HomeMy WebLinkAbout6512-DukeSutton_INSP-20180516FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 1 of 4
UNIT TYPE:
Lined
MSWLF LCID YW Transfer Compost SLAS COUNTY: NEW HANOVER
Closed
MSWLF HHW White
goods Incin T&P FIRM PERMIT NO.: 6512-INDUS-2016
CDLF Tire T&P /
Collection Tire
Monofill Industrial
Landfill X DEMO SDTF FILE TYPE: COMPLIANCE
Date of Site Inspection: May 16, 2018 Date of Last Inspection: December 4, 2017
FACILITY NAME AND ADDRESS:
Duke Energy, Sutton Energy Complex
801 Sutton Steam Plant Road
Wilmington, North Carolina 28401
GPS COORDINATES: N: 34.284019 W: -77.984175
FACILITY CONTACT NAME AND PHONE NUMBER:
John Toepfer, Lead Engineer, 919-546-7863, John.Toepfer@duke-energy.com
James Dalrymple, Duke Energy, James.Dalrymple@duke-energy.com
FACILITY CONTACT ADDRESS:
Same as above
PARTICIPANTS:
Shawn McKee, NCDEQ, Solid Waste Section
Shannon Aufman, NCDEQ, Solid Waste Section
Elizabeth Werner, NCDEQ, Solid Waste Section
Larry Frost, NCDEQ, Solid Waste Section
Debra Watts, NCDEQ, Division of Water Resources
Eric Smith, NCDEQ, Division of Water Resources
Geoff Kegley, NCDEQ, Division of Water Resources
James Dalrymple, Duke Energy
Steve Williams, Duke Energy
Bryson Sheetz, Duke Energy
Evan Andrews. Duke Energy
Ricky Stroupe, Duke Energy
Steve Gordy, Duke Energy
Don Gibbs, Duke Energy
Tom Sylvester, Duke Energy
Tim Russell, Duke Energy
Brian Gerbus, TransAsh
Manuel Lote, TransAsh
Ryan Jamison, TransAsh
Victor Damasceno, Geosyntec
STATUS OF PERMIT:
Permit to Construct and Permit to Operate, Original Issuance, September 21, 2016
Permit Approval to Operate Cell 3, Issuance, July 6, 2017
Permit Approval to Operate Cell 4, Issuance, August 25, 2017
Permit Approval to Operate Cell 5, Issuance, December 7, 2017
Permit Approval to Operate Cell 6, Issuance, February 7, 2018
Permit Approval to Operate Cell 7 & 8, Issuance, May 16, 2018
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 2 of 2
PURPOSE OF SITE VISIT:
Pre-Operations Meeting for Cells 7 & 8 and Comprehensive Inspection
STATUS OF PAST NOTED VIOLATIONS:
None.
OBSERVED VIOLATIONS:
None.
ADDITIONAL COMMENTS
This facility is a permitted industrial landfill. It is permitted to receive solid waste generated by or at the Duke
Energy, L.V. Sutton Energy Complex property. Acceptable waste types include, but are not limited to: coal
combustion residuals, wastewater treatment sludge, vacuum truck waste, waste soils (i.e. from ash removal activities or
soil that has contacted petroleum), and small quantities of inert debris from CCR (Coal Combustion Residuals) unit
decommissioning activities. The Permit to Operate shall expire September 21, 2026.
1. The Permit and Operations Plan must be maintained on-site as required and were reviewed during the site
inspection.
2. The facility is secured by a locked gate. Personnel are on site during operating hours. The facility has all
required information on signs.
3. TRANS-ASH personnel are responsible for daily landfill operations; certified staff are always present when the
landfill is in operation. Training records were documented and maintained on-site. Annual Operations Training
is scheduled to occur at the end of June. New staff were scheduled to receive training the afternoon of the day
of the inspection.
The following TRANS-ASH personnel are NC Certified Landfill Managers:
Randy Skelton, 17-02M-00287, expires 3/23/2020
Mike Gerbus, 17-02M-00283, expires 3/23/2020
Cecil Wilson, 17-02M-00285, expires 3/23/2020
Brian Gerbus, 17-02M-00284, expires 3/23/2020
Stephen Williams, 16-02M-00165, expires 5/20/2019
Robbie Jacobs, 17-02M-00288, expires 3/23/2020
Lyle Hunnicutt, 17-02M-0289, expires 3/23/2020
Faim Eckert, 17-02M-00326, expires 9/21/2020
Manuel Lote, 17-02M-0329, expires 9/21/2020
Billy Wilson, 17-02M-0327, expires 9/21/2020
Gregory Browning, 17-02M-0328, expires 9/21/2020
Additional Duke Energy personnel are certified but not listed on the report. TRANS-ASH personnel are
responsible for landfill operations; certified staff are always present when the landfill is in operation.
The item(s) listed above were observed by Section staff and require action on behalf of the facility in order to come into or maintain compliance
with the Statutes, Rules, and/or other regulatory requirements applicable to this facility. Be advised that pursuant to N.C.G.S. 130A-22, an
administrative penalty of up to $15,000 per day may be assessed for each violation of the Solid Waste Laws, Regulations, Conditions of a Permit,
or Order under Article 9 of Chapter 130A of the N.C. General Statutes. Further, the facility and/or all responsible parties may also be subject to
enforcement actions including penalties, injunction from operation of a solid waste management facility or a solid waste collection service and any
such further relief as may be necessary to achieve compliance with the North Carolina Solid Waste Management Act and Rules.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 3 of 3
4. On or before August 1, 2018, the permittee must submit an annual facility report to the Section for the period
between July 1, 2017 and June 30, 2018. The report must be submitted annually thereafter.
5. Between July 6, 2017 and May 15, 2018, a total of 1,741,044 tons of coal combustion residuals have been
landfilled onsite. During the month of April 2018, a total of 149,568.07 tons of CCRs were landfilled onsite.
The facility averages 8,000-12,000 tons of CCR landfilled per day depending on operating conditions. They
anticipate landfilling approximately 2 million tons of CCR in 2018.
6. Financial assurance documentation for the facility was reviewed during the inspection. The financial assurance
was submitted by Duke Energy Carolina on March 26, 2018. The approved financial assurance includes
$12,195,273 for closure, $2,897,956 for post-closure care, and $2,000,000 for potential assessment and
corrective action.
7. Leachate Detection System (LDS) records were reviewed during the inspection. Under typical weather
conditions, leachate generation is approximately 100 gallons per day.
8. Edge-of-waste markers delineating the permitted disposal area were visible and being maintained.
Active working area of the landfill, berms visible at outer edges
9. There was no water observed ponded over waste. Chimney drains convey the flow of leachate to the leachate
control system. The facility limits the active portion of the landfill to approximately 21 acres to reduce total
leachate. Leachate is being treated by an onsite waste water treatment plant.
10. Activities will likely begin in Cell 6 in late June. Cell 6 has two chimney drains to better facilitate drainage of
leachate into the collection system. Anticipated usage for Cells 7 and 8 is late 2018.
11. When Cell 3 reaches an elevation of 100ft, a temporary tarp may be used to divert storm water away from the
waste.
12. Onsite scales were inspected and calibrated on March 27, 2018.
FACILITY COMPLIANCE INSPECTION REPORT
Division of Waste Management
Solid Waste Section
Page 4 of 4
13. Dust control records were reviewed during the inspection. Onsite dust conditions are recorded in the morning
and afternoon.
Northern side slope with public access road on right
14. Side slopes had been recently hydroseeded to establish a vegetative cover.
15. The access road to the site was of all-weather construction and maintained in good condition.
16. Dust was being well controlled at the time of the inspection.
Please contact me if you have any questions or concerns regarding this inspection report.
Phone: 919-707-8284
Shawn McKee
Environmental Senior Specialist
Regional Representative
Sent on:
June 1, 2018
Email:
X
Hand delivery US Mail Certified No. [ _]
Copies: Ed Mussler, Permitting Branch Head, Solid Waste Section
Jason Watkins, Field Operations Branch Head, Solid Waste Section
Elizabeth Werner, Permitting Hydrogeologist, Solid Waste Section
Larry Frost, Engineering Project Manager, Solid Waste Section
Shannon Aufman, Solid Waste Section, Permitting Engineer