ELECTRIC POWER PLANT LANDFILL ROAD OXFORD, GRANVILLE COUNTY, NC OWNER: GRANVILLE COUNTY C/O LANDFILL PO BOX 906 OXFORD, NORTH CAROLINA 27565 PH: (XXX) XXX-XXXX VICINITY MAP SCALE: N.T.S. CONTENTS:COVER SHEETC1 C2 C3 C4 C5 C6 C7 C8 C9 C10 COVER SHEET SURVEY & EX CONDITIONS SITE PLAN EROSION CONTROL PH 1 EROSION CONTROL PH 2 OVERALL GRADING PLAN SKIMMER SEDIMENT BASINS PH1 SKIMMER SEDIMENT BASINS PH2 DETAILS DETAILS 1.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3.ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 4.SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMMENDED. 1-800-632-4949 AVOID UTILITY DAMAGE CALL ULOCO BEFORE YOU DIG SITE DEVELOPER: GREEN EARTH DEVELOPERS 547 W. CHARLES ST. STE. 100 MATTHEWS, NC 28105 PH: (704) 849-0054 COPYRIGHT 2013C 10 JMR 215046 C01 - COVER.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR C01 PP PP PP PP PP PP PP LP CONCRETEPAD SCRAPPILE 20' GRAVEL DRIVE 25' GRAVEL ROAD12' DIRT DRIVE 12' DIRT D R I V E IPF CONCRETEPAD IPF IPF IPF IPF IPF IPF IPF IPF IPF AXLE N/FGRANVILLE COUNTYMAP #191500244743LANDFILL ROADDB 1314 PG 324PB 37 PG 161 N/FYANCEY PROPERTIES INCMAP # 1905049403186606 CORNWALL ROADDB 649 PG 191PB 6 PG 94 N/FCHARLES & TYLETTE JONESMAP # 1905049218336566 CORNWALL ROADDB 245 PG 265 N/FTONEY MCGEE & MM WILSONMAP # 191500013742DB 580 PG 711 N/FRUTH ARMSTRONGMAP # 190504917752CORNWALL ROADDB 654 PG 622 N/FCAROLYN PITTSMAP # 190500018702DB 1085 PG 398PB 17 PG 143 WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS 25' GRA V E L R O A D SHED SHED GARAGE PP FRAMEBLDG SHED GRAVEL CONCRETE LP TRUCKSCALE ASHPALT GRAVEL ASPHALT ROAD FENCE PP 1ƒ :687.15'1 ƒ  :178 3.5 6 ' 1ƒ ( 239.55' 1ƒ ( 277.95' CP CP 6ƒ :249.92'6ƒ :490.21'LANDFILL ROADS.R. 1459(60' WIDE PUBLIC R/W) 1ƒ ( 3858.10' (GROU N D ) 100' CP&LEASEMENTAS SHOWN ONPLAT BOOK 37PG 161 100' 30' CP&LEASEMENTAS PERBK 1446-356 N/FMCGEE LINWOOD ET ALLMAP # 191500019857DB 1351 PG 519 N/FMCGEE LINWOOD ET ALLMAP # 19150011811DB 239 PG 258 N/FJOSEPH MCGHEEMAP # 191500123248DB 1211 PG 259 L1L2 L3L4L5L6 N/FGRANVILLE COUNTYMAP #191500244743LANDFILL ROADDB 1314 PG 324PB 37 PG 161 WOODS CMF WIRE FENCEEXTENDS 40'PAST PROPERTYLINE 800' TOSTERL CARLINGTONROAD YARD WASTEDROP 12' INGRESS/EGRESSEASEMENTBK 175-268(NO EVIDENCE OF USE) PP PP PP PP PP PP PP LP CONCRETEPAD SCRAPPILE 20' GRAVEL DRIVE 25' GRAVEL ROAD12' DIRT DRIVE 12' DIRT D R I V E IPF CONCRETEPAD IPF IPF IPF IPF IPF IPF IPF IPF IPF AXLE N/FGRANVILLE COUNTYMAP #191500244743LANDFILL ROADDB 1314 PG 324PB 37 PG 161 N/FYANCEY PROPERTIES INCMAP # 1905049403186606 CORNWALL ROADDB 649 PG 191PB 6 PG 94 N/FCHARLES & TYLETTE JONESMAP # 1905049218336566 CORNWALL ROADDB 245 PG 265 N/FTONEY MCGEE & MM WILSONMAP # 191500013742DB 580 PG 711 N/FRUTH ARMSTRONGMAP # 190504917752CORNWALL ROADDB 654 PG 622 N/FCAROLYN PITTSMAP # 190500018702DB 1085 PG 398PB 17 PG 143 WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS 25' GRA V E L R O A D SHED SHED GARAGE PP FRAMEBLDG SHED GRAVEL CONCRETE LP TRUCKSCALE ASHPALT GRAVEL ASPHALT ROAD FENCE PP 1ƒ :687.15'1 ƒ  :178 3.5 6 ' 1ƒ ( 239.55' 1ƒ ( 277.95' CP CP 6ƒ :249.92'6ƒ :490.21'LANDFILL ROADS.R. 1459(60' WIDE PUBLIC R/W) 1ƒ ( 3858.10' (GROU N D ) 100' CP&LEASEMENTAS SHOWN ONPLAT BOOK 37PG 161 100' 30' CP&LEASEMENTAS PERBK 1446-356 N/FMCGEE LINWOOD ET ALLMAP # 191500019857DB 1351 PG 519 N/FMCGEE LINWOOD ET ALLMAP # 19150011811DB 239 PG 258 N/FJOSEPH MCGHEEMAP # 191500123248DB 1211 PG 259 L1L2 L3L4L5L6 N/FGRANVILLE COUNTYMAP #191500244743LANDFILL ROADDB 1314 PG 324PB 37 PG 161 WOODS CMF WIRE FENCEEXTENDS 40'PAST PROPERTYLINE 800' TOSTERL CARLINGTONROAD YARD WASTEDROP 12' INGRESS/EGRESSEASEMENTBK 175-268(NO EVIDENCE OF USE) PP PP PP PP PP PP PP LP CONCRETE PAD SCRAP PILE 20' GRAVEL D R I V E 25' GRAVEL ROAD12' DIRT DRIVE 12' DI RT D RI V E IPF CONCRETE PAD IPF IPF IPF IPF IPF IPF IPF IPF IPF AXLE N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 N/F YANCEY PROPERTIES INC MAP # 190504940318 6606 CORNWALL ROAD DB 649 PG 191 PB 6 PG 94 N/F CHARLES & TYLETTE JONES MAP # 190504921833 6566 CORNWALL ROAD DB 245 PG 265 N/F TONEY MCGEE & MM WILSON MAP # 191500013742 DB 580 PG 711 N/F RUTH ARMSTRONG MAP # 190504917752 CORNWALL ROAD DB 654 PG 622 N/F CAROLYN PITTS MAP # 190500018702 DB 1085 PG 398 PB 17 PG 143 WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS 25' GRAVEL R OA D SHED SHED GARAGE FRAMEBLDG SHED GRAVEL CONCRETE LP TRUCKSCALE A S H P A L T GRAVEL ASPHALT ROAD FENCE PP 1ƒ :687.15'1ƒ :1783.56' 1ƒ   ( 239.55' 1ƒ    ( 277.95' CP CP 6ƒ :249.92'6ƒ :490.21'LANDFILL ROAD S.R. 1459 (60' WIDE PUBLIC R/W) 1ƒ   ( 3858.10' ( G R O U N D ) 100' CP&L EASEMENT AS SHOWN ONPLAT BOOK 37 PG 161 100' 30' CP&L EASEMENT AS PERBK 1446-356 N/F MCGEE LINWOOD ET ALL MAP # 191500019857 DB 1351 PG 519 N/F MCGEE LINWOOD ET ALL MAP # 19150011811 DB 239 PG 258 N/F JOSEPH MCGHEE MAP # 191500123248 DB 1211 PG 259 L1 L2L3L4L5L6 N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 WOODS CMF WIRE FENCE EXTENDS 40' PAST PROPERTY LINE 800' TO STERL CARLINGTONROAD YARD WASTE DROP 12' INGRESS/EGRESS EASEMENT BK 175-268 (NO EVIDENCE OF USE) PP PP PP PP PP PP PP LP CONCRETE PAD SCRAP PILE 20' GRAVEL D R I V E 25' GRAVEL ROAD12' DIRT DRIVE 12' DI RT D RI V E IPF CONCRETE PAD IPF IPF IPF IPF IPF IPF IPF IPF IPF AXLE N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 N/F YANCEY PROPERTIES INC MAP # 190504940318 6606 CORNWALL ROAD DB 649 PG 191 PB 6 PG 94 N/F CHARLES & TYLETTE JONES MAP # 190504921833 6566 CORNWALL ROAD DB 245 PG 265 N/F TONEY MCGEE & MM WILSON MAP # 191500013742 DB 580 PG 711 N/F RUTH ARMSTRONG MAP # 190504917752 CORNWALL ROAD DB 654 PG 622 N/F CAROLYN PITTS MAP # 190500018702 DB 1085 PG 398 PB 17 PG 143 WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS WOODS 25' GRAVEL R OA D SHED SHED GARAGE FRAMEBLDG SHED GRAVEL CONCRETE LP TRUCKSCALE A S H P A L T GRAVEL ASPHALT ROAD FENCE PP 1ƒ :687.15'1ƒ :1783.56' 1ƒ   ( 239.55' 1ƒ    ( 277.95' CP CP 6ƒ :249.92'6ƒ :490.21'LANDFILL ROAD S.R. 1459 (60' WIDE PUBLIC R/W) 1ƒ   ( 3858.10' ( G R O U N D ) 100' CP&L EASEMENT AS SHOWN ONPLAT BOOK 37 PG 161 100' 30' CP&L EASEMENT AS PERBK 1446-356 N/F MCGEE LINWOOD ET ALL MAP # 191500019857 DB 1351 PG 519 N/F MCGEE LINWOOD ET ALL MAP # 19150011811 DB 239 PG 258 N/F JOSEPH MCGHEE MAP # 191500123248 DB 1211 PG 259 L1 L2L3L4L5L6 N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 WOODS CMF WIRE FENCE EXTENDS 40' PAST PROPERTY LINE 800' TO STERL CARLINGTONROAD YARD WASTE DROP 12' INGRESS/EGRESS EASEMENT BK 175-268 (NO EVIDENCE OF USE)SURVEY / EX CONDITIONSTHIS EXISTING DATA COMPILED ON THIS SHEET WAS PROVIDED BY OTHERS AND IS INCLUDED AS REFERENCE ONLY BOUNDARY SURVEY BY: KCI ASSOCIATES ENTITLED: "ALTA/ACSM TOPOGRAPHIC SURVEYOF CORNWALL SOLAR CENTER 46 ACRES FOR CORNWALL SOLAR CENTER, LLC" DATED: 4/08/2015 TOPOGRAPHIC SURVEY BY: BATEMAN CIVIL SURVEY COMPANY ENTITLED: "TOPOGRAPHIC/QUANTITY SURVEY MAP SURVEY FOR GRANVILLL COUNTY OXFORD" DATED: 3/25/13 IF ANY CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONS ARE DISCOVERED, EITHER ON THE CONSTRUCTION DOCUMENTS OR THE FIELD CONDITIONS, THE CONTRACTOR MUST NOTIFY HENSON FOLEY, INC IMMEDIATELY, AND SHALL NOT COMMENCE OPERATION UNTIL THE CONFLICTS, DISCREPANCIES, OR OTHER UNSATISFACTORY CONDITIONS ARE RESOLVED. 1.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3.ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 4.SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMMENDED. 1-800-632-4949 AVOID UTILITY DAMAGE CALL ULOCO BEFORE YOU DIG W N E S NORTH ARROW GRAPHIC SCALE 1"=100 FT. 0 50 100 200 COPYRIGHT 2013C 10 JMR 215046 C02 - SURVEY.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR DEVELOPMENT AREA OVERALL LANDFILL SITE GRANVILLE COUNTY LANDFILL SITE NTS C02 PP PP PP PP PP PP PP LP CONCRETE PAD SCRAP PILE 20' GRAVEL D R I V E 25' GRAVEL ROADCONCRETE PAD N/F YANCEY PROPERTIES INC MAP # 190504940318 6606 CORNWALL ROAD DB 649 PG 191 PB 6 PG 94 N/F CHARLES & TYLETTE JONES MAP # 190504921833 6566 CORNWALL ROAD DB 245 PG 265 N/F TONEY MCGEE & MM WILSON MAP # 191500013742 DB 580 PG 711 N/F RUTH ARMSTRONG MAP # 190504917752 CORNWALL ROAD DB 654 PG 622 N/F CAROLYN PITTS MAP # 190500018702 DB 1085 PG 398 PB 17 PG 143 25' GRAVEL R OAD PP GRAVEL CONCRETE LP GRAVEL FENCE PP 1ƒ :687.15'1ƒ :1783.56'1ƒ   ( 239.55' 1ƒ   ( 277.95' 6ƒ :249.92'6ƒ :490.21'LANDFILL ROAD S.R. 1459 (60' WIDE PUBLIC R/W) 1ƒ   ( 3858.10' ( G R O U N D ) 100' CP&L EASEMENT AS SHOWN ON PLAT BOOK 37 PG 161 100' 30' CP&L EASEMENT AS PER BK 1446-356 N/F MCGEE LINWOOD ET ALL MAP # 191500019857 DB 1351 PG 519 N/F MCGEE LINWOOD ET ALL MAP # 19150011811 DB 239 PG 258 N/F JOSEPH MCGHEE MAP # 191500123248 DB 1211 PG 259 L1 L2L3L4L5L6 N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 WIRE FENCE EXTENDS 40' PAST PROPERTY LINE 12' INGRESS/EGRESS EASEMENT BK 175-268 (NO EVIDENCE OF USE) 50' SETBA C K 50' SETBACK 6' SECURITY FENCE W/ BARBED WIRE 25' SET B A C K 20 FT GRAVEL VEHICULAR ACCESS. EXISTING CONCRETE PAD 75' SETBACK LANDFILL ROAD75' SETBACK LANDFILL ROADEXISTING WOODED AREA TO REMAIN UNDISTURBED 6' SECURITY FENCE WITH BARBED WIRE EX CONCRETE PAD 24' ACCESS GATE 25' BUFFER OUTSIDE FENCE SUB-ARRAY B SUB-ARRAY C SUB-ARRAY A INVERTER INVERTER 20 FT GRAVEL VEHICULAR ACCESS 25' BUFFER 1 25' BUFFER 25' BUFFER EX CP & L R I G H T O F W A Y25'50' SETBACK EXISTING GRAVEL DRIVE 6' SECURITY FENCE W/ BARBED WIRE 6' SECURITY FENCE W/ BARBED WIRE PRESERVE/PROTECT EXISTING TREES FOR 25' BUFFER PRESERVE/PROTECT EXISTING TREES FOR 25' BUFFER 6' SECURITY FENCE W/ BARBED WIRE 25' BUFFER SEE DETAIL R30' EXISTING LANDFILL ROAD INVERTER20 FT GRAVEL VEHICULAR ACCESS25' BUFFER 325' BUFFER 3 25' BU F F E R 3 25' BUFFER 125' BUFFER 125' BUFFER 3PV ARRAYS PV ARRAYS 6' SECURITY FENCE WITH BARBED WIRE 25'100' 6' SECURITY FENCE WITH BARBED WIRE LOBLOLLY PINE 12' OC ABELIA - 5' OC 10'100' 6' SECURITY FENCE WITH BARBED WIRE SITE PLANW N E S NORTH ARROW GRAPHIC SCALE 1"=100 FT. 0 50 100 200 COPYRIGHT 2013C 10 JMR 215046 C03 - SITE PLAN.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR C03 BUFFERYARD SCREENING DETAIL 32-264 (2) GRANVILLE COUNTY LAND DEVELOPMENT ORDINANCE NOTES: 1. BUFFER IS 25 FT IN WIDTH FROM SECTION 32-264 1. BUFFER STRIP SHALL CONSIST OF A PLANTED STRIP WHICH SHALL BE A MINIMUM OF 25 FT IN WIDTH SHALL BE COMPRISED OF EVERGREEN SHRUBS AND/OR TREES SUCH THAT AT LEAST TWO ROWS OF COVERAGE SHALL BE PROVIDED FROM THE GROUND TO A HEIGHT OF FOUR FEET WHEN PLANTED. 2. IF A NATURAL SCREEN IS ALREADY IN PLACE WHICH WILL ADEQUATELY FULFILL THE PURPOSE OF THE BUFFER STRIP, THE ZONING ADMINISTRATOR MAY, IN WRITING ALLOW A SUBSTITUTION OF ALL OR PART OF THIS SCREEN FOR THE BUFFER STRIP. WRITTEN PERMISSION SHALL BE OBTAINED BEFORE REMOVING ANY EXISTING NATURAL BUFFER. GRANVILLE COUNTY ~ 25*VACANT PIN #OWNER SITE ADDRESS: 6595 LANDFILL ROAD, GRANVILLE COUNTY, NC EXISTING PARCEL DATA NTS ZONING PARCEL ACREAGE PROJECT ACREAGE LAND USE 191500244743 AR-40 397.76 AC GRANVILLE GIS FEMA FLOOD MAP: 3720191500J AND 3720190500J SETBACKS FRONT ZONING AR-40 SIDE REAR 50' 15' 25' LAND DEV. ORDINANCE 25' BUFFERSEC. 32-264 SEC. 32-163 (7)HEIGHT 25' * SPECIAL USE PERMIT GRANVILLE COUNTY JUNE 3, 2013 1.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3.ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 4.SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMMENDED. 1-800-632-4949 AVOID UTILITY DAMAGE CALL ULOCO BEFORE YOU DIG SCREENING DETAIL: 32-163 (3) FENCES GRANVILLE COUNTY LAND DEVELOPMENT CODE NOTES: 1. BUFFER IS TO BE PROVIDED WHERE EXISTING VEGETATION IS TO BE PRESERVED. FROM SECTION 32-163 (3) FENCES (C) 1. IF BARBED WIRE IS NECESSARY A DOUBLE ROW OF SHRUBS SHALL BE PLANTED, EACH ROW INSTALLED 3 FT ON CENTER AND MAINTAINED AT THE FENCE HEIGHT. NTS 1 2 6 FT CHAINLINK SECURITY FENCE WITH 2' OF BARBED WIRE NTS LANDSCAPE NOTES: PER SPECIAL USE PERMIT: 1. PROVIDE LANDSCAPE SCREENING PER DETAIL 2 OUTSIDE THE ENTIRE PERIMETER OF THE SECURITY FENCE. GRANVILLE LAND DEVELOPMENT CODE 32-163. 2. 25' BUFFER PROVIDED FOR NORTHERN, WESTERN AND SOUTHERN BOUNDARY LINE AND INCLUDING AN AREA ALONG LANDFILL ROAD SOUTH OF THE ARRAYS. EXISTING VEGETATION WILL PROVIDE THE BULK OF THE REQUIRED PLANTINGS. LANDSCAPE SCREENING PER DETAIL 1 WILL BE REQUIRED TO BE ADDITIONAL TO EXISTING AREAS WITHIN THE BUFFER DETERMINED TO BE INSUFFICIENT TO SATISFY THE REQUIREMENTS. 3. PROVIDE LANDSCAPE SCREENING WITH A COMBINATION OF DETAIL 1 AND DETAIL 2 IN 25' SETBACK WITH THE CP&L EASEMENT AND 25' BUFFER ALONG LANDFILL ROAD SHOWN AS 25' FROM THE SECURITY FENCE. 4. CONTRACTOR TO DETERMINE A WATER SOURCE FOR PLANTINGS FOR DURATION OF TIME TO ESTABLISH SCREENING. 5. THE CONTRACTOR FOR EACH INDIVIDUAL TRADE SHALL CONTACT ALL OWNERS OF EASEMENTS, UTILITIES, AND RIGHT-OF-WAY, PUBLIC OR PRIVATE, PRIOR TO WORKING IN THESE AREAS. 6. THE CONTRACTOR SHALL MAINTAIN THE SITE IN A MANNER SO THAT WORKERS AND THE PUBLIC SHALL BE PROTECTED FROM INJURY. 7. DO NOT SCALE DRAWING FOR ACTUAL DIMENSIONS, AS IT IS A REPRODUCTION AND SUBJECT TO DISTORTION.6'8'SITE NOTES: 1. SOLAR ARRAY DESIGN AND CONFIGURATION FOR THE PERFORMANCE AND PURPOSE OF HARNESSING AND DISTRIBUTING ELECTRICITY PROVIDED BY GREEN EARTH DEVELOPERS, ITS AFFILIATES, SUBSIDIARIES AND PARENT COMPANIES. 2. BEARINGS AND DISTANCES ARE PROVIDED FOR OVERALL ARRAY PLACEMENT ON THE SITE AND ARE SUBJECT TO APPROVALS/CONFIRMATIONS BY GREEN EARTH DEVELOPERS, ITS AFFILIATES, SUBSIDIARIES AND PARENT COMPANIES. 3. BEARINGS AND DISTANCES ARE PROVIDED TO ASSIST IN PLACEMENT OF ARRAYS WITHIN THE BOUNDARIES AND REQUIRED ZONING SETBACKS OF THE SITE AS WELL AS AVOIDING OBSTACLES AND ENVIRONMENTALLY SENSITIVE AREAS. 4. OUTLINE OF THE SUBARRAYS BASED ON THE ARRAY LAYOUT PROVIDED BY GREEN EARTH DEVELOPERS HAS BEEN ESTABLISHED BUT NOT SHOWN ON THESE PLANS. 5. HENSONFOLEY UNDERSTANDS THAT ARRAY DESIGN AS PROVIDED BY GREEN EARTH DEVELOPERS, ITS AFFILIATES, SUBSIDIARIES AND PARENT COMPANIES. HAS SPECIFICATIONS SUCH AS PANEL SEPARATIONS AND PANEL HEIGHTS AND PANEL ORIENTATIONS THAT ARE TO BE ADHERED TO. 6. SURVEYOR TASKED WITH CONSTRUCTION STAKING OF THE IMPROVEMENTS: PRIOR TO STAKING ARRAYS NEEDS CONFIRMATION FROM GREEN EARTH DEVELOPERS, ITS AFFILIATES, SUBSIDIARIES AND PARENT COMPANIES THAT ARRAY CONFIGURATION AS SHOWN ON THESE PLANS IS AS INTENDED. PROVIDE ENGINEER WITH CONFIRMATION. 7. BEARINGS AND DISTANCES ARE FROM ESTABLISHED PROPERTY LINES, EASEMENTS AND OTHER FIELD LOCATED EXISTING IMPROVEMENTS FROM SURVEY AS SHOWN IN THIS PLAN SET. DIMENSIONS FROM THE OUTER EDGE OF THE ARRAY ARE ORTHOGONAL TO THE PROPERTY LINE. 8. SIX FOOT HIGH SECURITY FENCE SET TO PROVIDE MIN 20' WIDTH FOR VEHICULAR ACCESS BETWEEN OUTER EDGE OF ARRAY AND FENCE FOR MAINTENANCE ACCESS. 9. HENSONFOLEY MAKES NO ASSERTIONS THAT THIS DEVELOPMENT IS TO IMPEDE PROPERTY OWNER'S ACCESS TO OTHER UNUSED AREAS OF HIS PROPERTY AS A RESULT. 10. "HOME RUN" ALIGNMENT WITHIN THE LIMITS OF THE GRAVEL ACCESS ROAD AS WELL AS CONNECTION TO EXISTING UTILITY BY GREEN EARTH DEVELOPERS, ITS AFFILIATES, SUBSIDIARIES AND PARENT COMPANIES. CONSULT GREEN EARTH DEVELOPERS FOR PROVISIONS FOR DEPTH, DITCH CROSSINGS, CONDUIT SIZING AND ROAD CROSSING FOR CONNECTION TO EXISTING UTILITY. LIMITS OF DISTURBANCE SILT FENCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE CONSTRUCTION ENTRANCE PP PP PP PP PP PP PP LP CONCRETE PAD SCRAP PILE 20' GRAVEL D R I V E 25' GRAVEL ROAD12' DIRT DRIVE 12' DI R T D RI V E CONCRETE PAD N/F YANCEY PROPERTIES INC MAP # 190504940318 6606 CORNWALL ROAD DB 649 PG 191 PB 6 PG 94 N/F CHARLES & TYLETTE JONES MAP # 190504921833 6566 CORNWALL ROAD DB 245 PG 265 N/F TONEY MCGEE & MM WILSON MAP # 191500013742 DB 580 PG 711 N/F RUTH ARMSTRONG MAP # 190504917752 CORNWALL ROAD DB 654 PG 622 N/F CAROLYN PITTS MAP # 190500018702 DB 1085 PG 398 PB 17 PG 143 25' GRAVEL R OAD SHED SHED GARAGE PP FRAMEBLDG SHED GRAVEL CONCRETE LP TRUCKSCALE A S H P A L T GRAVEL ASPHALT ROAD FENCE PP 1ƒ :687.15'1ƒ :1783.56'1ƒ   ( 239.55' 1ƒ   ( 277.95' 6ƒ :249.92'6ƒ :490.21'LANDFILL ROAD S.R. 1459 (60' WIDE PUBLIC R/W) 1ƒ   ( 3858.10' ( G R O U N D ) 100' CP&L EASEMENT AS SHOWN ON PLAT BOOK 37 PG 161 100' 30' CP&L EASEMENT AS PER BK 1446-356 N/F MCGEE LINWOOD ET ALL MAP # 191500019857 DB 1351 PG 519 N/F MCGEE LINWOOD ET ALL MAP # 19150011811 DB 239 PG 258 N/F JOSEPH MCGHEE MAP # 191500123248 DB 1211 PG 259 L1 L2L3L4L5L6 N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 WIRE FENCE EXTENDS 40' PAST PROPERTY LINE 800' TO STERL CARLINGTON ROAD 12' INGRESS/EGRESS EASEMENT BK 175-268 (NO EVIDENCE OF USE) LIMITS OF DISTURBANCE SKIMMER SEDIMENT BASIN 1 DA=5.6 AC DIST AREA=4.90 AC EX 24" PIPE INV IN=504.63 INV OUT=503.47 EX DRIVE EX 15" CPP LIMITS OF DISTURBANCE 506507508508 LIMITS OF DISTURBANCE SILT FENCE SKIMMER SEDIMENT BASIN 2 DA=11.8 AC PH 1 DA=17.4 AC PH 2 DIST AREA=10.00 AC SKIMMER SEDIMENT BASIN 3 WITH CONCRETE RISER DRAIN AREA=27 AC DIST AREA=11.6 AC SEE SHEET C07 PLACE HALF RING INLET PROTECTION PRIOR TO PLACEMENT OF RISER 12" CPP 4" SKIMMER LIMITS OF DISTURBANCE 514514 508 507 510 511 508 507 509 510 507508509507510PRECAST CONCRETE STRUCTURE 6.5' X 6.5 ID TOP ELEV=509.00 INV OUT=505.00 SKIMMER INLET=505.00 510 509 513 EROSION CONTROL PHASE 1W N E S NORTH ARROW GRAPHIC SCALE 1"=100 FT. 0 50 100 200 BEFORE YOU DIG CALL ULOCO AVOID UTILITY DAMAGE 1-800-632-4949 1.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3.ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 4.SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMMENDED. GENERAL NOTES: 1.NO ON-SITE BURIAL FOR DEBRIS. 2.ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3.GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 4.ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE EROSION CONTROL INSPECTOR. 5.ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, U.S. SOIL CONSERVATION SERVICE. 6.THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDENR EROSION INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 7.STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. 8.EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE COMMENCEMENT OF ANY SITE WORK OR EARTHWORK OPERATIONS, SHALL BE MAINTAINED DURING CONSTRUCTION, AND SHALL REMAIN IN PLACE UNTIL ALL SITE WORK IS COMPLETE AND GROUND COVER IS ESTABLISHED. 9.STOCKPILES SHALL BE SURROUNDED ON THEIR PERIMETERS WITH SILT FENCES TO PREVENT AND/OR CONTROL SILTATION AND EROSION. 10.TOPS OF STOCKPILES SHALL BE COVERED IN SUCH A MANNER THAT STORMWATER DOES NOT INFILTRATE THE MATERIALS AND THEREBY RENDER THE STOCKPILE UNSUITABLE FOR FILL USE. 11.ALL DISTURBED OR EXPOSED AREAS SUBJECT TO EROSION SHALL BE STABILIZED WITH MULCH OR SEEDED FOR TEMPORARY VEGETATIVE COVER. NO AREA SUBJECT TO EROSION SHALL BE LEFT DISTURBED AND UNSTABILIZED FOR PERIODS LONGER THAN IS ABSOLUTELY NECESSARY TO CARRY OUT THAT PORTION OF THE CONSTRUCTION WORK OR SIX MONTHS AFTER SOIL HAS BEEN DISTURBED WHICHEVER IS LESS. 12.INLET/OUTLET PROTECTION SHALL BE REQUIRED FOR ALL CULVERTS/PIPES/INLETS/OUTLETS LOCATED WITHIN THE AREA OF DISTURBANCE UNTIL THE SITE IS FULLY STABILIZED. 13.ROCK CHECK DAMS SHALL BE CONSTRUCTED AT ALL EXISTING & PROPOSED CATCH BASINS LOCATED IN FILL AREAS & SUBJECT TO STORMWATER RUN-OFF FROM PROPOSED FILL AREAS DURING CONSTRUCTION, OR AS DIRECTED BY THE OWNER/ENGINEER. NO SEDIMENTS SHALL ENTER THE ON-SITE OR OFF-SITE DRAINAGE SYSTEMS AT ANY TIME. 14.ALL PROPOSED SLOPES STEEPER THAN 3:1 SHALL BE STABILIZED WITH EROSION CONTROL MATTING S75 OR AN APPROVED EQUIVALENT BY THE ENGINEER AND PROTECTED FROM EROSION. 15.DISPOSAL OF ALL DEMOLISHED MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR AND MUST BE TAKEN OFF-SITE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL MUNICIPAL REQUIREMENTS. 16.THE AREA OR AREAS OF ENTRANCE AND EXIT TO AND FROM THE SITE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO ADJACENT RIGHTS-OF-WAY. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO ADJACENT RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 17.SEDIMENT BASIN SLOPES SHALL BE STABILIZED AND SEEDED IMMEDIATELY AFTER CONSTRUCTION. 18.TEMPORARY DIVERSIONS SHOULD BE USED AT THE END OF EACH WORKING DAY TO DIVERT STORMWATER AWAY FROM 2:1 SLOPES AND TOWARD THE SEDIMENT CONTROL BMP'S TO THE GREATEST EXTEND POSSIBLE. x PERIMETER DIKES, SWALES, DITCHES, AND SLOPES x HIGH QUALITY WATER (HQW) ZONES x SLOPES STEEPER THAN 3:1 x SLOPES 3:1 OR FLATTER x ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 7 7 7 14 14 NONE NONE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS * "EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE" (SECTION II.B (2)(b)) GROUND STABILIZATION REQUIREMENTS (PER NPDES CONSTRUCTION STORMWATER GENERAL PERMIT NCG010000) CONSTRUCTION SEQUENCE: 1.OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDENR. 2.SET UP AN ON-SITE PRE-CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR OF NCDENR TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF CODE AND IS SUBJECT TO A FINE. 3.3. INDICATE LIMITS OF DISTURBANCE/TREE PROTECTION. INSTALL SILT FENCE, CONSTRUCTION ENTRANCE, SKIMMER SEDIMENT BASINS, DIVERSION DITCHES, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, AND NCDENR LAND DEVELOPMENT STANDARDS MANUAL. 4.CALL FOR ON-SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING MAY BEGIN. 5.CLEAR AND GRUB IN AREAS SHOWN. MAINTAIN EROSION CONTROL DEVICES THROUGHOUT CLEARING OPERATION 6.BRING SITE TO FINISHED GRADE AND INSTALL SECURITY FENCING AS SHOWN ON SITE PLAN. 7.SEED ALL DISTURBED AREAS OUTSIDE ARRAY ACCESS AISLES. 8.PROCEED WITH INSTALLATION OF ARRAY AND ASSOCIATED EQUIPMENT. 9.MAINTAIN EROSION CONTROL MEASURES THROUGHOUT CONSTRUCTION. 10.UPON COMPLETION OF CONSTRUCTION, REMOVE TEMPORARY FENCING AND LOGGING MATS. INSTALL AND SEED PERMANENT GRASS DRIVE 11.INSTALL LANDSCAPE BUFFER. 12.SEED AND STABILIZE ALL REMAINING DISTURBED AREAS. 13.MONITOR SEDIMENT RUNOFF AS REQUIRED. PROVIDE MAINTENANCE AND MAINTENANCE LOG AS REQUIRED. CLEAN SEDIMENT FROM SILT FENCE AND SEDIMENT TRAP AS REQUIRED BY NCDENR STANDARDS. 14.ONCE SITE IS STABILIZED AND WITH PERMISSION OF EROSION CONTROL INSPECTOR EROSION CONTROL MEASURES CAN BE REMOVED AND STABILIZED. NOTE: PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. COPYRIGHT 2013C 10 JMR 215046 C04 - EROSION PH 1.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR EROSION CONTROL NOTES: 1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. 2.TOTAL DISTURBED AREA = 25.0 AC. 3. NO DISRUPTION OF LANDFILL DAILY OPERATIONS IS PERMITTED. CONTRACTOR TO COORDINATE WITH GRANVILLE COUNTY LANDFILL TO ACCOMMODATE: A. PARKING FOR CONSTRUCTION CREWS B. MATERIAL STORAGE 3.SEE SKIMMER GRADING SHEETS FOR OUTLETS OF TEMPORARY DITCHES INTO SKIMMER BASINS. BASINS REQUIRED TO HAVE CONCENTRATED FLOW THROUGH BAFFLES TO PREVENT SHORT CIRCUITING. C04 CORNWALL SOLAR CENTER EROSION CONTROL NARRATIVE: 1.EXISTING SITE WHERE SOLAR CENTER IS PROPOSED IS AN SOIL BORROW AREA FOR THE LANDFILL. SOIL BORROW OPERATION CEASED PRIOR TO PERMITTING. 2.SITE TO BE COMPLETELY RE-GRADED TO ACCOMMODATE RACKING SYSTEM FOR THE PV PANELS. 3.SITE LOCATION IS SUBJECT TO SIGNIFICANT OFFSITE DRAINAGE AREA. 4.SITE HAS THREE OUTLET AREAS THAT REQUIRE PROTECTION FROM SEDIMENT PROTECTION. 5.ONCE SKIMMER BASINS ARE INSTALLED IN THE FIRST PHASE ANY LOW AREA OR AREA WITH PONDING WATER IS TO BE BREACHED TO ALLOW GRAVITY FLOW OR PUMPED TO THE NEAREST BASIN. PROVIDE MAXIMUM OVERLAND FLOW LENGTH FOR EFFLUENT FOR EITHER METHOD OF DRAWDOWN. MONITOR SKIMMER SEDIMENT BASINS DURING OPERATION. DO NOT ALLOW SKIMMER BASINS TO BE OVERBURDENED DURING THIS EXCERCISE. STAGE THIS OPERATION TO PERFORM DURING DRY, NON OVERCAST PERIODS. 6.EROSION CONTROL INTENT IS TO PROTECT THE THREE IDENTIFIED OUTLET AREAS WITH SKIMMER SEDIMENT BASINS. SKIMMER SEDIMENT BASIN 1 WILL BE REMOVED FOR THE SECOND PHASE OF GRADING. SEE NOTE BELOW. SKIMMER SEDIMENT BASIN 1 DRAINAGE IS INTENDED TO BE DIRECTED TO SKIMMER SEDIMENT BASIN 2 AS THAT AREA OF THE SITE IS BROUGHT TO GRADE. SKIMMER BASINS: NOTES: THE SOLAR REQUIREMENTS FOR THIS SITE DO NOT PROVIDE ADEQUATE ROOM FOR SKIMMER BASINS TO BE PLACED OUTSIDE OF CONSTRUCTION ACTIVITY. CONSTRUCTION ACTIVITY WILL BE REQUIRED INSIDE ACTIVE SKIMMER BASINS. NCDENR IS ALLOWING THIS MODIFICATION. CONTACT NCDENR PRIOR TO WORK WITHIN THE SKIMMER SEDIMENT BASINS. STAGE CONSTRUCTION OF THE ARRAYS WITHIN THE BASINS TO DRY, NON OVERCAST PERIODS. DURING PANEL CONSTRUCTION WITHIN SKIMMER BASIN FOOTPRINT, SKIMMER AND OUTLET MUST BE INSPECTED AT THE END OF EACH WORKING DAY FOR OPERABILITY. *** CONTRACTOR IS RESPONSIBLE FOR REMEDIATION OF SEDIMENT TRANSPORT BEYOND THE LIMITS OF DISTURBANCE AS SHOWN ON THIS PLAN. REMEDIATION, IF NECESSARY, MUST BE AGREED UPON BY LANDFILL MANAGEMENT, NCDENR AND CONTRACTOR. SKIMMER BASIN 1 1.SKIMMER BASIN TO BE COMPLETED IN THE FIRST PHASE PRIOR TO ANY GRADING ACTIVITY. 2.SKIMMER BASIN TO REMAIN ACTIVE UNTIL SUCH A TIME DURING GRADING THE CONTRIBUTING DRAINAGE AREA CAN BE ROUTED TO SKIMMER SEDIMENT BASIN 2. 3.DO NOT REMOVE SKIMMER BASIN WITHOUT PERMISSION OF NCDENR AND PHASE 2 EROSION CONTROL OUTLET STRUCTURES IN PLACE. SKIMMER BASIN 2 1.SKIMMER BASIN TO BE COMPLETED IN THE FIRST PHASE PRIOR TO ANY GRADING ACTIVITY. 2.SKIMMER BASIN DESIGNED FOR MAX DRAINAGE AREA CONTRIBUTING DURING PHASE 2 OF EROSION CONTROL. 3.SURFACE AREA REQUIREMENTS FOR SKIMMER BASIN REQUIRE BASIN TO BE PLACED IN FOOTPRINT OF ARRAY. SEE NOTE ABOVE PERTAINING TO WORKING WITHIN ACTIVE SKIMMER BASINS. 4.ENSURE POROUS BAFFLE PLACEMENT CAN BE MAINTAINED THROUGHOUT THE REQUIRED LIFE OF THE SEDIMENT BASIN AND DOES NOT CONFLICT WITH RACKING SYSTEM. SKIMMER BASIN 3 1.SKIMMER BASIN TO BE COMPLETED IN THE FIRST PHASE PRIOR TO ANY GRADING ACTIVITY. PLACE INLET PROTECTION FOR EXISTING 60" RCP PRIOR TO CONSTRUCTION OF SKIMMER SEDIMENT BASIN. 2.SURFACE AREA REQUIREMENTS FOR SKIMMER BASIN REQUIRE BASIN TO BE PLACED IN FOOTPRINT OF ARRAY. SEE NOTE ABOVE PERTAINING TO WORKING WITHIN ACTIVE SKIMMER BASINS. 3.ENSURE POROUS BAFFLE PLACEMENT CAN BE MAINTAINED THROUGHOUT THE REQUIRED LIFE OF THE SEDIMENT BASIN AND DOES NOT CONFLICT WITH RACKING SYSTEM. 4.MAXIMUM DEPTH OF SKIMMER BASIN IS 1FT WITH 1 FT OF FREEBOARD TO TOP OF DAM. 5.PERMANENT SECURITY FENCE CANNOT BE CONSTRUCTED IN ACTIVE SEDIMENT BASIN. TEMPORARY FENCE TO BE CONSTRUCTED OUTSIDE OF BASIN UNTIL SITE IS STABILIZED AND BASIN IS NO LONGER NEEDED. 6.ONCE BASIN IS STABILIZED, CONCRETE RISER TO BE RETROFITTED TO ALLOW FOR STORM DRAINAGE TO PASS. RISER TOP NEEDS TO BE RESET AT ELEVATION 507. RISER TOP TO BE FITTED WITH AN OPEN THROATED CATCH BASIN INLET, NCDOT STD. 840.04. 6' SECURITY FENCE W/ BARBED WIRE SKIMMER SEDIMENT BASIN 2 WITH RISER DA=39 AC DIST AREA=19.1 AC LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE PP PP PP PP PP PP PP LP CONCRETE PAD SCRAP PILE 20' GRAVEL D R I V E 25' GRAVEL ROADIPF CONCRETE PAD IPF IPF IPF IPF IPF IPF IPF IPF IPF AXLE N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 N/F YANCEY PROPERTIES INC MAP # 190504940318 6606 CORNWALL ROAD DB 649 PG 191 PB 6 PG 94 N/F CHARLES & TYLETTE JONES MAP # 190504921833 6566 CORNWALL ROAD DB 245 PG 265 N/F TONEY MCGEE & MM WILSON MAP # 191500013742 DB 580 PG 711 N/F RUTH ARMSTRONG MAP # 190504917752 CORNWALL ROAD DB 654 PG 622 N/F CAROLYN PITTS MAP # 190500018702 DB 1085 PG 398 PB 17 PG 143 25' GRAVEL R OAD SHED SHED GARAGE PP FRAMEBLDG SHED GRAVEL CONCRETE LP TRUCKSCALE A S H P A L T GRAVEL ASPHALT ROAD FENCE PP 1ƒ :687.15'1ƒ :1783.56'1ƒ   ( 239.55' 1ƒ   ( 277.95' CP CP 6ƒ :249.92'6ƒ :490.21'LANDFILL ROAD S.R. 1459 (60' WIDE PUBLIC R/W) 1ƒ   ( 3858.10' ( G R O U N D ) 100' CP&LEASEMENT AS SHOWN ON PLAT BOOK 37 PG 161 100' 30' CP&L EASEMENT AS PER BK 1446-356 N/F MCGEE LINWOOD ET ALL MAP # 191500019857 DB 1351 PG 519 N/F MCGEE LINWOOD ET ALL MAP # 19150011811 DB 239 PG 258 N/F JOSEPH MCGHEE MAP # 191500123248 DB 1211 PG 259 L1 L2L3L4L5L6 N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 CMF WIRE FENCE EXTENDS 40' PAST PROPERTY LINE 800' TO STERL CARLINGTON ROAD YARD WASTE DROP 12' INGRESS/EGRESS EASEMENT BK 175-268 (NO EVIDENCE OF USE) PP PP PP PP PP PP PP LP CONCRETE PAD SCRAP PILE 20' GRAVEL D R I V E 25' GRAVEL ROADIPF CONCRETE PAD IPF IPF IPF IPF IPF IPF IPF IPF IPF AXLE N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 N/F YANCEY PROPERTIES INC MAP # 190504940318 6606 CORNWALL ROAD DB 649 PG 191 PB 6 PG 94 N/F CHARLES & TYLETTE JONES MAP # 190504921833 6566 CORNWALL ROAD DB 245 PG 265 N/F TONEY MCGEE & MM WILSON MAP # 191500013742 DB 580 PG 711 N/F RUTH ARMSTRONG MAP # 190504917752 CORNWALL ROAD DB 654 PG 622 N/F CAROLYN PITTS MAP # 190500018702 DB 1085 PG 398 PB 17 PG 143 25' GRAVEL R OAD SHED SHED GARAGE PP FRAMEBLDG SHED GRAVEL CONCRETE LP TRUCKSCALE A S H P A L T GRAVEL ASPHALT ROAD FENCE PP 1ƒ :687.15'1ƒ :1783.56'1ƒ   ( 239.55' 1ƒ   ( 277.95' CP CP 6ƒ :249.92'6ƒ :490.21'LANDFILL ROAD S.R. 1459 (60' WIDE PUBLIC R/W) 1ƒ   ( 3858.10' ( G R O U N D ) 100' CP&LEASEMENT AS SHOWN ON PLAT BOOK 37 PG 161 100' 30' CP&L EASEMENT AS PER BK 1446-356 N/F MCGEE LINWOOD ET ALL MAP # 191500019857 DB 1351 PG 519 N/F MCGEE LINWOOD ET ALL MAP # 19150011811 DB 239 PG 258 N/F JOSEPH MCGHEE MAP # 191500123248 DB 1211 PG 259 L1 L2L3L4L5L6 N/F GRANVILLE COUNTY MAP #191500244743 LANDFILL ROAD DB 1314 PG 324 PB 37 PG 161 CMF WIRE FENCE EXTENDS 40' PAST PROPERTY LINE 800' TO STERL CARLINGTON ROAD YARD WASTE DROP 12' INGRESS/EGRESS EASEMENT BK 175-268 (NO EVIDENCE OF USE) SILT FENCE OUTLET LIMITS OF DISTURBANCE SILT FENCE LIMITS OF DISTURBANCE LIMITS OF DISTURBANCE SILT FENCE SKIMMER SEDIMENT BASIN 2 DA=11.8 AC PH 1 DA=17.4 AC PH 2 DIST AREA=10.00 AC SEE SHEET C07 EX 24" RCP515509510514515513514 514 512 510 516 514 507513508 507 510 511 5175165155175165155145135 1 2 517 513 511525 520525 514 512 508 511506509 508 512514515516518519520522523515525513 513 512 SKIMMER SEDIMENT BASIN 3 WITH PRECAST CONCRETE RISER PHASE 2 DRAIN AREA=27 AC DIST AREA=11.6 AC SEE SHEET C07 CONSTRUCTION ENTRANCE262'126' LIMITS OF DISTURBANCE RIP RAP APRON SILT FENCE 507 507508509 5095106' SECURITY FENCE PRECAST CONCRETE STRUCTURE 6.5' X 6.5 ID TOP ELEV=509.00 INV OUT=504.63 SKIMMER INLET=505.00 4" SKIMMER 15" RCP 4" SKIMMER 510514510 510512511 510 TEMPORARY SECURITY FENCE CONCRETE WASHOUT CONCRETE WASHOUT CONCRETE WASHOUT EROSION CONTROL PHASE 2W N E S NORTH ARROW GRAPHIC SCALE 1"=100 FT. 0 50 100 200 BEFORE YOU DIG CALL ULOCO AVOID UTILITY DAMAGE 1-800-632-4949 1.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3.ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 4.SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMMENDED. GENERAL NOTES: 1.NO ON-SITE BURIAL FOR DEBRIS. 2.ANY GRADING BEYOND THE DENUDED LIMITS SHOWN ON THE PLAN IS A VIOLATION OF THE EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 3.GRADING MORE THAN ONE ACRE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION OF THE EROSION CONTROL ORDINANCE AND IS SUBJECT TO A FINE. 4.ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY A REPRESENTATIVE OF THE EROSION CONTROL INSPECTOR. 5.ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, U.S. SOIL CONSERVATION SERVICE. 6.THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES TO MINIMIZE EROSION. THE CONTRACTOR SHALL MAINTAIN CLOSE CONTACT WITH THE NCDENR EROSION INSPECTOR SO THAT PERIODIC INSPECTIONS CAN BE PERFORMED AT APPROPRIATE STAGES OF CONSTRUCTION. 7.STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE SHOWN ON THE PLAN. 8.EROSION AND SEDIMENTATION CONTROL MEASURES SHALL BE IN PLACE PRIOR TO THE COMMENCEMENT OF ANY SITE WORK OR EARTHWORK OPERATIONS, SHALL BE MAINTAINED DURING CONSTRUCTION, AND SHALL REMAIN IN PLACE UNTIL ALL SITE WORK IS COMPLETE AND GROUND COVER IS ESTABLISHED. 9.STOCKPILES SHALL BE SURROUNDED ON THEIR PERIMETERS WITH SILT FENCES TO PREVENT AND/OR CONTROL SILTATION AND EROSION. 10.TOPS OF STOCKPILES SHALL BE COVERED IN SUCH A MANNER THAT STORMWATER DOES NOT INFILTRATE THE MATERIALS AND THEREBY RENDER THE STOCKPILE UNSUITABLE FOR FILL USE. 11.ALL DISTURBED OR EXPOSED AREAS SUBJECT TO EROSION SHALL BE STABILIZED WITH MULCH OR SEEDED FOR TEMPORARY VEGETATIVE COVER. NO AREA SUBJECT TO EROSION SHALL BE LEFT DISTURBED AND UNSTABILIZED FOR PERIODS LONGER THAN IS ABSOLUTELY NECESSARY TO CARRY OUT THAT PORTION OF THE CONSTRUCTION WORK OR SIX MONTHS AFTER SOIL HAS BEEN DISTURBED WHICHEVER IS LESS. 12.INLET/OUTLET PROTECTION SHALL BE REQUIRED FOR ALL CULVERTS/PIPES/INLETS/OUTLETS LOCATED WITHIN THE AREA OF DISTURBANCE UNTIL THE SITE IS FULLY STABILIZED. 13.ROCK CHECK DAMS SHALL BE CONSTRUCTED AT ALL EXISTING & PROPOSED CATCH BASINS LOCATED IN FILL AREAS & SUBJECT TO STORMWATER RUN-OFF FROM PROPOSED FILL AREAS DURING CONSTRUCTION, OR AS DIRECTED BY THE OWNER/ENGINEER. NO SEDIMENTS SHALL ENTER THE ON-SITE OR OFF-SITE DRAINAGE SYSTEMS AT ANY TIME. 14.ALL PROPOSED SLOPES STEEPER THAN 3:1 SHALL BE STABILIZED WITH EROSION CONTROL MATTING S75 OR AN APPROVED EQUIVALENT BY THE ENGINEER AND PROTECTED FROM EROSION. 15.DISPOSAL OF ALL DEMOLISHED MATERIALS IS THE RESPONSIBILITY OF THE CONTRACTOR AND MUST BE TAKEN OFF-SITE IN ACCORDANCE WITH ALL FEDERAL, STATE, AND LOCAL MUNICIPAL REQUIREMENTS. 16.THE AREA OR AREAS OF ENTRANCE AND EXIT TO AND FROM THE SITE SHALL BE MAINTAINED IN A CONDITION WHICH WILL PREVENT TRACKING OR FLOWING OF SEDIMENT ONTO ADJACENT RIGHTS-OF-WAY. ALL SEDIMENT SPILLED, DROPPED, WASHED OR TRACKED ONTO ADJACENT RIGHT-OF-WAY MUST BE REMOVED IMMEDIATELY. 17.SEDIMENT BASIN SLOPES SHALL BE STABILIZED AND SEEDED IMMEDIATELY AFTER CONSTRUCTION. 18.TEMPORARY DIVERSIONS SHOULD BE USED AT THE END OF EACH WORKING DAY TO DIVERT STORMWATER AWAY FROM 2:1 SLOPES AND TOWARD THE SEDIMENT CONTROL BMP'S TO THE GREATEST EXTEND POSSIBLE. x PERIMETER DIKES, SWALES, DITCHES, AND SLOPES x HIGH QUALITY WATER (HQW) ZONES x SLOPES STEEPER THAN 3:1 x SLOPES 3:1 OR FLATTER x ALL OTHER AREAS WITH SLOPES FLATTER THAN 4:1 7 7 7 14 14 NONE NONE IF SLOPES ARE 10' OR LESS IN LENGTH AND ARE NOT STEEPER THAN 2:1, 14 DAYS ARE ALLOWED 7 DAYS FOR SLOPES GREATER THAN 50 FEET IN LENGTH NONE (EXCEPT FOR PERIMETERS AND HQW ZONES) SITE AREA DESCRIPTION STABILIZATION TIME FRAME STABILIZATION TIME FRAME EXCEPTIONS * "EXTENSIONS OF TIME MAY BE APPROVED BY THE PERMITTING AUTHORITY BASED ON WEATHER OR OTHER SITE-SPECIFIC CONDITIONS THAT MAKE COMPLIANCE IMPRACTICABLE" (SECTION II.B (2)(b)) GROUND STABILIZATION REQUIREMENTS (PER NPDES CONSTRUCTION STORMWATER GENERAL PERMIT NCG010000) NOTE: PERMANENT GROUNDCOVER FOR ALL DISTURBED AREAS WITHIN 15 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION OR DEVELOPMENT. COPYRIGHT 2013C 10 JMR 215046 C05 - EROSION PH2.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR CONSTRUCTION SEQUENCE: 1.OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM NCDENR. 2.SET UP AN ON-SITE PRE-CONSTRUCTION CONFERENCE WITH EROSION CONTROL INSPECTOR (CONTACT NCDENR LAND QUALITY SECTION RALEIGH OFFICE) TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF CODE AND IS SUBJECT TO A FINE. 3.INDICATE LIMITS OF DISTURBANCE/TREE PROTECTION. INSTALL SILT FENCE, CONSTRUCTION ENTRANCE, SKIMMER SEDIMENT BASINS, DIVERSION DITCHES, AND OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N. C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U. S. DEPT. OF AGRICULTURE, AND NCDENR LAND DEVELOPMENT STANDARDS MANUAL. 4.ONCE MEASURES ARE INSTALLED CALL FOR ON-SITE INSPECTION (CONTACT NCDENR LAND QUALITY SECTION RALEIGH OFFICE). WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING MAY BEGIN. 5.CLEAR AND GRUB IN AREAS SHOWN. MAINTAIN EROSION CONTROL DEVICES THROUGHOUT CLEARING OPERATION 6.BRING SITE TO FINISHED GRADE AND INSTALL SECURITY FENCING AS SHOWN ON SITE PLAN. 7.SEED ALL DISTURBED AREAS OUTSIDE ARRAY ACCESS AISLES. 8.PROCEED WITH INSTALLATION OF ARRAY AND ASSOCIATED EQUIPMENT. 9.MAINTAIN EROSION CONTROL MEASURES THROUGHOUT CONSTRUCTION. 10.UPON COMPLETION OF CONSTRUCTION, REMOVE TEMPORARY FENCING AND LOGGING MATS. INSTALL AND SEED PERMANENT GRASS DRIVE 11.INSTALL LANDSCAPE BUFFER. 12.SEED AND STABILIZE ALL REMAINING DISTURBED AREAS. 13.MONITOR SEDIMENT RUNOFF AS REQUIRED. PROVIDE MAINTENANCE AND MAINTENANCE LOG AS REQUIRED. CLEAN SEDIMENT FROM SILT FENCE AND SEDIMENT TRAP AS REQUIRED BY NCDENR STANDARDS. 14.ONCE SITE IS STABILIZED AND WITH PERMISSION OF EROSION CONTROL INSPECTOR EROSION CONTROL MEASURES CAN BE REMOVED AND STABILIZED. EROSION CONTROL NOTES: 1.ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH STATE AND LOCAL REQUIREMENTS. 2.TOTAL DISTURBED AREA = 25.0 AC. 3. NO DISRUPTION OF LANDFILL DAILY OPERATIONS IS PERMITTED. CONTRACTOR TO COORDINATE WITH GRANVILLE COUNTY LANDFILL TO ACCOMMODATE: A. PARKING FOR CONSTRUCTION CREWS B. MATERIAL STORAGE 3.SEE SKIMMER GRADING SHEETS FOR OUTLETS OF TEMPORARY DITCHES INTO SKIMMER BASINS. BASINS REQUIRED TO HAVE CONCENTRATED FLOW THROUGH BAFFLES TO PREVENT SHORT CIRCUITING. C05 CORNWALL SOLAR CENTER EROSION CONTROL NARRATIVE: 1.EXISTING SITE WHERE SOLAR CENTER IS PROPOSED IS A SOIL BORROW AREA FOR THE LANDFILL. SOIL BORROW OPERATION CEASED PRIOR TO PERMITTING. 2.SITE TO BE COMPLETELY RE-GRADED TO ACCOMMODATE RACKING SYSTEM FOR THE PV PANELS. 3.SITE LOCATION IS SUBJECT TO SIGNIFICANT OFFSITE DRAINAGE AREA. 4.SITE HAS THREE OUTLET AREAS THAT REQUIRE PROTECTION FROM SEDIMENT PROTECTION. 5.ONCE SKIMMER BASINS ARE INSTALLED IN THE FIRST PHASE ANY LOW AREA OR AREA WITH PONDING WATER IS TO BE BREACHED TO ALLOW GRAVITY FLOW OR PUMPED TO THE NEAREST BASIN. PROVIDE MAXIMUM OVERLAND FLOW LENGTH FOR EFFLUENT FOR EITHER METHOD OF DRAWDOWN. MONITOR SKIMMER SEDIMENT BASINS DURING OPERATION. DO NOT ALLOW SKIMMER BASINS TO BE OVERBURDENED DURING THIS EXCERCISE. STAGE THIS OPERATION TO PERFORM DURING DRY, NON OVERCAST PERIODS. 6.EROSION CONTROL INTENT IS TO PROTECT THE THREE IDENTIFIED OUTLET AREAS WITH SKIMMER SEDIMENT BASINS. SKIMMER SEDIMENT BASIN 1 WILL BE REMOVED FOR THE SECOND PHASE OF GRADING. SEE NOTE BELOW. SKIMMER SEDIMENT BASIN 1 DRAINAGE IS INTENDED TO BE DIRECTED TO SKIMMER SEDIMENT BASIN 2 AS THAT AREA OF THE SITE IS BROUGHT TO GRADE. SKIMMER BASINS: NOTES: THE SOLAR REQUIREMENTS FOR THIS SITE DO NOT PROVIDE ADEQUATE ROOM FOR SKIMMER BASINS TO BE PLACED OUTSIDE OF CONSTRUCTION ACTIVITY. CONSTRUCTION ACTIVITY WILL BE REQUIRED INSIDE ACTIVE SKIMMER BASINS. NCDENR IS ALLOWING THIS MODIFICATION. CONTACT NCDENR PRIOR TO WORK WITHIN THE SKIMMER SEDIMENT BASINS. STAGE CONSTRUCTION OF THE ARRAYS WITHIN THE BASINS TO DRY, NON OVERCAST PERIODS. DURING PANEL CONSTRUCTION WITHIN SKIMMER BASIN FOOTPRINT, SKIMMER AND OUTLET MUST BE INSPECTED AT THE END OF EACH WORKING DAY FOR OPERABILITY. *** CONTRACTOR IS RESPONSIBLE FOR REMEDIATION OF SEDIMENT TRANSPORT BEYOND THE LIMITS OF DISTURBANCE AS SHOWN ON THIS PLAN. REMEDIATION, IF NECESSARY, MUST BE AGREED UPON BY LANDFILL MANAGEMENT, NCDENR AND CONTRACTOR. SKIMMER BASIN 1 1.SKIMMER BASIN TO BE COMPLETED IN THE FIRST PHASE PRIOR TO ANY GRADING ACTIVITY. 2.SKIMMER BASIN TO REMAIN ACTIVE UNTIL SUCH A TIME DURING GRADING THE CONTRIBUTING DRAINAGE AREA CAN BE ROUTED TO SKIMMER SEDIMENT BASIN 2. 3.DO NOT REMOVE SKIMMER BASIN WITHOUT PERMISSION OF NCDENR AND PHASE 2 EROSION CONTROL OUTLET STRUCTURES IN PLACE. SKIMMER BASIN 2 1.SKIMMER BASIN TO BE COMPLETED IN THE FIRST PHASE PRIOR TO ANY GRADING ACTIVITY. 2.SKIMMER BASIN DESIGNED FOR MAX DRAINAGE AREA CONTRIBUTING DURING PHASE 2 OF EROSION CONTROL. 3.SURFACE AREA REQUIREMENTS FOR SKIMMER BASIN REQUIRE BASIN TO BE PLACED IN FOOTPRINT OF ARRAY. SEE NOTE ABOVE PERTAINING TO WORKING WITHIN ACTIVE SKIMMER BASINS. 4.ENSURE POROUS BAFFLE PLACEMENT CAN BE MAINTAINED THROUGHOUT THE REQUIRED LIFE OF THE SEDIMENT BASIN AND DOES NOT CONFLICT WITH RACKING SYSTEM. SKIMMER BASIN 3 1.SKIMMER BASIN TO BE COMPLETED IN THE FIRST PHASE PRIOR TO ANY GRADING ACTIVITY. PLACE INLET PROTECTION FOR EXISTING 60" RCP PRIOR TO CONSTRUCTION OF SKIMMER SEDIMENT BASIN. 2.SURFACE AREA REQUIREMENTS FOR SKIMMER BASIN REQUIRE BASIN TO BE PLACED IN FOOTPRINT OF ARRAY. SEE NOTE ABOVE PERTAINING TO WORKING WITHIN ACTIVE SKIMMER BASINS. 3.ENSURE POROUS BAFFLE PLACEMENT CAN BE MAINTAINED THROUGHOUT THE REQUIRED LIFE OF THE SEDIMENT BASIN AND DOES NOT CONFLICT WITH RACKING SYSTEM. 4.MAXIMUM DEPTH OF SKIMMER BASIN IS 1FT WITH 1 FT OF FREEBOARD TO TOP OF DAM. 5.PERMANENT SECURITY FENCE CANNOT BE CONSTRUCTED IN ACTIVE SEDIMENT BASIN. TEMPORARY FENCE TO BE CONSTRUCTED OUTSIDE OF BASIN UNTIL SITE IS STABILIZED AND BASIN IS NO LONGER NEEDED. 6.ONCE BASIN IS STABILIZED, CONCRETE RISER TO BE RETROFITTED TO ALLOW FOR STORM DRAINAGE TO PASS. RISER TOP NEEDS TO BE RESET AT ELEVATION 507. RISER TOP TO BE FITTED WITH AN OPEN THROATED CATCH BASIN INLET, NCDOT STD. 840.01. * SEE SHEET C08 FOR SKIMMER BASIN 2 AND 3 TAKEDOWN SEQUENCE. PROGRESS DRAWINGS PP PP PP PP IPF AXLE1ƒ :1783.56' 1ƒ    ( 239.55' EASEMENT AS SHOWN ON PLAT BOOK 37 PG 161 100' YARD WASTE DROP OPEN THROAT CATCH BASIN 6.5' X 6.5 ID, NCDOT STD 840.04 TOP ELEV=507.00 INV OUT=504.63 SKIMMER INLET=505.00 EX 24" RCP515509510514515513514 514 512 510 516 514 507513508 507 510 511 517516515 5175165155145135 1 2 517 513 511525 520525 514 512 508 511506509 508 512514515516518519520522523515525513 513 512 262'126' 507 507508509 509510510514510 510512511 510 OVERALL GRADING PLANW N E S NORTH ARROW GRAPHIC SCALE 1"=60 FT. 0 30 60 120 BEFORE YOU DIG CALL ULOCO AVOID UTILITY DAMAGE 1-800-632-4949 1.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3.ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 4.SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMMENDED. COPYRIGHT 2013C 10 JMR 215046 C06 - GRADING OVERALL.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR GENERAL NOTES: 1.RETAINING WALLS OVER 4' TALL REQUIRE A SEPARATE PERMIT AND INSPECTION. 2.ALL STORM WATER CATCH BASINS, INLETS, MANHOLES, ETC. SHALL BE PERMANENTLY LABELED AS "NO DUMPING, DRAINS TO RIVER" AND INCLUDE A FISH SYMBOL. 1.1 SOIL FILL (GEOTECH REPORT SHALL TAKE PRECEDENCE OVER THIS SPECIFICATION IF EXISTS.) A.PLOW, SCARIFY, BENCH, OR BREAK UP SLOPED SURFACES STEEPER THAN ¬9(57,&$/ TO 4 HORIZONTAL SO FILL MATERIAL WILL BOND WITH EXISTING MATERIAL. B.PLACE AND COMPACT FILL MATERIAL IN LAYERS TO REQUIRED ELEVATIONS AS FOLLOWS: 1.UNDER GRASS AND PLANTED AREAS, USE SATISFACTORY SOIL MATERIAL. 2.UNDER WALKS AND PAVEMENTS, USE SATISFACTORY SOIL MATERIAL. 3.UNDER STEPS AND RAMPS, USE ENGINEERED FILL. 4.UNDER BUILDING SLABS, USE ENGINEERED FILL. 5. UNDER FOOTINGS AND FOUNDATIONS, USE ENGINEERED FILL. C.PLACE SOIL FILL ON SUBGRADES FREE OF MUD, FROST, SNOW, OR ICE. 1.2 SOIL MOISTURE CONTROL REVISE PERCENTAGES IN THIS ARTICLE ACCORDING TO GEOTECHNICAL ENGINEER'S WRITTEN RECOMMENDATIONS. A.UNIFORMLY MOISTEN OR AERATE SUBGRADE AND EACH SUBSEQUENT FILL OR BACKFILL SOIL LAYER BEFORE COMPACTION TO WITHIN 2 PERCENT OF OPTIMUM MOISTURE CONTENT. 1.DO NOT PLACE BACKFILL OR FILL SOIL MATERIAL ON SURFACES THAT ARE MUDDY, FROZEN, OR CONTAIN FROST OR ICE. 2.REMOVE AND REPLACE, OR SCARIFY AND AIR DRY, OTHERWISE SATISFACTORY SOIL MATERIAL THAT EXCEEDS OPTIMUM MOISTURE CONTENT BY 2 PERCENT AND IS TOO WET TO COMPACT TO SPECIFIED DRY UNIT WEIGHT. 1.3 COMPACTION OF SOIL BACKFILLS AND FILLS A. PLACE BACKFILL AND FILL SOIL MATERIALS IN LAYERS NOT MORE THAN 8 INCHES (200 MM) IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HEAVY COMPACTION EQUIPMENT, AND NOT MORE THAN 4 INCHES (100 MM) IN LOOSE DEPTH FOR MATERIAL COMPACTED BY HAND-OPERATED TAMPERS. B.PLACE BACKFILL AND FILL SOIL MATERIALS EVENLY ON ALL SIDES OF STRUCTURES TO REQUIRED ELEVATIONS, AND UNIFORMLY ALONG THE FULL LENGTH OF EACH STRUCTURE. C. COMPACT SOIL MATERIALS TO NOT LESS THAN THE FOLLOWING PERCENTAGES OF MAXIMUM DRY UNIT WEIGHT $&&25',1*72$670¬'¬ UNDER STRUCTURES, BUILDING SLABS, STEPS, AND PAVEMENTS, SCARIFY AND RECOMPACT TOP 12 INCHES (300 MM) OF EXISTING SUBGRADE AND EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 100 PERCENT. 1.UNDER WALKWAYS, SCARIFY AND RECOMPACT TOP 6 INCHES (150 MM) BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 95 PERCENT. 2.UNDER TURF OR UNPAVED AREAS, SCARIFY AND RECOMPACT TOP 6 INCHES (150 MM) BELOW SUBGRADE AND COMPACT EACH LAYER OF BACKFILL OR FILL SOIL MATERIAL AT 85 PERCENT. 3.FOR UTILITY TRENCHES, COMPACT EACH LAYER OF INITIAL AND FINAL BACKFILL SOIL MATERIAL AT 95 PERCENT. 1.4 GRADING A.GENERAL: UNIFORMLY GRADE AREAS TO A SMOOTH SURFACE, FREE OF IRREGULAR SURFACE CHANGES. COMPLY WITH COMPACTION REQUIREMENTS AND GRADE TO CROSS SECTIONS, LINES, AND ELEVATIONS INDICATED. 1.PROVIDE A SMOOTH TRANSITION BETWEEN ADJACENT EXISTING GRADES AND NEW GRADES. 2.CUT OUT SOFT SPOTS, FILL LOW SPOTS, AND TRIM HIGH SPOTS TO COMPLY WITH REQUIRED SURFACE TOLERANCES. B.SITE ROUGH GRADING: SLOPE GRADES TO DIRECT WATER AWAY FROM BUILDINGS AND TO PREVENT PONDING. FINISH SUBGRADES TO REQUIRED ELEVATIONS WITHIN THE FOLLOWING TOLERANCES: 1.TURF OR UNPAVED AREAS: PLUS OR MINUS 1 INCH (25 MM). 2.WALKS: PLUS OR MINUS 1 INCH (25 MM). 3.PAVEMENTS: PLUS OR MINUS 1/2 INCH (13 MM). C.GRADING INSIDE BUILDING LINES: FINISH SUBGRADE TO A TOLERANCE OF 1/2 INCH (13 MM) WHEN TESTED WITH A 10-FOOT (3-M) STRAIGHTEDGE. 1.1 FIELD QUALITY CONTROL A.TESTING AGENCY: OWNER RESPONSIBILITY TO ENGAGE A QUALIFIED GEOTECHNICAL ENGINEERING TESTING AGENCY TO PERFORM TESTS AND INSPECTIONS. B.ALLOW TESTING AGENCY TO INSPECT AND TEST SUBGRADES AND EACH FILL OR BACKFILL LAYER. PROCEED WITH SUBSEQUENT EARTH MOVING ONLY AFTER TEST RESULTS FOR PREVIOUSLY COMPLETED WORK COMPLY WITH REQUIREMENTS. C.FOOTING SUBGRADE: AT FOOTING SUBGRADES, AT LEAST ONE TEST OF EACH SOIL STRATUM WILL BE PERFORMED TO VERIFY DESIGN BEARING CAPACITIES. SUBSEQUENT VERIFICATION AND APPROVAL OF OTHER FOOTING SUBGRADES MAY BE BASED ON A VISUAL COMPARISON OF SUBGRADE WITH TESTED SUBGRADE WHEN APPROVED BY ARCHITECT. D.TESTING AGENCY WILL TEST COMPACTION OF SOILS IN PLACE ACCORDING TO $670¬'¬ $670¬'¬ $670¬'¬ $1'$670¬'¬$6$33/,&$%/(7(676:,//%(3(5)250('$77+()2//2:,1*/2&$7,216$1')5(48(1&,(6 E. PAVED AND BUILDING SLAB AREAS: AT SUBGRADE AND AT EACH COMPACTED FILL AND BACKFILL LAYER, AT LEAST ONE TEST )25(9(5<64)7 64¬0 25/(662)3$9('$5($25%8,/',1*6/$%%87,112&$6()(:(57+$17+5((7(676 4.FOUNDATION WALL BACKFILL: AT EACH COMPACTED BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY 100 FEET ¬0 OR LESS OF WALL LENGTH, BUT NO FEWER THAN TWO TESTS. 5.TRENCH BACKFILL: AT EACH COMPACTED INITIAL AND FINAL BACKFILL LAYER, AT LEAST ONE TEST FOR EVERY 150 FEET ¬0 OR LESS OF TRENCH LENGTH, BUT NO FEWER THAN TWO TESTS. 6.WHEN TESTING AGENCY REPORTS THAT SUBGRADES, FILLS, OR BACKFILLS HAVE NOT ACHIEVED DEGREE OF COMPACTION SPECIFIED, SCARIFY AND MOISTEN OR AERATE, OR REMOVE AND REPLACE SOIL MATERIALS TO DEPTH REQUIRED; RECOMPACT AND RETEST UNTIL SPECIFIED COMPACTION IS OBTAINED. C06 277.95' SILT FENCE SKIMMER SEDIMENT BASIN 1 DA=5.6 AC DIST AREA=4.90 AC 507 510 510 OUTLET 506 XXX XXXXXX X X XXXXX X X X X X X X X4" SKIMMER POROUS BAFFLES 506 508 509 506507508506508510512514516506 508 510 512 514 5164" SKIMMERXXX X X X X XXXXXX XXXXXX X X X X X X XXXXXXXXXXX X X X X X X X X X X PRECAST CONCRETE RISER SILT FENCE POROUS BAFFLES 506508510512514506 508 510 512 506 508 508507 508 508 SKIMMER SEDIMENT BASIN 2 DA=11.8 AC PH 1 DA=17.4 AC PH 2 DIST AREA=10.00 ACEX GRAVELDRIVE507 508 509 507 508 509 510 511 512 513 512510514 EX CONCRETE PAD EX DIRT ROAD EX 24" PIPE INV IN=504.63 INV OUT=503.37 SKIMMER SEDIMENT BASIN 3 WITH CONCRETE RISER DRAIN AREA=27 AC DIST AREA=11.6 AC SEE SHEET C07 PLACE INLET PROTECTION PRIOR TO PLACEMENT OF RISER. NCDOT ROCK PIPE INLET SEDIMENT TRAP, TYPE A, 1635.01 REMOVE AFTER RISER SET. PRECAST CONCRETE STRUCTURE 6.5' X 6.5 ID TOP ELEV=509.00 INV OUT=505.00 SKIMMER INLET=505.00XXXXXXXX X XXXXXXXXX X X X XXXXXXXXXXX X X X POROUS BAFFLES 510 512 507508507508509510SKIMMER SEDIMENT BASINS PHASE 1W N E S NORTH ARROW GRAPHIC SCALE 1"=30 FT. 0 15 30 60 BEFORE YOU DIG CALL ULOCO AVOID UTILITY DAMAGE 1-800-632-4949 1.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3.ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 4.SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMMENDED. COPYRIGHT 2013C 10 JMR 215046 C07 - SKIMMERS EROSION PH 1.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR C07 SKIMMER SEDIMENT BASIN 1 SKIMMER SEDIMENT BASIN 2 SKIMMER SEDIMENT BASIN 3 RIP RAP APRON 509 508 506507508506508510512514516506 508 510 512 514 5164" SKIMMERX X XXX XXXX X X XXXXXX X X X X X PRECAST CONCRETE RISER SILT FENCE POROUS BAFFLES PROP PV ARRAYS 508 507 506 506508510512514506507508509 510 511 512SILT FENCE OUTLET 25' GRAVEL R OAD 25' GRAVEL R OAD514EX 24" RCP EX CONCRETE PAD EDGE OF DRIVE EX GRAVELDRIVEXXXXXXXXXX X X XXXXXXXXXXXX X X X X X X XXXXXXXXXXXXXXX X X X X X 507 508 509 508 509 EX CONCRETE PAD PROP PV ARRAYS 510POROUS BAFFLES 510 507508509510 511 512 511 510 513 514510 512 513514 511 514 510 507 510SKIMMER SEDIMENT BASIN 3 WITH PRECAST CONCRETE RISER PHASE 2 DRAIN AREA=27 AC DIST AREA=11.6 AC SEE SHEET C07 PRECAST CONCRETE STRUCTURE 6.5' X 6.5 ID TOP ELEV=509.00 INV OUT=504.63 SKIMMER INLET=505.00 4" SKIMMER TEMPORARY SECURITY FENCE SKIMMER SEDIMENT BASINS PHASE 2W N E S NORTH ARROW GRAPHIC SCALE 1"=100 FT. 0 50 100 200 BEFORE YOU DIG CALL ULOCO AVOID UTILITY DAMAGE 1-800-632-4949 1.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING APPROPRIATE PARTIES AND ASSURING THAT EXISTING UTILITIES ARE LOCATED PRIOR TO BEGINNING CONSTRUCTION. 2.CONTRACTOR IS RESPONSIBLE FOR PLACING BARRICADES USING FLAGMEN, ETC., AS NECESSARY TO INSURE SAFETY TO THE PUBLIC. 3.ALL PAVEMENT CUTS, CONCRETE OR ASPHALT, ARE TO BE REPLACED ACCORDING TO STANDARDS OF THE NORTH CAROLINA DEPARTMENT OF TRANSPORTATION. 4.SHORING WILL BE ACCORDING TO OSHA TRENCHING STANDARDS PART 1926 SUBPART P, OR AS AMMENDED. COPYRIGHT 2013C 10 JMR 215046 C08 - SKIMMERS EROSION PH 2.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR C08 SKIMMER SEDIMENT BASIN 2 SKIMMER SEDIMENT BASIN 3 SKIMMER BASIN REMOVAL 1.ONCE CONTRIBUTING DRAINAGE AREA IS STABILIZED AND WITH THE APPROVAL OF THE EROSION CONTROL INSPECTOR SKIMMER CAN BE REMOVED AND REGULAR DRAINAGE CAN BE ESTABLISHED. 2.REMOVE SKIMMER FROM CONCRETE STRUCTURE AND PLUG INLET ORIFICE WITH GROUT OF SUFFICIENT STRENGTH TO PROVIDE STABILITY FROM PLUG FAILURE AS WELL AS PREVENT WATER INFILTRATION. 3.PROVIDE POSITIVE DRAINAGE FROM AREA OF SKIMMER BASIN TO OUTLET STRUCTURE. 4.CONCRETE STRUCTURE TO BE FITTED WITH AN OPEN THROATED INLET, NCDOT STANDARD 840.04 5.PROVIDE TEMPORARY INLET PROTECTION FOR OPEN THROATED CATCH BASIN WHILE PROVIDING TIME FOR SKIMMER BASIN AREA TO ESTABLISH GROWTH AND STABILIZE. (NCDOT ROCK INLET SEDIMENT TRAP, TYPE A, 1632.01) SKIMMER BASIN REMOVAL 1.ONCE CONTRIBUTING DRAINAGE AREA IS STABILIZED AND WITH THE APPROVAL OF THE EROSION CONTROL INSPECTOR SKIMMER CAN BE REMOVED AND REGULAR DRAINAGE CAN BE ESTABLISHED. 2.REMOVE SKIMMER AND CONCRETE STRUCTURE AND BREACH DAM. 3.LEAVE SILT FENCE IN PLACE WITH SILT FENCE OUTLET WHILE PROVIDING TIME FOR SKIMMER BASIN AREA TO ESTABLISH GROWTH AND STABILIZE. C09 EROSION CONTROL DETAILSSKIMMER SEDIMENT BASINS NTS BAFFLE INSTALLATION Not to Scale x NO PAINT OR LIQUID WASTES IN STREAM OR STORM DRAINS x DEDICATED AREAS FOR DEMOLITION CONSTRUCTION AND OTHER WASTES 50 FT FROM STORM DRAINS AND STREAMS UNLESS NO OTHER REASONABLE ALTERNATIVE AVAILABLE x EARTHEN MATERIAL STOCKPILES MUST BE LOCATED 50 FT FROM STORM DRAINS AND STREAMS UNLESS NO REASONABLE ALTERNATIVES AVAILABLE x CONCRETE MATERIALS MUST BE CONTROLLED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS OR BUFFERS. BUILDING WASTES HANDLING x REQUIREMENTS ARE THE SAME AS IN PREVIOUS PERMIT x THE PERMIT ALLOWS THE REDUCTION FROM THE 20 ACRE MINIMUM IF THE DIRECTOR OF DWQ DETERMINES THAT THE OTHER BMP'S PROVIDE EQUIVALENT PROTECTION. DISCHARGES TO FEDERALLY LISTED WATERS x SAME WEEKLY INSPECTION REQUIREMENTS x SAME RAIN GAUGE & INSPECTIONS AFTER 0.5" RAIN EVENT. INSPECTIONS x INSPECTIONS ONLY REQUIRED DURING NORMAL BUSINESS HOURS. x INSPECTION REPORTS MUST BE AVAILABLE ONSITE DURING BUSINESS HOURS UNLESS A SITE SPECIFIC EXEMPTION IS APPROVED. x ELECTRONICALLY AVAILABLE RECORDS MAY BE SUBSTITUTED UNDER CERTAIN CONDITIONS. x RECORDS MUST BE KEPT FOR 3 YEARS AND AVAILABLE UPON REQUEST. x PROJECTS PERMITTED UNDER THE THE PREVIOUS PERMIT CAN CONTINUE TO FOLLOW THE PREVIOUSLY PERMITTED CONDITIONS x COMPLETE APPLICATIONS RECEIVED PRIOR TO AUGUST 3, 2011 CAN FOLLOW CONDITIONS OF APPROVED APPLICATION. IMPLEMENTATION OF NEW PERMIT CONDITIONS x APPLICATIONS RECEIVED AFTER AUGUST 2, 2011 MUST COMPLY WITH NEW PERMIT CONDITIONS. x DESIGNATION ON THE PLANS WHERE THE 7 AND 14 DAY GROUND STABILIZATION REQUIREMENTS OF THE NPDES PERMIT APPLY. x DESIGNATION ON THE PLANS WHERE BASINS THAT COMPLY WITH THE SURFACE WITHDRAWAL REQUIREMENTS OF THE NPDES PERMIT ARE LOCATED. CONDITIONS IN EROSION AND SEDIMENT CONTROL PLANS x OUTLET STRUCTURE MUST WITHDRAW FROM BASIN SURFACE UNLESS DRAINAGE AREA IS LESS THAN 1 ACRE. x USE ONLY DWQ APPROVED FLOCCULANTS. SEDIMENT BASINS TEMPORARY DIVERSION DITCH Not to Scale HIGH HAZARD TEMPORARY SILT FENCE Not to Scale SILT FENCE STONE OUTLET Not to Scale SEEDING SCHEDULE (SEASONAL)PERMANENT SEEDING SCHEDULE SKIMMER BASIN 3 RIPRAP APRON SKIMMER BASIN W/ 4" OUTLET 10' 11' 1' 6 - inches STABILIZED CONSTRUCTION ENTRANCE Not to Scale COPYRIGHT 2013C 10 JMR 215046 C09 - DETAILS.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR SKIMMER BASIN 2 15" 10' 11.5' 4.5' 11-inches ANTI VORTEX DEVICE COPYRIGHT 2013C 10 JMR 215046 C09 - DETAILS.DWG REVISIONS: PROJECT NUMBER: DRAWN BY:9/19/2015DATE: FILE NAME: SHEET OFCORNWALLSOLAR ELECTRIC POWER PLANTLANDFILL ROAD, GRANVILLE CO, NCNC ENGINEERING BOARD LISCENSE #: C-3781NC LANDSCAPE ARCHITECTURE BOARD LISCENSE #: C-399REV1 - PER CLIENT, REGRADE REV2 - PER NCDENR CURSORY REVIEW REV3 - 9/25/15 PER NCDENR EROSION CONTROL DETAILSC10 CONCRETE WASHOUT 9731-F Southern Pine Blvd. Charlotte, NC 28273 tel: 704/837-2002 fax: 704/837-2010 www.JoyceEngineering.com November 16, 2015 Mr. Ming-Tai Chao NC DEQ Division of Waste Management 1646 Mail Service Center Raleigh, North Carolina 27699 RE: Response to Comments - Proposed Solar Project Oxford Landfill Facility Granville County, North Carolina Permit No. 39-01, Document ID No. (DIN 25258) Dear Mr. Chao: On behalf of Granville County (the County), Joyce Engineering, Inc. (JOYCE) is submitting this response to your comment on the technical review letter dated November 9, 2015, for the above-referenced project. For your reference, your comment is repeated below in italicized print, with our response provided in bold print. 1. The current Shingles Collection Area (on top of a concrete pad as shown on OP-01 of the 2014 Permit Amendment Application DIN 22367) is adjacent to the proposed entrance of the solar farm. There is no statement in the permit application if the shingle collection area will be subjected removal to a new location (see Sheet C03 of 10 and FP-01). From an operational prospective, the current location of the shingle collection area may be easily interfered by the construction activities of the solar project. Please provide the future status of this Shingles Collection Area in the application including drawings. The County is no longer collecting asphalt shingles for recycling. Therefore, the shingle collection area (on top of a concrete pad adjacent to the proposed entrance of the solar farm) will not be relocated as a result of the proposed solar project. Section 4.0 – “Solar Project” of the facility plan, the operations plan, and the drawings were all revised to reflect those changes. A copy of Section 4.0, and revised operations plan and drawings are attached. Mr. Ming-Tai Chao November 16, 2015 Page 2 of 2 Please do not hesitate to contact us with any questions or comments you may have. We look forward to working with you to get the County’s permit modified to include the solar project. Sincerely, JOYCE ENGINEERING, INC. Amy Davis, P.E. Technical Consultant Attachments Revised Attachment to Facility Plan (Section 4.0) Revised Operations Plan and Drawigs C: Ms. Amanda Freeman, Landfill Manager   Section III- Facility Plan 8 Joyce Engineering, Inc. Oxford MSW Landfill Expansion Rev. October 2015 Granville County, North Carolina Rev. November 2015 4.0 SOLAR PROJECT   4.1. Solar Project Development   The proposed solar project is shown on Drawings No. FP-01 through FP-05. Drawing No. FP-01 shows the property boundaries, limits of the existing waste disposal areas, limits of the proposed waste disposal areas, the existing environmental monitoring system, the landfill entrance road, landfill access and perimeter roads, scalehouse and office, convenience center, and the proposed solar project. Current topography for the property is shown, as well as the 300-foot buffer from the property line and other site features. The solar project is located at the southwest end of the property as shown on Drawing No. FP-01. The solar project is surrounded by a fence to prevent illegal trespassing. The white goods containers are placed northeast of the proposed solar project, outside the fenced solar farm parameters. White goods are removed by a metal recycling contractor, which is handled through a bid process. Tires are disposed of by customers onto the ground in the designated tire disposal area as shown on Drawing No. FP-01. Prior to the proposed solar project, the County used the solar farm area to receive, process, and temporarily stockpile yard waste and land clearing debris, and to conduct active composting activities. Additionally, the solar farm area was used as a soil-borrow area to meet the facility soil needs. Due to the solar project, the County had to relocate the composting area and yard waste and land clearing debris area to Unit 2, south of Phase 1. Moreover, Unit 2 is now being used to serve as a soil-borrow area to sustain the site soil needs instead of the solar farm area. The new locations for displaced municipal solid waste management units are within the landfill property (Drawings No. FP-01 through FP-05). Finally, the County discontinued the disposal of animal carcass in the solar farm area in 2013. The County is no longer collecting asphalt shingles for recycling. Therefore, the shingle collection area (on top of a concrete pad adjacent to the proposed entrance of the solar farm) will not be relocated as a result of the proposed solar project.   PREPARED FOR: GRANVILLE COUNTY 141 WILLIAMSBORO STREET OXFORD, NORTH CAROLINA 27565 OXFORD LANDFILL GRANVILLE COUNTY, NORTH CAROLINA PERMIT NO. 39-01 OPERATIONS PLAN JUNE 2009 REVISED JANUARY 2012 REVISED SEPTEMBER 2014 REVISED NOVEMBER 2015 REVISED BY: 2211 WEST MEADOWVIEW ROAD SUITE 101 GREENSBORO, NORTH CAROLINA 27407 PHONE: (336) 323-0092 FAX: (336) 323-0093 WWW.JOYCEENGINEERING.COM JEI PROJECT NO 00660.1302.12 T09 NORTH CAROLINA CORPORATE LIC: C-0782 Operations Plan 1 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 OPERATIONS PLAN TABLE OF CONTENTS 1.0 GENERAL ...........................................................................................................................3  2.0 OPERATIONS DRAWINGS ..............................................................................................3  2.1 Existing Conditions ..............................................................................................................3  3.0  GENERAL OPERATING CONDITIONS ..........................................................................4  3.1 Hours of Operation ..............................................................................................................4  3.2 Site Access and Safety .........................................................................................................4  3.3 Waste Acceptance ................................................................................................................5  3.3.1 MSW Landfill ................................................................................................................5  3.3.2 C&D and MSW Landfills ..............................................................................................5  3.4 Prohibited Waste ..................................................................................................................6  3.5 Special Wastes .....................................................................................................................7  3.6 Litter Control .......................................................................................................................9  3.7 Equipment ............................................................................................................................9  3.8 Air Quality ...........................................................................................................................9  3.9 Dust, Odor, Fire and Vector Control ...................................................................................9  3.10  Scavenging/Salvaging ..................................................................................................10  3.11 Type 1 Composting Facility ..........................................................................................10  3.11.1 Waste Quantities ..........................................................................................................10  3.11.2 Design Considerations .................................................................................................11  3.11.3 Operations ....................................................................................................................11  3.11.4 Waste Acceptance Rule .1406 (6) .............................................................................12  3.11.5 Monitoring Requirements Rule .1406 (9) ...................................................................12  3.11.6 Temperature Parameters Rule .1406 (10) ..................................................................13  3.11.7 Addition of Nitrogen Bearing Materials Rule .1406 (13) ............................................13  3.11.8 Classification/Distribution of MSW Compost Products Rule .1407 ..........................13  4.0  RANDOM WASTE SCREENING PROGRAM ...............................................................14  4.1 Authority ............................................................................................................................14  4.2 Random Selection ..............................................................................................................14  4.3 Record Keeping .................................................................................................................15  4.4 Training ..............................................................................................................................15  4.5 Inspection Site Location ....................................................................................................15  4.6 Action Plan.........................................................................................................................15  5.0 SUBCELL PROGRESSION AND WASTE PLACEMENT ............................................16  5.1 MSW Landfill ....................................................................................................................16  5.1.1 Subcell Progression ......................................................................................................16  5.1.2 Waste Placement and Compaction ...............................................................................16  5.1.3 Filling Operations ........................................................................................................17  5.1.4 Daily Cover ..................................................................................................................17  5.1.5 Intermediate Cover.......................................................................................................17  Operations Plan 2 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 5.1.6  Alternate Cover Material .............................................................................................17  5.2 C&D Landfill .....................................................................................................................18  5.2.1 Waste Placement and Compaction ...............................................................................18  5.2.2 Daily and Intermediate Cover ......................................................................................18  6.0  ENVIRONMENTAL MONITORING PROGRAMS ......................................................18  6.1 Water Quality .....................................................................................................................18  6.2 Landfill Gas .......................................................................................................................18  7.0  EROSION AND SEDIMENT CONTROL REQUIREMENTS........................................19  8.0  RECORD KEEPING REQUIREMENTS .........................................................................19  9.0 LEACHATE MANAGEMENT PLAN FOR UNIT 2, PHASE 1 MSW LANDFILL ......20  9.1 Maintenance of the Leachate Collection System ...............................................................20  9.2 Leachate Generation Records ............................................................................................20  9.3 Leachate Monitoring ..........................................................................................................20  9.4 Leachate Disposal ..............................................................................................................20  9.5 Contingency Plan for Extreme Conditions ........................................................................21  9.6 Handling Leaks and Stormwater in the Leachate Collection Tank Area ...........................21  9.7 Operations in the Leachate Loadout Area .........................................................................21  10.0 CONTINGENCY PLAN ...................................................................................................21  10.1 Implementation..............................................................................................................22  10.2 Inoperable Periods .........................................................................................................22  10.3 Emergency Response Procedures ..................................................................................22  10.4 SEVERE WEATHER CONDITIONS ..........................................................................25  APPENDICES Appendix 1 Random Waste Screening Program Forms Appendix 2 POTW Approval Documentation Appendix 3 Tarp Data Sheet Appendix 4 Temperature Log Data Sheet Appendix 5 Compost End User Brochure Appendix 6 USDA Work Plan from Cooperative Service Agreement Appendix 7 Fire Occurrence Notification Form DRAWINGS Drawing No. OP-T Title Sheet Drawing No. OP-L Legend and General Notes Drawing No. OP-01 Existing Conditions Operations Plan 3 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 1.0 GENERAL The Operation Plan describes how the design and construction plans will be implemented during the life of the facility. The plan consists of drawings and accompanying text which illustrate existing conditions, cell progression, waste placement and daily operations, leachate management, special waste management, buffer zones and soil borrow procedures. The Oxford Landfill is owned and operated by Granville County. The landfill property is located at 6584 Landfill Road, Oxford, North Carolina, approximately 4 miles north of Oxford, North Carolina. The facility is north of the Oxford Outer Loop between Little Satterwhite Road and Highway 15 off of Sterl Carrington Road. The disposal area is located on a slight topographic high that slopes downward in all directions. Surface water flow is towards drainage features which eventually flow north to the Little Grassy Creek. The area to be served by the facility includes Granville County and the surrounding counties of Durham, Franklin, Person, Vance and Wake. The municipalities of Oxford, Butner, Creedmoor, Stem and Stovall will also be served. The intent of this facility is to accommodate waste from Granville County and minor overflow waste from the surrounding counties. Therefore, waste generation trends solely from Granville County were used to develop projected disposal rates. The landfill property is approximately 417 acres. The site consists of an existing C&D landfill (Permit No. 39-01) operating on top of a closed MSW landfill covering approximately 29 acres. Other areas at the facility include a convenience center, collection of scrap tires, and white goods for off-site recycling or disposal. Ancillary facilities such as a scale house and maintenance building are also located on the site. The MSW facility consists of 3 Units (157.8 acres). Unit 2 contains 5 phases, Unit 3 contains 11 phases, and Unit 4 contains 2 phases. This application is for a renewal of the Permit to Operate for the C&D landfill. Currently, an average of 50 tons of construction and demolition debris waste is managed daily, based on a five-day week, at the landfill. With the opening of the MSW Unit 2, Phase 1 landfill in May 2013, an average of 125 tons of MSW will be handled daily. 2.0 OPERATIONS DRAWINGS 2.1 Existing Conditions The site existing conditions is presented on Drawing No. OP-01 and currently includes the following components:  Active C&D landfill over closed unlined MSW landfill (Permit No. 39-01-1997)  Active MSW landfill Unit 2, Phase 1 (Permit No. 39-01-2012)  Convenience center (drop-off area for recyclables and waste)  Office and maintenance building  Weighing scales  Tire collection area  White goods collection area  Land clearing debris collection area Operations Plan 4 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015  Yard trash collection and compost area The drawing also shows the limits of the existing waste disposal area, the environmental monitoring system, the landfill entrance road, landfill access and perimeter roads, scale house, and office. Current topography for the property is shown, as well as the neighboring residence and wells, the 300-foot buffer from the property line, and other site features. Borrow areas will be located in future Units 2, 3, & 4. 3.0 GENERAL OPERATING CONDITIONS 3.1 Hours of Operation The MSWLF and C&DLF will operate Monday through Friday. The operation hours are 7:30 a.m. to 4:00 p.m., but may be adjusted slightly due to fluctuations in the waste stream, or other unforeseen conditions. Brush, metal, and tires are accepted Monday through Friday and 8:00 a.m. to 12:00 p.m. on Saturday unless altered by the County Board of Commissioners. The MSWLF will be closed on the following major holidays: New Year’s Day, Good Friday (close at 12:00 pm), Memorial Day, July 4th, Labor Day, Thanksgiving Day, Christmas Eve, and Christmas Day. An entrance sign has been posted noting operating hours. Holiday closings are advertised in the local paper and notices posted at the entrance ten days prior to the holiday. 3.2 Site Access and Safety Limiting access to the landfill facility is important for the following reasons:  Unauthorized and illegal dumping of wasted materials is prevented;  Trespassing, and injury resulting there from, is discouraged; and  The risk of vandalism is greatly reduced. Access to active areas of the landfill will be controlled by a combination of fences and natural barriers such as the creeks. Access to the facility is controlled through one entrance along Landfill Road, which has secure gates to prevent access after operating hours. A large sign containing the information required in Rule .1626(6) (i.e. dumping procedures, hours, permit number, etc.) is posted at the facility entrance. Waste collection vehicles are weighed in (and out if tare weights are not on file for the vehicle) at the existing scale. Signs have been posted directing traffic to separate areas for the collection of tires, white goods, yard waste, and other recyclable goods, and the MSW active landfill area. During the hours of operation, traffic is routed from the entrance gate and scale house via a gravel access road to the MSWLF or to the C&DLF. The roads shall be maintained to remain passable during all weather conditions. The cell access roads will change in location as the working face moves both horizontally and vertically with the progression of waste fill. The slopes of cell access roads at maximum fill heights should not exceed 10%. An attendant is on duty at the scale house at all times during the operating hours. Operations Plan 5 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 Frequent inspections of the access roads, gates and fences will be performed by landfill personnel. Landfill personnel will maintain the approved access road conditions, as well as, monitor the accessibility to monitoring points. Evidence of trespassing, vandalism, or illegal operation will be reported to the County Sheriff. 3.3 Waste Acceptance The landfills will accept only those solid wastes included in their current permits, including household, commercial, construction and demolition debris, land clearing and inert debris, and industrial solid wastes. These are defined in Rules .0532 for the C&D landfill and .1602 for the MSW landfill as follows: 3.3.1 MSW Landfill  Household waste means any solid waste derived from households including single and multiple residences, hotels and motels, bunkhouses, ranger stations, crew quarters, campgrounds, picnic grounds, and day-use recreation areas.  Commercial solid waste means all types of solid waste generated by stores, offices, restaurants, warehouses, and other nonmanufacturing activities, excluding residential and industrial wastes.  Industrial solid waste means solid waste generated by manufacturing or industrial processes that is not a hazardous waste regulated under Subtitle C of RCRA. Such waste may include, but is not limited to, waste resulting from the following manufacturing processes: electric power generation; fertilizer/agricultural chemicals; food and related products/by-products; inorganic chemicals; iron and steel manufacturing; leather and leather products; nonferrous metals manufacturing/ foundries; organic chemicals; plastics and resins manufacturing; pulp and paper industry; rubber and miscellaneous plastic products; stone, glass, clay, and concrete products; textile manufacturing; transportation equipment; and water treatment. This term does not include mining waste or oil and gas waste. Neither spoiled food, hatchery waste, nor other animal waste is intended to be received in quantities large enough to be problematic for operations. In the event that such wastes are received, they will be immediately buried and covered with a thick layer of soil followed by non- putrescible municipal solid waste. If asbestos waste is received, it will be managed in accordance with 40 CFR 61. The waste will be disposed at the bottom of the working face and covered immediately with soil in a manner that will not cause asbestos particles to become airborne. 3.3.2 C&D and MSW Landfills  Construction and Demolition Debris Waste means solid waste generated solely from the construction, remodeling, repair, or demolition operations on pavement and building structures. Operations Plan 6 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015  Land Clearing and Inert Debris means solid waste created during land clearing including untreated wood, yard trash, uncontaminated soils and rock.  Solid waste generated by mobile or modular home manufacturers and asphalt shingle manufacturers in Granville County. If asbestos waste is received, it will be managed in accordance with 40 CFR 61. The waste will be disposed at the bottom of the working face and covered immediately with soil in a manner that will not cause asbestos particles to become airborne. 3.4 Prohibited Waste A sign is posted at the landfill gate (see Section 3.2 above) that reads "No hazardous or liquid waste accepted without written permission from the Division of Solid Waste Management". The C&D and the MSW landfills will not accept:  Hazardous waste as defined within 15A NCAC 13A, including hazardous waste from conditionally exempt small quantity generators;  Polychlorinated biphenyl (PCB) wastes as defined in 40 CFR 761;  Liquid wastes (i.e., any waste material that is determined to contain "free liquids" as defined by SW-846 Method 9095 (Paint Filter Liquids Test), unless the waste is household waste other than septic waste or waste oil, or leachate or gas condensate derived from the landfill managed in accordance with Rule .1626(9);  Barrels and drums unless they are empty and sufficiently perforated, except fiber drums containing asbestos;  Wooden pallets (applies to MSW landfill only);  Discarded computer equipment and televisions (effective July 1, 2011)  Other wastes specifically banned from landfill disposal by rule or statute for C&D and MSW landfills, such as lead acid batteries, whole tires, used oil, oyster shells, or aluminum cans. In addition to the prohibited waste, the landfills will not dispose of yard waste, white goods, antifreeze, whole scrap tires, recyclable plastic and beverage containers, and motor vehicle oil filters. The County will notify the Division within 24 hours of attempted disposal of any waste the landfill is not permitted to receive, including waste from outside the area the landfill is permitted to serve. The waste screening program is described later in this Operation Plan. Operations Plan 7 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 3.5 Special Wastes The facility accepts “special wastes” such as tires and white goods but separates these wastes from the general disposal area. Tires Tires are received from residential and commercial customers. Tire counts are verified by observation and/or North Carolina Tire Certification Form (for customers with 6 or more tires). Customers are directed to the tire disposal area located north of the scale house as noted on Drawing No. OP-01. Tires are disposed of by customers on to the ground. Weekly, the tires are loaded into an open top trailer. The County contracts with Central Carolina Holdings for recycling and/or disposal of the tires that are collected on-site. Central Carolina Holdings changes out the trailer as needed with a maximum time of 10 calendar days between trailers. Tires are currently hauled to and processed in Cameron, North Carolina. White Goods Customers with white goods and/or scrap metal are directed to the white goods area located north of the scale house as shown on Drawing No. OP-01. Customers place white goods and scrap metal in the unloading area. Freon containing devices are off loaded to the northwest corner of the pad where a licensed contractor, Huff’s Soil Conservation, for Freon removal performs the recovery of Freon. The contractor marks appliances that have undergone Freon removal with an “X”. Records of Freon removal or damaged Freon lines are kept at the scalehouse. The appliance is then stockpiled with the other metals. The metals are stored on-site until they are removed to a recycling facility. Removal of white goods and scrap metal are usually bid out on a $/ton basis. Market conditions and the contractor determine the scrap yard which can range from Winston Salem, NC to Norfolk, Va. The County handles approximately 4 tons of metals for recycling per month. Land Clearing Debris The County receives land clearing debris from Granville County and the surrounding counties of Durham, Franklin, Person, Vance and Wake. The municipalities of Oxford, Butner, Creedmoor, Stem and Stovall will also be served. Land clearing debris consists of solid waste generated solely from land clearing activities. The facility receives on average 45 tons of this type of waste per month. This material is stockpiled and ground as needed. Once ground, the material is used on site for erosion control. The land clearing debris area is located east of Unit 1 and south of Unit 2 as shown on Drawing No. OP-01. Asbestos Waste Management The Oxford facility may dispose of asbestos within the C&D and MSW landfills. Asbestos will only be accepted if it has been processed and packaged in accordance with State and Federal (40 CFR 61) regulations. Asbestos will arrive at the site during morning operating hours in vehicles Operations Plan 8 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 that contain only the asbestos waste and only after a minimum 24-hour advance notification by the generator. Once the hauler brings the asbestos to the landfill, the hauler will be directed to the designated asbestos disposal area by operating personnel. The designated disposal area will be prepared by operations personnel by leveling a small area using a dozer or loader. Prior to disposal, the landfill operators will stockpile cover soil near the designated asbestos disposal area. The volume of soil stockpile will be sufficient to cover the waste and provide any berms, etc. to maintain temporary separation from other landfill traffic. Once placed in the prepared area, the asbestos will be covered with a minimum of 18 inches of daily cover soil placed in a single lift. The surface of the cover will be compacted and graded using a track dozer or loader. The landfill compactor will be prohibited from operating over asbestos disposal areas until at least 18 inches of cover are in place. The landfill staff will visually record the approximate location and elevation of asbestos waste once cover is in-place. The Solid Waste Director will then review pertinent disposal and location information to assure compliance with regulatory requirements and enter the information into the Operating Record. Asbestos location information is known by landfill staff and available to the Department upon request. Once disposal is completed, the area may be covered with waste. No excavation into designated asbestos disposal areas will be permitted. Recyclables The landfill’s convenience center also collects household recyclables such as aluminum cans, steel cans, newspaper, motor oil, vegetable oil, antifreeze, glass, PET Plastics, and cardboard. Used oil is picked up by Noble Oil when the facility has collected 350 gallons. The facility name, physical address, permit number (if applicable), phone number and/or email address for current contractors being used for transporting, treating, processing, and/or disposing of recyclable material will be maintained in the facility Operating Record. Sludge The landfill may accept wastewater treatment sludges in accordance with the following conditions:  Co-disposal with waste in a permitted MSW landfill facility; or  Utilized as a soil conditioner and incorporated into or applied onto the vegetative growth layer but in no case greater than six inches; Additional information about the facility’s management of special waste can be found in the Granville County Solid Waste Management Plan. Operations Plan 9 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 3.6 Litter Control Prompt compaction of the waste at the working face will be the first method used to control blowing litter. Temporary fences and/or dikes may be constructed to contain windblown material during operations. In addition, landfill personnel will pick up windblown litter as necessary each working day and return it to the working face. 3.7 Equipment Equipment will be needed for spreading and compacting wastes, hauling, spreading and compacting cover material, for support functions such as access road construction and maintenance, dust control, mud control and drainage channel excavation. The following table outlines the equipment, personnel, and working face requirements necessary for the proper operation of the facility, based on average waste intake rates. TABLE 1 EQUIPMENT AND PERSONNEL GUIDE Average Waste Intake Range (tons/day*) Required Equipment Type and Use Minimum Operating Units Required Minimum Personnel Required per Shift 0-500 Water Dispersion Equipment Dozer (spread refuse and cover, compact waste, berm construction) Compactor (compact waste and cover material) Truck and or scraper pans (haul refuse and cover material) Excavator (optional - excavate soil if pan not used) Scales 1 1 1 2 1 1 Scale Operators: 1 Equipment Operators: 3 Maintenance Workers: 1 Laborers: 1 500-1,000 Water Dispersion Equipment Dozer (spread refuse and cover, compact waste, berm construction) Compactor (compact waste and cover material) Truck and or scraper pans (haul refuse and cover material) Excavator (optional - excavate soil if pan not used) Scales 1 2 2 2 1 1 Scale Operators: 1 Equipment Operators: 4 Maintenance Workers: 1 Laborers: 1 Notes: 1. Dozer, Compactor, Truck, and Excavator (or Loader), and Water Dispersion Equipment sizes will vary to match operating needs. Each piece of equipment is matched with one or more operators to meet personnel needs over the daily operating period. 2. Equipment calculations are based on 10-hour operations and Bomag 671 Compactor (weight 70,000 lbs. min.), and CAT Track- Type Tractor (dozer) type D-7 (55,000 lbs. min) in combination with CAT tracked loader model 973 (58,000 lbs. min.) typical. 3. In the event that operations are for other than 10 hours, equipment needs will be adjusted proportionally. The amount of equipment on site should provide the necessary backup in the event of an emergency situation. 3.8 Air Quality The facility will maintain all necessary compliance with the Division of Air Quality. Open burning of waste, including yard waste and brush, is prohibited at the landfill. 3.9 Dust, Odor, Fire and Vector Control To minimize dust related to waste hauler traffic, road surfaces are sprayed with water from a water truck as needed during windy, dry weather. Operations Plan 10 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 Odors and disease vectors will be controlled by promptly covering the waste at the working face, and by use of the daily cover. Daily cover is described in more detail in a subsequent section. Incoming loads of waste are observed by site operators and scalehouse attendants for evidence of fire such as flames, smoke, or the odor of burning material. Inspections will be conducted in a designated area near the working face of the landfill. Burning loads will be extinguished before dumping if possible. The waste will be removed or segregated from other waste in the disposal area. The landfill operator will perform an evaluation of the situation to determine whether the fire can be extinguished using fire extinguishers or other equipment present at the site, or if off- site equipment will be needed. If necessary, the local fire department will be called to render assistance in extinguishing the fire. Fires that occur at the landfill will be reported verbally to the Division within 24 hours and in writing within 15 days. A copy of the Fire Occurrence Notification Form is in Appendix 7. If a fire occurs at the waste disposal area, the operator first observing the fire will immediately radio the landfill office to report the size of the fire and request backup. If possible, the waste will be removed or segregated from other waste in the disposal area. Following segregation, the situation will again be evaluated to determine whether or not additional assistance will be necessary from off-site emergency personnel and handled as described above. Fire extinguishers are located on each piece of equipment on site. Equipment operators are trained annually in the use of these extinguishers. Fire extinguishers will be used for small, localized fires. A stockpile of soil is maintained near the working face to be used for extinguishing small surface fires that may be too large to control with the fire extinguishers carried on the landfill equipment. Emergency personnel will be notified in the case of fires too large to be extinguished with fire extinguishers or soil as described above. Water contained in sedimentation ponds can serve as emergency reservoirs to aid local firefighters in the extinguishing of larger fires. 3.10 Scavenging/Salvaging The unauthorized removal of waste, or scavenging, is prohibited at the landfill. Landfill personnel may remove recyclable salvageable materials and process them through the County’s recycling program. 3.11 Type 1 Composting Facility 3.11.1 Waste Quantities The County receives yard trash from Granville County and the surrounding counties of Durham, Franklin, Person, Vance and Wake. The municipalities of Oxford, Butner, Creedmoor, Stem and Stovall will also be served. This waste consists of solid waste resulting from landscaping and yard maintenance such as brush, grass, tree limbs, and similar vegetative material. The composting facility covers approximately 1.9 acres. Accurate records of incoming waste should be kept at the scale house. These records should differentiate between loads of brush, clean wood, and loads of leaves or grass clippings. Operations Plan 11 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 3.11.2 Design Considerations Design Capacities and Product Quality The facility currently receives an average of 43 tons per year of yard trash. This material is windrowed as received. The following table summarizes the design criteria used to verify adequate space at the facility for the composting operation. As a factor of safety, it was assumed that the density of the product remains the same as the incoming waste stream. Total waste stream (by weight) 43 tons (annual) Density (assumed average) 500 lb/cubic yard Composting waste stream (by volume) 172 cubic yards Cross-section windrow 2' (top) x 15' (base) x 4' (ht) 34 square feet Total length windrow required 10 feet At 10' length 1 windrow needed annually With 15' base and 10' aisle, total acreage required 0.006 acres maximum (running 1 windrow at a time) The site is designed with a working area for the Type 1 facility of approximately 0.15 acres as illustrated on Drawing No. OP-01. Sufficient room is available for the operation of 2 windrows. Site Plan The composting facility is located north of the scalehouse. The location is shown on Drawing No. OP-01. 3.11.3 Operations General Description Incoming yard trash is weighed and directed to the yard trash collection and composting area. The yard trash is stockpiled and moved by landfill personnel into the windrow. The yard trash is formed into windrows using a front end loader. The windrows are spaced approximately 10 feet apart and each has a east/west orientation and the following geometry: 4 feet high x 15 feet wide at base x 2 feet wide at top. An aisle of 25’ is maintained on the east side of the windrows for emergency access. Once the windrow is formed, it will be turned several times using a front end loader to mix the materials. If necessary, water will be added as the windrow is constructed and then periodically during the stabilization process. The pile will be sprayed as it is turned on an as needed basis. For optimum composting the moisture should be maintained between 45% and 60%. Dryer than 45% and the microbial action is slowed; higher than 60% and the material becomes difficult to handle and difficult to aerate. Operations Plan 12 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 The temperatures are taken at a minimum of each third (3 separate places) of the windrow. It is suggested that the temperature be controlled by turning (aerating) to assure that the compostable material is maintained at an optimum range for decomposition (between 104oF and 113oF) and then allowed to elevate to 131oF where it must be maintained for a period of 3 consecutive days as required by Rule .1406(10). When the temperature within the windrow falls below 120oF – 130oF during the final stages of composting, the windrow is turned. Windrow construction and turning frequency will be sufficient to maintain aerobic conditions to produce a compost product in the desired time frame. Separate records are kept for each windrow. Once a windrow is constructed, it is assigned an I.D. number and folder which are used over the lifespan of the windrow. Every time windrow data is taken, it is documented and logged in the folder. A nitrogen source may be added to the yard waste as needed to promote the compost process. The County uses calcium nitrate when necessary. The calcium nitrate is spread by hand and mechanically mixed. The process of stabilization is expected to take 3 days. The final time frame is a function of material density, material type, moisture and operational controls. Once the windrow begins to cool indicating stabilization, the County screens the material and the larger particles are reused in the process or used as woodchips or mulch. By keeping the coarser materials in the compost, it enables more oxygen to get into the windrows and produces more compost in the finished product. The compost is now stockpiled. Depending on the end use requirements, the compost may be screened again prior to stockpiling if a finer screen is available. The larger particles would be either reused in the process or used as a coarser product. If the material is free of sharp particles, has no offensive odor, and has minimal pathogens, it may be used in an unrestricted way. Once the compost meets the regulatory requirements for distribution to the public, it can be released for use. As the public obtains the material they must be given the information indicated in Section 3.11.8. 3.11.4 Waste Acceptance Rule .1406 (6) The Type 1 compost facility will accept only grass, leaves, brush, tree limbs, and similar vegetative material. No municipal solid waste (MSW), hazardous waste, asbestos containing waste, land clearing debris, or medical waste shall be accepted at the facility. The County accepts yard trash in a non-bagged state or in approved biodegradable bags. Deliveries are monitored at the site. The County anticipates little contamination of the material. 3.11.5 Monitoring Requirements Rule .1406 (9) The windrows are monitored for temperature daily. A log will be kept of all temperature readings, which includes the location of the probes. A copy of the temperature log is contained in Appendix 4. Operations Plan 13 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 Moisture should be kept in the range of 45% - 60%. Water should be added as required to stay within this range. Temperature will be monitored daily until readings of 131°F are achieved for three (3) consecutive days. To monitor temperature, the probe should be inserted 12"- 24" every 50' along the windrow at a 45° - 90° angle. 3.11.6 Temperature Parameters Rule .1406 (10) For Type I facilities, the compost process must be maintained at or above 55°C (131°F) for 3 consecutive days and aerated to maintain elevated temperatures. 3.11.7 Addition of Nitrogen Bearing Materials Rule .1406 (13) Nitrogen compounds may be added as necessary to adjust the nutrient balance for optimum product development. Only approved waste materials (i.e. grass clippings, leaves) or chemical compounds may be added. Nitrogen rich materials can decompose rapidly and cause odor problems. Materials such as grass clippings must be incorporated into the process as soon as possible. To determine if nitrogen is necessary, the carbon to nitrogen ratio should be calculated. For proper composting, this ratio should be greater than 25:1, but less than 40:1 at the start of composting. Incoming materials have the following estimated ratios:  Grass clippings 12 - 15:1  Dry leaves 40:1  Paper and wood 200:1  Sawdust 200 - 500:1 Thus, adjustment may be necessary after grinding, screening and blending the feedstock materials. 3.11.8 Classification/Distribution of MSW Compost Products Rule .1407 Requirements For unrestricted use, the finished Type I compost must meet the following criteria:  Minimal pathogenic organisms  Free from offensive odors  Containing no sharp particles  Man-made inerts do not exceed 1 inch in size If these criteria are met then the finished compost material will be marketed to residents of the County and surrounding areas with directions provided. Labeling Operations Plan 14 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 When the Type 1 compost material is to be marketed to the public, sufficient information should be provided to the public to:  Inform users of the benefits of using compost  Advise users on suggested uses of product  Inform users of cautions in using product  Inform users of composition of the material including nutrients and contaminants  Inform users of source of feedstock Appendix 5 includes samples of informative brochures that may be provided to the end user. 4.0 RANDOM WASTE SCREENING PROGRAM 4.1 Authority The following “Random Waste Screening Program” has been developed in accordance with North Carolina's Solid Waste Management Regulations, Rule .0544(e) and .1626(1)(f) for the landfill. The program is primarily used to detect hazardous waste that is mixed with waste. However, the same methodology can be used to keep hazardous wastes and prohibited wastes out of the landfill. Key elements addressing waste screening are as follows: No hazardous or liquid wastes as defined in 15A NCAC 13A, municipal solid waste, or materials offering an undue hazard to landfill personnel or the landfill operations shall be accepted at the landfill except as specifically authorized by the facility permit or by the Division. The owner or operator has implemented an inspection program to detect and prevent disposal of unpermitted wastes, hazardous and liquid wastes, and polychlorinated biphenyls (PCB). This program includes, at a minimum:  Random inspections of incoming loads, unless the owner or operator takes other steps to ensure that incoming loads do not contain municipal solid waste, regulated hazardous or liquid wastes, or PCB wastes;  Records of any inspections;  Training of facility personnel to recognize municipal solid waste, regulated hazardous or liquid wastes, or PCB wastes; and  A contingency plan to properly manage any identified unpermitted or hazardous and/or liquid wastes. 4.2 Random Selection Random selection of vehicles to be inspected will be conducted on a regular basis, depending on personnel available. At least one vehicle per week, but not less than one percent by weight of the waste stream (based on the previous week’s total) will be randomly selected at the working face by the personnel conducting the inspection. A random truck number and time will be selected (i.e., the tenth load after 10:00 a.m.) on the day of inspections. Operations Plan 15 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 4.3 Record Keeping Report forms for record keeping purposes are included in Appendix 1. These forms will be completed at each inspection. All reports and resulting correspondence will be maintained at the County Landfill office for the life of the landfill and during the post-closure period. 4.4 Training The Landfill Operations Manager and/or staff from the Department of Solid Waste who are trained to identify and manage MSW waste and hazardous and liquid waste will supervise inspections. Landfill operators, recycling attendants, and landfill clerks responsible for screening waste will be properly trained to identify hazardous and liquid waste. 4.5 Inspection Site Location Inspections will be conducted in a designated area near the working face of the landfill. 4.6 Action Plan The following action plan details the procedure to follow for conducting the random waste inspections. 1) Dump single load in prepared area. Detain truck and driver until inspection is completed. 2) Spread waste with compactor and/or hand tools as appropriate. Hand rake loads that include items such as large closed containers to avoid possible rupturing of the containers. Have appropriate safety equipment present. Minimum safety equipment will include:  Rubber gloves;  Rubber boots;  Safety glasses; and  Long handled hoe 3) Examine waste for excluded waste and/or safety hazards:  Containers labeled hazardous;  Excessive or unusual moisture;  Regulated biomedical (red bag) waste;  Powders, dusts, smoke, vapors, or chemical odors;  Sludges, pastes, slurries, or bright colors (such as dyes); and  Unauthorized out-of-County waste 4) Take appropriate action(s) as follows:  Incorporate acceptable waste into working face. Facility personnel, especially the landfill operator and scalehouse attendant, should be familiar with the acceptable and unacceptable waste materials and the control measures necessary to prevent unacceptable wastes from being disposed of at this facility. Operations Plan 16 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015  Hold suspect waste for identification by on-site personnel and, if necessary, confirmation by others such as a contract laboratory, hazardous waste management firm, or state and/or federal regulator;  Interview driver and hauler to identify the source of suspect waste in the load;  Hold rejected hazardous or liquid waste for generator; and  Arrange for hazardous or liquid waste collection by a collector licensed to store, transport, and dispose of hazardous waste according to federal and state requirements. 5) Document Actions:  Record Inspection;  Retain Reports; and  Report hazardous, liquid or PCB wastes to Solid Waste Section – DENR. A verbal notice to the Division within 24 hours and a written notice shall be submitted within 15 days. In the event hazardous, liquid, and/or PCB wastes is placed on the working face. The hauler will be retained and requested to remove the waste from the facility. However, if the hauler is unable to be retained or identified the landfill operator will immediately act to contain the area. A hazardous waste management firm will be contacted to remove and properly dispose of the waste. 5.0 SUBCELL PROGRESSION AND WASTE PLACEMENT 5.1 MSW Landfill 5.1.1 Subcell Progression The method of filling shall be the area method in accordance with the previously submitted and approved plans. Phase 1 was constructed with stormwater segregation features to limit the potential of stormwater runoff to become leachate. Inactive areas will be separated from the active area by the use of a temporary berms and a rainflap to segregate the uncontaminated runoff. Captured stormwater will gravity drain to the downgradient end of the Unit 2, Phase 1 area not in use. Stormwater will be removed from the cell with electric and portable pumps and placed into a drainage area leading to sediment basin SB-4 located north of Unit 2. As filling progresses to the remaining Phase area, the rainflap and berms will be removed. The date of the rainflap and berm removal will be documented and kept with the facility’s operating records. The first active area will be in the northwest portion of Phase 1. 5.1.2 Waste Placement and Compaction The waste will be tipped in the active area as closely as possible to the working face, and pushed if necessary to the desired area. The length of the daily working face will be maintained at approximately 100 feet in order to provide adequate space for several trucks to dump at the same time. The width of the working face varies somewhat depending on the rate of waste acceptance on a given day, weather conditions and other factors, but should be maintained as small as Operations Plan 17 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 possible. The waste shall be compacted as described below with steel-wheeled compactors (see equipment list earlier in section 3.7). To minimize the chance of damage to the liner in any new subcell, the initial lift of waste will be at least 5 feet thick, and will consist of only residential, non-bulky waste. Compaction will be minimal because later lifts will surcharge the initial lift so that there is no net loss of density. Typical compaction procedures above the initial lift will involve placement of waste in thin layers (1-2 feet thick) on 4H:1V slope and not to exceed 3H:1V. The compactor will roll a minimum of three times across the waste. The compaction effort will extend slightly past the waste to prevent wind-blown material leaving from the edge of the lift. Calculations have determined that the approximate in-place density of waste and soil combined is around 1,200 pounds per cubic yard. The waste density calculation will be reviewed periodically. Operational procedures may be revised to improve the efficiency of the site. 5.1.3 Filling Operations The waste will be compacted according to the procedures described above. Each lift of waste shall be approximately 10 feet thick, including an allowance for weekly cover. The proposed waste to total soil volume ratio is approximately 7:1. The size of the working face will be maintained as small as possible. The width of the working face will vary, depending on the rate of waste acceptance on a given day and weather conditions. 5.1.4 Daily Cover At the end of each day's operation, compacted waste in the subcell will be covered with a tarp using two bulldozers and two men. Every Friday, a minimum of six inches of soil is used to cover the waste. The cover soil shall be compacted with minimum of two passes with the compactor. Waste may be covered more frequently than once per day if necessary to control fires, odors, or blowing litter. 5.1.5 Intermediate Cover In areas where another lift of waste will not be placed for at least 12 months, an additional 6 inches of soil shall be placed over the daily cover for a total of 12 inches of intermediate cover. Provisions for a vegetative ground cover sufficient to restrain erosion shall be accomplished within 30 working days or 120 calendar days following completion of each phase of development. 5.1.6 Alternate Cover Material Although alternate daily cover (ADC) materials and methods have been used at this facility in the past, Granville County will undergo a demonstration period as approved by NC DENR prior to adopting a method to ensure the ADC adequately meets the requirements established by the Division. Operations Plan 18 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 5.2 C&D Landfill 5.2.1 Waste Placement and Compaction Waste will be placed into the smallest area feasible and compacted as densely as practical. 5.2.2 Daily and Intermediate Cover Waste will be covered with six inches of earthen material when the waste disposal area exceeds one-half acre and at least once weekly. Cover may be placed more frequently if necessary to control disease vectors, fires, odors, blowing litter, and scavenging. The date and time of cover placement will be recorded in the operating record. Areas which will not have additional wastes placed on them for three months or more, but where final termination of waste disposal has not occurred, will be covered and stabilized with vegetative ground cover or other stabilizing material. 6.0 ENVIRONMENTAL MONITORING PROGRAMS 6.1 Water Quality Per the facility Water Quality Monitoring Plan, the groundwater monitoring network for the Unit 1 landfill consists of one upgradient well (MW-7) and five downgradient wells (MW-2, MW-3R, MW-4R, MW-5R and MW-6R). In addition, the Corrective Action Plan (CAP) dated April 23, 2009 designated NES-1S and NES-2S as performance wells and NES-1D and NES-2D as sentinel wells. In a letter dated June 3, 2014, the DENR approved removal of NES-1S and NES- 1D as performance/sentinel wells, so they are no longer monitored. The monitoring network for Unit 2, Phase 1 includes one upgradient background well and four downgradient compliance wells to monitor the Unit 2, Phase 1 waste area, plus one compliance well to monitor the leachate storage area. Upgradient well MW-7 serves as the background well for both Unit 1 and Unit 2. Wells MW-9, MW-10, MW-11 and NES-2S will serve as downgradient compliance wells for Unit 2, Phase 1. (NES-2S also serves as a performance well for Unit 1.) Monitoring well MW-8 is located downgradient of the Unit 2 leachate storage area. There are four surface water sampling points, SW-1, SW-2, SW-3, and SW-4. Sampling point SW-1 is a sedimentation pond located near the southeast corner of Unit 1, and is upstream of waste. Sampling point SW-2 is on the small creek located between Unit 1 and Unit 2 and is downstream of the waste units. SW-3 is on the creek located east of Unit 2, upstream of the waste unit, and SW-4 is on the same creek downstream of the waste unit, before its confluence with the small creek between the two units. 6.2 Landfill Gas Per the facility Landfill Gas Monitoring Plan, the monitoring network for Unit 1 consists of 11 gas probes, GP-1A, GP-2, GP-3A, GP-4, GP-5, GP-6, GP-7, GP-8, GP-9, GP-10 and GP-11. GP-8 and GP-9 are located between Units 1 and 2, and thus are not boundary probes but serve to monitor gas migration between the two units. In addition, gas probes GP-11 and GP-12 serve to Operations Plan 19 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 monitor Unit 2. GP-12 is on the north side of Unit 2 and GP-11 is near the leachate storage area. In addition to the 12 gas probes, two structures located on the facility property, the scale house and maintenance shop, are also monitored. 7.0 EROSION AND SEDIMENT CONTROL REQUIREMENTS Erosion and sediment control features have been designed in accordance with all applicable requirements, as will all future structures. The erosion and sediment control features will prevent silt from leaving the facility, as well as, prevent excessive on-site erosion. As required, the facility will be operated in a manner which will not cause a discharge of pollutants into waters of the United States, including wetlands, that violates any requirements of the Clean Water Act, including, but not limited to, the National Pollutant Discharge Elimination System (NPDES) requirements, pursuant to Section 402. The facility will not cause the discharge of a nonpoint source of pollution to waters of the United States, including wetlands, that violates any requirement of an area-wide or State-wide water quality management plan that has been approved under Section 208 or 319 of the Clean Water Act, as amended. Surface water shall be diverted from the operational area and shall not be impounded over or in waste. Drainage structures and embankment slopes are regularly inspected for erosion, and maintained as needed. The vegetation on the slopes is mowed at least once a year. These slopes are maintained with reseeding, fertilizer, and other means, as necessary, to promote a healthy stand of vegetation. 8.0 RECORD KEEPING REQUIREMENTS The following Operating Records are maintained at the landfill office and made available to the Division upon request:  Operating Permit and pertinent correspondence;  Operation Plan;  Emergency Response Plan;  Inspection records, waste determination records, and waste screening programs training procedures;  Date and time notation for cover placement at the C&D landfill;  Amounts by weight of all waste received at the facility including source of generation;  All financial assurance documentation including detailed cost estimates submitted to the Division for closure, post-closure care and any corrective action programs;  Water Quality Monitoring Plan and any demonstration, certification, finding, monitoring, testing, or analytical data required by the approved water quality monitoring program at the site;  Gas monitoring plan, monitoring results and remediation plans developed in accordance with Division requirements if required in response to elevated gas concentrations;  Documentation of stormwater segregation devices removal and leachate piping  Leachate disposal documentation, generation records, and monitoring sample results; Operations Plan 20 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015  Safety training records. 9.0 LEACHATE MANAGEMENT PLAN FOR UNIT 2, PHASE 1 MSW LANDFILL 9.1 Maintenance of the Leachate Collection System The operator will conduct weekly inspections of the leachate collection and storage system. The weekly inspection will consist of inspecting the forcemain and its appurtenances, overfill prevention equipment, the truck filling station, and the exterior of the tank for leaks, corrosion, and maintenance deficiencies. If there are any deficiencies, remedial measures will immediately be taken to correct the deficiencies. Inspection reports will be maintained and made available throughout the lifetime of the storage system. Leachate levels in the storage tank will be monitored daily and recorded. Cleanouts are provided to allow access to the leachate collection system. In accordance with state law, water under pressure and mechanical methods through these cleanouts are periodically used as preventive maintenance of the piping system. Only certified explosion-proof equipment will be used for video inspections in accordance with OSHA requirements. Maintenance needs will be re-evaluated if there is an unexpected change in leachate production rates. 9.2 Leachate Generation Records The volume of leachate in the tank is monitored daily. Flow meters in the side slope riser and the pumping station will be used to record daily flows. Leachate is anticipated to be hauled at least once a week from the facility. The frequency may change depending on the amount of leachate generated, but per the agreement with City of Oxford, the monthly average amount of leachate disposed of cannot exceed 15,000 gallons per day. The County maintains records of leachate hauled from the leachate tank at the landfill to a wastewater treatment plant. Records will be maintained at the landfill throughout the operating life and during the post-closure care period. In addition to leachate generation quantities, the County maintains analytical data from leachate sampling events. 9.3 Leachate Monitoring The chemical composition of untreated leachate will be analyzed as required by the treatment facility. The leachate will be collected into laboratory provided containers directly from a sampling port on the piping connected to the storage tank. The leachate will be analyzed semi- annually for the Detection Monitoring constituents (EPA Appendix I list from Subtitle D) required by Rule.1633, and for pH, specific conductance, BOD, COD, phosphate, nitrate and sulfate. Test results will be submitted to the Solid Waste Section as required. 9.4 Leachate Disposal Leachate from Unit 2, Phase 1 flows by gravity to a sump located in the northwest corner of Unit 2. Leachate from the Unit 2, Phase 1 sump is pumped from the landfill area via side-slope riser directly to the leachate storage tank. The leachate will be periodically removed from the tank by pumping into a tanker truck for transport to the City of Oxford wastewater plant for treatment and disposal. An agreement with the City of Oxford is in place for the discharge of wastewater from the landfill to the plant (see Appendix 2). Although no pretreatment of the leachate is currently required, the new tank is designed so that a pretreatment system can be retrofitted if necessary for future treatment. Operations Plan 21 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 9.5 Contingency Plan for Extreme Conditions The landfill staff hauls leachate from the tank to the wastewater treatment plant using three dedicated tanker trucks by a private hauler. If required, additional hauling capacity will be obtained from subcontract haulers or by the rental of additional tanker trucks. Truck drivers shall remain with their vehicle during loading to provide continuous visual inspection to prevent overfilling or accidental release. For any observed leak, action is taken to properly contain or remove accumulations of leachate. If the leak is sufficiently large enough to cause accumulation in a contained area, the leak will be promptly corrected or repaired. To prevent overflow at the storage area, the leachate collection tank is accompanied with a high level alarm and the tank is surrounded by a secondary storage tank to prevent spills due to tank failure. If for some reason the receiving facility no longer accepts the leachate, it will be pre-treated to facilitate acceptance, or hauled to another POTW or commercial pretreatment facility. 9.6 Handling Leaks and Stormwater in the Leachate Collection Tank Area Being an above ground tank, any leaks in the primary containment system will be readily apparent during routine operations and inspections. If a leak develops in either the primary containment tank, or piping leading to or from the tank, any water (stormwater or otherwise) that has accumulated in the secondary containment area will be treated as leachate and pumped back into the primary containment area for disposal. For normal storm events in which rainwater accumulates in the secondary containment area, the Operator will verify that there are no visible leaks in the system and then may discharge the rainwater into the surface stormwater management system. 9.7 Operations in the Leachate Loadout Area Appropriate warning signs will be posted in the filling station that relate to safe operations around the loading area. Smoking is not allowed on the landfill property. Site speed limits will be posted, although not necessarily in the leachate loading area. The facility does have traffic signs and markers to promote orderly traffic patterns and to maintain safe and efficient operating conditions. The capacity of the loadout area spill containment collection basin is approximately 186 ft3 or approximately 1,400 gallons. Small spills will be allowed to evaporate from the concrete basin, and a dedicated pump for this area will load larger spills into the tanker truck or a vacuum truck may be used. In the event that the system is inundated and leachate leaves the area, the County will follow spill response procedures as outlined in the site NPDES permit. 10.0 CONTINGENCY PLAN This section details the Contingency Plan for the Oxford Landfill facility. This plan has been developed to protect human health and the environment from fires, explosions, or any unplanned sudden or non-sudden release of hazardous waste to the air, soil, or surface water. The Landfill Manager and serves as the Primary Emergency Coordinator (PEC). He can be reached at the following numbers: Operations Plan 22 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 PHONE: (919) 603-1355 Depending on the type of emergency, all or some of the following agencies will be notified as soon as possible: County Emergency Preparedness Agency 911 Fire Department 911 Emergency Medical Services (EMS) 911 10.1 Implementation If an emergency situation develops at the facility, the person discovering the emergency should contact the emergency coordinator immediately. The decision to implement the Contingency Plan depends upon whether or not a situation exists which presents a threat to human health or the environment. The Contingency Plan should be implemented due to any of the following situations: Personnel Injury Fire Explosion Spills Potential Hazardous Waste 10.2 Inoperable Periods In the event of equipment breakdown, adequate backup equipment will be available onsite to maintain operations, or replacement equipment will be brought onsite within 24 hours. Routine preventative maintenance will be performed on equipment, including: routine inspections, following manufacturer’s recommendations, and keeping accurate maintenance records. The landfill will maintain a soil stockpile onsite to be used to repair and maintain roads to ensure that all-weather access is maintained. 10.3 Emergency Response Procedures In the event of an imminent or actual emergency situation, the emergency coordinator will immediately implement the emergency response procedures as discussed below. Accident/Injury Response In the event of an accident or injury, the following procedure will be observed: 1) Notify the PEC immediately; 2) Take action to prevent further injury/damage to personnel or property; 3) Provide emergency first aid; 4) If the injury is deemed serious, obtain additional medical assistance by notifying EMS. If medical attention is required but ambulance service is not needed, the injured party should be transported to a nearby medical facility; and Operations Plan 23 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 5) The PEC will investigate the accident to gather the facts and determines the causes of the accident. Fire in the Waste In the event of fire in the waste, the following procedure will be observed: 1) Notify the PEC immediately; 2) If the fire is deemed manageable, the fire will be extinguished by covering the burning waste with soil; 3) If the fire is deemed unmanageable, the area will be evacuated and the fire department notified; and 4) Incoming solid waste haulers will not be allowed entrance to the landfill until the fire is extinguished. Equipment Fire In the event of an equipment fire, the following procedure will be observed: 1) The equipment will be evacuated as quickly and safely as possible; 2) Notify the PEC immediately; 3) If there are injured personnel, implement the procedures discussed in the Accident/Injury Response section; 4) If the fire is deemed manageable, the fire will be extinguished; 5) If the fire is deemed unmanageable, the area will be evacuated and the fire department notified; 6) Incoming solid waste haulers will not be allowed entrance to the landfill until the fire is extinguished; and 7) The PEC will investigate the incident to gather the facts and determine suspected causes of the fire. Explosions In the event of an explosion, the following procedure will be observed: 1) Evacuate the area; 2) Notify the PEC immediately; 3) If there are injured personnel, implement the procedures discussed the Accident/Injury Response section; 4) If there is a resulting fire, implementation of the procedures discussed in the Fire in the Waste or Equipment Fire sections; 5) The PEC will investigate the incident to gather the facts and determine suspected causes of the explosion. Hazardous and Infectious Waste in Landfill Operations Plan 24 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 No hazardous or infectious wastes will be accepted at the site. Vehicles are inspected as stated in Section 4 – Waste Screening Program. Explosive Gas Detection In the event that methane gas levels exceed the limits described in section 1.3 Regulatory Limits of the Landfill Gas Monitoring Plan, the following procedure will be observed: 1) Put out all smoking materials and turn off all ignition sources; 2) Evacuate all personnel; 3) Vent the structure; 4) Do not allow personnel to reenter the building except to perform gas monitoring until the results of additional monitoring indicate that methane concentrations are sustained or stabilized below 25% of the LEL; 5) Begin continuous monitoring within the structure; 6) Undertake an assessment to determine the origin and pathways of the gas migration; and 7) Prepare and implement a remediation plan for methane gas exceedances within 60 days Spills or Release In the event of a spill or release, the following procedure will be observed: 1) Notify the PEC immediately; 2) Immediate action will be taken to control/limit the spread of the spill or release; 3) The County Emergency Preparedness Agency will be notified; 4) Perform appropriate cleanup procedures; and 5) The PEC will investigate the incident to gather the facts and causes of the spill or release. Evacuation Plan The PEC is responsible for determining whether or not an emergency situation warrants evacuation of the facility. If conditions warrant, the following actions will be taken: 1) The PEC gives the evacuation alarm; 2) All personnel (visitors, contractors, and employees) will be assembled at the main gate; 3) Only qualified personnel may reenter the affected area after approval by the emergency coordinator; 4) The PEC will make a tally of all facility employees, visitors, and contractors; 5) The PEC or a designated representative will notify the County Emergency Preparedness Agency; and Operations Plan 25 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 6) Reentry to the affected area will be allowed only after the clear signal is given by the PEC. Report Requirements A written report detailing the event will be placed in the landfill record and a copy will be sent to the Department within fifteen days of the incident. 10.4 SEVERE WEATHER CONDITIONS Ice Storms An ice storm can make access to the landfill dangerous, prevent movement or placement of periodic cover, and thus, may require closure of the landfill until the ice is removed or melted. Heavy Rains Exposed soil surfaces can create a muddy situation in some portions of the landfill during rainy periods. The control of drainage and use of crushed stone on unpaved roads should provide all- weather access for the site and promote drainage away from critical areas. In areas where the aggregate surface is washed away or otherwise damaged, new aggregate should be used for repair. Intense rains can affect newly constructed drainage structures such as swales, diversions, cover soils, and vegetation. After such a rain event, inspection by landfill personnel will be initiated and corrective measures taken to repair any damage found before the next rainfall. Electrical Storms The open area of a landfill is susceptible to the hazards of an electrical storm. If necessary, landfilling activities will be temporarily suspended during such an event. To guarantee the safety of all field personnel, refuge will be taken in the on-site buildings or in rubber-tired vehicles. Windy Conditions The proposed operational sequence minimizes the occurrence of unsheltered operations relative to prevailing winds. If this is not adequate during a particularly windy period, work will be temporarily shifted to a more sheltered area. When this is done, the previously exposed face will be immediately covered with daily cover. Violent Storms Operations Plan 26 Joyce Engineering Oxford Landfill Facility Rev. September 2014 Granville County, North Carolina Rev. November 2015 In the event of hurricane, tornado, or severe winter storm warning issued by the National Weather Service, landfill operations may be temporarily suspended until the warning is lifted. Daily cover will be placed on exposed waste and buildings and equipment will be properly secured. [End] APPENDIX 1 RANDOM WASTE SCREENING PROGRAM FORMS Attach related correspondence to this form File completed form in Operating Record OXFORD LANDFILL WASTE INSPECTION FORM FORM A DATE: TIME WEIGHED IN. TRUCK OWNER: DRIVER NAME: TRUCK TYPE: VEHICLE ID/TAG: WEIGHT: TARE: WASTE SOURCE: Reason Load Inspected: Random Inspection ______ Staff Initials _____ Detained at Scales ______ Staff Initials _____ Detained by Operating Staff ______ Staff Initials _____ Inspection Location: ____________________________________________________________ Description of Load: ____________________________________________________________ Waste: Accepted [ ] Rejected [ ] Held [ ] Notified: Supervisor [ ] County EMS [ ] Generator [ ] Hauler [ ] NCDENR [ ] Federal [ ] Loader Operator: ____________________________________________________________ Personnel Conducting the Inspection: __________________________________________ Load Accepted (signature) _____________________ Date ___________ Load Not Accepted (signature) _____________________ Date ___________ REASON LOAD NOT ACCEPTED (Complete the following section if load not accepted)_ Description of Suspicious Contents: Color ________________ Texture ________________ Smell __________________ Drums Present __________ Haz Waste Markings _____________________________ Estimated CY present in load: _________ Estimated tons present in load: __________ Granville County Emergency Management Contacted? _________________________________ Hazardous Materials Present: ______________________________________________________ ______________________________________________________________________________ Hauler notified (if waste not accepted) Phone: ____________ Time Contacted: __________ Other Observations: ____________________________________________________________ ______________________________________________________________________________ Final Disposition Signature: _________________________ Date: _________ Time: _______ Waste Screening Inspector or Landfill Manager ADDITIONAL COMMENTS: on the back EPAA Landfill Critteria Technica       al Manual, Subpart C, Noveember 1993  APPENDIX 2 POTW APPROVAL DOCUMENTATION APPENDIX 3 TARP DATA SHEET TYPE TGPN3N3M Made from high density polyethylene tapes, coated on two sides with low density polyethylene. 9 23.9 16 495 326 135 152 162 107 1.5 609 20.2 oz/yd2 Tapes/in lbf lbf lbf mil psi mil UNIT Unit Weight Warp Construction Tensile Grab Strength Tear Strength * (tongue) Tear Strength (trapezoid) Coating Mullen Burst Strength Nominal Thickness PROPERTY ASTM D3776 ASTM D3775 ASTM D751 ASTM D2261 ASTM D4533 ASTM D1777 MOD ASTM D751 ASTM D1777 MOD TEST METHODVALUES Warp Weft Warp Weft Warp Weft Warp Weft * Includes force to shift tapes - Tear may be crosswise to direction of force. Fabrene® TGPN3N3M contains ultraviolet inhibitors and is suitable for outdoor applications. For further information, contact your FABRENE Inc. representative. Suggested Applications: Heavy tarpaulins, Geomembranes 00/10/23Date:NOTE: These values are typical data and are not intended as limiting specifications. North Bay, ON, Canada Tel: (888) FABRENE (888) 322-7363 ext. 222 or 226 Fax: (705) 476-0665 SALES INQUIRIES ORDER DESK Fabrene Inc. Tel: (888) 322-7363 ext 234Tel: (705) 476-7057 ext 234Fax: (705) 476-7787 MAILING ADDRESS Fabrene Inc. 240 Dupont Rd.P.O. Box 4040North Bay, ON, Canada P1B 9B4 Made from high density polyethylene tapes, coated on two sides with low density polyethylene. TYPE TGPN3N3M 305 94 63 2200 1450 600 675 720 475 38 4200 513 g/m2 Tapes/10cm Newtons Newtons Newtons µm kPa µm UNIT Unit Weight Warp Construction Tensile Grab Strength Tear Strength * (tongue) Tear Strength (trapezoid) Coating Mullen Burst Strength Nominal Thickness PROPERTY ASTM D3776 ASTM D3775 ASTM D751 ASTM D2261 ASTM D4533 ASTM D1777 MOD ASTM D751 ASTM D1777 MOD TEST METHODVALUES Warp Weft Warp Weft Warp Weft Warp Weft Fabrene® TGPN3N3M contains ultraviolet inhibitors and is suitable for outdoor applications. For further information, contact your FABRENE Inc. representative. Suggested Applications: Heavy tarpaulins, Geomembranes 00/10/23Date: * Includes force to shift tapes - Tear may be crosswise to direction of force. North Bay, ON, Canada Tel: (888) FABRENE (888) 322-7363 ext. 222 or 226 Fax: (705) 476-0665 SALES INQUIRIES ORDER DESK Fabrene Inc. Tel: (888) 322-7363 ext 234Tel: (705) 476-7057 ext 234Fax: (705) 476-7787 MAILING ADDRESS Fabrene Inc. 240 Dupont Rd.P.O. Box 4040North Bay, ON, Canada P1B 9B4 APPENDIX 4 TEMPERATURE LOG DATA SHEET P:\Granville\Old Folder Structure\660.06.18 - MSW Unit 2\Task 18 - Phase 1 Permit to Const App\VI - Operations Plan\Appendices\Appendix VI-4 Temperature Log\Temp Log.docx GRANVILLE COUNTY OXFORD C&D LANDFILL TEMPERATURE LOG (Complete one (1) per windrow) Windrow ID Number: _____________________ Date Windrow Started: _____________________ General windrow location and length: _________ Date & Initials (x) if turned and number of times turned Temp. at Location #1 Temp. at Location #2 Temp. at Location #3 Temp. at Location #4 Weather: Temp/ Condition APPENDIX 5 COMPOST END USER BROCHURE Depth of Compost Layer 1/2 inch 1 inch 2 inches 3 inches Cubic Yards Needed Per 1,000 Square Feet 1.5 3.0 6.0 9.0 Landscape Compostwith Landscape Compostwith www.carolinascompostingcouncil.org (919) 545-9050 10Tips for Healthier Soil & Plants Artwork provided by the Seattle, Washington Saving Water Partnership’s “The Natural Lawn & Garden” series. Reprinted with permission. Layout and design provided by the S.C. Department of Health and Environmental Control’s (S.C. DHEC) Office of Solid Waste Reduction and Recycling. Printed on RECYCLED Paper DHEC OR-0498 11/04 How much compost $$$$$Trees and Shrubs – Backfill plantings with a 50:50 mix of compost and nativesoil. Mulch a 2 to 3 inch layer of compost around plants extending 6 inches beyond the drip line. Do not mound compost or mulch around stems and tree trunks because this invites insects and diseases. 'Flowers and Vegetable Gardens – Work 2 to 3 inches of compost into the top6 inches of soil before planting. .....Turf Grass – Work 2 to 3 inches ofcompost into the top 6 inches of soil prior to sod placement or seeding. Z Containers and Raised Beds. Add transplants to containers and beds filled with a 30 percent blend of compost and potting soil. TTTTT Foundations – Replace compacted and contaminated fill along building foundations with a blend of compost, sand and topsoil. &&&&&Mulch – Spread a 2 to 3 inch layer around plants to prevent erosion, act as a weedbarrier and conserve water. MIX CALCULATOR: Creating a landscapebed? Use this formula: square feet to be covered X depth to be filled (in inches) X 0.0031 = cubic yards of mix needed. Use compost instead of peat moss. to use when planting?* * Provided by Gardening and Recycling Organics Wisely (GROW), a program sponsored by S.C. DHEC’s Office of Solid Waste Reduction and Recycling. Landscape with compost!Landscape with compost! 1. It’s alive! It’s alive! Like every other living organism, soil needs food, water and oxygen. Feed your soil to grow healthier plants. Keep it aerated. Don’t let it dry out or become water logged. 2. Break it up. Soil preparation is an important first step. Don’t skip it. Break up large areas of high compaction by tilling and amending with compost before planting. Dig planting beds to a depth of 6 to 12 inches and add compost. 3. Boost resistance. Compost is microbiologically active like yogurt and yeast. This helps plants with nutrient uptake as well as builds resistance to pests and diseases. Do not use fumigants and harsh chemicals that will kill hard-working microbes and cancel one of compost’s most desirable benefits. 4. Control run-off. Compost is one of the best products you can use to encourage rainwater to stay on your property. It will reduce erosion and minimize run-off of soils and nutrients to rivers and streams. Sediment and excess nutrients negatively impact water quality and aquatic life. 5. Waterhogs unite! Consider water resources when placing plants in the landscape. Plants that need more water should be located where water naturally collects – near downspouts, roof drip lines and similar locations. Use compost to improve both moisture retention and drainage. 6. It looks like soil. Look for compost that is dark in color and smells like soil. Immature compost is light in color and/or smells like ammonia. Immature compost may burn sensitive plants and compete for nutrients. 7. A little bit does a lot. As little as 1/4 inch of compost as a top dressing can give lawns a boost. Bare spot? Add a layer of compost and rake into the soil before seeding. 8. Quality counts. The U.S. Composting Council has developed a marketing label to identify tested compost. Look for the Seal of Testing Assurance when comparing products. 9. Don’t concentrate! Add no more than 30 percent compost in a blend with bark, topsoil, sand, clay and other ingredients. Use in raised beds or in potting and planting mixes for trees, shrubs and garden plants. As mulch, add 2 to 3 inches to the surface. 10. Dress it up. Top dress with 1/4 to 1/2 inch of compost to replenish nutrients and keep root zones cool and moist. Surface applications should always be well incorporated with a rake or tilling equipment. Pictured (right): This garden shows many places to use compost – around trees as mulch, in flower and vegetable beds, in raised beds and containers as well as around shrubs. APPENDIX 6 USDA WORK PLAN FROM COOPERATIVE SERVICE AGREEMENT APPENDIX 7 FIRE OCCURRENCE NOTIFICATION FORM SOLID WASTE MANAGEMENT FACILITY FIRE OCCURRENCE NOTIFICATION NC DENR Division of Waste Management Solid Waste Section Notify the Section verbally within 24 hours and submit written notification within 15 days of the occurrence. (If additional space is needed, use back of this form.) NAME OF FACILITY:PERMIT # DATE AND TIME OF FIRE:@ HOW WAS THE FIRE REPORTED AND BY WHOM: LIST ACTIONS TAKEN: WHAT WAS THE CAUSE OF THE FIRE: DESCRIBE AREA, TYPE, AND AMOUNT OF WASTE INVOLVED: WHAT COULD HAVE BEEN DONE TO PREVENT THIS FIRE: DESCRIBE PLAN OF ACTIONS TO PREVENT FUTURE INCIDENTS: NAME:TITLE:DATE: *********************************************************************************************************** THIS SECTION TO BE COMPLETED BY SOLID WASTE SECTION REGIONAL STAFF DATE RECEIVED _________________________________ List any factors not listed that might have contributed to the fire or that might prevent occurrence of future fires: ___________________________________________________________________________________________________________ FOLLOW-UP REQUIRED: NO PHONE CALL SUBMITTAL MEETING RETURN VISIT BY:____________________ (DATE) ACTIONS TAKEN OR REQUIRED: Revised 6/8/09 1 Chao, Ming-tai From:Amy Davis <adavis@joyceengineering.com> Sent:Monday, November 16, 2015 12:55 PM To:Chao, Ming-tai Cc:Amanda Freeman; Mousa A. Maimoun Subject:RE: Granville County Solar Farm Permit Modification Attachments:Permit Modification Application (RTC letter).pdf Follow Up Flag:Follow up Flag Status:Flagged Ming, Please see the attached response to your comments. Let me know if you need anything else. Thanks! Amy R. Davis, PE │Senior Project Consultant │ JOYCE ENGINEERING Richmond, VA - Greensboro, NC - Charlotte, NC - Charleston, SC│9731-F Southern Pine Blvd., Charlotte, NC 28273 │ tel: (704) 817-2037 │direct: (704) 837-2004 │fax: (704) 837-2010 │ JoyceEngineering.com From: Chao, Ming-tai [mailto:ming.chao@ncdenr.gov] Sent: Tuesday, November 10, 2015 9:41 AM To: Amanda Freeman <Amanda.Freeman@granvillecounty.org> Cc: Alex Everhart <aeverhart@joyceengineering.com>; Jason Falls <jason.falls@granvillecounty.org>; Whaley, Mary <mary.whaley@ncdenr.gov>; Amy Davis <adavis@joyceengineering.com> Subject: RE: Granville County Solar Farm Permit Modification Hi Amanda: Good morning and Thanks for the prompt responses. If the County doesn’t plan to operate the tear-off asphalt shingle collection in this permit cycle, please make a written statement (s) in the permit modification application. The Solid Waste Section will remove the permit conditions of this unit from the new Permit to Operate. Thanks. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw 2 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Amanda Freeman [mailto:Amanda.Freeman@granvillecounty.org] Sent: Tuesday, November 10, 2015 9:10 AM To: Amy Davis <adavis@joyceengineering.com>; Chao, Ming-tai <ming.chao@ncdenr.gov> Cc: 'Alex Everhart' <aeverhart@joyceengineering.com>; Jason Falls <jason.falls@granvillecounty.org> Subject: FW: Granville County Solar Farm Permit Modification Good morning, Shingle recycling is no longer being done. The referenced concrete pad is now used for heavy equipment maintenance that way we do not have to worry about disposing of contaminated soils. We have already discussed the use of the pad and possible interferences with the solar contractor. So, the shingle collection area will not be subjected to relocation. I don’t foresee the County doing shingle recycling again before we renew our MSW permit or close the C&D. Amy, if we can just change that in the permit mod and take it off the drawings that would be great! Thank you! Amanda From: Chao, Ming-tai [mailto:ming.chao@ncdenr.gov] Sent: Monday, November 09, 2015 2:51 PM To: Amanda Freeman <Amanda.Freeman@granvillecounty.org> Cc: Alex Everhart <aeverhart@joyceengineering.com>; Amy Davis <adavis@joyceengineering.com>; Mussler, Ed <ed.mussler@ncdenr.gov>; Whaley, Mary <mary.whaley@ncdenr.gov>; Shackelford, Dennis <dennis.shackelford@ncdenr.gov>; Mousa A. Maimoun <mmaimoun@joyceengineering.com> Subject: RE: Granville County Solar Farm Permit Modification Hi Amanda: The Solid Waste Section completed a review of the Permit Modification Application (DIN 25258) and has one comment stated below. The current Shingles Collection Area (on top of a concrete pad as shown on OP-01 of the 2014 Permit Amendment Application DIN 22367) is adjacent to the proposed entrance of the solar farm. There is no statement in the permit application if the shingle collection area will be subjected removal to a new location (see Sheet C03 of 10 and FP-01). From an operational prospective, the current location of the shingle collection area may be easily interfered by the construction activities of the solar project. Please provide the future status of this Shingles Collection Area in the application including drawings. Thanks. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section 3 NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Chao, Ming-tai Sent: Friday, November 06, 2015 8:39 AM To: 'Mousa A. Maimoun' <mmaimoun@joyceengineering.com> Cc: Amanda Freeman <Amanda.Freeman@granvillecounty.org>; Alex Everhart <aeverhart@joyceengineering.com>; Amy Davis <adavis@joyceengineering.com>; Mussler, Ed <ed.mussler@ncdenr.gov>; Whaley, Mary <mary.whaley@ncdenr.gov>; Shackelford, Dennis <dennis.shackelford@ncdenr.gov> Subject: RE: Granville County Solar Farm Permit Modification Hi Mousa: Good morning. The electronic copy of the permit application was received, scanned, and uploaded to the SWS document tracking system with a DIN 25258. I only need one hard copy for review right now. Please mail the document to my attention at the following mailing address: 1646 Mail Service Center Raleigh, NC 27699-1646 Thanks. Have a wonderful weekend. Ming Chao Ming-Tai Chao, P.E. Environmental Engineer Permitting Branch, Solid Waste Section NCDEQ, Division of Waste Management (Mailing Address) 1646 Mail Service Center Raleigh, NC 27699-1646 (Street Address) Green Square, 217 West Jones Street Raleigh, NC 27603 Tel. 919-707-8251 ming.chao@ncdenr.gov http://portal.ncdenr.org/web/wm/sw 4 E-mail correspondence to and from this address may be subject to the North Carolina Public Records Law and may be disclosed to third parties. From: Mousa A. Maimoun [mailto:mmaimoun@joyceengineering.com] Sent: Thursday, November 05, 2015 5:01 PM To: Chao, Ming-tai <ming.chao@ncdenr.gov> Cc: Amanda Freeman <Amanda.Freeman@granvillecounty.org>; Alex Everhart <aeverhart@joyceengineering.com>; Amy Davis <adavis@joyceengineering.com> Subject: RE: Granville County Solar Farm Permit Modification Hi Ming, Amy tried earlier to send you the Permit Modification Application for Granville County; however, her email did not go through. Below is a link you can use to download the Permit Modification Application. https://joyce.sharefile.com/d-s4971a1ad33d40da8 How many hard copies would you like, we can send those out tomorrow? Please let us know if you have any questions. Thank you, Mousa -- Mousa A. Maimoun, PhD │Project Consultant │ JOYCE ENGINEERING Richmond, VA - Greensboro, NC - Charlotte, NC - Charleston, SC │9731-F Southern Pine Blvd., Charlotte, NC 28273 │ tel: (704) 817-2037 │direct: (704) 837-2005 │fax: (704) 837-2010 │ JoyceEngineering.com From: Amy Davis Sent: Thursday, November 05, 2015 4:23 PM To: Ming Chao (ming.chao@ncdenr.gov) <ming.chao@ncdenr.gov> Cc: Mousa A. Maimoun <mmaimoun@joyceengineering.com>; Amanda Freeman <Amanda.Freeman@granvillecounty.org> Subject: Granville County Solar Farm Permit Modification Hi Ming, Please see the attached permit modification per your request for your review. How many hard copies would you like, I can send those out tomorrow? Please let us know if you have any questions. Thanks! Amy R. Davis, PE │Senior Project Consultant │ JOYCE ENGINEERING Richmond, VA - Greensboro, NC - Charlotte, NC - Charleston, SC│9731-F Southern Pine Blvd., Charlotte, NC 28273 │ tel: (704) 817-2037 │direct: (704) 837-2004 │fax: (704) 837-2010 │ JoyceEngineering.com